OHAUS 1119-DO Instruction Manual
Text of the manual
This manual contains installation, operation and maintenance instructions for the
Ohaus Heavy Duty Solution Balance, Model 1119D. To ensure proper operation of
the Balance, please read this manual completely.
DESCRIPTION
The Model 1119D Heavy Duty Solution Balance is a dual beam mechanical balance
UNPACKING AND SET-UP (Cont.)
7. Place the Scale Plate on the four vertical Support Posts, with the solid weld
stud resting on the left front Post (with the two Lock Nuts). Hook the mass
Hanger Assembly on the Ring that is located at the right end of the Beam.
8. Unpack the Slotted Masses from the corrugated box and place them on the
Mass Rack.
USING THE BALA
CARE AND MAINTENANCE
The following practices will ensure that your Heavy Duty Solution Balance will give
years of satisfactory and trouble-free service.
1. When not in use, remove any load from the Scale Plate and place the Slotted
Masses on the Mass Rack. Slide one of the Poises away from ZERO, so that
the Balance is not in equilibrium. This will stop the
7 Campus Drive
Suite 310
Parsippany, NJ 07054, USA
Tel: (973) 377-9000
Fax: (973) 944-7177
www.ohaus.com
With offices worldwide
*80253378*
P/N 80253378 A © Ohaus Corporation 2011, all rights reserved
Printed in Mexico