Chauvet Professional GROUND SUPPORT 2 KIT Quick Reference Manual

Text of the manual

QUICK REFERENCE GUIDE

Ground Support 2 Kit QRG Rev. 4 About This Guide The Ground Support 2 Kit Quick Reference Guide (QRG) has basic product information such as setup and mounting diagrams. Download the User Manual from www.chauvetvideo.com for more details. Disclaimer The information and specifications contained in this QRG are subject to change witho

Ground Support 2 Kit QRG Rev. 4

QUICK REFERENCE GUIDE Product Overview Product Dimensions Panel Attachment Arm (x6) Floor Base (x2) Angling Horizontal Bar (x2) Angling 1M Pipe with 2 clamps (x3) 1M Ladder Truss (x6) TR16 Screw Jack (x10) 10.24 ft 3.12 m 3.28 ft 1 m 3.28 ft 1 m

QUICK REFERENCE GUIDE

Ground Support 2 Kit QRG Rev. 4 Setup Before setting this product up, read the Safety Notes. 1. Insert TR16 screw jacks into their corresponding threaded holes on the bottom of the dual-function rig bar (DRB- F50CM or DRB-F100CM; not included with the Ground Support 2 Kit). 2. Align the male speego connector of the floor base with

Ground Support 2 Kit QRG Rev. 4

QUICK REFERENCE GUIDE 3. Turn the tightening nuts on the screw jacks with a 1-inch wrench (or adjustable wrench) to raise or lower the rig bar and floor base until they are both completely level with each other. Verify that they are level with a bubble level tool. 4. Turn the screw jack locking nuts with a 1-inch wrench

Other Racks & Stands Manuals