Installation booklet
CIRCULAR SERIES WH45P - 500 Pa / 300 Pa
Cert. N° 1812-CPR-1107 EN 15650
This is a 16 page installation booklet.
www.mp3-italia.it
*1MUBWH45PUEN* rev 19-05
*1MUBWH45PUEN*
www.lindab.com - Fire dampers are manufactured by MP3 Srl www.mp3-italia.it
*1MUBWH45PUEN-LIND* rev 19-05
*1MUBWH45PUEN-LIND*
WH45P
LINDAB SAFE
Fire resistance classification according to EN 13501-3-2009
EI 180 S
(500 Pa)
EI 120 S
(500 Pa)
EI 90 S
(500 Pa)
EI 60 S
(500 Pa)
EI 30 S
(500 Pa)
Rigid wall
EI 90 S Installation within vertical rigid wall
Wall minimum thickness 100 mm
Wall minimum density 500 kg/m³
Plasterboard and rock wool 100 kg/m³ sealing
ve (i↔o)
D
-
-
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
EI 120 S Installation within vertical rigid wall
Wall minimum thickness 100 mm
Wall minimum density 500 kg/m³
Mortar or plaster putty sealing
ve (i↔o)
W
-
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
EI 180 S Installation within vertical rigid wall
Wall minimum thickness 150 mm
Wall minimum density 500 kg/m³
Mortar sealing
ve (i↔o)
W
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
Flexible wall
EI 90 S Installation within vertical light wall (plasterboard)
Wall minimum thickness 100 mm
Wall rock wool density up to 100 kg/m³ (optional)
Plasterboard and rock wool 100 kg/m³ sealing
ve (i↔o)
D
-
-
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
EI 120 S Installation within vertical light wall (plasterboard)
Wall minimum thickness 100 mm
Wall rock wool density up to 100 kg/m³ (optional)
Mortar or plaster putty sealing
ve (i↔o)
W
-
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
EI 90 S Installation within vertical light wall (gypsum blocks wall)
Wall minimum thickness 70 mm
Wall minimum density 995 kg/m³
Plaster putty sealing
ve (i↔o)
W
-
-
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
EI 120 S Installation within vertical light wall (gypsum blocks wall)
Wall minimum thickness 100 mm
Wall minimum density 995 kg/m³
Plaster putty sealing
ve (i↔o)
W
-
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
Floor
EI 90 S Installation within floor
Floor minimum thickness 100 mm
Floor minimum density 650 kg/m³
Mortar sealing
ho (i↔o)
W
-
-
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
EI 120 S Installation within floor
Floor minimum thickness 150 mm
Floor minimum density 650 kg/m³
Mortar sealing
ho (i↔o)
W
-
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
EI 180 S Installation within floor
Floor minimum thickness 150 mm
Floor minimum density 2200 kg/m³
Mortar sealing
ho (i↔o)
W
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
Ø is the minimum and maximum nominal diameter of fire dampers in mm
ve
Vertical installation
ho
Horizontal installation
(i↔o) Origin of fire irrelevant
Pa
Pascal of depression
E
Integrity
I
Thermal insulation
S
Smoke seal
W
Wet method sealing
D
Dry method sealing
Cert. N° 1812-CPR-1107 EN 15650
Fire Batt (Weichschott) sealings
EI 120 S
(300 Pa)
EI 90 S
(300 Pa)
EI 60 S
(300 Pa)
EI 30 S
(300 Pa)
Rigid wall
EI 120 S Installation within vertical rigid wall with Fire Batt (Weichschott) sealing
Wall minimum thickness 100 mm
Wall rock wool minimum density 500 kg/m³
Rock wool 140 kg/m³ and endothermic varnish sealing
ve (i↔o)
W
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
Minimum distance allowed between 2 dampers
200 mm
50 mm
50 mm
50 mm
Flexible wall
EI 120 S Installation within vertical light wall (plasterboard) with Fire Batt (Weichschott) sealing
Wall minimum thickness 100 mm
Wall rock wool density up to 100 kg/m³ (optional)
Rock wool density 140 kg/m³ and endothermic varnish sealing
ve (i↔o)
W
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
Minimum distance allowed between 2 dampers
200 mm
50 mm
50 mm
50 mm
EI 120 S Installation within vertical light wall (gypsum blocks wall) with Fire Batt (Weichschott) sealing
Wall minimum thickness 100 mm
Wall minimum density 995 kg/m³
Rock wool 140 kg/m³ and endothermic varnish sealing
ve (i↔o)
W
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
Minimum distance allowed between 2 dampers
200 mm
50 mm
50 mm
50 mm
Floor
EI 90 S Installation within floor and Fire Batt (Weichschott) sealing
Floor minimum thickness 150 mm
Floor minimum density 650 kg/m³
Rock wool 140 kg/m³ and endothermic varnish sealing
ho (i↔o)
W
-
Ø
min 200
max 800
Ø
min 200
max 800
Ø
min 200
max 800
Minimum distance allowed between 2 dampers
-
200 mm
200 mm
200 mm
Ø is the minimum and maximum nominal diameter of fire dampers in mm
ve
Vertical installation
ho
Horizontal installation
(i↔o) Origin of fire irrelevant
Pa
Pascal of depression
E
Integrity
I
Thermal insulation
S
Smoke seal
W
Wet method sealing
D
Dry method sealing
Cert. N° 1812-CPR-1107 EN 15650
Mechanism type
Manual / Manual with magnet
1.
Manual opening lever
2.
Protection box
3.
Lever position when the blade is open
4.
Lever position when the blade is closed
5.
Magnet knob (for magnetic version)
6.
Closed blade indicator
7.
Open blade indicator
8.
Manual closing button
Blade closing mode
Automatic closing with thermal fuse.
The control mechanism has a thermosensitive element that auto-
matically closes the blade when the temperature in the duct exceeds
70°C (or 95°C for the fire damper with 95°C thermal fuse).
It is possible to close the damper by pressing the indicated button.
If the manual mechanism is equipped with electromagnet it is possi-
ble to remotely close the fire damper.
The manual command mechanism with magnet is equipped with
an electromagnet which, in case power is interrupted (interuption
magnet version) or when power is supplied (input magnet version),
comands the closing of the damper.
Blade opening mode
The damper must be opened when the ventilation system if
switched off.
In case of closed damper by pressing the closing button or remotely
by electromagnet (magnetic version), it is possible to manually open
the fire damper blade by rotating the lever antyclockwise.
For power supply interruption electromagnet, provide power supply
and pull the magnet knob before opening the fire damper.
In case of closed damper as a result of the action of the thermosen-
sitive element, it is possible to manually reopen the damper by rotat-
ing the lever counterclockwise once the element has been replaced.
Position indication microswitches
On request, the fire damper can be supplied with position mi-
croswitches (SA/SC/S2 optional) that signal the blade position (open
or closed). Refer to Electrical connections paragraph for more details.
Closing by remote control
With power supply input or interruption magnet (WH45PM version
only).
Temperature calibration of thermosensitive element for auto-
matic damper closing
70 °C±7 °C (Standard)
95 °C±9 °C (On request).
Belimo motorized version
1.
Manual closing switch
2.
Manual opening lever
3.
Position indicator
4.
Blade locking lever
Blade closing mode
Automatic closing with thermal fuse.
The control mechanism has a thermosensitive element that auto-
matically closes the blade when the temperature in the duct or in
the room exceeds 72°C (or 95°C for the 95°C version).
To close the damper when the motor is connected, press the switch
on the temperature sensor or cut off the power supply.
Blade opening mode
The damper must be opened when the ventilation system if
switched off.
To open the damper with the electric motor driven actuator, provide
power supply to the motor. Refer to the section Electrical connec-
tions for further information.
To manually open the damper, use the handle supplied and carefully
rotate clockwise to the 90° indicator. To hold the damper in open
position operate on the lever indicated in figure.
For VGB/DGB versions to hold the damper in open position, carefully
rotate the handle counterclockwise.
During the manual opening of the damper, power must not be sup-
plied to the motor.
Position indication microswitches
The motorized versions are supplied with two microswitches to
show the blade's position (open or closed). Refer to the section Elec-
trical connections for further information.
Closing by remote control
If power to the motor is cut off, the blade will close.
Temperature calibration of thermosensitive element for auto-
matic damper closing
72 °C±7 °C (Standard)
95 °C±9 °C (On request).
Siemens motorized version
1.
Manual closing switch
2.
Manual opening lever
3.
Screwdriver
4.
Position indicator
Blade closing mode
Automatic closing with thermal fuse.
The control mechanism has a thermosensitive element that auto-
matically closes the blade when the temperature in the duct or in
the room exceeds 72°C (or 95°C for the 95°C version).
To close the damper when the motor is connected, press the switch
on the temperature sensor or cut off the power supply.
Blade opening mode
The damper must be opened when the ventilation system if
switched off.
To open the damper with the electric motor driven actuator, provide
power supply to the motor. Refer to the section Electrical connec-
tions for further information.
To manually open the damper, use the handle supplied and carefully
rotate counterclockwise to the 90 °C indicator. To hold the damp-
er in open position, rotate the screw anticlockwise as shown in the
picture.
During the manual opening of the damper, power must not be sup-
plied to the motor.
Position indication microswitches
The motorized versions are supplied with two microswitches to
show the blade's position (open or closed). Refer to the section Elec-
trical connections for further information.
Closing by remote control
If power to the motor is cut off, the blade will close.
Temperature calibration of thermosensitive element for auto-
matic damper closing
72 °C±7 °C (Standard)
95 °C±9 °C (On request).
ELECTRICAL CONNECTIONS
Electrical wiring
Electrical connections must be done by qualified and trained people.
Switch off the power supply before starting any work on the electric
elements. Never switch on the power supply during electrical con-
nections.
SC (closed damper) microswitch - on request
2.
SA (open damper) microswitch - on request
3.
Magnet - on request
4.
Magnet cables for wiring
SC/SA microswitches position
1.
"NC" contact of SC microswitch. When the fire blade is closed the circuit
is open.
2.
"NO" contact of SC microswitch. When the fire blade is closed the circuit
is closed.
3.
"NC" contact of SA microswitch. When the fire blade is open the circuit is
open.
4.
"NO" contact of SA microswitch. When the fire blade is open the circuit is
closed.
230 V AC magnet wiring
1.
230 V AC power supply
2.
Magnet
3.
Rectifier
24 V DC magnet wiring
1.
24 V DC power supply
2.
Magnet
WH45P - Motorized version
Belimo servomotor:
BFL24T, BFN24T, BF24T, BFL230T, BFN230T, BF230T.
Siemens servomotor:
GRA126, GNA126, GGA126.
Siemens servomotor:
GRA326, GNA326, GGA326.
Motorized fire dampers electical wiring
To connect the dampers to the power supply, proceed as follows:
• Check that the voltage and electrical frequency are equivalent to
those of the motor of the servomotor (check the motor's informa-
tion label);
• Make the connections as shown in the below diagram.
1
Negative (DC) or neutral (AC)
2
Positive (DC) or phase (AC)
3
Phase
4
Neutral
S1 Common closed damper microswitch
S2 Normally closed, closed damper microswitch
S3 Normally opened, closed damper microswitch
S4 Common open damper microswitch
S5 Normally closed, open damper microswitch
S6 Normally opened, open damper microswitch
Electrical specifications
Manual
Manual with magnet
Belimo motorized version
Siemens motorized version
Voltage and power consumption
-
Power interrruption magnet:
P=4,5 W (24V DC or 230 V AC version)
Power input magnet:
P=4,5 W (24V DC or 230 V AC version)
Motor 24V AC/DC (WH45PVMB):
Belimo BFN24T
Opening: 4 W
In stand-by: 1,4 W
Motor 230V AC (WH45PDMB):
Belimo BFN230T
Opening: 5 W
In stand-by: 2,1 W
24V AC/DC (WH45PVGB) motor:
Belimo BF24T
Opening: 7 W
In stand-by: 2 W
230V AC (WH45PDGB) Motor:
Belimo BF230T
Opening: 8 W
In stand-by: 3 W
Motor 24V AC/DC (WH45PVPS) /
(WH45PVSS):
Siemens GNA126 / GRA126
Opening: 3,5 W
In stand-by: 2 W
Motor 230V AC (WH45PDPS) /
(WH45PDSS):
Siemens GNA326 / GRA326
Opening: 4,5 W
In stand-by: 3,5 W
24V AC/DC motor (WH45PVGS):
Siemens GGA126
Opening: 6 W
In stand-by: 1,5 W
230V AC motor (WH45PDGS):
Siemens GGA326
Opening: 6 W
In stand-by: 2,5 W
Microswitches position contacts
Manual control version:
15 - 400V
1,8 A
Motorized version:
Siemens: AC 24V…230V / 6 (2) A
Belimo: DC 5V…AC 250V / 1mA…3A (0,5A)
Blade closing time
Spring: 1 s
motor: < 30 s
Protection degree
IP42
IP42 MAGNETIC VERSION
IP54 MOTORIZED VERSION
S1 blade exposition
mm
0
0
0
0
0
0
S2 blade exposition
mm
0
0
0
0
0
0
Lp
mm
38
57
57
57
60
73
Ø
mm
450
500
560
600
630
710
800
S1 blade exposition
mm
23
49
79
99
114
131
176
S2 blade exposition
mm
0
0
0
0
0
0
38
Lp
mm
73
73
73
73
73
95
95
Lp
Overlap length between fire damper and duct
MAINTENANCE AND INSPECTIONS
Fire dampers and control mechanisms do not require routine main-
tenance.
Extraordinary maintenance (repairs) and periodic inspection opera-
tions are the responsibility of the ventilation system operator.
The implementation of a periodic inspection plan allows to guaran-
tee the efficiency and functionality of the fire dampers for the fire
safety of the building.
Periodic inspection and cleaning
Periodic inspection shall be performed in accordance with the re-
quirements of the law or by the building regulations or other local
regulations.
In the absence of specific regulations (or to their complement), in ac-
cordance with point 8.3 of the EN 1560 standard, it is recommended
to carry out the following control activities at intervals of no more
than 6 months:
• If the damper is connected to a remote control or command sys-
tem (eg BMS or alarm or fire detection), that responds correctly to
commands by performing at least one opening and closing test
and verifying the correct movement of the blade and the correct
functioning of the microswitches (limit switches).
• If the damper is not connected to a remote control or command
system, manually execute an opening and closing test and check
the correct movement of the blade and the correct functioning of
the microswitches (limit switches) if present.
Together with the control activities, it is recommended to visually
verify the absence of corrosion, the integrity of the electrical wiring
and the sealing of the construction support.
Damper cleaning is included in the ordinary maintenance activities
of the ventilation ducts.
Fire dampers can be cleaned with a dry or wet cloth.
In the case of resistant dirt, it is possible to use normal household
detergents.
If prescribed for the type of building, it is possible to use disinfectant
detergents.
The use of detergents or mechanical abrasive cleaning systems is not
permitted.
These indications comply with the standards EN 15650 annex D and
EN 15423 annex C.
Repair
For safety reasons, repair activities involving fire-fighting compo-
nents must be carried out only by qualified personnel.
Only original spare parts supplied by the fire damper manufacturer
must be used.
A functional test must be performed after each repair.
.
At the end of the inspection, cleaning or repair operations, check that
the fire damper is in the normal operating position.
Keep records of all inspections, repair activities, any problems en-
countered and their resolution.
This practice, even when not mandatory, is very useful in practice.
Disposal
Disposal in case of destruction must be carried out in accordance
with national legislation. For electrical and electronic parts also refer
to EU Directive 2011/65.
The sizes shown are in mm.
It is recommended to perform a functional test before Installation to
exclude possible damage during transport and another test immedi-
ately after installation to exclude accidental damage to the product
and interference with mounting components.
Positioning brackets before fixing
1.
Positioning brackets
Blade rotation axis positioning
The fire damper can be installed with the blade axis positioned verti-
cally or horizontally or tilted at any angle.
Installation of flexible connectors in order to balance out the
ventilation ducts expansion
CAUTION: Refer anyway to law and national standardization.
Flexible connectors compensate any duct thermal expansion and
wall bending in case of fire.
Flexible connectors are used to limit fire damper stresses due to ex-
ternal forces in case of fire and to preserve fire resistance class.
In general it is always appropriate the use of flexible connectors for
the followings installations:
– light walls;
– Plasterboard and rock wool or Fire Batt (Weichschott) sealing;
– Applique fixing system.
Flexible connector must be normal flammability and in case of fire
the grounding bonding should disconnet to guarantee the com-
plete separation between fire damper and connected air duct.
When flexible connectors made of conductive material (e.g. alumi-
num) are used, no additional grounding bonding is required.
Despite flexible connector installation, the fire damper must be in-
stalled in the construction support so that its weight does not affect
damper’s installation position both during normal operation and in
case of fire.
It is recommended not to compress flexible connectors in the in-
stallation phase.
Flexible connector must be at least 100mm long and in order that
possible duct thermal expansions are balanced.
Take care that the flexible connector does not interfer with opening
/ closing movement of the blade.
Transfer Application (application not connected to air ducts on
one or both sides)
Following tests performed as per EN 1366-2, section 6.3.6 Standard,
it is possible to install the fire damper free from air duct from one or
both sides.
• Attention: fire resistance classification for transfer application is
conform to section Fire resistance classification according to EN
13501-3-2009 limited to EI 90S if the ducted classification is higher.
• End cap with mesh shall be mounted on the side not connected
to air duct.
• End cap with mesh is made from galvanized steel sheet.
• End cap with mesh is supplied loose from the fire damper.
Components (Transfer Application)
1.
End cap with mesh (to fix to fire damper with steel screws)
2.
Fire damper
Technical data (Transfer Application)
1.
Mechanism side
2.
Mechanism opposite side
3.
End cap with mesh
L1 End cap length mechanism side
L2 End cap length mechanism opposite side
Ø
Fire damper nominal diameter
Length of end cap with mesh depending on fire damper di-
ameter Ø.
Ø
L1
L2
200
40
40
250
60
60
300
60
60
315
60
60
355
60
80
400
80
100
450
80
120
500
80
120
560
80
170
600
80
210
630
80
210
710
120
290
800
170
290
Ø
Fire damper nominal diameter
L1
End cap length mechanism side
L2
End cap length mechanism opposite side
Minimum distances
It is recommended to keep enough space for using the control
mechanism or for maintenance.
In accordance with Articles 7 and 13 of EN 1366-2 respect the mini-
mum distances indicated below.
Minimum distances
1.
Side vertical wall
2.
Floor
a.
Distance between fire dampers installed within vertical wall
b.
Distance between fire damper and vertical lateral wall / floor
c.
Distance between fire dampers installed within floor
d.
Distance between fire damper and vertical lateral wall
Fire dampers installed within vertical wall
Fire dampers installed within floor
Installation
a [mm]
b [mm]
c [mm]
d [mm]
Rigid wall
EI 180 S Installation within vertical rigid wall
Mortar sealing
50
75
-
-
EI 120 S Installation within vertical rigid wall
Mortar or plaster putty sealing
50
75
-
-
EI 90 S Installation within vertical rigid wall
Plasterboard and rock wool 100 kg/m³ sealing
50
75
-
-
Flexible wall
EI 120 S Installation within vertical light wall
(plasterboard)
Mortar or plaster putty sealing
50
75
-
-
EI 90 S Installation within vertical light wall
(plasterboard)
Plasterboard and rock wool 100 kg/m³ sealing
50
75
-
-
EI 120 S Installation within vertical light wall (gypsum
blocks wall)
Plaster putty sealing
50
75
-
-
EI 90 S Installation within vertical light wall (gypsum
blocks wall)
Plaster putty sealing
50
75
-
-
Floor
EI 180 S Installation within floor
Mortar sealing
-
-
50
75
EI 120 S Installation within floor
Mortar sealing
-
-
50
75
EI 90 S Installation within floor
Mortar sealing
-
-
50
75
Fire Batt (Weichschott) sealings
Fire dampers installed within vertical wall
Fire dampers installed within floor
Installation
a [mm]
b [mm]
c [mm]
d [mm]
Rigid
wall
EI 120 S Installation within vertical rigid wall with Fire
Batt (Weichschott) sealing
Rock wool 140 kg/m³ and endothermic varnish sealing
50 *
50
-
-
Flexible wall
EI 120 S Installation within vertical light wall
(plasterboard) with Fire Batt (Weichschott) sealing
Rock wool 140 kg/m³ and endothermic varnish sealing
50 *
50
-
-
EI 120 S Installation within vertical light wall (gypsum
blocks wall) with Fire Batt (Weichschott) sealing
Rock wool 140 kg/m³ and endothermic varnish sealing
50 *
50
-
-
Floor
EI 90 S Installation within floor and Fire Batt
(Weichschott) sealing
Rock wool 140 kg/m³ and endothermic varnish sealing
-
-
200
75
* For the distance a including between 50 mm and 200 mm the fire resistance class is reduced to EI
90 S
Construction supports characteristics
The European standard for fire dampers foresees a precise correlation
between the wall/floor characteristics and the fire resistance class
obtained, as well as the correlation between wall/floor used for the
test and wall/floor used for the actual installation.
The test results obtained on a type of wall/floor are valid also for
walls/floor of the same type but with greater thickness and/or densi-
ty than those used in the test.
For plasterboard walls, the test results are also valid for walls with a
greater number of plasterboard layers on each side.
As a result, the indicated thickness and density characteristics are to
be considered as minimum values.
The wall/floor in which the fire dampers are installed must be fire
class certified according to the standards foreseen for the structure.
Rigid walls
Can be made with aerated concrete blocks, poured concrete, con-
crete panels, perforated cell elements in concrete or brick in accord-
ance with the following characteristics:
• minimum thickness 100 mm;
• minimum density 500 kg/m³.
The use of a reinforcing beam above the opening is recommended
for walls made from concrete blocks, bricks or in concrete cell ele-
ments.
For walls built with perforated elements, it is also recommended that
the area of the opening be made from full elements (for example
aerated concrete blocks) to guarantee the correct adhesion of the
mortar.
1.
Reinforcing beam
Light plasterboard vertical walls
During testing, light plasterboard walls have been used with the fol-
lowing characteristics:
• U-shaped horizontal metal frame (50 mm) and C-shaped vertical
frame (49 mm) made from 0,6 mm thick sheet metal;
• Vertical profiles placed with a maximum spacing of 625 mm be-
tween each other;
• Filling made of rock wool with density up to 100 kg/m³ (optional);
• Each side is made from two plasterboard layers 12,5 mm thick, un-
alinged to avoid alignment between the joints of the layer above
and below.
The following indications are given for the installation walls:
• metal profiles minimum width: 49 mm;
• metal profiles minimum thickness: 0,6 mm;
• vertical profiles placed with a maximum spacing of 625 mm be-
tween each other;
• vertical profile fixing with selfthreading screws or by clinching to
the bottom horizontal profile and insertion in the top horizontal
profile;
• profiles fixed using self-threading screws or by clinching on every
intersection.
• installation of a frame around the damper with base and height
where shown in the installation instructions;
• Filling made of rock wool with density up to 100 kg/m³ (optional);
• each side is made from two plasterboard layers 12,5 mm minu-
mum thick, unalinged to avoid alignment between the joints of
the layer above and below.
• the front plasterboards layers are fixed using long enough screws
to pass through the lower plasterboard and attach to the steel pro-
file underneath.
1.
Plasterboard thickness 12,5 mm
2.
Rock wool density up to 100 kg/m³ (optional)
3.
Horizontal U-shaped profile
4.
Vertical C-shaped profile
5.
Self-drilling screw Ø 3,5 X 25 mm
6.
Self-drilling screw Ø 3,5 X 35 mm
Gypsum blocks light walls
Gypsum blocks wall can be built with special solid gypsum blocks
with interlocking shaped edges as indicated in the supplier's instruc-
tions and according to the following characteristics:
• minimum thickness 70 or 100 mm according to the type and re-
sistance class required;
• minimum density 995 kg/m³.
It is generally advisable to first build the wall and then provide the
opening for the fire damper.
Aerated concrete floors
Aerated concrete floors can be built during installation or with pre-
formed slabs with interlocking shaped edges according to the fol-
lowing characteristics:
• minimum thickness 100 or 150 mm according to the type and re-
sistance class required;
• minimum density 650 kg/m³
Poured concrete floors
Poured concrete floors can be built during installation or with pre-
formed slabs with interlocking shaped edges according to the fol-
lowing characteristics:
• minimum thickness 100 or 150 mm according to the resistance
class required;
• minimum density 2200 kg/m³.
Installations within vertical rigid wall
Refer to the section Construction supports characteristics for further
information.
Comply with the minimum distances indicated on section Minimum
distances
Wall opening
A opening must be provided in the wall as indicated in the table and
in the drawing
Damper positioning
Position the damper in the opening so that the side of the closing
mechanism extends as indicated in the table and in the drawing.
Filling
Fill the space between the wall and the damper as indicated in the
table and in the drawing.
Fire resistance classification
“D” hole size
[mm]
Damper protrusion from
the wall “E”
[mm]
Wall minimum thickness “S”
[mm]
Sealing
EI 90 S Installation within vertical rigid wall
Wall minimum density 500 kg/m³
EI 90 S
(500 Pa)
Da (Ø + 35) x (Ø + 35)
a (B+50) x (H+50)
(square hole)
215 + Lp
100
Rock wool 100 kg/m³
with infill plasterboard
(thickness 12.5 mm)
EI 120 S Installation within vertical rigid wall
Wall minimum density 500 kg/m³
EI 120 S
(500 Pa)
From Ø + 25
to Ø + 580
(circular hole)
215 + Lp
100
Mortar or plaster putty
sealing
EI 180 S Installation within vertical rigid wall
Wall minimum density 500 kg/m³
EI 180 S
(500 Pa)
From Ø + 25
to Ø + 35
(circular hole)
190 + Lp
100
Mortar sealing
EI 90 S Installation within vertical rigid wall
1.
Rock wool, 100 kg/m³
2.
Plasterboard arch infill, thickness 12,5 mm
3.
Self-drilling screw Ø 3,5 X 45 mm
D
Hole size: see table above
E
Damper protrusion from the wall: see table above
Lp Overlap length between fire damper and duct: see section Dimension
EI 120 S / EI 180 S Installations within vertical rigid wall
1.
Sealing indicated in the table
D
Hole size: see table above
S
Wall minimum thickness: see table above
E
Damper protrusion from the wall: see table above
Lp Overlap length between fire damper and duct: see section Dimension
Installations within vertical light wall (plasterboard)
Refer to the section Construction supports characteristics for further
information.
Comply with the minimum distances indicated on section Minimum
distances
Wall opening
A opening must be provided in the wall as indicated in the table and
in the drawing
Damper positioning
Position the damper in the opening so that the side of the closing
mechanism extends as indicated in the table and in the drawing.
Filling
Fill the space between the wall and the damper as indicated in the
table and in the drawing.
Fire resistance classification
“D” hole size
[mm]
Damper protrusion from
the wall “E”
[mm]
Wall minimum thickness “S”
[mm]
Sealing
EI 90 S Installation within vertical light wall (plasterboard)
Wall rock wool density up to 100 kg/
m³ (optional)
EI 90 S
(500 Pa)
Da (Ø + 35) x (Ø + 35)
a (B+50) x (H+50)
(square hole)
215 + Lp
100
Rock wool 100 kg/m³
with infill plasterboard
(thickness 12.5 mm)
EI 120 S Installation within vertical light wall (plasterboard)
Wall rock wool density up to 100 kg/
m³ (optional)
EI 120 S
(500 Pa)
Da (Ø + 35) x (Ø + 35)
to (B+580) x (H+580)
(square hole)
215 + Lp
100
Mortar or plaster putty
Rock wool density up to 100 kg/m³ (optional)
2.
Plasterboard arch infill, thickness 12,5 mm for rock wool sealing
3.
Plasterboard thickness 12,5 mm
4.
Sealing indicated in the table
5.
Self-drilling screw Ø 3,5 X 45 mm
6.
Metal frame
D
Hole size: see table above
E
Damper protrusion from the wall: see table above
Lp Overlap length between fire damper and duct: see section Dimension
Installations within vertical light wall (gypsum blocks wall)
Refer to the section Construction supports characteristics for further
information.
Comply with the minimum distances indicated on section Minimum
distances
Wall opening
A opening must be provided in the wall as indicated in the table and
in the drawing
Damper positioning
Position the damper in the opening so that the side of the closing
mechanism extends as indicated in the table and in the drawing.
Filling
Fill the space between the wall and the damper as indicated in the
table and in the drawing.
Fire resistance classification
“D” hole size
[mm]
Damper protrusion from
the wall “E”
[mm]
Wall minimum thickness “S”
[mm]
Sealing
EI 90 S Installation within vertical light wall (gypsum blocks wall)
Wall minimum thickness 70 mm
Wall minimum density 995 kg/m³
Plaster putty sealing
ve (i↔o)
EI 90 S
(500 Pa)
From Ø + 25
to Ø+35
(circular hole)
230 + Lp
70
Plaster putty sealing
EI 120 S Installation within vertical light wall (gypsum blocks wall)
Wall minimum thickness 100 mm
Wall minimum density 995 kg/m³
Plaster putty sealing
ve (i↔o)
EI 120 S
(500 Pa)
From Ø + 25
to Ø+35
(circular hole)
215 + Lp
100
Plaster putty sealing
1.
Plaster putty
D
Hole size: see table above
S
Wall minimum thickness: see table above
E
Damper protrusion from the wall: see table above
Lp Overlap length between fire damper and duct: see section Dimension
Installations within floor
Refer to the section Construction supports characteristics for further
information.
Comply with the minimum distances indicated on section Minimum
distances
Floor opening
A opening must be provided in the floor as indicated in the table
and in the drawing
Damper positioning
Position the damper in the opening so that the side of the closing
mechanism extends as indicated in the table and in the drawing.
Filling
Fill the space between the floor and the damper as indicated in the
table and in the drawing.
Fire resistance classification
“D” hole size
[mm]
Damper protrusion from the
floor “E”
[mm]
Floor minimum thickness “S”
[mm]
Sealing
EI 90 S Installation within floor
Floor minimum density 650 kg/m³
EI 90 S
(500 Pa)
From Ø + 40
to Ø + 55
(circular hole)
215 + Lp
100
Mortar sealing
EI 120 S Installation within floor
Floor minimum density 650 kg/m³
EI 120 S
(500 Pa)
From Ø + 40
to Ø + 55
(circular hole)
190 + Lp
150
Mortar sealing
EI 180 S Installation within floor
Floor minimum density 2200 kg/m³
EI 180 S
(500 Pa)
From Ø + 40
to Ø + 55
(circular hole)
190 + Lp
150
Mortar sealing
1.
Mortar M-10, EN998-2
D
Hole size: see table above
S
Floor minimum thickness: see table above
E
Damper protrusion from the floor: see table above
Lp Overlap length between fire damper and duct: see section Dimension
Installations within vertical wall with Fire Batt (Weichschott) sealing
Refer to the section Construction supports characteristics for further
information.
Comply with the minimum distances indicated on section Minimum
distances
Wall opening
A opening must be provided in the wall as indicated in the table and
in the drawing
Damper positioning
Position the damper in the opening so that the side of the closing
mechanism extends as indicated in the table and in the drawing.
Filling
Fill the space between the damper and the wall using Fire Batt
(Weichschott) sealing made from two rock wool panels with mini-
mum thickness of 50 mm and minimum density of 140 kg/m³.
The panels must be covered on both faces of the wall with endo-
thermic varnish type PROMASTOP E PASTE or HILTI CFS-CT (mini-
mum thickness of 1 mm) and with an internal perimeter sealant type
PROMASTOP E PASTE or HILTI CFS-S ACR (minimum thickness of 1
mm).
Fire resistance classification
“D” hole size
[mm]
Damper protrusion from
the wall “E”
[mm]
Wall minimum thickness “S”
[mm]
Sealing
Rigid wall
EI 120 S Installation within rigid vertical wall with Fire Batt (Weichschott) sealing
Wall minimum density 500
kg/m³
EI 120 S
(300 Pa)
(Ø + 800 max) x (Ø +
800 max)
(rectangular hole)
215 + Lp
100
Rock wool 140 kg/
m³ and endothermic
varnish sealing
Flexible wall
EI 120 S Installation within vertical light wall (plasterboard) with Fire Batt (Weichschott) sealing
Wall rock wool density up to 100
kg/m³ (optional)
EI 120 S
(300 Pa)
(Ø + 800 max) x (Ø +
800 max)
(rectangular hole)
215 + Lp
100
Rock wool 140 kg/
m³ and endothermic
varnish sealing
EI 120 S Installation within vertical light wall (gypsum blocks) with Fire Batt (Weichschott) sealing
Wall minimum density 995
kg/m³
EI 120 S
(300 Pa)
(Ø + 800 max) x (Ø +
800 max)
(rectangular hole)
215 + Lp
100
Rock wool 140 kg/
m³ and endothermic
varnish sealing
1.
Rock wool panel 50 mm thick with 140 kg/m³ density.
2.
PROMASTOP E PASTE or HILTI CFS-S ACR type sealant
3.
PROMASTOP E PASTE or HILTI CFS-CT endothermic varnish
4.
Wall indicated in the table
D
Hole size: see table above
E
Damper protrusion from the wall: see table above
Lp Overlap length between fire damper and duct: see section Dimension
Installation within floor with Fire Batt (Weichschott) sealing
Refer to the section Construction supports characteristics for further
information.
Comply with the minimum distances indicated on section Minimum
distances
Floor opening
A opening must be provided in the floor as indicated in the table
and in the drawing
Damper positioning
Position the damper in the opening so that the side of the closing
mechanism extends as indicated in the table and in the drawing.
Filling
Fill the space between the damper and the floor using Fire Batt
(Weichschott) sealing made from two rock wool panels with mini-
mum thickness of 50 mm and minimum density of 140 kg/m³.
The panels must be covered on both faces of the wall with endo-
thermic varnish type PROMASTOP E PASTE or HILTI CFS-CT (mini-
mum thickness of 1 mm) and with an internal perimeter sealant type
PROMASTOP E PASTE or HILTI CFS-S ACR (minimum thickness of 1
mm).
Fire resistance classification
“D” hole size
[mm]
Damper protrusion from the
floor “E”
[mm]
Floor minimum thickness “S”
[mm]
Sealing
EI 120 S Installation within floor and Fire Batt (Weichschott) sealing
Floor minimum density 650 kg/m³
EI 90 S
(300 Pa)
(Ø + 800 max) x (Ø +
800 max)
215 + Lp
150
Rock wool 140 kg/
m³ and endothermic
varnish sealing
Rock wool panel 50 mm thick with 140 kg/m³ density.
2.
PROMASTOP E PASTE or HILTI CFS-S ACR type sealant
3.
PROMASTOP E PASTE or HILTI CFS-CT endothermic varnish
D
Hole size: see table above
E
Damper protrusion from the wall: see table above
Lp Overlap length between fire damper and duct: see section Dimension