UTICA BOILERS UBSSC-299 Installation, Operation & Maintenance Manual

File Specifications

Brand: UTICA BOILERS
Category: Boiler
Model: UBSSC-299 (Installation, Operation & Maintenance Manual), prIW5.1O5DMHE
File Info: Adobe Acrobat PDF (DjVu)
File Size:
Pages: 88 pages

Download PDF

Download UTICA BOILERS UBSSC-299 Manual (88 pages)

Read Online:

Read the UTICA BOILERS UBSSC-299 Installation, Operation & Maintenance Manual online using the built-in PDF viewer. This document explains how to operate the device, adjust settings and perform regular maintenance.

Key Pages of Document

- Lo-ckut Alarm

A O 1 lgnit error Install Enter the Installer Menu and place the boiler into test mode in high fire. Once the boiler starts, go to the boiler status screen and monitor the flame signal. Is the flame signal greater than 7.0uA when running on hi h fire? YES Has gas valve been adjusted per instructions? YES Check vent termination for proper consideration of wind effects Is this boiler to run with propane gas? Is this a new boiler on first startup? YES Is the Gas Shutoff Valve closed? YES Open gas shutoff valves Reset the boiler by Check all wires including the igniter and flam ...

13 - TROUBLE SHOOTING

Is harness plugged into Return Temperature Sensor? Is harness plugged into Control Module J5? _ P _ _ _ Blocking Error E 5 2 Return Sens Open Replace Return Temperature Sensor Replace Control Module Check continuity of brown wires between Return Temperature Sensor and Control Module J5-4 and J5-12 Continuity? Measure Return Temperature Sensor resistance with digital meter. Estimate Sensor temperature. Do temperature and resistance fall within ranges shown in chart? Replace Wires 50 to 90 10 to 32 9K to 24K ohms 150 to 200 90 to 130 °F °C Resistance 130 to 15 ...

13 - TROUBLE SHOOTING

Error shows when safety circuit is open. Remove J13 connector from control module. Check for continuity between two pins connected to two pink wires, is continuity available? YES NO Replace Control Module Boiler fired without enough water flow through heat exchanger. Heat exchanger is over heated. Either high limit or heat exchanger temperature switch is open. Check the following: • Air in system? • Verify water flow in system piping • Flush system if water is dirty. Is boiler supply pipe (above heat exchanger) hot? Wait for boiler to cool down. YES NO Replace Br ...

Vent shall not terminate directly above paved

sidewalk or paved driveway located between two single-family dwellings serving both dwellings. 7' (2.1m) Minimum 3' (914mm) Minimum Termination Stones, Balls, Etc. Position combustion air and vent termination where it will NOT be damaged by foreign objects, such as stones, balls, etc. People or Pets Locate combustion air and vent termination to prevent accidental contact with people or pets. Eddy, Flue Gases Position termination so it will not be effected by wind eddy, air born leaves, snow, or recirculated vent gases. ...

UTICA BOILERS UBSSC-299 user guide recommended for: MAC-205, CHB-100, BC3D, MAH-100, MACF-150.

⚠️ Download Safety

The Boiler Installation, operation & maintenance manual (88 pages) is completely safe to download (last scan date: 07/03/2026).

Related PDF Instructions for UTICA BOILERS UBSSC-299:

Boiler Equipment: Frequently Requested

Have some Questions about UTICA BOILERS UBSSC-299 Device?

Get valuable and actionable advices from other UTICA BOILERS UBSSC-299 device users. Describe your problem or question, regarding the using of UBSSC-299, in as much detail as possible, and other users will be able to answer you.