SolarEdge SE K Series Quick Installation Manual

Specifications

Brand: SolarEdge
Category: Inverter
Model: SE K Series (Quick Installation Manual)
File Type: PDF
File Size: —
Pages: 24

Read Online

Read the SolarEdge SE K Series Quick Installation Manual online using the built-in PDF viewer.

Text of the manual

Three Phase Inverter

with Synergy Technology Quick Installation Guide PN: SExxK-xxxxIxxxx For North America Version 1.3 Scan for full installation guide

SAVE THESE INSTRUCTIONS – This manual contains important instructions for the Three Phase Inverter with Synergy Technology that should be followed during installation

and maintenance. Using this equipment in a manner not specified in this guide by SolarEdge may impair the protection provided by this equipment. Legend WARNING! SYNERGY UNIT, PN: SESUK-USRxxxxx, INCLUDE A PHOTOVOLTAIC RAPID SHUTDOWN SYSTEM (PVRSS). SUCH UNITS, INCORPORATE ONE OR MORE PIECES OF EQUIPMENT THAT EXERCISE THE RAPID SHUTDOWN CONTROL OF PV SYSTEM CONDUCTORS REQUIRED BY SECTION 690.12 OF THE NEC (NFPA 70). OTHER EQUIPMENT INSTALLED IN OR ON THIS PV SYSTEM MAY ADVERSELY AFFECT THE OPERATION OF THIS PVRSS. IT IS THE RESPONSIBILITY OF THE INSTALLER TO ENSURE THAT THE COMPLETED PV SYSTEM MEETS THE APPLICABLE RAPID SHUT DOWN FUNCTIONAL REQUIREMENTS. THIS EQUIPMENT MUST BE INSTALLED ACCORDING TO THE MANUFACTURER’S INSTALLATION INSTRUCTIONS WARNING! Upon servicing or replacing equipment, instructions in the installation manual must be followed to maintain the integrity of the PV hazard control system. SolarEdge commercial optimizers and three phase inverters should only be replaced with SolarEdge commercial optimizers and inverters. Third party equipment is not compatible. ! Turn ON/OFF the main circuit board AC switch. When turning off, wait 5 minutes for DC Voltage to drop to safe level before removing the front panel. Turn the DC Disconnect Switch on/off. When turning off, wait 5 minutes for DC Voltage to drop to safe level before removing the front panel. Turn the ON/OFF/P Switch on/off. When turning off, wait 5 minutes for DC Voltage to drop to safe level before removing the front panel. Before connecting aluminum wires to terminals: 1. Remove oxide from the exposed wires with emery paper or a steel wire brush 2. Clean dust with a cloth and Isopropyl alcohol (IPA) 3. Coat wires with a designated antioxidant aluminum wire grease immediately after cleaning CAUTION! Connection of oxidize aluminum wires may result in resistance and high temperatures at contact points. Improper execution of the following procedure may cause damage to the unit. ON OFF ! NOTE This symbol denotes information intended to assist the user in making optimum use of the product. CAUTION! Denotes a hazard. It calls attention to a procedure that, if not correctly performed or adhered to, could result in damage or destruction of the product. Do not proceed beyond a caution sign until the indicated conditions are fully understood and met. WARNING! Denotes a hazard. It calls attention to a procedure that, if not correctly performed or adhered to, could result in injury or loss of life. Do not proceed beyond a warning note until the indicated conditions are fully understood and met. Do not cut the cable connectors This symbol appears at grounding points on the SolarEdge manuals and equipment. P 1 0 OFF (0) P 1 0 ON (1) ON OFF !

Installing the Power Optimizers

MAN-01-00786-1.3 1 Use SolarEdge Designer to design SE system https://designer.solaredge.com 1 Download SolarEdge Mapper to map string Power Optimizers Download 1 1 2 3 4 5 6 2

Installing the Power Optimizers

1 1 2 3 4 5 6 3 Scan QR code using Mapper Complete site registration and physical layout in the Monitoring platform Install Power Optimizer M6 (1/4’’) or M8 (5/16”) stainless steel 9.5 N*m / 7 lb*ft 12.7 mm /0.5” 10 mm / 0.4" 25 mm / 1" (P860,P960) 10 mm / 0.4" 25 mm / 1" (P860,P960) 10 mm / 0.4" 25 mm / 1" (P860,P960) 10 mm / 0.4" 25 mm / 1" (P860,P960)

Connect input from Module

Connect output to String 5 6 MAN-01-00786-1.3 3 2:1 series connection Use a dual input optimizer (P800p) for parallel connection of two PVs or use a branch cable to connect two PVs to a single input optimizer. Installing the Power Optimizers 1 1 2 3 4 5 6

Connecting the PV Array

2 Check array polarity. Verify 1±0.1V per optimizer Example: 8 optimizers = ~8V + 8V -

40 cm / 16”

10 cm / 4” 114.5 cm / 45” 100.8 cm / 39.68” CAUTION! Donot block Airflow WARNING! Area in front of the inverter must be kept clear for at least one meter ! 20 cm / 8” 30 cm / 11.8” Back to back On metal back sheet On mesh fence Indoor Clearance Outdoor Clearance 20 cm / 8” where annual average high temperature equals or above 25˚C / 77˚F Keep more than 10° Horizontal Installation 15 cm / 6” 5 cm / 2” 40 cm / 16” 40 cm / 16”

Avoid wobbly installation by

adding back support 6 MAN-01-00786-1.3 2 1 Optional Optional Marking & Drilling Holes 4 3 Level provided template horizontally Position provided template vertically 4 Mark holes Mark holes 5 Optional unit - model dependent Ø 9mm / 0.35” Drill holes 6.53” / 16.6 cm 7.36” / 18.7 cm 6.1” / 15.5 cm 3.3” / 9.3 cm CAUTION! Donot block airflow 6.1” / 15.5 cm 3.3” / 9.3 cm

Mounting the Units

5 For left or right units, use only the outer screw

CAUTION! Remove plates

from unit before drilling holes Max conduit size 2” 1.9 lb*ft Max conduit size 2.5” CAUTION! Donot block Airflow Boundary for single conduit entry. Max conduit size 3” Connect cables according to labels 2 Align pin grooves in connector with pin guides in socket 1

DISCONNECT POWER BEFORE BEGINNING INSTALLATION

! 1 OFF OFF 3 4 MAN-01-00786-1.3 9 Removing Covers 7

Up to 12 Strings

2 1 When using a stranded wire, use of ferrule is at the installer discretion 6 - 12 AWG 18 mm 0.7” 10 MAN-01-00786-1.3 Ground conduit nut if required by regulation Connecting PV Strings (Option 1) 8

Connecting PV Strings (Option 2)

8 Combiner Box Important: When installing a system with more than 3 strings per a single Synergy Unit (whether connected directly or via a combiner box), fuses are required. In SolarEdge system, 25A fuses shall be used Max 2 AWG - 4 AWG: 3.7 lb.*ft 3 – 2 AWG: 5.9 lb.*ft Ground conduit nut if required by regulation Synergy Units Left Center Right Left Center Right 2.2 lb.*ft. 4-14 AWG + DC- DC+ Fine stranded Ferrule

The inverter can either support 4 wire + PE or 3 wire + PE connection

One-hole, standard barrel, compression lugs only, 600V 2 1 3 4 5 15.4 lb.*ft. Overcurrent protection for the AC output must be provided by others, see manual for guidance Connect PE wire first • For aluminum wires, USE ONLY aluminum lugs • For copper wires, USE ONLY copper tin-plated lugs Connecting AC and Protective Earth 9 Max 1.39” / 33 mm Max: 4/0 AWG Max thickness 0.27” / 7mm Ø 0.5” / 10 mm Heat shrink insulation 12 MAN-01-00786-1.3 0.4 - 0.43“ / 10 -11 mm PE Wire Ground conduit nut if required by regulation Max: 1/0 AWG 10 – 4 AWG: 3.7 lb.*ft 3 – 1/0 AWG: 5.9 lb.*ft Ferrule Fine stranded

CAT6, 3-wire, shielded, twisted pair (0.2- 1 mm²) max 1km / 3300 ft.

14 MAN-01-00786-1.3 RS485 Connection of Multiple Inverters 11 Move SW1 switch to ON (up) to terminate first and last inverters on RS485 bus

Pre-commissioning when AC Power is Not Connected (Option 1)

15 1 3 4 Download SolarEdge SetApp Start Download Start and follow SetApp Connect power bank 2 Turn switch to ON ON Power bank: 60W output port , USB-C Power Delivery (PD): 20V 3A (not provided) Cover connector when not used 5 7 6 Disconnect and remove power bank Wait until inverter turns-off (all LEDs turn-off) Turn switches to OFF 3.3 ft / 1 meter, USB-C / USB-C (not provided)

Commissioning with DC and AC Power (Option 2) 16

1 Download SolarEdge SetApp Download 3 Start Start & follow SetApp 2 ON ON Turn switches to ON

RS485-1 Protocol SolarEdge Solaredge Leader

RS485-1 Follower Detect 4 Commissioning Inverter Units Country & Language Site Communication Pairing Status 20 MAN-01-00786-1.3 Commissioning the Leader Inverter 17

System is producing Power

AC is connected but the system is not producing power Inverter is communicating with the monitoring platform System error A Green Blue Red MAN-01-00786-1.3 21 POWER COMM FAULT LED Indications 18

Support Contact Information

If you have technical problems concerning SolarEdge products, please contact us: https://www.solaredge.com/service/support Subject to change without notice. Copyright © SolarEdge Inc. All rights reserved. July 2021.

Other Inverter Manuals