SolarEdge SE K Series Quick Installation Manual
Read Online
Read the SolarEdge SE K Series Quick Installation Manual online using the built-in PDF viewer.
Text of the manual
Three Phase Inverter
with Synergy
Technology
Quick Installation Guide
PN: SExxK-xxxxIxxxx
For North America
Version 1.3
Scan for full
installation guide
SAVE THESE INSTRUCTIONS – This manual contains important instructions for the Three Phase Inverter with Synergy Technology that should be followed during installation
and maintenance. Using this equipment in a manner not specified in this guide by SolarEdge may impair the protection provided by this equipment.
Legend
WARNING! SYNERGY UNIT, PN: SESUK-USRxxxxx, INCLUDE A PHOTOVOLTAIC RAPID SHUTDOWN SYSTEM (PVRSS). SUCH UNITS, INCORPORATE ONE OR MORE PIECES OF
EQUIPMENT THAT EXERCISE THE RAPID SHUTDOWN CONTROL OF PV SYSTEM CONDUCTORS REQUIRED BY SECTION 690.12 OF THE NEC (NFPA 70). OTHER EQUIPMENT INSTALLED IN
OR ON THIS PV SYSTEM MAY ADVERSELY AFFECT THE OPERATION OF THIS PVRSS. IT IS THE RESPONSIBILITY OF THE INSTALLER TO ENSURE THAT THE COMPLETED PV SYSTEM MEETS
THE APPLICABLE RAPID SHUT DOWN FUNCTIONAL REQUIREMENTS. THIS EQUIPMENT MUST BE INSTALLED ACCORDING TO THE MANUFACTURER’S INSTALLATION INSTRUCTIONS
WARNING! Upon servicing or replacing equipment, instructions in the installation manual must be followed to maintain the integrity of the PV hazard
control system. SolarEdge commercial optimizers and three phase inverters should only be replaced with SolarEdge commercial optimizers and inverters.
Third party equipment is not compatible.
!
Turn ON/OFF the main circuit board AC switch.
When turning off, wait 5 minutes for DC Voltage to
drop to safe level before removing the front panel.
Turn the DC Disconnect Switch on/off. When turning off,
wait 5 minutes for DC Voltage to drop to safe level before
removing the front panel.
Turn the ON/OFF/P Switch on/off. When turning off, wait
5 minutes for DC Voltage to drop to safe level before
removing the front panel.
Before connecting aluminum wires to terminals:
1. Remove oxide from the exposed wires with emery paper or a steel
wire brush
2. Clean dust with a cloth and Isopropyl alcohol (IPA)
3. Coat wires with a designated antioxidant aluminum wire grease
immediately after cleaning
CAUTION! Connection of oxidize aluminum wires may result in
resistance and high temperatures at contact points. Improper
execution of the following procedure may cause damage to the unit.
ON
OFF
!
NOTE
This symbol denotes information intended to assist the user
in making optimum use of the product.
CAUTION!
Denotes a hazard. It calls attention to a procedure that, if
not correctly performed or adhered to, could result in
damage or destruction of the product. Do not proceed
beyond a caution sign until the indicated conditions are
fully understood and met.
WARNING!
Denotes a hazard. It calls attention to a procedure that, if
not correctly performed or adhered to, could result in injury
or loss of life. Do not proceed beyond a warning note until
the indicated conditions are fully understood and met.
Do not cut the cable connectors
This symbol appears at grounding points on the SolarEdge
manuals and equipment.
P 1 0
OFF (0)
P 1 0
ON (1)
ON
OFF
!
Installing the Power Optimizers
MAN-01-00786-1.3
1
Use SolarEdge Designer
to design SE system
https://designer.solaredge.com
1
Download SolarEdge Mapper to
map string Power Optimizers
Download
1
1
2
3
4
5
6
2
Installing the Power Optimizers
1
1
2
3
4
5
6
3
Scan QR code using Mapper
Complete site registration
and physical layout in the
Monitoring platform
Install Power Optimizer
M6 (1/4’’) or M8 (5/16”)
stainless steel 9.5 N*m / 7 lb*ft
12.7 mm /0.5”
10 mm / 0.4"
25 mm / 1" (P860,P960)
10 mm / 0.4"
25 mm / 1" (P860,P960)
10 mm / 0.4"
25 mm / 1" (P860,P960)
10 mm / 0.4"
25 mm / 1" (P860,P960)
Connect input from Module
Connect output to String
5
6
MAN-01-00786-1.3
3
2:1 series connection
Use a dual input optimizer (P800p)
for parallel connection of two PVs
or use a branch cable to connect
two PVs to a single input optimizer.
Installing the Power Optimizers 1
1
2
3
4
5
6
Connecting the PV Array
2
Check array polarity.
Verify 1±0.1V per optimizer
Example: 8 optimizers = ~8V
+
8V
-
40 cm / 16”
10 cm / 4”
114.5 cm / 45”
100.8 cm / 39.68”
CAUTION! Donot block Airflow
WARNING! Area
in front of the
inverter must be
kept clear for at
least one meter
!
20 cm / 8”
30 cm / 11.8”
Back to back
On metal back sheet
On mesh fence
Indoor Clearance
Outdoor Clearance
20 cm / 8” where annual average high temperature equals or above 25˚C / 77˚F
Keep more than 10°
Horizontal Installation
15 cm / 6”
5 cm / 2”
40 cm / 16”
40 cm / 16”
Avoid wobbly installation by
adding back support
6 MAN-01-00786-1.3
2
1
Optional
Optional
Marking & Drilling Holes
4
3
Level provided template horizontally
Position provided template vertically
4
Mark holes
Mark holes
5
Optional unit - model dependent
Ø 9mm / 0.35”
Drill holes
6.53” / 16.6 cm
7.36” / 18.7 cm
6.1” / 15.5 cm
3.3” / 9.3 cm
CAUTION! Donot block airflow
6.1” / 15.5 cm
3.3” / 9.3 cm
Mounting the Units
5
For left or right units,
use only the outer screw
CAUTION! Remove plates
from unit before drilling holes
Max conduit
size 2”
1.9 lb*ft
Max conduit
size 2.5”
CAUTION! Donot
block Airflow
Boundary for single conduit
entry. Max conduit size 3”
Connect cables
according to labels
2
Align pin grooves in
connector with pin
guides in socket
1
DISCONNECT POWER BEFORE BEGINNING INSTALLATION
!
1
OFF
OFF
3
4
MAN-01-00786-1.3
9
Removing Covers
7
Up to 12 Strings
2
1
When using a stranded wire, use of
ferrule is at the installer discretion
6 - 12 AWG
18 mm
0.7”
10 MAN-01-00786-1.3
Ground conduit nut if required by regulation
Connecting PV Strings (Option 1)
8
Connecting PV Strings (Option 2)
8
Combiner
Box
Important: When installing a system with
more than 3 strings per a single Synergy Unit
(whether connected directly or via a combiner
box), fuses are required. In SolarEdge system,
25A fuses shall be used
Max 2 AWG
-
4 AWG: 3.7 lb.*ft
3 – 2 AWG: 5.9 lb.*ft
Ground conduit nut if
required by regulation
Synergy Units
Left Center Right
Left Center Right
2.2 lb.*ft.
4-14 AWG
+
DC-
DC+
Fine stranded
Ferrule
The inverter can either support 4 wire + PE or 3 wire + PE connection
One-hole, standard barrel,
compression lugs only, 600V
2
1
3
4
5
15.4 lb.*ft.
Overcurrent protection for the AC output must be provided by others, see manual for guidance
Connect PE
wire first
• For aluminum wires, USE
ONLY aluminum lugs
• For copper wires, USE ONLY
copper tin-plated lugs
Connecting AC and Protective Earth
9
Max 1.39” / 33 mm
Max: 4/0 AWG
Max thickness
0.27” / 7mm
Ø 0.5” / 10 mm
Heat shrink
insulation
12 MAN-01-00786-1.3
0.4 - 0.43“ /
10 -11 mm
PE Wire
Ground conduit nut if
required by regulation
Max: 1/0 AWG
10 – 4 AWG: 3.7 lb.*ft
3 – 1/0 AWG: 5.9 lb.*ft
Ferrule
Fine
stranded
CAT6, 3-wire, shielded, twisted pair (0.2- 1 mm²) max 1km / 3300 ft.
14 MAN-01-00786-1.3
RS485 Connection of Multiple Inverters
11
Move SW1 switch to ON (up) to terminate
first and last inverters on RS485 bus
Pre-commissioning when AC Power is Not Connected (Option 1)
15
1
3
4
Download SolarEdge SetApp
Start
Download
Start and follow SetApp
Connect power bank
2
Turn switch to ON
ON
Power bank: 60W
output port , USB-C
Power Delivery (PD):
20V 3A (not provided)
Cover connector
when not used
5
7
6
Disconnect and remove power bank
Wait until inverter turns-off (all LEDs turn-off)
Turn switches to OFF
3.3 ft / 1 meter, USB-C / USB-C (not provided)
Commissioning with DC and AC Power (Option 2) 16
1
Download
SolarEdge SetApp
Download
3
Start
Start & follow SetApp
2
ON
ON
Turn switches to ON
RS485-1 Protocol SolarEdge Solaredge Leader
RS485-1 Follower Detect
4
Commissioning
Inverter Units
Country & Language
Site Communication
Pairing
Status
20 MAN-01-00786-1.3
Commissioning the Leader Inverter
17
System is producing Power
AC is connected but the system is not producing power
Inverter is communicating with the monitoring platform
System error
A
Green
Blue Red
MAN-01-00786-1.3
21
POWER COMM FAULT
LED Indications 18
Support Contact Information
If you have technical problems concerning