SolarEdge SE5000H-AU Installation Manual
Text of the manual
EV Charging Single Phase
Inverter
with SetApp Configuration
For Australia
Version 1.2
Copyright © SolarEdge Inc. All rights reserved.
No part of this document may be reproduced, stored in a retrieval system or
transmitted, in any form or by any means, electronic, mechanical, photographic,
magnetic or otherwise, without the prior written permission of SolarEdge Inc.
The material furnished in this document is believed to be accurate and reliable.
However, SolarEdge assumes no responsibility for the use of this material. SolarEdge
reserves the right to make changes to the material at any time and without notice. You
may refer to the SolarEdge web site (www.solaredge.com) for the most updated version.
All company and brand products and service names are trademarks or registered
trademarks of their respective holders.
Patent marking notice: see http://www.solaredge.com/patent
The general terms and conditions of delivery of SolarEdge shall apply.
The content of these documents is continually reviewed and amended, where
necessary. However, discrepancies cannot be excluded. No guarantee is made for the
completeness of these documents.
The images contained in this document are for illustrative purposes only and may vary
depending on product panels.
EV Charging Single Phase Inverter MAN-01-00629-1.2
1 Disclaimers
This equipment has been tested and found to comply with the limits applied by the
local regulations.
These limits are designed to provide reasonable protection against harmful interference
in a residential installation. This equipment generates, uses and can radiate radio
frequency energy and, if not installed and used in accordance with the instructions,
may cause harmful interference to radio communications. However, there is no
guarantee that interference will not occur in a particular installation. If this equipment
does cause harmful interference to radio or television reception, which can be
determined by turning the equipment off and on, you are encouraged to try to correct
the interference by one or more of the following measures:
Reorient or relocate the receiving antenna.
Increase the separation between the equipment and the receiver.
Connect the equipment into an outlet on a circuit different from that to which the
receiver is connected.
Consult the dealer or an experienced radio/TV technician for help.
Changes or modifications not expressly approved by the party responsible for
compliance may void the user’s authority to operate the equipment.
Disclaimers 2
EV Charging Single Phase Inverter MAN-01-00629-1.2
Version 1.2 , September 2019 - Modified circuit breaker values
Version 1.1 , September 2019 - Modified EV charging level 2 to EV charging Mode 3
and added that is also supports socket type 2.
Version 1.0 , August 2019 - first release
EV Charging Single Phase Inverter MAN-01-00629-1.2
3 Emission Compliance
HANDLING AND SAFETY INSTRUCTIONS
6
Safety Symbols Information
6
IMPORTANT SAFETY INSTRUCTIONS
7
Chapter 1: Introducing the SolarEdge Power Harvesting System
10
Power Optimiser
11
EV Carging Single Phase Inverter
11
Monitoring Platform
12
Installation Procedure
13
Installation Equipment List
13
Inverter Transport and Storage
14
EV Charging Safety Instructions
15
Chapter 2: Installing the Power Optimisers
16
Safety
16
Package Contents
17
Installation Guidelines
17
Step 1: Mounting the Power Optimisers
19
Step 2: Connecting Power Optimisers in Strings
20
Step 3: Verifying Proper Power Optimiser Connection
22
Chapter 3: Installing the Inverter
23
Inverter Package Contents
23
Identifying the Inverter
23
Inverter Interfaces
23
Opening Conduit Drill Guides
26
Mounting the Inverter
28
Chapter 4: Connecting the AC and the Strings to the Connection Unit
31
Connecting the Strings to the Connection Unit with Safety Switch
34
Chapter 5: Activating, Commissioning and Configuring the System
36
Step 1: Activating the Installation
36
Step 2: Commissioning and Configuring the Installation
37
Step 3: Verifying Proper Activation and Commissioning
41
Viewing System Status
42
Reporting and Monitoring Installation Data
49
Chapter 6: Setting Up Communication to the Monitoring Platform
52
Communication Options
52
Disclaimers 4
EV Charging Single Phase Inverter MAN-01-00629-1.2
Removing the Inverter Cover
56
Removing the Connection Unit with Safety Switch Cover
56
Creating an Ethernet (LAN) Connection
57
Creating an RS485 Bus Connection
60
Verifying the Connection
63
Chapter 7: Errors and Troubleshooting
64
Identifying Errors
64
EV Charger-related Troubleshooting
65
Troubleshooting Communication
68
Power Optimiser Troubleshooting
70
Appendix A: Replacing and Adding System Components
72
Fuse Replacement
72
Replacing an Inverter
73
Replacing the Connection Unit with Safety Switch
75
Appendix B: Connecting the Energy Meter To the Inverter
78
78
Energy Meter DIP Switches
78
Appendix C: SafeDC™
81
Mechanical Specifications
82
Technical Specifications - EV Charging Single Phase Inverter - (Australia)
83
Inverter Specifications
83
Default Trip Limits and Times According to IEEE1547
85
Recommended OCPD Size per Grid
85
EV Charger and EV Charger Cable Specifications
86
Support Contact Information
88
EV Charging Single Phase Inverter MAN-01-00629-1.2
5 Emission Compliance
HANDLING AND SAFETY INSTRUCTIONS
During installation, testing and inspection, adherence to all the handling and safety
instructions is mandatory. Failure to do so may result in injury or loss of life and
damage to the equipment.
Safety Symbols Information
The following safety symbols are used in this document. Familiarize yourself with the
symbols and their meaning before installing or operating the system.
WARNING!
Denotes a hazard. It calls attention to a procedure that, if not correctly
performed or adhered to, could result in injury or loss of life. Do not proceed
beyond a warning note until the indicated conditions are fully understood and
met.
CAUTION!
Denotes a hazard. It calls attention to a procedure that, if not correctly
performed or adhered to, could result in damage or destruction of the
product. Do not proceed beyond a caution sign until the indicated conditions
are fully understood and met.
NOTE
Denotes additional information about the current subject.
IMPORTANT SAFETY FEATURE
Denotes information about safety issues.
Disposal requirements under the Waste Electrical and Electronic Equipment (WEEE)
regulations:
NOTE
Discard this product according to local regulations or send it back to SolarEdge.
HANDLING AND SAFETY INSTRUCTIONS 6
EV Charging Single Phase Inverter MAN-01-00629-1.2
When using electric products, basic precautions should always be followed,
including the following. This manual contains important instructions that shall
be followed during installation, operation and maintenance of the unit.
a. Read all the instructions before using this product.
b. This device should be supervised when used around children.
c. Do not put fingers into the electric vehicle connector.
d. Do not use this product if the flexible power cord or EV cable is frayed, has
broken insulation, or any other signs of damage.
e. Do not use this product if the enclosure or the EV connector is broken,
cracked, open, or shows any other indication of damage.
1. An insulated grounding conductor that is identical in size, insulation
material, and thickness to the grounded and ungrounded branch-circuit
supply conductors, except that it is green with or without one or more
yellow stripes, shall be installed as part of the branch circuit that supplies the
device or system.
2. The grounding conductor described in item 1 shall be grounded to earth at
the service equipment or, when supplied by a separately derived system, at
the supply transformer.
WARNING!
The inverter cover must be opened only after switching the inverter ON/OFF/P
switch located at the bottom of the inverter to OFF. This disables the DC voltage
inside the inverter. Wait five minutes before opening the cover. Otherwise, there
is a risk of electric shock from energy stored in the capacitors.
EV Charging Single Phase Inverter MAN-01-00629-1.2
7 IMPORTANT SAFETY INSTRUCTIONS
Before operating the inverter, ensure that the inverter AC power cable and wall
outlet are grounded properly. This product must be connected to a grounded,
metal, permanent wiring system, or an equipment-grounding conductor must
be run with the circuit conductors and connected to the equipment grounding
terminal or lead on the product.
WARNING!
Opening the inverter and repairing or testing under power must be performed
only by qualified service personnel familiar with this inverter.
WARNING!
Do not touch the PV panels or any rail system connected when the inverter
switch is ON, unless grounded.
WARNING!
SafeDC complies with IEC60947-3 when installing the system with a worst case
SafeDC voltage (under fault conditions) < 120V.
The worst case voltage is defined as: Voc,max+ (String Length-1)*1V, where:
Voc,max = Maximum Voc (at lowest temperature) of the PV panels in the
string (for a string with multiple panels, use the max value)
String Length = number of power optimisers in the string
CAUTION!
This unit must be operated according to the technical specification datasheet
provided with the unit.
CAUTION!
HEAVY OBJECT. To avoid muscle strain or back injury, use proper lifting
techniques, and if required - a lifting aid.
IMPORTANT SAFETY INSTRUCTIONS 8
EV Charging Single Phase Inverter MAN-01-00629-1.2
The inverter is IP65 rated . Unused conduit openings and glands should be
sealed with appropriate seals.
NOTE
Use PV panels rated according to IEC 61730 class A.
NOTE
The symbol
appears at grounding points on the SolarEdge equipment. This
symbol is also used in this manual.
NOTE
A SolarEdge inverter may be installed in a site with a generator. SolarEdge
requires installing a physical or electronic interlock, which will signal to the
inverter when the grid has been disconnected. Interlock procurement,
installation, maintenance and support are the responsibility of the installer.
Damage to the inverter due to incorrect interlock installation or use of an
interlock that is incompatible with the SolarEdge system will render the
SolarEdge warranty invalid.
For more information, refer to
https://www.solaredge.com/sites/default/files/se-inverter-
support-of-voltage-sources.pdf.
NOTE
The following warning symbols appear on the inverter warning label:
Risk of electric shock
Risk of electric shock from energy stored in the capacitor. Do not
remove cover until 5 minutes after disconnecting all sources of
supply.
Hot surface – To reduce the risk of burns, do not touch.
EV Charging Single Phase Inverter MAN-01-00629-1.2
9 IMPORTANT SAFETY INSTRUCTIONS
Chapter 1: Introducing the SolarEdge Power
Harvesting System
The SolarEdge power harvesting solution maximizes the power output from any type of
solar Photovoltaic (PV) installation while reducing the average cost per watt. The
following sections describe each of the system’s components.
Figure 1: The SolarEdge power harvesting system components
Chapter 1: Introducing the SolarEdge Power Harvesting System 10
EV Charging Single Phase Inverter MAN-01-00629-1.2
The power optimisers are DC-DC converters connected to PV panels in order to
maximize power harvesting by performing independent Maximum Power Point
Tracking (MPPT) at the panellevel.
The power optimisers regulate the string voltage at a constant level, regardless of string
length and environmental conditions.
The power optimisers include a safety voltage function that automatically reduces the
output of each power optimiser to 1 Vdc in the following cases:
During fault conditions
The power optimisers are disconnected from the inverter
The inverter ON/OFF/P switch is turned OFF
The safety switch on the Connection Unit with Safety Switch is turned OFF
The inverter AC breaker is turned OFF
Each power optimiser also transmits panel performance data over the DC power line to
the inverter.
Two types of power optimisers are available:
Panel Add-on power optimiser – connected to one or more panels
Smart panels - the power optimiser is embedded into a panel
EV Carging Single Phase Inverter
The EV Charging Single Phase Inverter (referred to as “inverter” throughout) efficiently
converts DC power from the panels into AC power that can be fed into the main
AC service of the site and from there to the grid. The inverter also receives the
monitoring data from each power optimiser and transmits it to a central server (the
monitoring platform; requires Internet connection).
The EV Charging Single Phase Inverter is designed to provide reliable and economical
charging of an electric vehicle (EV). It provides Mode 3 EV charging from both the grid
and the PV system, and is designed to work with all plug-in vehicles with J1772 (Type 1)
socket and (Type 2) IEC62196 sockets.
An EV Charger cable (ordered separately) is required for EV charging:
The EV Charger Cable connects the EV plug to the inverter
The wall mounted EV Charger cable holder is used for hanging the EV Charger cable
and plug, protecting the plug from rain when not plugged into the vehicle , and
provides strain relief for the inverter when the cable is pulled.
EV Charging Single Phase Inverter MAN-01-00629-1.2
11 Power Optimiser
Figure 2: The EV Charger Cables (with holders)
Monitoring Platform
The monitoring platform enables monitoring the technical and financial performance of
one or more SolarEdge sites. It provides past and present information on the system
performance both at the system and panel levels.
12
EV Charging Single Phase Inverter MAN-01-00629-1.2
The following is the procedure for installing and setting up a new SolarEdge site. Many
of these also apply to modification of an existing site.
1. Connecting Power Optimizers in Strings, page 20.
2. Recording power optimiser serial numbers (optional), page 50.
3. Mounting the inverter, page 28.
4. Connecting the AC and the Strings to the Connection Unit, page31.
5. Activating, Commissioning and Configuring the System Using the Inverter SetApp,
page 36
6. Connecting the inverter to the monitoring platform, page 51.
7. Installing and connecting the cable - Refer to the installation guide supplied with
the product. The cable and holder can be installed at the same time as the inverter
or added later.
8. Configuring the EV Charger - Refer to the installation guide supplied with the EV
Charger Cable. Configuration can be done only after the EV Charger Cable is
connected to the inverter and the inverter is connected to the monitoring platform.
Installation Equipment List
Standard tools can be used during the installation of the SolarEdge system. The
following is a recommendation of the equipment needed for installation:
Allen screwdriver for 3mm screw type for the inverter cover, side screws, and
Connection Unit with Safety Switch cover (if applicable)
Standard flat-head screwdrivers set
Non-contact voltage detector
Cordless drill (with a torque clutch) or screwdriver and bits suitable for the surface
on which the inverter and optimisers will be installed. Use of an impact driver is not
allowed.
Appropriate mounting hardware (for example: stainless bolts, nuts, and washers)
for attaching:
the inverter mounting bracket to the mounting surface
the power optimiser to the racking (not required for smart panels)
MC4 crimper (if applicable)
Wire cutters
EV Charging Single Phase Inverter MAN-01-00629-1.2
13 Installation Procedure
Mobile phone with latest SetApp version
For installing the communication options, you may also need the following:
For Ethernet:
CAT5/6 twisted pair Ethernet cable with RJ45 connector
If using a CAT5/6 cable spool: RJ45 plug and RJ45 crimper
For RS485:
Four- or six-wire shielded twisted pair cable
Watchmaker precision screwdriver set
Inverter Transport and Storage
Transport the inverter in its original packaging, facing up and without exposing it to
unnecessary shocks. If the original package is no longer available, use a similar box that
can withstand the weight of the inverter (refer to the inverter weight in the specification
datasheet provided with the unit), has a handle system and can be closed fully.
Store the inverter in a dry place where ambient temperatures are -25°C to +65°C /
-13°F to 149°F.
14
EV Charging Single Phase Inverter MAN-01-00629-1.2
EV Charging Safety Instructions
WARNING!
Do not charge a vehicle indoors if it requires ventilation. Contact your EV service
representative for information.
WARNING!
Automatic CCID (charge circuit interrupting device) reset provided.
WARNING!
Risk of electric shock. Do not remove cover. No user serviceable parts inside.
Refer servicing to qualified service personnel.
CAUTION!
Do not use this product if there is any damage to the unit.
CAUTION!
Do not use an extension cord between the SolarEdge EV Charger Cable and the
EV Charging Single Phase Inverter. You may use a conversion adapter only if it
has been approved by SolarEdge.
NOTE
This product is intended for use with electric vehicles, however it operates as a
PV inverter also when no charging cable is connected.
EV Charging Single Phase Inverter MAN-01-00629-1.2
15 EV Charging Safety Instructions
Chapter 2: Installing the Power Optimisers
Safety
The following notes and warnings apply when installing the power optimisers. Some of
the following may not be applicable to smart panels:
WARNING!
When modifying an existing installation, turn OFF the inverter ON/OFF/P
switch, the Safety Switch (if applicable) and the AC circuit breaker on the main
AC distribution panel.
CAUTION!
Power optimisers are IP68/NEMA6P rated. Choose a mounting location where
optimisers will not be submerged in water.
CAUTION!
This unit must be operated according to the operating specifications provided
with the unit.
CAUTION!
Cutting the power optimiser input or output cable connector is prohibited and
will void the warranty.
CAUTION!
All PV panels must be connected to a power optimiser.
CAUTION!
If you intend to mount the optimisers directly to the panelor panele frame, first
consult the panel manufacturer for guidance regarding the mounting location
and the impact, if any, on panel warranty. Drilling holes in the panel frame
should be done according to the panel manufacturer instructions.
Chapter 2: Installing the Power Optimisers 16
EV Charging Single Phase Inverter MAN-01-00629-1.2
Installing a SolarEdge system without ensuring compatibility of the panel
connectors with the optimiser connectors may be unsafe and could cause
functionality problems such as ground faults, resulting in inverter shut down. To
ensure mechanical compatibility of the power optimisers’ connectors with the PV
panel’ connectors to which they are connected:
Use identical connectors from the same manufacturer and of the same type
on both the power optimisers and on the panels; or
Verify that the connectors are compatible in the following way:
The panel connector manufacturer should explicitly verify compatibility
with the SolarEdge optimiser connector; and
A third-party test report by one of the listed external labs (TUV, VDE,
Bureau Veritas UL, CSA, InterTek) should be obtained, verifying the
compatibility of the connectors.
For more information, refer to
https://www.solaredge.com/sites/default/files/optimizer-input-
connector-compatibility.pdf
IMPORTANT SAFETY FEATURE
Panel with SolarEdge poweroptimisers are safe. They carry only a low safety
voltage before the inverter is turned ON. As long as the power optimisers are
not connected to the inverter or the inverter is turned OFF, each power
optimiser will output a safe voltage of 1V.
Package Contents
Power optimisers
Stainless steel grounding lock washers
Installation Guidelines
The minimum and maximum string length guidelines are stated in the power
optimiser datasheets. Refer to the Designer for string length verification. The
Designer is available on the SolarEdge website at
https://www.solaredge.com/products/installer-tools/designer#/.
EV Charging Single Phase Inverter MAN-01-00629-1.2
17 Package Contents
Frame-mounted power optimisers are mounted directly on the panel
frame, regardless of racking system (rail-less or with rails). For
installation of frame-mounted power optimisers, refer to
http://www.solaredge.com/sites/default/files/installing_frame_
mounted_power_optimizers.pdf.
The steps in this chapter refer to panel add-on power optimisers. For smart panels,
start from Step 2: Connecting Power Optimisers in Strings on page 20 .Also refer to
the documentation supplied with the smart panels.
The power optimiser can be placed in any orientation.
If connecting more panels than optimiser inputs in parallel, use a branch cable.
Some commercial power optimiser panels have a dual input.
Position the power optimiser close enough to its panel so that their cables can be
connected.
Make sure to use power optimisers that have the required output conductor length:
Do not use extension cables between a panel and a power optimiser, between
two panels connected to the same optimiser, or between two optimisers other
than in the cases specified below.
You can use extension cables between power optimisers only from row to row,
around obstacles or pathways within a row, and from the end of the string to
the inverter, as long as the maximum distance is not exceeded.
NOTE
Use at least 11 AWG/ 4 mm² DC cables.
The total cable length of the string (excluding power optimisers’
cables) should not exceed 300 m from DC+ to DC- of the inverter.
Completely shaded panels may cause their power optimisers to temporarily shut
down. This will not affect the performance of the other power optimisers in the
string, as long as the minimum number of unshaded power optimisers connected in
a string of panels is met. If under typical conditions fewer than the minimum
optimisers are connected to unshaded panels, add more optimisers to the string.
To allow for heat dissipation, maintain a minimum of 2.5 cm clearance between the
power optimiser and other surfaces, on all sides except the mounting bracket side.
Chapter 2: Installing the Power Optimisers 18
EV Charging Single Phase Inverter MAN-01-00629-1.2
Figure 3: Power optimiser clearance
When installing panels in a confined space, for example, if installing Building-
integrated photovoltaic (BIPV) panels, ventilation measures may be needed to
ensure the power optimisers are not be exposed to temperatures outside their
specifications.
NOTE
The images contained herein are for illustrative purposes only and may vary
depending on product panels.
Step 1: Mounting the Power Optimisers
For each of the power optimisers(1):
1. Determine the power optimiser mounting location and use the power
optimiser mounting brackets to attach the power optimiser to the
support structure . It is recommended to mount the power optimiser
in a location protected from direct sunlight. For frame-mounted
power optimisers follow the instructions supplied with the optimisers,
or refer to https://www.solaredge.com/sites/default/files/installing_frame_
mounted_power_optimizers.pdf.
2. If required, mark the mounting hole locations and drill the hole.
(1)Not applicable to smart panels.
EV Charging Single Phase Inverter MAN-01-00629-1.2
19 Step 1: Mounting the Power Optimisers
Drilling vibrations may damage the power optimiser and will void the
warranty. Use a torque wrench or an electric drill with adjustable clutch that
meets the mounting torque requirements. Do not use impact drivers for
mounting the power optimiser.
Do not drill through the power optimiser or through the mounting holes.
3. Attach each power optimiser to the rack using M6 (1/4'') stainless steel bolts, nuts
and washers or other appropriate mounting hardware. Apply torque of 9-10 N*m /
6.5-7 lb*ft.
4. Verify that each power optimiser is securely attached to the panel support structure.
5. Record power optimiser serial numbers and locations, as described in Reporting and
Monitoring Installation Data on page 49.
Step 2: Connecting Power Optimisers in Strings
You can construct parallel strings of unequal length, that is, the number
of power optimisers in each string does not have to be the same. The
minimum and maximum string lengths are specified in the power
optimiser datasheets. Refer to the Designer for string length verification.
1. Connect the Minus (-) output connector of the string’s first power optimiser to the
Plus (+) output connector of the string’s second power optimiser
2. Connect the rest of the power optimisers in the string in the same manner.
WARNING!
If using a dual-input power optimiser and some inputs are not used, seal the
unused input connectors with the supplied pair of seals.
Figure 4: Power optimisers connected in series
Chapter 2: Installing the Power Optimisers 20
EV Charging Single Phase Inverter MAN-01-00629-1.2
3. If you intend to monitor the installation, using the monitoring platform, record the
physical location of each power optimiser, as described in Creating Logical and
Physical Layout using Installation Information on page 50.
EV Charging Single Phase Inverter MAN-01-00629-1.2
21 Step 2: Connecting Power Optimisers in Strings
Step 3: Verifying Proper Power Optimiser Connection
When a panel is connected to a power optimiser, the power optimiser outputs a safe
voltage of 1V (±0.1V). Therefore, the total string voltage should equal 1V times the
number of power optimisers connected in series in the string. For example, if 10 power
optimisers are connected in a string, then 10V should be produced.
Make sure the PVpanels are exposed to sunlight during this process. The power
optimiser will only turn ON if the PV panel provides at least 2W.
In SolarEdge systems, due to the introduction of poweroptimisers between the PV
panels and the inverter, the short circuit current ISC and the open circuit voltage VOC
hold different meanings from those in traditional systems.
For more information about the SolarEdge system’s string voltage and
current, refer to the VOC and ISC in SolarEdge Systems Technical Note,
available on the SolarEdge website at:
https://www.solaredge.com/sites/default/files/isc_and_voc_in_solaredge_
sytems_technical_note.pdf
To verify proper power optimiser connection:
Measure the voltage of each string individually before connecting it to the other strings
or to the inverter. Verify correct polarity by measuring the string polarity with a
voltmeter. Use a voltmeter with at least 0.1V measurement accuracy.
NOTE
Since the inverter is not yet operating, you may measure the string voltage and
verify correct polarity on the DC wires inside the Connection Unit with Safety
Switch.
For troubleshooting power optimiser operation problems, refer to Power Optimiser
Troubleshooting on page 70.
Chapter 2: Installing the Power Optimisers 22
EV Charging Single Phase Inverter MAN-01-00629-1.2
Chapter 3: Installing the Inverter
Install the inverter either before or after the panels and power optimisers have been
installed.
CAUTION!
Do not rest the connectors at the bottom of the inverter on the ground, as it
may damage them. To rest the inverter on the ground, lay it on its back, front
or side.
Inverter Package Contents
One inverter with Connection Unit with Safety Switch
Two Allen screws for fastening the inverter to the mounting bracket
Connection Unit with Safety Switch sealing cover (if applicable, for use in case of
inverter replacement)
Installation guide
Identifying the Inverter
Refer to the sticker on the inverter that specifies its Serial Number and its Electrical
Ratings. Provide the serial number when contacting SolarEdge support. The serial
number is also required when opening a new site in the monitoring platform.
Inverter Interfaces
The following figures show the inverter and Connection Unit with Safety Switch
connectors and interfaces.
Figure 5: Inverter and Connection Unit with Safety Switch interfaces
EV Charging Single Phase Inverter MAN-01-00629-1.2
23 Chapter 3: Installing the Inverter
Connection Unit with Safety Switch Interface
EV Charger cable connector: Used for connecting the EV charger cable to the
inverter
EV Charger LED indicator: Three LEDs indicate the EV Charger statuses.
Figure 6: LEDs
The following table lists the LED indications when the EV Charger Cable is connected to
the inverter and activated (refer to the EV Charger Cable Installation Guide supplied with
the EV Charger Cable):
Color
Description
All LEDs
OFF - No AC power
Red
ON - Error
Blue
ON - the EV Charger is communicating with the inverter
OFF - the EV Charger is not communicating with the inverter
Green
ON - Charging
Blinking(1) - the EV Charger is plugged in but not charging
Flickering(2) - the EV Charger is ready to charge but not plugged in
AC output / input: For connection of the AC grid
DC input: For connection of the PV installation
Communication gland: For connection of inverter communication options. Refer
to Setting Up Communication to the Monitoring Platform on page 52 for more
information.
(1)Lights ON for 1000ms and OFF for 1000ms
(2)Lights ON for 100ms and OFF for 5000ms
Chapter 3: Installing the Inverter 24
EV Charging Single Phase Inverter MAN-01-00629-1.2
EV Charger push button: Pressing the button on the Connection Unit with Safety
Switch has the following functionality:
For a system with scheduled charging: Start charging immediately (not during
charging scheduled times). For setting a charging schedule, refer to the EV
Charger Cable Installation Guide (supplied with the EV Charger Cable).
In case of an error ,the system re-tests after 15 minutes. Pressing the push
button performs the re-test immediately.
Drain valve: Drains any moisture that may be accumulated in the unit.
Inverter Interface
ON/OFF/P switch: Turning this switch ON starts the operation of the power
optimisers, enables power production and allows the inverter to begin exporting
power to the utility grid. Turning it OFF reduces the power optimiser voltage to a
low safety voltage and inhibits exportation of power. When this switch is OFF, the
inverter control circuitry remains powered up.
Inverter LED indicator (See Figure 6): Indicate the inverter statuses as described in
the following table:
Color
Description
Functionality
All LEDs turn on while the inverter is being configured.
Green
Power production
On - The inverter is producing power.
Blinking - Standby mode. The inverter is in
Standby mode until its working voltage is
reached. The inverter then enters Production
mode and produces power.
Off - The inverter is not producing power. This
may be during Night mode, when the inverter
ON/OFF/P switch is OFF or when an error occurs.
Blue
Communication and
inverter shutdown
Blinking:
- Monitoring information is being received from a
power optimiser.
-The inverter is being shut down.
Red
Error
On - There is an error. Refer to Errors and
Troubleshooting on page 64 for more
information.
Blinking - The inverter is being shut down.
EV Charging Single Phase Inverter MAN-01-00629-1.2
25 Inverter Interfaces
The EV charger includes a buzzer with the following indications:
Event
Buzzer Indication
Connected to EV
1 short beep
Charging starts
2 short beeps + 1 long beep
Error
5 beeps
DIP Switches
Set the circuit breaker rating DIP switches as shown in the following figure.
Figure 7: Connection Unit with Safety Switch with EV Charger internal interfaces
To set the circuit breaker ratings:
Use the circuit breaker rating DIP switches to set circuit breaker ratings.
Circuit Breaker Rating
DIP Switch Settings
Maximum Allowed
AC Current from Grid
1 (left)
2 (right)
16 A
OFF
OFF
16 A
20 A
ON
OFF
20 A
25 A
OFF
ON
25 A
32 A
ON
ON
32 A
Opening Conduit Drill Guides
This step may be performed before or after mounting the inverter.
To open conduit drill guides:
1. Move the Connection Unit with Safety Switch ON/OFF/P switch and the inverter
ON/OFF/P switch to OFF.
Chapter 3: Installing the Inverter 26
EV Charging Single Phase Inverter MAN-01-00629-1.2
2. Loosen the screws on the front cover of the Connection Unit with Safety Switch, as
shown below:
Figure 8: Opening the Connection Unit with Safety Switch cover
3. Remove the Connection Unit with Safety Switch cover.
4. Open the required AC and DC conduit drill guides according to the conduits used in
the installation: The drill guides are located at the bottom and sides of the
enclosure, each with a maximum size of 25 mm. Open the required drill guides,
taking care not to interfere with any of the internal components. It is recommended
to use a Unibit drill.
Figure 9: Connection Unit with Safety Switch drill guides
NOTE
Unused conduit openings and glands should be sealed with appropriate
seals.
EV Charging Single Phase Inverter MAN-01-00629-1.2
27 Opening Conduit Drill Guides
Mounting the Inverter
The inverter is supplied with a mounting bracket kit:
Figure 10: Mounting bracket
NOTE
Make sure the mounting surface or structure can support the weight of the
inverter.
CAUTION!
SolarEdge inverters and power optimisers can be installed at a minimum
distance of 50 m from the shoreline of an ocean or other saline environment, as
long as there are no direct salt water splashes on the inverter or power
optimiser.
1. Determine the inverter mounting location, on a wall, stud framing or pole. It is
recommended to mount the inverter in a location protected from direct sunlight.
2. To allow proper heat dissipation, maintain the following minimum clearance areas
between the inverter and other objects:
Figure 11: Clearance areas
Chapter 3: Installing the Inverter 28
EV Charging Single Phase Inverter MAN-01-00629-1.2
20 cm from the top of the inverter.
At least 45 cm from the bottom of the inverter if installing it indoors, 60 cm if
outdoors; if conduit entry to the Connection Unit with Safety Switch will be
from the bottom, leave sufficient clearance for the conduits as well.
10 cm from the right and left of the inverter.
3. Position the mounting bracket against the wall/ pole and mark the drilling hole
locations (refer to Mechanical Specifications on page 82 for inverter and mounting
bracket dimensions).
4. Drill the holes and mount the bracket. Verify that the bracket is firmly attached to
the mounting surface.
5. Hang the inverter on the bracket:
a. Lift the inverter from the sides, or hold it at the top and bottom of the inverter
to lift the unit into place.
b. Lower the inverter onto the U-shaped indentations, as shown below. Let the
inverter lay flat against the wall or pole.
c. Insert the two supplied screws through the outer heat sink fin on both sides of
the inverter and into the bracket. Tighten the screws with a torque of 4.0 N*m /
2.9 lb.*ft.
Figure 12: Hanging the inverter on the brackets
6. Optionally, secure the Connection Unit with Safety Switch bracket to the wall/pole,
using 3 screws:
NOTE
In case of inverter replacement with the Connection Unit with Safety Switch
still mounted, it is recommended to use all 3 holes.
EV Charging Single Phase Inverter MAN-01-00629-1.2
29 Mounting the Inverter
a. Mark the location of the bracket screw for the Connection Unit with Safety
Switch, and optionally the two additional bracket holes.
Figure 13: Connection Unit with Safety Switch bracket
b. Remove the inverter from the wall/ pole.
c. Drill the hole for the Connection Unit with Safety Switch bracket.
d. Hang the inverter on the mounted brackets.
e. Fasten the Connection Unit with Safety Switch bracket using a standard bolt.
7. Insert the screws at the top of the inverter brackets and fasten the brackets together.
8. Verify that all the brackets are firmly attached to the mounting surface.
Chapter 3: Installing the Inverter 30
EV Charging Single Phase Inverter MAN-01-00629-1.2
Chapter 4: Connecting the AC and the Strings
to the Connection Unit
This chapter describes how to:
Connect the Connection Unit with Safety Switch to the AC grid, and to the PV
strings.
If required connect additional grounding, for example for installations in locations
requiring earth rod.
Figure 14: Inside the Connection Unit
To connect the AC grid and grounding to the Connection Unit with Safety Switch:
1. Turn OFF the AC circuit breaker.
2. Open the Connection Unit with Safety Switch cover: Release the four Allen screws
and carefully move the cover horizontally before lowering it.
CAUTION!
When removing the cover, make sure not to damage internal components.
SolarEdge will not be held responsible for any components damaged as a
result of incautious cover removal.
3. Strip the required length of the external and internal cables insulation.
Figure 15: Insulation stripping – AC
EV Charging Single Phase Inverter MAN-01-00629-1.2
31 Chapter 4: Connecting the AC and the Strings to the Connection Unit
4. Open the AC cable gland and insert the cable through the AC gland.
WARNING!
Turn OFF the AC before connecting the AC terminals. If connecting
equipment grounding wire, connect it before connecting the AC Line and
Neutral wires.
5. Connect the AC wires according to the labels on the terminal block.
Connection Unit with Safety Switch
Figure 16: Connection Unit AC Terminals
Wire type
Connect to
terminal
PE (grounding)
GND
Line
L
Neutral
N
6. Check that the wires are fully inserted and cannot be pulled out easily.
7. Tighten the AC cable gland with a torque of 2.8-3.3 N*m
8. Verify that there are no unconnected wires to the inverter and that the unused
terminal screws are tightened.
To connect additional grounding:
1. Repeat steps 1- 3 from the previous procedure.
2. Open the AC cable gland and insert the grounding cable through the AC gland.
3. Strip 8mm of the grounding wire insulation (seeFigure 15).
Chapter 4: Connecting the AC and the Strings to the Connection Unit 32
EV Charging Single Phase Inverter MAN-01-00629-1.2
4. Insert the grounding cable to the equipment grounding bus-bar (see Figure 14).
5. Tighten the bus-bar screw with a torque of: 3.4 N*M
EV Charging Single Phase Inverter MAN-01-00629-1.2
33 Chapter 4: Connecting the AC and the Strings to the Connection Unit
Connecting the Strings to the Connection Unit with
Safety Switch
You can connect systems with multiple DC strings in parallel to the DC input terminals
of the Connection Unit with Safety Switch. Inverters may have a different number of
pairs of DC input terminals, depending on the inverter power rating. If more strings are
required, they can be connected in parallel using an external combiner box before
connecting to the Connection Unit with Safety Switch. When connecting multiple
strings, it is recommended to run separate circuits to the Connection Unit with Safety
Switch or to position the combiner box near the Connection Unit with Safety Switch.
This simplifies commissioning by allowing testing and servicing near the inverter.
NOTE
Use 16-6 AWG, 75-90°C copper wires only.
To connect the strings to the Connection Unit with Safety Switch:
1. Equipment grounding: Connect the DC equipment ground conductor to the
equipment grounding terminal block (bus-bar) in the Connection Unit with Safety
Switch.
2. Insert the DC conduit into the DC-side opening on the Connection Unit with Safety
Switch (left side at the bottom of the Connection Unit with Safety Switch).
3. Connect the DC wires to the DC+ and DC- terminal blocks, according to the labels
on the terminals, connect two wires (DC+ and DC-) per string:
a. Use a standard flat-blade screwdriver to connect the wires to the spring-clamp
terminals. The screwdriver blade should fit freely in the terminal opening. Too
large a blade can crack the plastic housing.
b. Insert the screwdriver and firmly tilt it to press the release mechanism and open
the clamp.
c. Insert the wire into the top opening.
d. Remove the screwdriver – the wire is automatically clamped.
CAUTION!
Ensure that the Plus (+) wire is connected to the + terminal and that the Minus
(-) wire is connected to the Minus (-) terminal connector.
Chapter 4: Connecting the AC and the Strings to the Connection Unit 34
EV Charging Single Phase Inverter MAN-01-00629-1.2
SolarEdge's fixed input voltage architecture enables the parallel strings to be of
different lengths. Therefore, they do not need to have the same number of
power optimisers, as long as the length of each string is within the permitted
range.
4. Close the Connection Unit with Safety Switch cover: Attach the switch cover and
secure it by tightening the four screws with a torque of 1.2 N*m/ 0.9 lb*ft.
5. Ensure proper conduit sealing; inspect the entire conduit run and use standard
conduit sealants to avoid water penetration.
EV Charging Single Phase Inverter MAN-01-00629-1.2
35 Connecting the Strings to the Connection Unit with Safety Switch
Chapter 5: Activating, Commissioning and
Configuring the System
You can connect communication options at this stage, as described in Setting Up
Communication to the Monitoring Platform on page 52.
Once all connections are made, the system should be activated and commissioned
using the Inverter SetApp mobile application. You can download the app from the
Apple App Store and Google Play prior to reaching the site.
Internet connection is required for the download and for the one-time registration,
however not required for using the SetApp.
Step 1: Activating the Installation
During system activation, a Wi-Fi connection is created between the mobile device and
the inverter and the system firmware is upgraded.
Before activation - download, register (first time only) and log-in to SetApp on your
mobile device. Internet connection is required for the download and for the one-time
registration. Verify that the application is updated with the latest version.
To activate the inverter:
1. Turn ON the AC circuit breaker on the main distribution panel.
2. Move the Connection Unit with Safety Switch (if applicable) switch to the ON
position.
3. Open SetApp and follow the instructions on the screen (scan the inverter bar-code;
move the ON/OFF/P switch to P position and release within 5 sec. back to ON (1)
position). SetApp creates a Wi-Fi connection, upgrades the inverter CPU firmware
and activates the inverter.
Chapter 5: Activating, Commissioning and Configuring the System 36
EV Charging Single Phase Inverter MAN-01-00629-1.2
4. When the activation is complete, do one of the following:
Select Activate Another Inverter to continue activating additional inverters.
Select Start Commissioning for pairing and other system configuration. The
Commissioning screen is displayed. Refer to the next section for more
information.
Step 2: Commissioning and Configuring the
Installation
This section describes how to use the SetApp menus for commissioning and
configuring the inverter settings.
Menus may vary in your application depending on your system type.
To access the Commissioning screen:
Do one of the following:
During first time installation: Upon Activation completion, in the SetApp, tap Start
Commissioning. The main Commissioning menu screen is displayed.
Commissioning
Country and Language
›
Pairing
›
Communication
›
Device Manager
›
Maintenance
›
Information
›
Status
›
If the inverter has already been activated and commissioned:
EV Charging Single Phase Inverter MAN-01-00629-1.2
37 Step 2: Commissioning and Configuring the Installation
If not already ON - turn ON AC to the inverter by turning ON the circuit breaker
on the main distribution panel.
Open SetApp and follow the instructions on the screen (scan the inverter bar-
code; move the ON/OFF/P switch to P position (for less than 5 sec) and
release).
The mobile device creates a Wi-Fi connection with the inverter and displays the
main Commissioning screen.
In the main menus, tap the menu red arrows (›) to perform the system commissioning
or configuration task. Tap the Back arrow (‹) to return to the previous menu.
The next sections provide more information about configuration options (in addition to
Country and Language and Pairing, described in Step 2: Commissioning and
Configuring the Installation on page 37).
Setting Country and Language
1. From the Commissioning screen select Country and Language .
2. From the Country drop-down list, select the required country setting.
WARNING!
The inverter must be configured to the proper setting in order to ensure that
it complies with the country grid code and functions properly with the
country grids.
3. From the Language drop-down list, select the language.
4. Tap Set Language.
Pairing
1. From the main menu, select Pairing.
2. Tap Start Pairing.
3. When Pairing Complete is displayed, the system startup process begins:
Since the inverter is ON, the power optimisers start producing power and the
inverter starts converting AC.
WARNING!
When you turn ON the inverter ON/OFF/P switch, the DC cables carry a high
voltage and the power optimisers no longer output a safe output.
Chapter 5: Activating, Commissioning and Configuring the System 38
EV Charging Single Phase Inverter MAN-01-00629-1.2
When the inverter starts converting power after the initial connection to the AC, the
inverter enters Wakeup mode until its working voltage is reached. This mode is
indicated by the flickering green inverter LED.
When working voltage is reached, the inverter enters Production mode and
produces power. The steadily lit green inverter LED indicates this mode.
4. Tap OK to return to the main menu.
Communication
Communication settings can be configured only after communication connections are
complete. Refer to Setting Up Communication to the Monitoring Platform on page 52.
1. Select the Communication menu to define and configure the following:
The communication option used by the inverter to communicate with the
monitoring platform.
The communication option used to communicate between multiple SolarEdge
devices or other external non-SolarEdge devices, such as electricity meters or
loggers.
2. Tap the Server red arrow to set the communication method to be used for
communication between devices and the SolarEdge monitoring platform. The
default is LAN.
NOTE
The Server menu shows only the communication options installed in the
inverter.
For detailed information about all the configuration options, refer to the
Communication Options Application Note, available on the SolarEdge
website at https://www.solaredge.com/sites/default/files/solaredge-
communication_options_application_note_v2_250_and_above.pdf.
Power Control
Power control options are detailed in the Power Control Application
Note, available on the SolarEdge website at
https://www.solaredge.com/sites/default/files/application_note_power_
control_configuration.pdf.
The Grid Control option may be disabled. Enabling it opens additional
options in the menu.
EV Charging Single Phase Inverter MAN-01-00629-1.2
39 Step 2: Commissioning and Configuring the Installation
The Energy Manager option is used for setting power export limitation, as
described in the Export Limitation Application Note, available on the
SolarEdge website at https://www.solaredge.com/sites/default/files/feed-
in_limitation_application_note.pdf.
Device Manager
From the Commissioning menu, select Device Manager to configure various system
Smart Energy Management devices.
For more information refer to
https://www.solaredge.com/products/device-control#/.
Maintenance
From the Commissioning menu, select Maintenance to configure various
system settings, as described below.
Date and Time: Set the internal real-time clock. If connected to the monitoring
platform, the date and time are set automatically and only time zone should be set.
Reset Counters: Resets the accumulated energy counters that are sent to the
monitoring platform.
Factory Reset: Performs a general reset to the default device settings.
Firmware Upgrade: Perform a software upgrade.
Diagnostics: Displays the Isolation status and power optimiser status
screens. Refer to
https://www.solaredge.com/sites/default/files/application_note_
isolation_fault_troubleshooting.pdf.
Activate Standby Mode: Enables/disables Standby Mode - for remote
commissioning.
Board Replacement: Backs up and restores the system parameters, including
energy counters; Used during board replacement according to the instructions
supplied with replacement kits.
Information
From the Commissioning menu, select Information to view and set various system
settings, as described below.
Chapter 5: Activating, Commissioning and Configuring the System 40
EV Charging Single Phase Inverter MAN-01-00629-1.2
CPU Version: The communication board firmware version
DSP 1/2 Version: The digital board firmware version
NOTE
Please have these numbers ready when you contact SolarEdge Support.
Serial Number: The inverter serial number as appears on the enclosure sticker
Error Log: Displays the last five errors, and enables resetting (clearing) the log
Warning Log: Displays the last five warnings, and enables resetting (clearing) the
log
Step 3: Verifying Proper Activation and
Commissioning
1. Select Information and verify that the correct firmware versions are installed on each
inverter.
2. Select Status and verify that inverter is operating and producing power (see also
Viewing System Status on page 42).
3. Verify that additional configurations were properly set by viewing the relevant
Status screens.
4. Verify that the green inverter LED is steadily lit.
Your SolarEdge power harvesting system is now operational.
EV Charging Single Phase Inverter MAN-01-00629-1.2
41 Step 3: Verifying Proper Activation and Commissioning
Viewing System Status
During normal operation, the Status screen displays all the inverter settings and
operation status. Scroll up or down to display various status parameters as described in
the following sections.
The LED indication provides more information about system performance; Refer to
Inverter Interfaces on page 23
To access the Status screen:
From the Commissioning menu select Status. The main inverter Status screen is
displayed (see below).
A red or orange icon (for example:
) may appear at the top left corner of a status cell,
indicating an error. The color indicates error severity (red is top severity). The error
description or information appears on the screen. Tap the error line for more
information and troubleshooting instructions, and refer to Errors and Troubleshooting
on page 64.
A gray clock icon (
) may appear at the top left corner of a status cell, indicating a
temporary status, such as a connection process. When the process is complete, the icon
disappears and a constant status message is displayed.
Chapter 5: Activating, Commissioning and Configuring the System 42
EV Charging Single Phase Inverter MAN-01-00629-1.2
Main Inverter Status
Status
Inverter
SN 07318000C
Power
7.6 kW
50 kW
Voltage
240Vac
230Vac
Frequency
60 Hz
50 Hz
P_OK: 15 of 30
P_OK: 15 of 20
Optimisers
Connected
Server Comm.
S_OK
(LAN)
Status
Production
Switch
OFF
CosPhi
1.00
Limit
No Limit
Country
Netherlands
Voltage
380 Vdc
350 Vdc
Temp
20 C
Fan
OK
Switch Off. Production disabled ›
Commissioning ›
Inverter: The inverter serial number
Power: The AC output power
Voltage (Vac): The AC output voltage
Frequency: The AC output frequency
S_OK: The connection to the monitoring platform. (Server Connected appears only
if the inverter is connected to the monitoring platform).
EV Charging Single Phase Inverter MAN-01-00629-1.2
43 Viewing System Status
Status: The inverter operation status: Off, Not Paired, Night Mode, Error, Pairing, or
Production.
Switch: Indicates the position of the inverter ON/OFF/P switch: On, Off, or P
position.
CosPhi: Indicates the ratio between active and reactive power.A negative value
indicates a lagging CosPhi.
For more information, refer to the Power Control Application
Note, available on the SolarEdge website at
https://www.solaredge.com/sites/default/files/application_note_
power_control_configuration.pdf.
Limit: The inverter maximum output power
Country: The selected country and grid setting
Voltage (Vdc): The DC input voltage
Temp (°C or °F): The inverter heat sink temperature
Chapter 5: Activating, Commissioning and Configuring the System 44
EV Charging Single Phase Inverter MAN-01-00629-1.2
The Site status screen shows the accumulated status of all inverters connected to a
master inverter in a chain (bus) and the master inverter status.
Status
Site
Production
90 kW
90 kW
Limit
1.00 MW
Inverters
10/10
Inverter
SN 07318000C
Power
100 kW
Voltage
277 Vac
Frequency
60.9 Hz
P_OK: 31 0f 31
P_OK: 31 0f 31
Optimisers Connected
S_OK
Server Connected
Status
Production
Switch
OFF
CosPhi
1.00
Limit
Export
Country
ITA
Switch Off. Production disabled›
Commissioning ›
Site status:
Production: The AC output power
Limit: Limitation setting (Export or Production)
Inverters: Number of connected inverters in the cluster, including the master
EV Charging Single Phase Inverter MAN-01-00629-1.2
45 Viewing System Status
This screen displays the status of connection option(s): LAN, RS485, Wi-Fi, cellular or
ZigBee Plug-in.
Communication
LAN
Connected
RS485-1
Modbus
2 of 2
RS485-2
SE Slave
None
Cellular
N/A
Wi-Fi
NC
ZigBee
NC
For each communication option, one of the following statuses is displayed:
Connected: The inverter established a successful connection and communication
with the specified server port
NC: Not Connected
S_OK: The connection to the monitoring platform is successful (should appear only
if the is connected to the server)
N/A : Not Applicable
x of y: Number of devices connected out of all devices
Temporarily displayed (with a
clock sign):
Initializing communication
Connecting to a network
Connecting to SolarEdge servers
Error message (with the
sign)
Chapter 5: Activating, Commissioning and Configuring the System 46
EV Charging Single Phase Inverter MAN-01-00629-1.2
Inverter Energy Status
Displays the total energy produced during the last day, month, year and since inverter
installation.
Inverter Energy
Today
45 kWh
This Month
1.14 MWh
This Year
13.68 MWh
Total: 41.03 MWh
Today: Since midnight
This Month: Since 1st of the current month
This Year: Since January 1st
Total (Wh): The inverter total energy. If an external meter is installed, the value
displayed in this line depends on the meter type connected to the inverter and its
location:
If a bidirectional meter is connected at the consumption point, this value is the
consumed energy.
If the meter is installed at the production point, this value is the energy
produced by the site.
If the meter is installed at the grid connection point, this value is the energy
exported to the grid.
EV Charging Single Phase Inverter MAN-01-00629-1.2
47 Viewing System Status
Modbus ID #2
Status
OK
Power
7.60 kW
Energy
13.68MWh
Export Meter
SN: XXXXXXXX
GPIO S0 meter
1000 pulses per kWh
Power
7.60 kW
Energy
13.68MWh
Type and function: Displays the meter functionality (Production, Export, Import,
Export+Import).
Status: Displays OK if the meter is communicating with the inverter.
: If there is a meter error, it is displayed in this line.
Power: Depending on the meter type connected to the inverter, this line displays
the exported or imported power.
Energy: The total energy read by the meter. The value displayed in this line depends
on the meter type connected to the inverter and its location:
If a bidirectional meter is connected at the consumption point, this value is the
consumed energy.
If the meter is installed at the production connection point, this value is the
energy produced by the site.
If the meter is installed at the grid connection point, this value is the energy
exported to the grid. This data is accumulated according to an internal real-
time clock.
Chapter 5: Activating, Commissioning and Configuring the System 48
EV Charging Single Phase Inverter MAN-01-00629-1.2
EV Charging Status
When the EV charger is activated, this screen displays the EV charging status ,
according to the charging mode.
Status
Inverter Energy
Today
45 kWh
This Month
1.14 Wh
This Year
13.68 Wh
Total 41.03 MWh
EV Charger
Car
Charging
Charger
3.81 kW
Energy Added 163 Wh
EV / Car Status: Connected / Disconnected / Charging
Charger: Charging power x.xkW / Ready / Initializing
Energy Added: 0 - 999 kWh added to the EV battery.
After disconnecting the EV charger the last charged energy is displayed.
Reporting and Monitoring Installation Data
NOTE
Monitoring the site requires connecting the inverter to the monitoring
platform, using any of the wired or wireless options available from SolarEdge.
Refer to Setting Up Communication to the Monitoring Platform on page 52.
The Monitoring Platform
The monitoring platform provides enhanced PV performance monitoring and yield
assurance through immediate fault detection and alerts at the panel, string and system
level.
EV Charging Single Phase Inverter MAN-01-00629-1.2
49 Reporting and Monitoring Installation Data
Using the platform, you can:
View the latest performance of specific components.
Find under-performing components, such as panels, by comparing their
performance to that of other components of the same type.
Pinpoint the location of alerted components using the physical layout.
The monitoring platform enables accessing site information, including up-to-date
information viewed in a physical or logical view:
Logical Layout: Shows a schematic tree-layout of the components in the system,
such as: inverters, strings, panels, meters and sensors, as well as their electrical
connectivity. This view enables you to see which panels are connected in each
string, which strings are connected to each inverter, and so on.
Physical Layout: Provides a bird's eye view of the actual placement of panels in the
site, and allows pinpoint issues to the exact location of each panel on a virtual site
map.
If you do not report the mapping of the installed power optimisers, the monitoring
platform will show the logical layout indicating which power optimisers are connected
to which inverter, but will not show strings or the physical location of power optimisers.
The monitoring platform includes a built-in help system, that guides you
through the monitoring functionality.
For more information, refer to https://www.solaredge.com/products/pv-
monitoring#/.
Creating Logical and Physical Layout using
Installation Information
To display a logical layout, insert the inverter serial number in the new site created in
the monitoring platform. When the communication between the inverter and the
monitoring server is established, the logical layout is displayed.
To display a physical layout, you need to map the locations of the installed power
optimisers. To map the locations, use one of the methods described in the next sections.
Designer
Designer recommends inverter and power optimiser selection per site size and enables
report generation. You can create a project in Designer and export the site design with
the string layout to the monitoring platform.
Chapter 5: Activating, Commissioning and Configuring the System 50
EV Charging Single Phase Inverter MAN-01-00629-1.2
For more information, refer to
https://www.solaredge.com/products/installer-tools/designer#/.
Mapper Application
Use the Mapper smart phone application to scan the power optimiser
and inverter 2D bar-codes and create a virtual map of a PV site for
enhanced monitoring and easier maintenance.
The Mapper application is integrated with the monitoring platform and enables:
Simple on-site registration of new systems.
Creating, editing and verifying system physical layout.
Scanning and assigning the power optimiser serial number to the correct panel in
the system physical layout.
For detailed information, refer to the Mapper demo movies:
Creating new sites using the Mapper mobile application
Mapping existing sites using the Mapper mobile application
Physical Layout Editor
1. If you are a registered installer, access the monitoring platform site
creation page at https://monitoring.solaredge.com/solaredge-
web/p/home#createSites. If you have not yet signed up, go to
https://monitoring.solaredge.com/solaredge-
web/p/createSelfNewInstaller.
2. Fill out all required information in the screen, which includes
information about your installation, as well as details about its logical
and physical mapping.
Using a Paper Template
Fill out the Physical Layout Template (downloadable from the SolarEdge
website http://www.solaredge.com/files/pdfs/physical-layout-
template.pdf) using the detachable 2D barcode stickers on each power
optimiser. Once the form is completed, use the Mapper to scan the 2D
codes and create the map in the monitoring platform. Optionally, you can
send the sticker sheet to SolarEdge Support for physical layout creation.
EV Charging Single Phase Inverter MAN-01-00629-1.2
51 Reporting and Monitoring Installation Data
Chapter 6: Setting Up Communication to the
Monitoring Platform
The inverter sends the following information to the monitoring platform:
Power optimiser information received via the DC power lines (the PV output circuit)
Inverter information
Information of any other connected devices
Car charging information
This chapter describes how to set up communication between:
The inverter and the monitoring platform through the Internet (wired/ wireless)
Multiple inverters for a master/slave configuration
Communication setup is not required for power harvesting, however it is needed for
using the monitoring platform and for first time charging and activating the cable.
NOTE
It is recommended to connect communication connections before
connecting the AC, for easier access to the communication board.
CAUTION!
Communication Options
The following types of communication can be used to transfer the monitored
information from the inverter to the monitoring platform.
Only communication products offered by SolarEdge are supported.
Ethernet
Ethernet is used for a LAN connection. For connection instructions refer to Creating an
Ethernet (LAN) Connection on page 57
RS485
The following RS485 ports are available:
RS485-1: Connects to the internal EV Charger circuit and (optionally) for
connecting other ModBus devices on the same bus, such as external meters.
Chapter 6: Setting Up Communication to the Monitoring Platform 52
EV Charging Single Phase Inverter MAN-01-00629-1.2
RS485-2: Enables connection of multiple SolarEdge devices and of non-SolarEdge
devices over the same bus.
For connection instructions refer to Creating an RS485 Bus Connection on page 60
Wi-Fi
This communication option enables using a Wi-Fi connection for connecting to the
monitoring platform.
The Wi-Fi access point is built into the inverter. An antenna is required and available
from SolarEdge for connection to the monitoring platform.
Cellular
This wireless communication option (purchased separately) enables
using a cellular connection to connect one or several devices (depending
on the data plan used) to the monitoring platform.
The Cellular Plug-in is provided with a user manual, which should be
reviewed prior to connection. Refer to
https://www.solaredge.com/sites/default/files/cellular-plug-in-for-setapp-installation-
guide.pdf
EV Charging Single Phase Inverter MAN-01-00629-1.2
53 Communication Options
A communication gland with multiple openings is used for connection of the various
communication options. The table below describes the functionality of each gland
opening. Unused openings should remain sealed.
Opening for cable size (diameter)
Connection type
2.5 - 5 mm
RS485
4.5 - 7 mm, with cut
Ethernet (CAT5/6)
2 - 4 mm, with cut
Antenna cable for wireless
communication
Figure 17: Communication Gland
Chapter 6: Setting Up Communication to the Monitoring Platform 54
EV Charging Single Phase Inverter MAN-01-00629-1.2
The communication board has a standard RJ45 terminal block for Ethernet connection,
a 6-pin terminal block for RS485 connection, and an 8-pin connector for power control
devices.
The SolarEdge Cellular Plug-in can be connected to the communication board for
optional wireless connection.
Figure 18: Communication board connectors
EV Charging Single Phase Inverter MAN-01-00629-1.2
55 Communication Connectors
Removing the Inverter Cover
1. Switch the inverter ON/OFF/P switch to OFF. Wait 5 minutes for the capacitors to
discharge.
2. Turn the Safety Switch (if applicable) to OFF.
3. Disconnect the AC to the inverter by turning OFF the circuit breakers on the
distribution panel.
4. Open the Allen screws of the inverter cover and carefully pull the cover horizontally
before lowering it.
5. Open the inverter cover (see Figure 19).
CAUTION!
When removing the inverter cover, make sure not to damage the internal
components. SolarEdge will not be held responsible for any components
damaged as a result of incautious cover removal.
Figure 19: Removing the inverter cover
Removing the Connection Unit with Safety Switch
Cover
1. Turn OFF the AC breaker of the distribution panel and the safety switch (if
applicable).
2. Open the Connection Unit with Safety Switch cover: Release the four Allen screws
and remove the cover.
CAUTION!
When removing the Connection Unit with Safety Switch cover, make sure not to
damage the internal components. SolarEdge will not be held responsible for any
components damaged as a result of incautious cover removal.
Chapter 6: Setting Up Communication to the Monitoring Platform 56
EV Charging Single Phase Inverter MAN-01-00629-1.2
Creating an Ethernet (LAN) Connection
This communication option enables using an Ethernet connection to connect the
inverter to the monitoring platform through a LAN.
Figure 20: Example of Ethernet connection
Ethernet cable specifications:
Cable type – a shielded Ethernet cable (Cat5/5E STP) may be used
Maximum distance between the inverter and the router – 100 m/ 330 ft.
NOTE
If using a cable longer than 10 m / 33 ft in areas where there is
a risk of induced voltage surges by lightning, it is recommend
to use external surge protection devices.
For details refer to:
http://www.solaredge.com/files/pdfs/lightning_surge_
protection.pdf.
To connect the Ethernet cable:
1. Remove the inverter cover as described in Removing the Inverter Cover on page 56.
2. Open the communication gland.
CAUTION!
The gland includes a rubber waterproof fitting, which should be used to
ensure proper sealing.
3. Remove the plastic seal from one of the large openings.
4. Remove the rubber fitting from the gland and insert the CAT5/6 cable through the
gland and through the gland opening in the inverter.
5. Push the cable into the cut opening of the rubber fitting.
EV Charging Single Phase Inverter MAN-01-00629-1.2
57 Creating an Ethernet (LAN) Connection
Figure 21: Communication gland and rubber fitting
CAT5/6 standard cables have eight wires (four twisted pairs), as shown in the diagram
below. Wire colors may differ from one cable to another. You can use either wiring
standard, as long as both sides of the cable have the same pin-out and color-coding.
RJ45 Pin #
Wire Color(1)
10Base-T Signal
100Base-TX Signal
T568B
T568A
1
White/Orange
White/Green
Transmit+
2
Orange
Green
Transmit-
3
White/Green
White/Orange
Receive+
4
Blue
Blue
Reserved
5
White/Blue
White/Blue
Reserved
6
Green
Orange
Received-
7
White/Brown
White/Brown
Reserved
8
Brown
Brown
Reserved
(1)The inverter connection does not support RX/TX polarity change. Supporting crossover Ethernet cables
depends on the switch capabilities.
Chapter 6: Setting Up Communication to the Monitoring Platform 58
EV Charging Single Phase Inverter MAN-01-00629-1.2
Figure 22: Standard cable wiring
6. Use a pre-crimped cable to connect via gland #1 to the RJ45 plug on the inverter's
communication board or, if using a spool of cable, connect as follows:
a. Insert the cable through the gland.
b. Remove the cable’s external insulation using a crimping tool or cable cutter and
expose eight wires.
c. Insert the eight wires into an RJ45 connector, as described in Figure 22
d. Use a crimping tool to crimp the connector.
e. Connect the Ethernet connector to the RJ45 port on the communication board.
Figure 23: The RJ45 Ethernet connection
7. For the switch/router side, use a pre-crimped cable or use a crimper to prepare an
RJ45 communication connector: Insert the eight wires into the RJ45 connector in the
same order as above (Figure 22).
8. Connect the cable RJ45 connector to the RJ45 port of the Ethernet switch or router.
You can connect more than one inverter to the same switch/router or to different
switches/routers, as needed. Each inverter sends its monitored data independently
to the SolarEdge monitoring platform.
EV Charging Single Phase Inverter MAN-01-00629-1.2
59 Creating an Ethernet (LAN) Connection
9. The inverter is configured by default to LAN. If reconfiguration is required:
a. Make sure the ON/OFF/P switch is OFF.
b. Turn ON the AC to the inverter by turning ON the circuit breaker on the main
distribution panel.
c. Configure the connection as described in Communication on page 39.
NOTE
If your network has a firewall, you may need to configure it to enable
the connection to the following address:
Destination Address: prod.solaredge.com
TCP Port: 22222 (for incoming and outgoing data)
10. Verify the connection, as described in Verifying the Connection on page 63.
Creating an RS485 Bus Connection
The RS485 option enables creating a bus of connected inverters, consisting of up to 31
slave inverters and 1 master inverter. Using this option, inverters are connected to each
other in a bus (chain), via their RS485 connectors. The first and last inverters in the
chain must be terminated as described on page 60.
RS485 wiring specifications:
Cable type: Min. 3-wire shielded twisted pair (a shielded Ethernet cable (Cat5/5E
STP) may be used)
Wire cross-section area: 0.2- 1 mm²/ 24-18 AWG (a CAT5 cable may be used)
Maximum nodes: 32
Maximum distance between first and last devices: 1 km /3300 ft.
Chapter 6: Setting Up Communication to the Monitoring Platform 60
EV Charging Single Phase Inverter MAN-01-00629-1.2
If using a cable longer than 10 m/ 33 ft in areas where there is a
risk of induced voltage surges by lightning, it is recommend to
use external surge protection devices. For details refer to:
https://www.solaredge.com/sites/default/files/lightning_surge_
protection.pdf.
If grounded metal conduit are used for routing the communication wires, a
lightning protection device is not required.
If not using surge protection, connect the grounding wire to the first inverter
in the RS485 chain; make sure the grounding wire is not in contact with other
wires. For inverters with a Connection Unit with Safety Switch, connect the
grounding wire to the grounding bus-bar in the Connection Unit with Safety
Switch.
To connect to the monitoring platform:
1. Designate a single inverter as the connection point between the RS485 bus and the
monitoring platform. This inverter will serve as the master inverter.
2. Connect the master to the monitoring platform via the LAN option (refer to Creating
an Ethernet (LAN) Connection on page 57) or any of the other options.
To configure the RS485 bus:
All inverters are configured by default as slaves. To configure the master:
1. Verify the ON/OFF/P switch is OFF.
2. Verify that AC is on.
3. Use SetApp to access the Commissioning menu screen as described in
Communication on page 39.
4. From the Commissioning menu tap Communication. The Communication screen is
displayed.
5. Select the following to configure the connection:
Server è LAN, Cellular or Wi-Fi
RS485-2 è Protocol è SolarEdge èSolarEdge Master
RS485-2 è Slave Detect
The system starts automatic detection of the slave inverters connected to the master
inverter. The inverter should report the correct number of slaves. If it does not, verify
the connections and terminations.
EV Charging Single Phase Inverter MAN-01-00629-1.2
61 Creating an RS485 Bus Connection
6. To check the slave IDs and last communication time, select RS4852 è Slave List.
7. Verify the connection of the master to the monitoring platform, as described in the
next section.
Chapter 6: Setting Up Communication to the Monitoring Platform 62
EV Charging Single Phase Inverter MAN-01-00629-1.2
Verifying the Connection
After connecting and configuring a communication option, perform the following
steps to check that the connection to the monitoring server has been successfully
established.
1. Access the Status screen:
a. If not already ON - turn ON AC to the inverter by turning ON the circuit breaker
on the main distribution panel.
b. Open SetApp and follow the instructions on the screen (scan the inverter bar-
code; move the ON/OFF/P switch to P position (for less than 5 sec) and release).
The mobile device creates a Wi-Fi connection with the inverter and displays the
main Commissioning screen.
Status
Inverter
SN 07318000C
Power
Voltage
Frequency
Optimisers
Connected
S_OK
Server Connected
Status
Production
Switch
ON
CosPhi
1.00
Limit
No Limit
Country
Netherlands
Voltage
Temp
Fan
Commissioning
2. Check that S_OK - Server Connected status appears in the main inverter section.
3. Scroll down to the Communication section and check that the communication
options are as required. For more information refer to Communication Status on
page 46.
EV Charging Single Phase Inverter MAN-01-00629-1.2
63 Verifying the Connection
Chapter 7: Errors and Troubleshooting
This appendix describes general system problems, and how to troubleshoot them. For
further assistance, contact SolarEdge Support.
Identifying Errors
Errors may be indicated in various system interfaces: On the inverter bottom panel, a
red LED indicates an error. In the monitoring platform and SetApp, errors are displayed
with codes. For more information on the codes displayed for error and warning
messages, refer to http://www.solaredge.com/sites/default/files/se-
inverter-installation-guide-error-codes.pdf. This document describes
errors that appear in SetApp, monitoring platform, and LCD (for inverters
with LCD). To identify the error types, use the methods described below.
To identify the error type using the inverter LEDs:
1. Move the ON/OFF/P switch to P position for less than 5 seconds and release it.
2. Observe the LED lights and use the following table to identity the
error type. For more information, refer to
https://www.solaredge.com/leds.
Error type
LED color and state
Red
Green
Blue
Arc detected
ON
OFF
OFF
Isolation or RCD problem
Blinking
OFF
OFF
Grid error
OFF
ON
OFF
High temperature
OFF
Blinking
OFF
Pairing failed
OFF
OFF
ON
Other issue
OFF
OFF
Blinking
To identify the error type using the monitoring platform:
1. Open the site dashboard and click the Layout icon.
2. Right-click the inverter and select Info from the menu. The inverter details window is
displayed.
3. Click the Errors tab. The list is displayed.
Chapter 7: Errors and Troubleshooting 64
EV Charging Single Phase Inverter MAN-01-00629-1.2
EV Charger-related Troubleshooting
For the following system errors, when an error occurs, the red LED lights ON and the
buzzer beeps 10 times.
The error message is displayed on the SolarEdge mobile app screen.
If the error persists- contact SolarEdge Support.
Error code
Displayed Error message
Description and Troubleshooting
3x85
EVSE Comm. Error
An internal communication error.
When this error occurs, the red
LED is not lit, the buzzer does not
beep and charging is not affected.
Check that the internal connections
on the communication board are
properly done.
1Cx1; 1Cx8
Over Current
Press Charge Now
EV Charger AC over current.
Press the Charge Now
pushbutton on the Connection
Unit with Safety Switch, see
Figure 5.
-or-
Tap Charge Now on the EV
Charger tab of the Monitoring
App
1Cx2; 1xC9
Over Voltage
Press Charge Now
EV Charger AC voltage too high.
Press the Charge Now
pushbutton on the Connection
Unit with Safety Switch, see
Figure 5.
-or-
Tap Charge Now on the EV
Charger tab of the Monitoring
App
1Cx3,Cx14;
1Cx15
Ground Fault (RCD)
Press Charge Now
EV Charger ground fault detected.
Press the Charge Now
EV Charging Single Phase Inverter MAN-01-00629-1.2
65 EV Charger-related Troubleshooting
Displayed Error message
Description and Troubleshooting
pushbutton on the Connection
Unit with Safety Switch, seeFigure
5.
-or-
Tap Charge Now on the EV
Charger tab of the Monitoring
App
1Cx4; 1Cx5;
1Cx12 -1Cx13
Internal Error
Disconnect from EV
Internal error.
Disconnect the EV Charger cable
from the vehicle.
Turn the inverter AC circuit
breaker OFF and ON.
Reconnect the EV Charger Cable
to the vehicle
1CxB/D; 1Cx10 -
1Cx11
Interface Error (Pilot) Press
Press Charge Now
Press the Charge Now
pushbutton on the Connection
Unit with Safety Switch, see
Figure 5.
-or-
Tap Charge Now on the EV
Charger tab of the Monitoring
App
1Cx6
Ground Disconnected
Disconnect from EV
Ground Disconnected.
Disconnect the EV Charger cable
from the vehicle.
Contact SolarEdge Support.
1Cx7
Over Temperature
EV Charger over temperature
Verify proper clearances around the
inverter and EV Charger Cable.
After verification reconnect the EV
charger cable to the EV.
1CxA
Under Voltage
EV Charger AC voltage too low.
Chapter 7: Errors and Troubleshooting 66
EV Charging Single Phase Inverter MAN-01-00629-1.2
Displayed Error message
Description and Troubleshooting
Press Charge Now
Press the Charge Now
pushbutton on the Connection
Unit with Safety Switch, see
Figure 5.
-or-
Tap Charge Now on the EV
Charger tab of the Monitoring
App
1CxC
Vent not supported
Disconnect from EV
The SolarEdge EV charger does not
charge vehicles that require
ventilation while charging. If this
error occurs, the vehicle cannot be
charged.
1CxE;1CxF
Charging retries ended
Disconnect from EV
Charging retries ended
Disconnect the EV Charger cable
from the vehicle.
Contact SolarEdge Support.
EV Charging Single Phase Inverter MAN-01-00629-1.2
67 EV Charger-related Troubleshooting
Troubleshooting Ethernet (LAN) Communication
The possible errors and their troubleshooting are detailed in the following table:
Error Message
Possible Cause and Troubleshooting
LAN cable disconnected
Physical connection fault. Check the cable pin-
out assignment and cable connection.
Refer to "Creating an Ethernet (LAN)
Connection" on page 57
No DHCP
IP settings issue. Check the router and
configuration. Consult your network IT.
Configure Static IP or set to DHCP
Gateway not responding
Ping to router failed. Check the physical
connection to the switch/ router. Check that
the link LED at the router /switch is lit
(indicating phy-link). If OK - contact your
network IT, otherwise replace the cable or
change it from cross to straight connection.
No Internet connection
Ping to google.com failed. Connect a laptop
and check for internet connection. If internet
access is unavailable, contact your IT admin or
your internet provider.
For Wi-Fi networks, ensure that user-name and
password are as defined in the internet
provider AP/ router.
No connection to SolarEdge servers
Ping or connection to SolarEdge server failed.
Check the SolarEdge server address, under LAN
Conf sub-menu:
Address: prod.solaredge.com
Port: 22222
Check with your network administrator
whether a firewall or another device is blocking
transmission.
Chapter 7: Errors and Troubleshooting 68
EV Charging Single Phase Inverter MAN-01-00629-1.2
Troubleshooting RS485 Communication
If the message RS485 Master Not Found appears in the Status screen, check the
connections to the master device and fix if required.
If after slave detection the number of slaves displayed for the master under RS485-
2 Conf è Slave Detect is lower than the actual number of slaves, refer to the
following application note to identify missing slaves and troubleshoot connectivity
problems: https://www.solaredge.com/sites/default/files/troubleshooting_
undetected_RS485_devices.pdf
Additional Troubleshooting
1. Check that the modem or hub/router is functioning properly.
2. Check that the connection to the internal connector on the communication board is
properly done.
3. Check that the selected communication option is properly configured.
4. Use a method independent of the SolarEdge device to check whether the network
and modem are operating properly. For example, connect a laptop to the Ethernet
router and connect to the Internet.
5. Check whether a firewall or another type of network filter is blocking
communication.
EV Charging Single Phase Inverter MAN-01-00629-1.2
69 Troubleshooting Communication
Power Optimiser Troubleshooting
Problem
Possible Cause and Troubleshooting
Pairing failed
Power optimisers are shaded.
If you connected the inverter to the monitoring
platform, retry pairing remotely (during
sunlight). Make sure to leave the inverter
ON/OFF/P switch ON and that S_OK appears in
the status screen.
String voltage is 0V
Power optimiser (s) output is disconnected.
Connect all power optimiser outputs.
String voltage not 0V but lower than
number of optimisers
Power optimiser(s) not connected in the string.
Connect all power optimisers.
Panel(s) not connected properly to power
optimiser inputs (not applicable to smart panels).
Connect the panels to the optimiser inputs.
String reverse polarity.
Check string polarity using a voltmeter and
correct if needed.
Chapter 7: Errors and Troubleshooting 70
EV Charging Single Phase Inverter MAN-01-00629-1.2
Possible Cause and Troubleshooting
String voltage is higher than number
of optimisers
WARNING!
If the measured voltage is
too high, the installation
may not have a safe low
voltage. PROCEED WITH
CARE! A deviation of ±1%
per string is reasonable.
Extra power optimiser(s) connected in the string
(not applicable to smart panels).
Check if an extra power optimiser is connected
in the string. If not – proceed to next solution.
A panel is connected directly to the string,
without a power optimiser (not applicable to
smart panels).
Verify that only power optimisers are connected
in the string and that no panel outputs are
connected without a power optimiser. If the
problem persists, proceed to the next step.
Power optimiser(s) malfunction.
1. Disconnect the wires connecting the power
optimisers in the string.
2. Measure the output voltage of each power
optimiser to locate the power optimiser that
does not output 1V safety voltage. If a
malfunctioning power optimiseris located,
check its connections, polarity, panel, and
voltage.
3. Contact SolarEdge Support. Do not continue
before finding the problem and replacing the
malfunctioning power optimiser. If a
malfunction cannot be bypassed or resolved,
skip the malfunctioning power optimiser,
thus connecting a shorter string.
EV Charging Single Phase Inverter MAN-01-00629-1.2
71 Power Optimiser Troubleshooting
Appendix A: Replacing and Adding System
Components
NOTE
If you are permanently disassembling the installation or part of it, make sure to
use the disposal methods dictated by local regulations.
Fuse Replacement
The inverter is equipped with a fuse, located at the top right corner of the inverter.
Fuse replacement kits are available from SolarEdge or you can use other fuses with
identical ratings.
1.
1. Turn OFF the inverter ON/OFF/P switch, and wait until the green LED is blinking,
indicating that the DC voltage is safe (<50V), or wait five minutes before continuing
to the next step.
Turn OFF the Connection Unit with Safety Switch(if applicable).
2. Open and remove the inverter cover.
3. Remove the existing fuse from the upper corner of the inverter and replace with a
new fuse.
4. Close the inverter cover.
Figure 24: Inverter fuse
5. Turn ON:
The inverter ON/OF/P switch
Appendix A: Replacing and Adding System Components 72
EV Charging Single Phase Inverter MAN-01-00629-1.2
The Connection Unit with Safety Switch(if applicable)
6. Verify proper system operation.
Replacing an Inverter
1. Turn OFF the inverter ON/OFF/P switch, and wait until the green LED is blinking ,
indicating that the DC voltage is safe (<50V), or wait five minutes before continuing
to the next step.
2. Turn OFF the Connection Unit with Safety Switch.
3. Disconnect the AC to the inverter by turning OFF the AC circuit breaker of the
distribution panel.
4. Open the Connection Unit with Safety Switch cover: Release the four Allen screws
and remove the cover.
5. Open the inverter cover as described in Removing the Inverter Cover on page 56.
6. Disconnect the DC wires from the inverter and the AC wires from the Connection
Unit with Safety Switch.
Figure 25: DC and AC connections
7. Disconnect the wires connected between the inverter and the Connection Unit with
Safety Switch:
Antenna cable from the communication board
RS485 connection from the communication board
Grounding cable
8. Disconnect the Connection Unit with Safety Switch from the inverter by opening the
two clips securing the Connection Unit with Safety Switch to the inverter: Carefully
place a screwdriver between the clip and the enclosure and pull the clip.
EV Charging Single Phase Inverter MAN-01-00629-1.2
73 Replacing an Inverter
Figure 26: Disconnecting the Connection Unit with Safety Switch from the inverter
9. Remove the screws securing the inverter to the mounting brackets and lift the
inverter from the mounting bracket.
Figure 27: Mounting brackets
Appendix A: Replacing and Adding System Components 74
EV Charging Single Phase Inverter MAN-01-00629-1.2
If you remove the old inverter and do not immediately install a new one, then:
Lock the Connection Unit with Safety Switch in the OFF position using a
lock on the switch.
Secure the Connection Unit with Safety Switch bracket to the wall/pole,
using 3 screws
Use insulation tape to isolate each of the AC and DC wires.
Seal the open conduits using duct tape.
Install the Connection Unit with Safety Switch sealing cover supplied with
the inverter and secure with retaining clips.
10. Place the new inverter on the mounting brackets and secure it using the screws.
11. Insert the wires from the Connection Unit with Safety Switch into the openings in
the inverter and the ferrite bead.
12. Fasten the two clips securing the Connection Unit with Safety Switch to the inverter.
13. Reconnect the cables: Follow the instructions of Installing the Inverter on page 23.
14. Close the inverter and Connection Unit with Safety Switch covers.
15. Perform the commissioning steps as described in Activating, Commissioning and
Configuring the System on page 36.
Replacing the Connection Unit with Safety Switch
1. Turn OFF the inverter ON/OFF/P switch, and wait until the green LED is blinking ,
indicating that the DC voltage is safe (<50V), or wait five minutes before continuing
to the next step.
2. Turn OFF the AC breaker of the distribution panel and the Connection Unit with
Safety Switch .
3. Open the Connection Unit with Safety Switch cover: Release the four Allen screws
and remove the cover.
4. Open the inverter cover as described in Removing the Inverter Cover on page 56.
EV Charging Single Phase Inverter MAN-01-00629-1.2
75 Replacing the Connection Unit with Safety Switch
5. Disconnect the DC wires from the inverter and the AC wires from the Connection
Unit with Safety Switch.
6. Disconnect the wires connected between the inverter and the Connection Unit with
Safety Switch:
Antenna cable from the communication board
RS485 and/or Ethernet connection from the communication board
Grounding cable
7. Open the Connection Unit with Safety Switch bracket screws.
Figure 28: Connection Unit with Safety Switch bracket
8. Disconnect the Connection Unit with Safety Switch from the inverter by opening the
two clips securing the Connection Unit with Safety Switch to the inverter: Carefully
place a screwdriver between the clip and the enclosure and pull the clip.
Figure 29: Disconnecting the Connection Unit with Safety Switch from the inverter
9. Detach the Connection Unit with Safety Switch from the inverter.
10. Place the new Connection Unit with Safety Switch and secure it to the inverter using
the clips.
11. Insert the wires from the inverter into the openings in the Connection Unit with
Safety Switch and the ferrite bead.
Appendix A: Replacing and Adding System Components 76
EV Charging Single Phase Inverter MAN-01-00629-1.2
12. Reconnect the cables: Follow the instructions of Installing the Inverter on page 23.
13. Close the inverter cover.
14. Fasten the Connection Unit with Safety Switch bracket using a standard bolt.
15. Perform the commissioning steps as described in Activating, Commissioning and
Configuring the System on page 36.
EV Charging Single Phase Inverter MAN-01-00629-1.2
77 Replacing the Connection Unit with Safety Switch
Appendix B: Connecting the Energy Meter To
the Inverter
This section provides instructions for connecting an Energy meter to the EV Charging
Single Phase Inverter.
For Smart Energy Management applications, such as maximizing self-consumption, the
EV Charging Single Phase Inverter requires an Energy Meter.
To install the Energy Meter, refer to the installation guide supplied with it:
http://www.solaredge.com/files/pdfs/solaredge-meter-installation-guide.pdf
Energy Meter DIP Switches
Energy Meter ID DIP Switches
The ID DIP switches are used to set the Modbus address of the meter. The
addressing options are listed in the table below. See the figureID and termination DIP
switches on page 79 for switch direction guidelines.
Table 1: Energy Meter ID DIP Switches
Modbus Address
ID 1
ID 2
ID 3
0
Down
Down
Down
1
Up
Down
Down
2
Down
Up
Down
3
Up
Up
Down
4
Down
Down
Up
5
Up
Down
Up
6
Down
Up
Up
7
Up
Up
Up
Energy Meter Termination DIP Switches
The Termination DIP switches are used to configure RS485 wiring termination. The
termination options are listed in the table below. See the figureID and termination DIP
switches on page 79 for switch direction guidelines and refer to Table 1.
Table 2: Energy Meter ID DIP Switches
RS485 Termination
TERM 1 TERM 2
Terminated
Down
Down
Not Terminated (factory default)
Up
Up
Appendix B: Connecting the Energy Meter To the Inverter 78
EV Charging Single Phase Inverter MAN-01-00629-1.2
Figure 30: ID and termination DIP switches
To connect the Energy Meter to the inverter:
1. Connect one end of the communication cable to the Energy Meter, as explained in
the Energy Meter's installation guide.
2. Remove the seal from one of the openings inthe communication gland at the
bottom of the inverter and insert the RS485 wires from the meter through the
opening.
Figure 31: Meter connection
3. Remove the 3-pin connector from the RS485-1 port on the communication board.
4. Loosen the screws of the connector and remove the DC-to-DC unit wires. Twist the
DC-to-DC unit wires together with the Energy Meter wires (B with B, A with A, G
with G).
EV Charging Single Phase Inverter MAN-01-00629-1.2
79 Energy Meter DIP Switches
You can use any color wire for each of the A, B and G connections, as long as:
The same color wire is used for all A pins the same color for all B pins and the
same color for all G pins
The wire for G is not from the same twisted pair as A or B.
5. Insert the twisted wires into the connector and tighten them with the screws.
6. Connect the connector back to the RS485-1 port.
7. In the meter, ensure the RS485-1 DIP switch is down. See Figure 30.
8. In the meter, set the Modbus address 1-3 of the meter according to table Table 1
Appendix B: Connecting the Energy Meter To the Inverter 80
EV Charging Single Phase Inverter MAN-01-00629-1.2
Appendix C: SafeDC™
When AC supply to the inverter is shut off (by shutting off the AC breaker at the site), or
when the inverter ON/OFF/P switch is turned to OFF, the DC voltage drops to a safe
voltage of per optimiser.
The SolarEdge inverters are certified for compliance with the following standards as
disconnection devices for PV generators, meaning that they can replace a DC
disconnect:
IEC 60947-3:1999 + Corrigendum: 1999 + A1:2001 + Corrigendum 1:2001 + A2:2005;
DIN EN 60947-3
VDE 0660-107:2006-03
IEC 60364-7-712:2002-05
DIN VDE 0100-712:2006-06.
In compliance with these standards, the disconnection mechanism operates as follows:
1. Turn the inverter ON/OFF/P switch, located at the bottom of the inverter, to OFF, or
disconnect the AC by shutting off the AC breaker at the site. The DC voltage
displayed on the SetApp screen begins to decrease.
2. When the DC voltage reaches a safe voltage, the PV connectors at the input to the
inverter can be disconnected. A galvanic separation then exists between the PV
array and the inverter.
EV Charging Single Phase Inverter MAN-01-00629-1.2
81 Appendix C: SafeDC™
The following figure provides inverter dimensions in mm [in].
Figure 32: Inverter dimensions
Mechanical Specifications 82
EV Charging Single Phase Inverter MAN-01-00629-1.2
Technical Specifications - EV Charging Single
Phase Inverter - (Australia)
Inverter Specifications
OUTPUT
SE5000H-AU
Unit
Rated AC Power Output
5000
VA
Max AC Power Output
5000
VA
AC Output Voltage (Nominal)
220 / 230
Vac
Maximum Continuous Output
Current
23
A
Current 14 23 A Total Harmonic
Distortion (THD)
< 3
A
Power factor
1, adjustable -0.8 to 0.8
Total harmonic distortion
< 3%
Utility Monitoring, Islanding
Protection, Country Configurable
Thresholds
Yes
INPUT
Maximum DC Power
7750
W
Transformer-less, Ungrounded
Yes
Maximum Input Voltage
480
Vdc
Nominal DC Input Voltage
380
Vdc
Maximum Input Current
13.5
Adc
Reverse-Polarity Protection
Yes
Ground-Fault Isolation Detection
600 kΩ Sensitivity
Maximum Inverter Efficiency
99.2
%
CEC Weighted Efficiency
99
%
Nighttime Power Consumption
< 2.5
W
EV Charging Single Phase Inverter MAN-01-00629-1.2
83 Technical Specifications - EV Charging Single Phase Inverter -
(Australia)
RS485, Ethernet, ZigBee for Smart Energy
(1)(optional), Wi-Fi (requires antenna) (2)
(optional)
Smart Energy Management
Export Limitation and Excess Solar
Charging(3)
Inverter Commissioning
with the SetApp mobile application using
built-in Wi-Fi access point for local
connection, Cellular (optional)
STANDARD COMPLIANCE
Safety
IEC62109, AS/NZS3100
Grid Connection Standards
AS/NZS4777:2015
Emissions
IEC61000-6-2, IEC61000-6-3, IEC61000-3-
11, IEC61000-3-12, FCC Part 15 Class B
INSTALLATION SPECIFICATIONS
AC Output Conduit Size / Wire cross
section
25mm Maximum / 1-13 mm2
DC Input Conduit Size / # of Strings
/ Wire cross section
25mm Maximum / 1-2 srings / 1-13 mm2
Dimensions with Connection Unit
with Safety Switch (HxWxD)
450 x 370 x 174
mm
Weight with Connection Unit with
Safety Switch
11.4
kg
Noise
<25
dBA
Cooling
Natural Convection
Operating Temperature Range
-40 to +60(4)
°F/ °C
Protection Rating
IP65 — Outdoor and Indoor
(1)For more information refer to: https://www.solaredge.com/sites/default/files/se-device-
control-zigbee-module-datasheet.pdf
(2)Wi-Fi connectivity requires an external antenna. For more information refer to:
https://www.solaredge.com/sites/default/files/se-wifi-zigbee-antenna-datasheet.pdf
(3)Import/Export meter is required for Export Limitation and for controlled Excess Solar charging
(4)Full power up to at least 50°C/122°F . For power de-rating information refer to:
https://www.solaredge.com/sites/default/files/se-temperature-derating-note.pdf
Technical Specifications - EV Charging Single Phase Inverter - (Australia) 84
EV Charging Single Phase Inverter MAN-01-00629-1.2
Default Trip Limits and Times According to IEEE1547
NOTE
The inverters are equipped with adjustable utility protective function set-
points, and can be aggregated above 30kW on a single Point of Common
Connection. The default settings are in compliance with IEEE1547. Utility
authorization is required to change these set-points.
Voltage Range (% of Base Voltage) Maximum Clearing Time (Sec)
V < 50%
0.16
50 % < V < 88%
2.00
110% < V < 120%
1.00
V > 120 %
0.16
Frequency Range (Hz)
Maximum Clearing Time (Sec)
> 60.5
0.16
< 59.3 (Hawaii – 57)
0.16
Recommended OCPD Size per Grid
Inverter
Maximum Output
Current (A)
Minimum Fuse Rating
(A)
Maximum Fuse
Rating (A)
SE5000H-AU
21
30
50
EV Charging Single Phase Inverter MAN-01-00629-1.2
85 Default Trip Limits and Times According to IEEE1547
EV Charger and EV Charger Cable Specifications
NOTE
The EV Charging inverter and EV Charger cable are ordered separately.
OUTPUT- AC (EV CHARGER)
Charging Mode
AC Mode 3
Connection to the SolarEdge monitoring
platform is required for first EV charging
Minimum charge rate (1)
1.5
kW
Rated AC Power Output(grid &
PV)(2)
7400
W
Nominal AC Output Voltage
230
Vac
Nominal AC Frequency
50 / 60
Hz
Maximum Continuous Output
Current @230V
32
Aac
Residual Current Detector (AC)
30
mA rms
ADDITIONAL FEATURES
EV Charger Status LEDs, Fault
Indicator
Yes
EV Charger Ground Connection
Monitoring
Yes, continuous
EV Charger Configuration
Via the monitoring app; Ethernet or Wi-Fi
connection is required (3)
EV Charger Unplugging
Detection
Yes, current termination according to IEC
62196
STANDARD COMPLIANCE
Safety
IEC 61851, IEC 62752:2016
EV Charger
IEC 62196
INSTALLATION SPECIFICATIONS
EV Charger Connector
IEC 62196 Type 1 /Type 2
EV Charger Cable Length(4)
7.6 (4.5 option)
m
(1)Minimum charge rate is in compliance with IEC61851-1 and J1772™ FEB2016 standards.
(2)Minimum charge rate 1.5 kW
(3)Cellular connection may be used; requires a SIM card with a 1GB data plan that should be
purchased from a cellular provider
(4) EV Charger cable ordered separately.
Technical Specifications - EV Charging Single Phase Inverter - (Australia) 86
EV Charging Single Phase Inverter MAN-01-00629-1.2
EV Charger Cable Weight
5.7 (3.5 for 4.5m option)
kg
EV Charger Cable Operating
Temperature Range
-30 to +50
°C
Protection Rating (connected to
EV or with dust cap)
IP54
EV Charging Single Phase Inverter MAN-01-00629-1.2
87 EV Charger and EV Charger Cable Specifications
Support Contact Information
If you have technical problems concerning SolarEdge products, please contact us:
https://www.solaredge.com/service/support
Before contact, make sure to have the following information at hand:
Panel and serial number of the product in question.
The error indicated on the product SetApp mobile application or on the
monitoring platform or by the LEDs, if there is such an indication.
System configuration information, including the type and number of panels
connected and the number and length of strings.
The communication method to the SolarEdge server, if the site is connected.
The product's software version as it appears in the status screen.
Support Contact Information 88
EV Charging Single Phase Inverter MAN-01-00629-1.2