GEZE ECturn Wiring Diagram

File Specifications

Brand: GEZE
Category: Door Opening System
Model: ECturn (Wiring Diagram), pry8R7RwD80Fw
File Info: Adobe Acrobat PDF (DjVu)
File Size:
Pages: 44 pages

Download PDF

Download GEZE ECturn Manual (44 pages)

Read Online:

Read the GEZE ECturn Wiring Diagram online using the built-in PDF viewer. This document explains how to operate the device, adjust settings and perform regular maintenance.

Key Pages of Document

43 41 42

2 RS485 1 SHLD RS485-B RS485-A 24V GND RS485-B RS485-A 24V GND 41 42 2 1 10 4 1 11 56 55 5 1 20 3 52 2 10 4 1 13 21 4 1 51 2 1 TST 24VSENS GND SIO PA B PA A 24VTOE GND KB 24VKB K 24VSENS GND PE2 24V PE1 24V GND TST 24VSENS GND SIS OFF ECturn PE ECturn Inside 4.1 ECturn terminals For the designations see chapter 18 WRB-5 BA- LEED DCU700 BUZZER MOTOR PROG S3 1 2 42 41 43 RS485 1 4 21 1 2 51 1 2 42 41 K PE RS485 3 20 13 1 4 10 1 5 55 56 KB SIO PA 11 1 4 10 SIS AKKU + IGM LED 24Vext + – – S1 S2 LED1 LED2 LED3 ...

Mode of operation display

WRB-5 Receiving module STAT WRB-5 status LED LERN WRB-5 teach button LED 24V Operating voltage display 24 V LED1 to LED5 Service LEDs for displaying errors, parameters and parameter values PROG Programming connection S1, S2 Service buttons for setting parameters for the control unit S3 Mode of operation key 18.1 ECturn control unit àà ECturn control unit (DCU 702 connection board, DCU700 control unit and power supply), mat. no. 131472 àà WRB-5 radio reception board, mat. no. 135170 ~ ~ DCU702 0 I 2 DCU70 ...

Tel. +49 (0) 7152 203 594

E-Mail: [email protected] GEZE GmbH Niederlassung Süd-Ost Tel. +49 (0) 7152 203 6440 E-Mail: [email protected] GEZE GmbH Niederlassung Ost Tel. +49 (0) 7152 203 6840 E-Mail: [email protected] GEZE GmbH Niederlassung Mitte/Luxemburg Tel. +49 (0) 7152 203 6888 E-Mail: [email protected] GEZE GmbH Niederlassung West Tel. +49 (0) 7152 203 6770 E-Mail: [email protected] GEZE GmbH Niederlassung Nord Tel. +49 (0) 7152 203 6600 E-Mail: [email protected] GEZE Service GmbH Tel. +49 (0) 1802 923392 E-Mail: service-info ...

Commissioning and service

20 Commissioning and service Commissioning and service can be effected either via the display programme switch or the buttons S1 and S2, see chapter 21, “Parameter menu”. 20.1 Display programme switch The DPS can be used for commissioning and servicing (mat. no. 151524); àà for changing the drive parameters àà for teaching the drive àà for diagnosis Modes of operation Service mode OFF 1 2 1 Service key 2 Position unknown Na Night mode × Cancel and return to first menu level ls Without function  Confirm aU Automatic  Scroll up ...

GEZE ECturn user guide recommended for: F 1200+, ECdrive H, GC 342, Powerturn, TS 5000 EFS 3-6.

⚠️ Download Safety

The Door Opening System Wiring diagram (44 pages) is completely safe to download (last scan date: 08/11/2025).

Related PDF Instructions for GEZE ECturn:

Door Opening System Equipment: Frequently Requested

Have some Questions about GEZE ECturn Device?

Get valuable and actionable advices from other GEZE ECturn device users. Describe your problem or question, regarding the using of ECturn, in as much detail as possible, and other users will be able to answer you.