SolarEdge Inline Energy Meter Installation Manual
Text of the manual
Inline Energy Meter with
SolarEdge Energy Net
Communications
For Europe and Australia
Version 1.0
Copyright © SolarEdge Inc. All rights reserved.
No part of this document may be reproduced, stored in a retrieval system or
transmitted, in any form or by any means, electronic, mechanical, photographic,
magnetic or otherwise, without the prior written permission of SolarEdge Inc.
The material furnished in this document is believed to be accurate and reliable.
However, SolarEdge assumes no responsibility for the use of this material. SolarEdge
reserves the right to make changes to the material at any time and without notice. You
may refer to the SolarEdge web site (www.solaredge.com) for the most updated version.
All company and brand products and service names are trademarks or registered
trademarks of their respective holders.
Patent marking notice: see http://www.solaredge.com/patent
The general terms and conditions of delivery of SolarEdge shall apply.
The content of these documents is continually reviewed and amended, where
necessary. However, discrepancies cannot be excluded. No guarantee is made for the
completeness of these documents.
The images contained in this document are for illustrative purposes only and may vary
depending on product models.
Disclaimers 1
Inline Energy Meter with SolarEdge Energy Net Communications
This equipment has been tested and found to comply with the limits applied by the
local regulations.
These limits are designed to provide reasonable protection against harmful interference.
This equipment generates, uses and can radiate radio frequency energy and, if not
installed and used in accordance with the instructions, may cause harmful interference
to radio communications. However, there is no guarantee that interference will not
occur in a particular installation. If this equipment does cause harmful interference to
radio or television reception, which can be determined by turning the equipment off
and on, you are encouraged to try to correct the interference by one or more of the
following measures:
Reorient or relocate the receiving antenna.
Increase the separation between the equipment and the receiver.
Connect the equipment into an outlet on a circuit different from that to which the
receiver is connected.
Consult the dealer or an experienced radio/TV technician for help.
Changes or modifications not expressly approved by the party responsible for
compliance may void the user’s authority to operate the equipment.
CAUTION!
Where EN55011 Class A is deemed applicable, the following requirements apply:
This equipment is not intended for use in residential environments and may
not provide adequate protection to radio reception in such environments.
This equipment should be connected to inverters with a rated power > 20
kVA and is intended to be installed in a large photovoltaic power generating
system by a professional.
This equipment should be physically separated from residential
environments by a distance greater than 30 m, and can be equipped with
additional filtering if necessary.
Inline Energy Meter with SolarEdge Energy Net Communications
2 Emission Compliance
Version 1.0 (August 2021) - FIrst issue
Disclaimers 3
Inline Energy Meter with SolarEdge Energy Net Communications
HANDLING AND SAFETY INSTRUCTIONS
5
Safety Symbols Information
5
Chapter 1: The SolarEdge Inline Energy Meter with SolarEdge Energy Net
Communications
6
SolarEdge Energy Net Wireless Connectivity
6
Package Contents
6
Terminology
7
Metering Applications
8
Meter Connection Options
10
Meter Interfaces
11
Chapter 2: Meter Installation
15
Installation Guidelines
15
Installing and Connecting the Inline Meter
16
Chapter 3: Configuration
26
SolarEdge Device Firmware Version
26
Device Configuration
27
Appendix A: Troubleshooting Meter Connection
36
Troubleshooting the Meter using SetApp
36
Appendix B: Installing Multiple Meters
39
Connecting Two Meters
39
Configuring the Dual-Meter Connection
40
Verifying Meter Connections
40
Troubleshooting Dual-Meter Connections
40
Appendix C: Monitoring Platform - Meter Data
41
Appendix D: Supplemental Documentation
43
Support Contact Information
44
Inline Energy Meter with SolarEdge Energy Net Communications
4 Emission Compliance
HANDLING AND SAFETY INSTRUCTIONS
Safety Symbols Information
The following safety symbols are used in this document. Familiarize yourself with the
symbols and their meaning before installing or operating the system.
WARNING!
Denotes a hazard. It calls attention to a procedure that, if not correctly
performed or adhered to, could result in injury or loss of life. Do not proceed
beyond a warning note until the indicated conditions are fully understood and
met.
CAUTION!
Denotes a hazard. It calls attention to a procedure that, if not correctly
performed or adhered to, could result in damage or destruction of the
product. Do not proceed beyond a caution sign until the indicated conditions
are fully understood and met.
NOTE
Denotes additional information about the current subject.
IMPORTANT SAFETY FEATURE
Denotes information about safety issues.
Disposal requirements under the Waste Electrical and Electronic Equipment (WEEE)
regulations:
NOTE
Discard this product according to local regulations or send it back to SolarEdge.
HANDLING AND SAFETY INSTRUCTIONS 5
Inline Energy Meter with SolarEdge Energy Net Communications
Chapter 1: The SolarEdge Inline Energy Meter
with SolarEdge Energy Net Communications
The SolarEdge Inline Energy Meter (also referred to as “the inline meter”) is used to
measure the power and energy of the photovoltaic (PV) system.
The inline meter:
Fits in a standard EU electrical cabinet
Supports a direct connection of up to 65A per phase, for three phase and single
phase grid connections
Is supplied with integrated current transformers - eliminating the need to install
external CTs
The three phase inline meter (part number: MTR-240-3PC1-D-A-MW) supports both
single-phase and three-phase grid connections.
The single phase inline meter (part number: MTR-240-1PC1-DW-MW) supports single-
phase grids only.
NOTE
This installation guide provides instructions for configuration of the inline meter
using SetApp. To connect the inline meter to display inverters, purchase the
relevant communication board kit from SolarEdge. See Energy Net Support on
page 14 to select the required kit.
SolarEdge Energy Net Wireless Connectivity
The inline meter supports wireless communication with the inverter using the SolarEdge
Energy Net connectivity. To establish communications, the inverter must also support
SolarEdge Energy Net.
Alternatively, serial RS485 connectivity can be implemented.
Package Contents
SolarEdge Inline Energy Meter
NOTE
For the complete list of part numbers that this manual applies to, refer to the
technical specification in the Appendix Supplemental Documentation on page 43.
RS485 Terminal Block
Quick Installation Guide
Inline Energy Meter with SolarEdge Energy Net Communications
6 Chapter 1: The SolarEdge Inline Energy Meter with SolarEdge Energy
Net Communications
The following terms are used in this document:
Export: The power injected to the grid.
Import: The power purchased from the grid.
Export/Import meter: A meter that is installed at the grid connection point and
measures the energy/power exported/imported to/from the grid.
Consumption: The power consumed at the site. Consumption power is calculated as
the sum of self-consumption power and import power.
Consumption meter: A meter that is installed at the load consumption point and
measures the energy/power consumed by the site.
Self-consumption: The PV power consumed by the site and not fed into the grid.
Production: The power produced by the PV system.
Production meter: A meter that is installed at the inverter output or site AC
connection, and measures the energy/power produced by the PV system or site.
External production meter: A meter that is used for production metering of 3rd party
generators, or for AC coupling with non-SolarEdge inverters.
Site production meter: A meter that is installed at a SolarEdge inverter output, and
reads the energy produced by all the inverters at the site.
Site limit: The power level (in kW) that the inverter falls back to once an export limit
event is triggered.
Figure 1: Terminology Illustration
7
Inline Energy Meter with SolarEdge Energy Net Communications
The SolarEdge inverter reads data from the inline meter, typically using one of the
scenarios illustrated in the figures below:
Production metering, using a meter installed at the output power connection of the
inverter. Production metering functions (inverter production, external production,
site production) are supported in software version 4.14.xx and above.
Export/import metering, using a meter installed at the grid connection point
Consumption metering, using a meter installed at the load consumption point
Figure 2: Typical installation with production meter
Figure 3: Typical installation with export/import meter
Figure 4: Typical installation with consumption meter
Inline Energy Meter with SolarEdge Energy Net Communications
8 Metering Applications
The AC wires connected to the main terminal block of the inline meter can be
swapped - allowing the grid to be connected to either the upper terminal
blocks or the lower terminal blocks. For further details, see Installing the Inline
Meter on page 17
NOTE
Up to three meters can be connected to a single inverter. Each meter should
perform a different function. Any combination of Energy Net and
Modbus/RS485 communication is supported.
9
Inline Energy Meter with SolarEdge Energy Net Communications
Meter Connection Options
In a single inverter system, the inline meter is connected directly to an RS485 port of the
inverter, or communicates over a wireless SolarEdge Energy Net channel.
NOTE
Hereafter, when an RS485 connection is mentioned in this installation guide,
the user may opt alternatively to connect the inline meter to the inverter using
a wireless SolarEdge Energy Net connection (the inverter should support
Energy Net Communications).
Figure 5: Single-inverter connection with export/import meter using RS485 link
Figure 6: Single-inverter connection with export/import meter using SolarEdge Energy Net
wireless link
In a multiple inverter system:
The inline meter is connected to an RS485 port of one of the inverters.
If the inverter has a second RS485 port, use this port to connect between the
inverters.
If the inverter has only one RS485 port, use an RS485 Plug-In (available from
SolarEdge) to connect the inverters.
Inline Energy Meter with SolarEdge Energy Net Communications
10 Meter Connection Options
This section describes the SolarEdge inline meter's interfaces.
Figure 7: Inline Meter Interfaces
Main line connectors: inputs/output terminal blocks
RS485: detachable connector for wired connectivity with the inverter
Internal antenna: for wireless connectivity with the inverter
Three push buttons: to operate the inline meter display
LEDs: used to monitor meter status:
Orange: meter operation
Blue: Energy Net/RS485 communication status
Display: used to view energy readings and to configure the inline meter.
11
Inline Energy Meter with SolarEdge Energy Net Communications
The inline meter utilizes the orange and blue LEDs in the front of the unit (see the figure
above) in order to indicate the meter's status:
Orange: energy measurements
Blue: Energy Net/RS485 communication status
Function
LED
Indication
Energy
measurements
Orange
Blinking rate of 1000 pulses per hour indicates 1
kWh of measured energy.
Communication
status
Blue
Blinking: Meter is searching for an Energy Net
network, or is not connected to RS485 bus.
Lit: Meter is in the reboot state, or has
successfully paired with the Energy Net
network, or was successfully connected to the
RS485 bus.
Fast blinking during configuration of the inline
meter.
Inline Energy Meter with SolarEdge Energy Net Communications
12 Meter Interfaces
Display Screen and Push Buttons
Display Screen
The inline meter display screen is used for basic configuration and operation of the
meter, and for reapplying factory default settings.
Push Buttons
Button
Function
Combination
Left
Up
Push the left button for 5 seconds
in order to reset the meter.
Push the Left and Middle buttons
simultaneously for 5 seconds in order
to initiate an Energy Net network
search session.
Middle
Down
Right
Enter
13
Inline Energy Meter with SolarEdge Energy Net Communications
Energy Net Support
The inline meter supports wireless communication with the inverter over SolarEdge
Energy Net. The inverter should be equipped with a communications board supporting
Energy Net (and with the Energy Net module).
Access the following link for a list of all optional kits and their part numbers that can be
used with the inverter:
https://www.solaredge.com/sites/default/files/
se-energy-net-plug-in-datasheet.pdf
Notes:
All kits should be purchased separately.
Solaredge Energy Net modules are supplied with an external antenna that is to be
mounted on the inverter.
Some Solaredge Energy Net modules and kits are supplied in sets of 5 units.
Inline Energy Meter with SolarEdge Energy Net Communications
14 Meter Interfaces
Chapter 2: Meter Installation
Installation Guidelines
AC wiring specifications:
If an AC wiring extension is required, use the same type of AC wiring that is used in
the cabinet.
RS485 wiring specifications:
Cable type: Min. 3-wire shielded twisted pair (a 4-wire cable may be used)
Wire cross-section area: 0.2-1 mm² (a CAT6 cable may be used)
NOTE
If using RS485 cable longer than 10 meters in areas where there is a risk of
induced voltage surges by lightning, it is recommend to use surge protection
devices. If grounded metal conduits are used for routing the communication
wires, there is no need for a lightning protection device.
Additional Guidelines:
The inline meter is considered “permanently connected equipment” and requires a
disconnect means (circuit breaker, switch, or disconnect) and overcurrent
protection (fuse or circuit breaker).
The rating of any switches, disconnects, fuses, and/or circuit breakers is determined
by the inline meter's current rating, the mains voltage, and the current interruption
rating required.
The switch, disconnect, or circuit breaker must be located near the inline meter and
be easily operated.
Use grouped circuit breakers when monitoring more than one line.
The circuit breakers or fuses must protect the mains terminals labeled L1, L2, and L3.
In the rare case in which neutral has overcurrent protection, the overcurrent
protection device must interrupt both neutral and the ungrounded conductors
simultaneously.
The circuit protection / disconnect system must meet IEC 60947-1 and IEC 60947-3,
as well as all national and local electrical codes.
Chapter 2: Meter Installation 15
Inline Energy Meter with SolarEdge Energy Net Communications
Installing and Connecting the Inline Meter
NOTE
Make sure the inline meter's rating is within maximum permitted current
limitations.
In export/import applications, check that the rating of the main circuit breaker
is within maximum permitted current limitations.
Mounting the Inline Meter
To mount the inline meter on a DIN rail:
The inline meter is designed for permanent installation in indoor locations. It is
intended for installation in switch cabinets or in small-installation distributors on a 35
mm mounting rail as per DIN EN 60715.
Mount the inline meter on the DIN rail as shown in the figure below. Fit the slot on the
back of the meter over the DIN rail (see steps 1 and 2), and secure it in place on the
DIN rail using the latching mechanism at the bottom of the meter.
Figure 8: Mounting the inline meter on a DIN-rail
To detach the inline meter from the DIN rail:
1. Disconnect all AC wires and RS485 cable (if connected), or Energy Net antenna.
2. Detach the meter from the DIN rail by releasing the lever at the bottom of the meter,
and then separating it from the rail.
Inline Energy Meter with SolarEdge Energy Net Communications
16 Installing and Connecting the Inline Meter
Installing the Inline Meter
This section contains the following installation instructions:
General Installation Guidelines on page 17
Installing the Three Phase Inline Meter on page 18
Installing the Single Phase Inline Meter on page 21
General Installation Guidelines
The valid wiring schemes are as follows:
Class B (meter accuracy: ±1%). AC grid-side lines are connected to the upper terminal
blocks of the inline meter.
Class A (meter accuracy: ±2%). AC load-side lines are connected to the upper terminal
blocks of the inline meter.
NOTE
The difference between accuracy classes A and B results from the differing
current path through the meter in each scheme. For best performance, choose
Class B if possible.
General guidelines for installing the inline meter:
1. Turn off the AC power (main circuit breakers) before connecting the inline meter.
2. Using one of the below wiring schemes, connect the AC wiring to the terminal
blocks at the top and the bottom of the inline meter.
NOTE
Insert a flat-head screwdriver in the dedicated slot to open the screw covers.
Use cable with a cross-section of 1.0 - 26.0 mm2.
CAUTION
DO NOT use a circuit breaker with a rated current of more than 65A.
Chapter 2: Meter Installation 17
Inline Energy Meter with SolarEdge Energy Net Communications
Installing the Three Phase Inline Meter
For Export/Import Metering Applications
3Ø Meter Wiring - Accuracy class B (1%)
3Ø Meter Wiring - Accuracy class A (2%)
Figure 9: Export/Import Metering - Three Phase Wiring Schemes
NOTE
If the inline meter is connected to a single phase grid, connect phase 3 and N. The
two installation schemes depicted in the figure above are valid for single-phase grids
as well.
Inline Energy Meter with SolarEdge Energy Net Communications
18 Installing and Connecting the Inline Meter
For Consumption Metering Applications
3Ø Meter Wiring - Accuracy class B (1%)
3Ø Meter Wiring - Accuracy class A (2%)
Figure 10: Consumption Metering - Three Phase Wiring Schemes
NOTE
If the inline meter is connected to a single phase grid, connect phase 3 and N. The
two installation schemes depicted in the figure above are valid for single-phase grids
as well.
Chapter 2: Meter Installation 19
Inline Energy Meter with SolarEdge Energy Net Communications
For Inverter Production, Site Production, and External Production Metering Applic-
ations
3Ø Meter Wiring - Accuracy class B (1%)
3Ø Meter Wiring - Accuracy class A (2%)
Figure 11: Production Metering - Three Phase Wiring Schemes
NOTE
If the inline meter is connected to a single phase grid, connect phase 3 and N. The
two installation schemes depicted in the figure above are valid for single-phase grids
as well.
Inline Energy Meter with SolarEdge Energy Net Communications
20 Installing and Connecting the Inline Meter
Installing the Single Phase Inline Meter
For Export/Import Metering Applications
1Ø Meter Wiring - Accuracy class B (1%)
1Ø Meter Wiring - Accuracy class A (2%)
Figure 12: Export/Import Metering - Single Phase Wiring Scheme
Chapter 2: Meter Installation 21
Inline Energy Meter with SolarEdge Energy Net Communications
For Consumption Metering Applications
1Ø Meter Wiring - Accuracy class B (1%)
1Ø Meter Wiring - Accuracy class A (2%)
Figure 13: Consumption - Single Phase Wiring Scheme
Inline Energy Meter with SolarEdge Energy Net Communications
22 Installing and Connecting the Inline Meter
For Production Metering Applications
1Ø Meter Wiring - Accuracy class B (1%)
1Ø Meter Wiring - Accuracy class A (2%)
Figure 14: Production Metering - Single Phase Wiring Scheme
Chapter 2: Meter Installation 23
Inline Energy Meter with SolarEdge Energy Net Communications
Wired Connection of the Inline Meter and the Inverter
(Optional)
You may opt to establish a wired, RS485 connection between the inline meter and the
inverter, as shown in the figure below.
Figure 15: Wired connection between inline meter and inverter
To wire the inline meter's RS485 connection:
1. To establish RS485 communication with the inverter, connect the RS485 twisted pair
cable to the 3-pin connector supplied with the inline meter, using a CAT6 cable:
a. Detach the RS485 connector from the inline meter.
b. Prepare the three wires, exposing 10 mm of insulation .
c. Connect the wires to the A+ and B- terminals. Make sure the wires are twisted.
d. Connect the shield to the G terminal.
e. Re-attach the RS485 connector to the meter.
NOTE
The maximum supported length of the RS485 cable is 1000 meters.
Inline Energy Meter with SolarEdge Energy Net Communications
24 Installing and Connecting the Inline Meter
To wire the inverter's RS485 connection:
1. Prepare to connect to one of the available RS485 ports of the device, as shown
below:
Inverter RS485-1. Pull out the RS485 connector located on the communication
board.
Figure 16: Inverter RS485 connectors
2. Connect the meter's RS485 B, A, and G connectors to the B, A, and G connecters in
the inverter.
3. If the inverter is at the end of the RS485 bus, terminate the bus by switching a
termination DIP switch inside the inverter to ON (top position).
NOTE
For StorEdge inverters, set a termination DIP switch inside the inverter to
OFF.
Figure 17: RS485 termination switch on inverter
Chapter 2: Meter Installation 25
Inline Energy Meter with SolarEdge Energy Net Communications
Chapter 3: Configuration
SolarEdge Device Firmware Version
To ensure proper communication with the inline meter, make sure that the inverter
communication board firmware (CPU) version is up-to-date.
NOTE
If the inverter uses an earlier firmware version, it will automatically upgrade the CPU
to the required version upon connection of the inverter to SetApp. In the event that
an upgrade is required, open SetApp, making sure that your smart phone has an
Internet connection. This will enable it to download the most up-to-date CPU version.
To check the inverter CPU version using SetApp:
1. Select Commissioning è Information to view the CPU Version.
Information
CPU Version
4.13.xx
DSP1 Version
1.0210.1066
DSP2 Version
2.0052.0410
Serial Number
7Fxxxxxx-yy
Hardware IDs
›
Error Log
›
Warning Log
›
Inline Energy Meter with SolarEdge Energy Net Communications
26 Chapter 3: Configuration
This section describes basic configuration of SolarEdge inverters for use of the inline
meter. In addition, a configuration that is specific to the application being used is
required in some cases. Refer to the following documents:
Export Limitation - https://www.solaredge.com/sites/default/files/feed-in_
limitation_application_note.pdf
To configure two connected meters, refer to Installing Multiple Meters on page 39.
NOTE
Calculated meter readings, such as self-consumption, are calculated using the
data measured by the inline meter and the inverters. Calculated meter
readings are only sent when Energy Manager is enabled (for details refer to:
https://www.solaredge.com/sites/default/files/feed-in_limitation_application_
note.pdf).
Chapter 3: Configuration 27
Inline Energy Meter with SolarEdge Energy Net Communications
Device Configuration using SetApp
Configuring the Inline Meter Connection using SetApp
To configure the inline meter for RS485 communication using SetApp:
1. From the SetApp main menu, select Site Communication, and select the port to
which the inline meter is connected - RS485-1 or RS485-2.
2. Select Protocol >> Modbus (Multi-Device)
3. Return to the RS485-x Menu and select Add Modbus Device >> Meter. A meter
identified as "Meter n" (where n = 1, 2, 3...) is created. The RS485-x Menu reappears.
4. Select Meter n. The RS485-x Meter n Menu appears.
5. Select Device ID and enter the Modbus address corresponding to the inline meter's
Modbus address. You can view and change the meter's Modbus address using the
meter's display and push buttons. Refer to Inline Meter Display Screen Operation on
page 31.
6. Select Meter Function, and choose one of the following options:
Inverter Production: The inline meter is installed at the inverter output and reads
the energy produced by the inverter (valid for version 4.14.xx and above).
Export+Import: The inline meter is installed at the grid connection point and
reads both export and import energy.
Consumption: The inline meter is installed at the load consumption point and
reads the energy consumed by the site.
Site Production: The inline meter is installed at the inverter output and reads the
energy produced by inverters at the site (valid for version 4.14.xx and above).
Ext. Production: The inline meter is used for export limitation with 3rd party
generators and for AC coupling with non-SolarEdge inverters (valid for version
4.14.xx and above).
7. Select AC-Grid Connection (Top / Bottom) and specify whether the AC grid is
connected to the upper terminal blocks or the bottom terminal blocks.
Inline Energy Meter with SolarEdge Energy Net Communications
28 Device Configuration
Configuring the Inline Meter Connection using the SetApp Device Manager
To configure the inline meter for Energy Net communication using the SetApp
Device Manager:
1. From the SetApp Commissioning menu, select Device Manager.
2. From the Device Manager's New Devices page, select Inline Meter >> Configure.
3. Select Meter Function, and choose one of the options listed in step 5 of To
configure the inline meter for RS485 communication using SetApp: on page 28. If
the "Production" function was selected, enter the Serial Number of the inverter to
be metered.
4. Select AC-Grid Connection (Top / Bottom), and specify whether AC inputs are
connected to the upper terminal blocks or the bottom terminal blocks.
5. To complete the configuration, select Set and View Status to view inline meter
status details.
Notes:
During the SetApp Device Manager's operation, the inline meter's blue LED will blink
rapidly, signaling that the meter is being configured.
If the AC grid is connected to the upper terminal blocks, the meter accuracy is 1%
(Class B). If the AC grid is connected to the lower terminal blocks, the meter
accuracy is 2% (Class A).
Once powered on, the inline meter will search for an Energy Net network to join, for
up to 48 hours. After 48 hours, the meter will stop searching for a network. Push the
Up and Down buttons simultaneously for 5 seconds in order to initiate another
search session.
Push the Up and Down buttons simultaneously for 5 seconds in the following cases:
When a new communications board is installed in the inverter
When connecting to a new inverter
When switching from RS485 configuration to Energy Net
To switch connectivity from RS485 to Energy Net, use SetApp to remove the RS485
meter from the connected device list. Push the Up and Down buttons
simultaneously for 5 seconds in order to initiate Energy Net search session. Use the
SetApp Device Manager to connect the meter to the inverter (see To configure the
Chapter 3: Configuration 29
Inline Energy Meter with SolarEdge Energy Net Communications
inline meter for Energy Net communication using the SetApp Device Manager: on
page 29).
To switch connectivity from Energy Net to RS485, use SetApp to remove the Energy
Net meter from the connected device list. Connect the RS485 cable and use SetApp
to configure the meter (see To configure the inline meter for RS485 communication
using SetApp: on page 28).
Inline Energy Meter with SolarEdge Energy Net Communications
30 Device Configuration
Inline Meter Display Screen Operation
The inline meter supports initial meter configuration and operations using the meter's
display screen and push buttons. To change settings, unlock the meter using the "1231"
password. Supported operations include:
Factory reset. Resetting the meter's configuration parameters and energy counter to
factory default values.
The main screen displays export and import power readings, as shown in the figure
below.
Figure 18: Display Screen Export and Import Power Readings
MODBUS ID - This operation is used to set the inline meter's expected Modbus ID.
The Modbus ID should match the meter's Modbus ID as configured in SetApp.
Select RS485 Term to set the inline meter's RS485 termination (120 ohm) to ON or
OFF (default = ON).
Select Info to view the inline meter's firmware version.
The Inline Meter display screen automatically returns to the default Export/Import
Energy Values screen following 30 seconds of inactivity. When the default screen is
displayed, the display screen shuts down following 120 seconds of inactivity. Press any
key to light the display.
A guide to display screen navigation appears in the figure below.
Chapter 3: Configuration 31
Inline Energy Meter with SolarEdge Energy Net Communications
Figure 19: Display Screen Navigation
Inline Energy Meter with SolarEdge Energy Net Communications
32 Device Configuration
Verifying the Inline Meter Connection
Verifying the Inline Meter Connection using SetApp
To verify the inline meter connection using SetApp:
1. From the SetApp main menu, select Status.
2. If the inline meter is connected to the inverter via RS485:
On the Status page, scroll down to the Communication status section. Check that
one or more meters is connected to the RS485-1 or RS485-2 bus.
Communication
LAN
Connected
RS485-1
Modbus
2 of 2
RS485-2
SE Follower
None
Cellular
N/A
Wi-Fi
NC
ZigBee
NC
3. Continue scrolling to the Meters section. If there is more than one meter/function,
there is a status sub-section for each one. An example appears below. The following
information is displayed:
Type and function: Displays the function performed by the inline meter.
Status:
Displays 'OK' if the meter is communicating with the inverter.
: If an internal error occurs in the meter, it will be displayed
here. To resolve the error, refer to Troubleshooting Meter Connection on
page 36.
Power: The total power read by the meter
Energy: The total energy read by the meter
Chapter 3: Configuration 33
Inline Energy Meter with SolarEdge Energy Net Communications
Modbus ID #2
Status
OK
Power
7.60 kW
Energy
13.68MWh
Export Meter
SN: XXXXXXXX
GPIO S0 meter
1000 pulses per kWh
Power
7.60 kW
Energy
13.68MWh
Inline Energy Meter with SolarEdge Energy Net Communications
34 Device Configuration
Verifying the Meter Connection using SetApp When Connected via Energy
Net
To verify the inline meter connection using the SetApp Device Manager:
1. From the SetApp Commissioning menu, select Device Manager.
2. On the Device Manager page, select a specific meter (in case there is more than one
meter installed). The following information is displayed:
Meter Function: Displays the function performed by the inline meter.
Communication Type: The method of communication with the inverter - either
SolarEdge Energy Net (wireless) or RS485 (wired).
Serial Number: The serial number of the inline meter.
Power: The total power read by the meter.
Energy: The total energy read by the meter.
FW Version: The inline meter's firmware version.
Address: The SolarEdge Energy Net network address, or Modbus ID.
3. Select View Status to view meter status details:
Per phase: current, voltage, power
Total power and energy values
If the export/import metering function is in use, an arrow indicates the
instantaneous energy direction flow, per phase.
4. Additional options:
Remove Device: Select to delete the meter.
More Information: Select to receive additional operational guidance regarding
the meter.
Chapter 3: Configuration 35
Inline Energy Meter with SolarEdge Energy Net Communications
Appendix A: Troubleshooting Meter
Connection
This section describes how to troubleshoot meter-related installation and performance
errors.
For troubleshooting dual-meter connections, refer to Installing Multiple Meters on
page 39.
Troubleshooting the Meter using SetApp
Power Failure
If the inline meter does not power on, check the following:
Make sure that the main circuit breaker is switched to ON.
If the inline meter is functioning as a three phase meter in a single phase grid:
Make sure that the phase AC line is connected to the L3 connector on the meter.
Make sure that the neutral AC line is connected to the N connector on the meter.
Communications Failure
The following are indications of a connectivity failure between the inverter and the
meter:
If NC (not connected) appears for a meter in the RS485-1 or RS485-2 sub sections of
the Communication page.
Communication
LAN
Connected
RS485-1
Modbus
2 of 2
RS485-2
SE Follower
None
Cellular
N/A
Wi-Fi
NC
ZigBee
NC
If the following error message appears in the bottom left-hand corner of the
Inverters section of the Status page: "Error 3x6E: Meter Comm. Error"
If the status in the Meters section of the Status page is "Comm. Error"
Inline Energy Meter with SolarEdge Energy Net Communications
36 Appendix A: Troubleshooting Meter Connection
Modbus ID #2
Status
Comm. Error
Power
7.60 kW
Energy
8.42 MWh
If the inline meter is not detected by Energy Net, "New Device" will not appear in
SetApp under "Device Manager" in the Commissioning page.
If a connectivity failure occurs, check the following:
If Energy Net is employed:
Make sure that an Energy Net module (see Energy Net Support on page 14) and
an external antenna are installed in the inverter.
If the inline meter is installed in a metal cabinet, or you suspect that there is a
range issue, an external antenna for the meter may be required (see the appendix
Supplemental Documentation on page 43).
If RS485 wiring is used to connect the meter and the inverter, check that the wiring
is in accordance with the guidelines in To wire the inverter's RS485 connection: on
page 25
Check that the meter is configured as required in the chapter "Configuration" on
page 26.
Check for water damage or sealing problems:
Inspect the entire conduit run for possible points of water penetration, and fix
leaks.
Ensure that proper outdoor rated components are used.
Use a Voltmeter to measure the voltage on the meter's AC wiring. The L1 – L2 – L3
line to line voltage should be 208-240 Vac.
The Energy value is not advancing
Make sure the correct meter function is selected.
Make sure that the AC Grid Connection is configured correctly.
Appendix A: Troubleshooting Meter Connection 37
Inline Energy Meter with SolarEdge Energy Net Communications
Check the Energy value in the Meters section of the Status page, as shown in the figure
below:
Meters
Export Meter
RS485-1
Modbus ID #2
Status
Comm. Error
Power
7.60 kW
Energy
8.42 MWh
If the Energy [in MWh] value displays a steady value even though the the site is
consuming power, check the following:
There are no loose connections at the inverter connectors and at the meter,
specifically the AC wiring on the meter's AC wiring connector.
Check for water damage or sealing problems:
Inspect the entire conduit run for possible points of water penetration, and fix
leaks.
Ensure that proper outdoor rated components are used.
Inline Energy Meter with SolarEdge Energy Net Communications
38 Troubleshooting the Meter using SetApp
Appendix B: Installing Multiple Meters
You can connect up to three meters on the same RS485 bus and over SolarEdge Energy
Net.
To connect two meters, install two wires into each screw terminal by twisting the wires
together, inserting them into terminal, and securely tightening. RS485 wiring is daisy-
chained between meters, as described in the following figure:
Figure 20: RS485 chain of meters
Connecting Two Meters
To connect the inline meter and an additional meter to the inverter on the same
RS485 bus:
1. Connect the twisted pair wiring to the meters as shown in the figure above.
2. Wire the RS485 connections between the meters and the inverter.
3. For a SolarEdge energy meter with Modbus connection, set the 120 ohm termination
DIP switches as follows.
a. If the meter is the closest to the inverter, the meter should be set for No
Termination. Both switch 1 and switch 2 should be in the UP position.
b. If the meter is the furthest from the inverter, the meter should be set for
Termination. Both switch 1 and switch 2 should be in DOWN position.
4. Set Modbus IDs to available addresses as follows:
a. For Modbus energy meters, set the address using the DIP switches.
b. For inline meters, set the address using the meter's LCD display and buttons.
Appendix B: Installing Multiple Meters 39
Inline Energy Meter with SolarEdge Energy Net Communications
Configuring the Dual-Meter Connection
Configuring Dual-Meter Connection Using SetApp
In the sample configuration described below, a SolarEdge energy meter with Modbus
connection is configured as a production meter, and is set to address 1, while an inline
meter is configured as an export/import meter, and is set to address 2.
To configure the SolarEdge energy meter with Modbus connection using SetApp:
1. Verify that the meter at address 1 is configured as a production meter. From the
SetApp main menu, select Communication è RS485-x è Meter 1
2. Verify the value of the following parameters:
Meter Function è Inverter Production
Protocol è SolarEdge
Device ID è 1
3. Select Meter 2 to configure the export/import meter in the following steps:
4. Select Meter Function, and select Export+Import.
5. Set the inline meter's Modbus ID to address 2.
Verifying Meter Connections
Verifying the Meter Connections using SetApp
To verify the connectivity of two meters using SetApp, refer to Verifying the Inline
Meter Connection using SetApp on page 33
Troubleshooting Dual-Meter Connections
Troubleshooting Dual-Meter Connections using SetApp
To troubleshoot the connectivity of two meters using SetApp, refer to Troubleshooting
the Meter using SetApp on page 36
Inline Energy Meter with SolarEdge Energy Net Communications
40 Configuring the Dual-Meter Connection
Appendix C: Monitoring Platform - Meter Data
If your device is connected to the SolarEdge server, you can view the meter’s readings
in the monitoring platform. Verify that the meter type is set correctly in the Admin page
> Logical Layout > Meter details:
Figure 21: Setting the Meter details in the monitoring platform
Calculated meter readings (also referred to as "virtual meters"), such as self-
consumption, are calculated using the data measured by the meter and the inverters.
The data from the inverters and from installed meters is displayed in the Dashboard and
Charts tabs of the monitoring platform. The displayed data depends on the meter(s)
location: grid connection point (export), or load consumption point (consumption).
The following tables detail the displayed information per meter location.
Appendix C: Monitoring Platform - Meter Data 41
Inline Energy Meter with SolarEdge Energy Net Communications
No meter installed:
Data
Displayed in
Monitoring Dashboard
Displayed in
Monitoring Charts
Production (inverter/site)
a
a
Consumption
X
X
Self-consumption
X
X
Export
X
X
Import
X
X
Export meter:
Data
Displayed in
Monitoring Dashboard
Displayed in
Monitoring Charts
Production (inverter/site)
a
a
Consumption
a(calculated)
a(calculated)
Self-consumption
a(calculated)
a(calculated)
Export
X
a
Import
X
a
Consumption meter:
Data
Displayed in
Monitoring Dashboard
Displayed in
Monitoring Charts
Production (inverter/site)
a
a
Consumption
a
a
Self-consumption
a(calculated)
a(calculated)
Export
X
a(calculated)
Import
X
a(calculated)
Inline Energy Meter with SolarEdge Energy Net Communications
42 Appendix C: Monitoring Platform - Meter Data
Appendix D: Supplemental Documentation
Inline Energy Meter with SolarEdge Energy Net Communications
For complete technical specifications, see the following datasheet:
https://www.solaredge.com/sites/default/files/se-Inline-
energy-meter-datasheet.pdf
For installation guidelines on the inline meter's external antenna kit, see the following
installation guide:
https://www.solaredge.com/sites/default/files/se-inline-
energy-meter-antenna-installation.pdf
Appendix D: Supplemental Documentation 43
Inline Energy Meter with SolarEdge Energy Net Communications
Support Contact Information
If you have technical problems concerning SolarEdge products, please contact us:
https://www.solaredge.com/service/support
Before contact, make sure to have the following information at hand:
Model and serial number of the product in question.
The error indicated on the SetApp mobile application, on the monitoring platform,
or by the LEDs, if there is such an indication.
System configuration information, including the type and number of modules
connected and the number and length of strings.
The communication method to the SolarEdge server, if the site is connected.
The product's software version as it appears in the status screen.
Inline Energy Meter with SolarEdge Energy Net Communications
44 Support Contact Information