eqss Gen-3 LMS Installation Manual
Read Online
Read the eqss Gen-3 LMS Installation Manual online using the built-in PDF viewer.
Text of the manual
EQUIPMENT SAFETY SYSTEMS PTY LTD
eqss™ Gen-3 LMS
Telehandler Load Management System
Installation Manual for JCB 541-70 CS
PLEASE NOTE:
VER: 1607211119
***Failure To Follow Installation Manual Will Void Warranty***
***Do Not Swap Components between Gen3-LMS kits***
When installing multiple Gen3-LMS kits, make sure the serial
number on the sticker matches the serial number on the
machine.
The list below highlights important documentation conventions.
Text presented in this manner is intended to provide the user
with some general information. The user should ensure
information presented in this manner is clearly understood.
Text presented in this manner provides the user with
information to assist in completion of the current procedure
being explained.
Text presented in this manner indicates that a failure to follow
directions could result in damage to equipment, loss of
information, bodily harm, or loss of life.
VER: 1607211119
2 of 40
Information contained in this publication regarding this device's applications and the like is
provided only for your convenience and may be superseded by updates. It is your
responsibility to ensure that the application or our equipment meets with your
specifications.
EQUIPMENT SAFETY SYSTEMS MAKE NO REPRESENTATIONS OR WARRANTIES
OF ANY KIND WHETHER EXPRESS OR IMPLIED, WRITTEN OR ORAL, STATUTORY
OR OTHERWISE, RELATED TO THE INFORMATION, INCLUDING BUT NOT LIMITED
TO, IT'S CONDITION, QUALITY, PERFORMANCE, MERCHANTABILITY OR FITNESS
FOR PURPOSE.
Equipment Safety Systems disclaims all liability arising from this information and its use.
Use of Equipment Safety Systems’ products as critical components in life support systems
is not authorised except with express written approval by Equipment Safety Systems. No
licenses are conveyed, implicitly or otherwise, under any Equipment Safety Systems
intellectual property rights.
VER: 1607211119
3 of 40
Table of Contents
Tools Required for Installation.....................................................................................5
Covers...........................................................................................................................6
Cable Reeler Installation...............................................................................................7
Cable Reeler Mounting Position...............................................................................9
Pressure Sensor Installation.......................................................................................10
Main Cylinder Pressure Sensors............................................................................10
Compensation Pressure Sensors............................................................................12
Reverse Camera..........................................................................................................14
Forward Camera..........................................................................................................15
Signal Light Installation..............................................................................................17
With Windshield Guard Bar.....................................................................................17
Without Windshield Guard Bar................................................................................18
Can Pressure Input Module (CPIM)............................................................................20
External Cable Completion.........................................................................................21
Can Cabin Interface Module (CCIM)...........................................................................23
Dashboard Switches....................................................................................................24
Display Installation......................................................................................................25
Machine Connections..................................................................................................26
Finalisation..................................................................................................................29
Set Time & Sensor Calibration...................................................................................32
Appendix A: Attaching Display Connectors...............................................................35
Indexes and Tables.....................................................................................................39
VER: 1607211119
4 of 40
Tools Required for Installation
The tools required to perform the installation of the TSS are listed below
•
Pencil or Texta
•
Drill
•
Drill bits
◦
3.3 mm
◦
4.5 mm
◦
5 mm
◦
6.25 mm
◦
6.8 mm
◦
8.5 mm
•
Centre punch
•
Tap T-Handle
•
Taps
◦
M6
◦
M7 x 0.75
◦
M8
•
Drill and tap oil
•
Metric Allen keys
•
Phillips Head screw driver
•
Spanners and sockets
◦
7 mm
◦
10 mm
◦
13 mm
•
Locktite thread locker
•
Side cutters
•
Stanely knife
•
Crimpers
•
Wire strippers
VER: 1607211119
5 of 40
Remove the following covers before starting the installation
Step
Description
Diagram
1.
Release the dashboard display bolts
2.
Remove the indicator display behind
the steering wheel
3.
Remove the cover for the hydraulics
behind the cabin
Table 1: Cover removal
VER: 1607211119
6 of 40
Cable Reeler Installation
The cable reeler is used to measure the boom extension to determine the maximum lifting
capacity.
A false N07 fault can occur if the boom jumps off the stow
switch due to pressurising the hydraulic system and without
operating the boom extension control. Ensure the stow switch
arm is correctly adjusted to prevent this error.
Step
Description
Diagram
1.
Drill and tap the holes for the cable
reeler according to the mounting
diagram on page 9.
Mount using the supplied M6 x 12
mm bolts and washers.
2.
Drill and tap an M8 hole for the
cable anchor. Ensure the cable
anchor is positioned so the cable
runs in line with the boom.
Mount the cable anchor and secure
the cable to the anchor.
3.
Drill and tap the M6 holes for the
stow switch trigger. Ensure the stow
switch is pressed when the boom is
retracted.
Mount the stow switch trigger using
the supplied M6 x 30 mm bolts and
17 mm standoffs.
VER: 1607211119
7 of 40
Connect the supplied M12 10 metre
cable (CB001027) into the cable
reeler connection.
5.
Run the cable along the hydraulic
pipes running down the boom,
secure using cable ties every 150
mm to 200 mm.
Cable tie to the flexible hydraulic
hoses down to the chassis. Make
sure the cable isn't pinched or
stretched when the boom is raised
or lowered.
Run the cable towards the cabin and
cable tie with the other cables
during External Cable Completion on
page 21.
Table 2: Cable Reeler Installation
VER: 1607211119
8 of 40
Cable Reeler Mounting Position
Illustration 1: Cable Reeler Mounting Position
VER: 1607211119
9 of 40
Pressure Sensor Installation
The hydraulic pressure sensors are used to measure the lifting load of the telehandler.
Main Cylinder Pressure Sensors
Step
Description
Diagram
1.
Raise the boom to approximately 40
degrees.
Support and secure the boom using
an A Frame or similar apparatus. It
must support at least 2 tons.
Apply the handbrake and insert
chock under wheels.
Release the blanking cap on the
hydraulic tee.
Removing the blanking cap will
release the hydraulic pressure which
may result in a spray of oil.
Install the supplied pressure sensor
and ensure it is tightly sealed.
2.
Install the tee connector and
pressure sensor into the rod of the
main lift cylinder, where the flexible
hose is connected to the solid hose
on the chassis under the lift
cylinder.
Start the machine, pressurise the
boom and check for leaks.
View from under the main lift
cylinder
VER: 1607211119
10 of 40
Connect the supplied M12 4 metre
cables (CB001026) into each of the
pressure sensors.
Cable tie the head pressure sensor
cable to the flexible hydraulic hoses
connected to the main lift cylinder.
Make sure the cable isn't pinched or
stretched when the boom is raised
or lowered.
Run the cables towards the cabin
and cable tie with the other cables
during External Cable Completion on
page 21.
Table 3: Pressure Manifold Installation
VER: 1607211119
11 of 40
Compensation Pressure Sensors
Step
Description
Diagram
1.
Release the cover behind the
machine.
Undo the hydraulic connection for
the head compensation into flexible
hydraulic line at the rear of the
machine.
Install the supplied tee piece and
pressure sensor in line with the
hydraulic connection.
2.
Undo the hydraulic connection for
the rod compensation into flexible
hydraulic line at the rear of the
machine.
Install the supplied tee piece and
pressure sensor in line with the
hydraulic connection
Start the machine, pressurise the
boom and check for leaks.
3.
Connect the supplied M12 4 metre
cables (CB001026) into each of the
pressure sensors.
Add both cables to 2 m of snake
tube.
Run the snake tube and cables
towards the cabin and cable tie with
the other cables during External
Cable Completion on page 21.
Table 4: Compensation Pressure Sensor Installation
VER: 1607211119
12 of 40
Angle the tee connections to ensure the hydraulic connections
and pressure sensor do not hit the boom when the boom is
lowered
VER: 1607211119
13 of 40
The rear camera video is displayed on the screen when the machine is in reverse gear to
allow the operator to see behind the telehandler while reversing.
Do not disconnect the camera power connection while the
system is operating as this can damage the fuse.
Step
Description
Diagram
1.
Drill a 31mm hole in the location
shown. Making sure to leave enough
room for a license plate
Insert the camera through the hole
and adjust the angle using the
alignment washers.
2.
Connect the camera power and
signal connectors to the supplied 5m
camera cable (CB001032).
Note; The white connector is not
used.
Secure the camera cable to the
license plate light cables
Run the remainder of the cable
towards the cabin and cable tie with
the other cables during External
Cable Completion on page 21.
Table 5: Reverse Camera Installation
The camera's viewing angle may need to be adjusted once the
system is installed and the display is operational.
VER: 1607211119
14 of 40
The forward camera video is displayed on the screen when the machine is in forward gear
to allow the operator to see past the boom to obstructions that would damage the right
front tyre.
Do not disconnect the camera power connection while the
system is operating as this can damage the fuse.
Step
Description
Diagram
1.
Mount the camera to the side mirror
using the p-clips as shown.
Secure using two M6 nuts.
2.
Connect the camera power and
signal connectors to the supplied 5m
camera cable (CB001032).
Note; The white connector is not
used.
Run the cable along the same path
as the headlight cable, run it through
the headlight post, then under the
chassis to the side of the cabin.
Cable tie during External Cable
Completion on page 21.
Table 6: Forward Camera Installation
VER: 1607211119
15 of 40
The camera's viewing angle may need to be adjusted once the
system is installed and the display is operational.
VER: 1607211119
16 of 40
Signal Light Installation
The signal light warns other workers when the telehandler is lifting loads close to it's
maximum capacity.
Ensure the power supply voltage is greater than 13.5V
otherwise the signal light may not illuminate correctly.
With Windshield Guard Bar
Step
Description
Diagram
1.
Mount the signal light to the top of
the front windshield guard on the
cabin.
2.
Run the cable down the side of the
windshield and cable tie to the
windshield guard bar down towards
the chassis.
Table 7: Signal Light Installation With Windshield Guard Bar
VER: 1607211119
17 of 40
Without Windshield Guard Bar
Step
Description
Diagram
1.
Remove the magnet from the bottom
of the signal light mounting bracket
and flip the signal light mounting
bracket so the mounting holes are on
the bottom.
Cut and remove 2.6 m of snake tube
from the end of the cable starting at
the signal light.
Drill two M4 holes to mount the
signal light bracket to the left
headlight support bracket on the
roof.
Mount using the supplied M4 bolts
and nuts.
2.
Run the cable along the top of the
roof to towards the right headlight
support bracket.
Drill a single M6 hole to mount a
metal p-clip.
Attach the cable to metal p-clip and
secure using the supplied M6 bolt
and nut.
3.
Run the cable down between the
edge of the windshield and cabin
frame to the base of the windshield.
Use a water proof adhesive to
ensure the cable will remain within
the gap between the edge of the
windshield and cabin frame.
VER: 1607211119
18 of 40
Secure the cable to the chassis using
a cable tie.
Note: Make sure the cable is
securely tensioned, so it doesn't
move out of the groove between the
edge of the windshield and cabin
frame.
Table 8: Signal Light Installation Without Windshield Guard Bar
VER: 1607211119
19 of 40
Can Pressure Input Module (CPIM)
The CPIM is responsible for processing the information sent from the pressure sensors.
Accidentally swapping the pressure sensor connections will
not damage system and can be determined if the display is
showing a negative load.
Do not plug the pressure sensor cable into the far right side
boom cable. This will damage the system.
Step
Description
Diagram
1.
Drill and tap two M8 holes for the
CPIM bracket in the chassis behind
the cabin.
Mount using the supplied M8 x
12mm bolts and washers.
2.
Connect the cables for the pressure
sensors and boom cable to the CPIM
according to the picture shown.
Connect the supplied M12 4 metre
cable (CB001026) into the
connection out of the right side of
the CPIM for the CCIM cable.
Run the CCIM cable towards the
cabin.
Table 9: Can Pressure Input Module (CPIM) Installation
VER: 1607211119
20 of 40
External Cable Completion
All external cabling is completed in this step.
Step
Description
Diagram
1.
Locate the reverse camera, boom
and compensation pressure cables at
the rear of the machine and cable tie
to the existing snake tube and
hydraulic lines running towards and
underneath the cabin.
Coil up any additional cable and
store under the side panel beside
the cabin.
View from under the boom towards
the rear of the machine
2.
At the front of the machine cable tie
the front camera cable to the side of
the cabin.
Note: The old light tower is shown
3.
Run the CCIM, signal light and
camera cables through the hole into
the cabin
VER: 1607211119
21 of 40
Secure all the cables from the CPIM
and from out the holes into the cabin
from the joystick and dashboard.
Coil up any additional cable and
store under the side panel beside
the cabin.
Table 10: External Cable Completion
VER: 1607211119
22 of 40
Can Cabin Interface Module (CCIM)
The CCIM connects the system into the machine electronics.
Step
Description
Diagram
1.
Connect the CCIM and signal light
cables to the M12 connectors on the
CCIM.
Note: It doesn't matter which of the
M12 connectors the CCIM and signal
light cables are plugged into.
2.
Connect the Power/Camera and IO
Harnesses to the bulkhead
connectors on the CCIM.
Position the CCIM underneath the
dashboard using double sided velcro
tape.
Note: Make sure to leave enough
room for the connectors and that the
dashboard displays can be
reinstalled.
3.
Install the backup battery behind the
indicator display using double sided
velcro tape.
Table 11: CCIM Installation
VER: 1607211119
23 of 40
The user input control and override switch are installed in the dashboard.
Step
Description
Diagram
1.
Remove a blanking switch plate from
the dashboard and install the
override switch.
2.
Drill a 34 mm hole into the
dashboard.
Install the user input control dial in
the dashboard, aligned so the Enter
cap is facing up.
Table 12: Dashboard Switches Installation
VER: 1607211119
24 of 40
The display shows the current safety status of the telehandler.
Step
Description
Diagram
1.
Position the display bracket in the
top right of the dashboard in the
approximate location shown.
Drill two 7 mm holes to attach the
bracket to the dashboard.
Secure the bracket to the dashboard
using the supplied large washers and
nuts
Attach the display to the bracket and
tighten the grub screw
Table 13: Display Installation
Adjust the display bracket for optimal viewing angle once the
display is powered
VER: 1607211119
25 of 40
The following procedures connect the safety systems to the existing electronics in the
machine.
Isolate the main battery before starting the machine
connections
Step
Description
Diagram
1.
Splice the following wire colours
from the machine input harness
with the 4 pin connector into the
connector for the left steering
column switch (marked with red
tape).
Note: Remove the steering wheel
height adjustment lever, to move
the steering wheel higher, to get
better access to the switch
connector
Wire Colour
Wire Number
Orange
809
Red
808
2.
Connect the spade terminals from
the machine input harness to the
override switch
VER: 1607211119
26 of 40
Locate the hydraulic block behind
the cabin.
Run the machine cutout harness
from underneath the dashboard
down to the hydraulic block.
4.
Attach the supplied 2 pin
connectors to the machine cutout
harness according to the table
below.
Wire Colour
Pin Number
Black
Male - 1
Violet
Male - 2
Blue
Female - 1
Violet
Female - 2
5.
Connect the tee connectors from
the machine cutout harness into
the bottom solenoid connector
shown.
Disconnect the tee connector from
the solenoid, to allow for complete
boom function until the installation
is completed in the section
Finalisation.
VER: 1607211119
27 of 40
Attach the radio power harness to
the radio connector.
Note: If the radio connector is not
installed in the machine. Cut off
the tee connectors from the radio
power harness and splice into the
4 pin radio power connector
located under the dashboard
according to the table below.
Wire Colour
Wire Number
Black
601AG
Violet
181
Yellow
301F
Table 14: Machine Connections
VER: 1607211119
28 of 40
This section will complete the final power connections to power the system and finish any
additional items.
Do not disconnect the camera power connection while the
system is operating as this can damage the fuse.
Step
Description
Diagram
1.
Connect the 4, 6 and 12 pin
connectors from the machine input
and cutout harnesses into the I/O
harness.
2.
Connect the camera power and
signal cables from the front and
rear cameras to the power/camera
harness connectors.
Note: The white connector is not
used.
3.
Connect the 3 pin connector from
the radio power harness into the
power/camera harness.
VER: 1607211119
29 of 40
Connect the spade lug on the
black wire to the negative (black)
battery terminal.
Connect the spade lug on the blue
wire to the positive (red) battery
terminal.
5.
Coil up the extra cables and store
underneath the dashboard cover.
6.
Reconnect the tee connector back
into the hydraulic block behind the
cabin.
7.
Reconnect the main battery from
the isolation switch.
Turn the machine onto first
stage /accessories and ensure the
system is activated.
VER: 1607211119
30 of 40
Adjust the display bracket for
optimal viewing
Set the machine into forward gear
to activate the forward camera.
Adjust the forward camera so the
front right wheel is visible.
Set the machine into reverse gear
to activate the reverse camera.
Adjust the reverse camera so the
video is level.
9.
Perform a final check on all the
cabling and sensors.
Replace all the covers
Table 15: Finalisation
Complete the system checklist once installation has been
completed.
VER: 1607211119
31 of 40
Set Time & Sensor Calibration
Once the installation is complete, the time will need to be set and the sensors will require
calibration.
Step
Description
Diagram
1.
Press Enter on the user control dial
to enter the menu system.
Press the arrow buttons to select
System Menu.
Press Enter to select the menu.
2.
Select Advanced Menu
VER: 1607211119
32 of 40
A sensor calibration must be performed once the cable reeler
and CPIM have been mounted. If the cable reeler or CPIM
have been moved/repositioned a recalibration must be
performed
Enter the password
(Default Password: 2-8-4)
4.
Select Set Time / Date
5.
Enter the correct time and date for
your area.
Press the arrow keys to select a
time/date parameter
Press Enter and the parameter will
change to red, press the arrow keys
to change the value and then press
the Enter key to store the value.
Note: The hour parameter is in 24
hour clock
Repeat for the rest of the time
values
VER: 1607211119
33 of 40
Scroll to the next page and select
Save to store the new time/date and
return to the Advanced Menu.
7.
Select Sensor Calibrations
8.
Select Calibrate Carrier Angle and
then follow the instructions on the
screen to complete the calibration.
Repeat for Calibrate Boom Angle and
Calibrate Boom Length.
Table 16: Sensor Calibration
VER: 1607211119
34 of 40
Appendix A: Attaching Display
Connectors
The procedure below describes the correct method of attaching the cables to the screw
lock connectors on the display.
If the M12 screw lock connectors on the display are over
tightened, it will twist the connector pins attaching the
connector to the PCB.
Step
Description
Diagram
1.
Connect the cable from the user
control to the top 5 pin connector on
the display.
Connect the cable from the CCIM to
the bottom 8 pin connector on the
display.
2.
Line up the alignment hole on the
cable connector with the alignment
notch on the display connector.
VER: 1607211119
35 of 40
Push the female connector from the
cable into the male connector on the
display.
4.
Rotate the nut on the female
connector by hand in a clockwise
direction, until the tension on the nut
starts to increase.
5.
Push the cable in again and repeat
steps 3 and 4 until the connector is
secure.
Table 17: Install Display Connector Procedure
The method to correctly secure the cable is to push-twist-
push-twist until the connector is fully inserted and secure.
This will minimise the twisting force applied to the connector.
Below is a picture of a damaged connector on the PCB inside the display. This damaged
occurred because the connector was over tightened.
VER: 1607211119
36 of 40
Illustration 2: Damaged Display Connector
Do not use any tools to tighten the connector.
Illustration 3: Do Not Use Tools To Tighten Connector
VER: 1607211119
37 of 40
Do not over-tighten the nuts on the back of the display
connectors. These nuts should only be hand tightened. If the
nuts are overtightened it will damage the PCB inside the
display.
Illustration 4: Do Not Over Tighten Nuts
Damage to the display connectors is not covered under
warranty.
VER: 1607211119
38 of 40
Indexes and Tables
Illustration Index
Illustration 1: Cable Reeler Mounting Position............................................................9
Illustration 2: Damaged Display Connector................................................................37
Illustration 3: Do Not Use Tools To Tighten Connector...........................................37
Illustration 4: Do Not Over Tighten Nuts...................................................................38
Index of Tables
Table 1: Cover removal................................................................................................6
Table 2: Cable Reeler Installation................................................................................8
Table 3: Pressure Manifold Installation.....................................................................11
Table 4: Compensation Pressure Sensor Installation................................................12
Table 5: Reverse Camera Installation........................................................................14
Table 6: Forward Camera Installation........................................................................15
Table 7: Signal Light Installation With Windshield Guard Bar..................................17
Table 8: Signal Light Installation Without Windshield Guard Bar.............................19
Table 9: Can Pressure Input Module (CPIM) Installation..........................................20
Table 10: External Cable Completion........................................................................22
Table 11: CCIM Installation........................................................................................23
Table 12: Dashboard Switches Installation................................................................24
Table 13: Display Installation.....................................................................................25
Table 14: Machine Connections.................................................................................28
Table 15: Finalisation.................................................................................................31
Table 16: Sensor Calibration......................................................................................34
Table 17: Install Display Connector Procedure.........................................................36
VER: 1607211119
39 of 40
Equipment Safety Systems Pty. Ltd. ABN: 31 061 789 151
Tel:
+61 3 8770 6555
27 Cumberland Drive, Seaford 3198, Victoria, Australia
Fax:
+61 3 8770 6590
Web: www.eqss.com.au
VER: 1607211119
40 of 40