Porta-Dock 1265V Instructions Manual

Text of the manual

U:\Instructions - CURRENT\Lifts\A3 LIFT INST 1265 V FLB.doc

PG. 1 OF 11 PORTA-DOCK, INC. 210A FLB VERTICAL 1265V LIFT W/ GEAR DRIVE WINCH Thank you for purchasing our product! Please read these instructions and follow them step by step.* STEP 1. Separate and group like parts and fasteners together. Locate the winch side member with the longer upright tube and diagonal braces (REF. # 1). Lay this side member on its side with the corner angles up. Slide the leveling legs (REF. # 4) into the side member uprights. Secure in place with 1/2" X 3/4” set screws (REF. # 19). Repeat with the anchor side member. STEP 2. Locate the two 2 X 2” X 64 1/2” bottom cross tubes (REF. # 5) Using two people stand the side member up on it’s leveling legs. With one person balancing the side member, bolt the bottom cross tube to the corner angles using 1/2” X 3” bolts, washers, and nuts (REF. # 24, 25, & 26). Leave nuts finger tight.

U:\Instructions - CURRENT\Lifts\A3 LIFT INST 1265 V FLB.doc

PG 2 OF 11 STEP 3. Locate the 2” X 3” X 68 1/8” top bed cross tubes. The tube with a single cable protruding from each end is the winch bed cross tube (REF. # 6). The other one with the two cables on each end is the anchor cross tube (REF. # 7). From the inside of the lift frame, on the winch end, place the winch bed cross tube across the end of the lift, so that the nylon slide angles are up against the inside corners of the side member upright tubes. Take the anchor cross bed tube and place across the other end of the lift frame so that the bottom loops of the cable are in the cutout holes of the bottom side tube of the side members and the nylon slide angles are against the uprights as on the other bed cross. STEP 4. Assembly may be easier if 2” X 4” ‘s are laid diagonally on the end across the bottom four corners of the lift and the bed is assembled on top of the 2” X 4” ‘s. Take the two 1” X 3” X 64 1/8” side bed tube cable assembly tubes (REF. # 8 & 9). With the cable loop end down and toward the winch end of the lift, fasten the angle end of the side rail tube to the two holes in the bed cross tubes with 3/8” X 3” bolts, washers, & nuts (REF. # 16, 21 & 23). Place cable loops into the cutout holes of the bottom tube of the side members. Secure in place with 3/8” X 3” bolts, and nuts (REF. # 18 & 23). Secure the cable loops of the anchor bed cross tubes, on the other end of the lift with 3/8” X 2 1/2” stainless steel bolts and nuts. (REF. # 18 & 23). Using a tape measure, square the corners of the lift to within 1/4” or less. Tighten all bolts at this time.

U:\Instructions - CURRENT\Lifts\A3 LIFT INST 1265 V FLB.doc

PG 3 OF 11 STEP 5. Bolt the winch to the inside of the winch upright with a 3/8”x 3” bolts, washers, fender washer, and nuts (REF. # 16, 21, 20, & 23) NOTE: the 3/8” fender washer goes against the tube on the top hole only. Find the end of the lift cable, thread the end of the cable through the hole in the side of the winch drum and secure with the cable clip, carriage bolt, and nut. Thread on the winch wheel (REF. # 10) and secure with the winch hardware. STEP 6. As a reference the corners are marked below on the assembly drawing. At corner B slide a rubber stop tube (Ref.no.11) onto the cable. Fasten the cable stud to the top cross tube of the anchor side member using a 3/8” fender washer, 3/8” washer, and 3/8" locknut (REF. # 20, 21, & 22). At corner C slide a rubber stop tube (REF. # 11) onto the cable that is farthest from the upright tube. Fasten both cable studs to the top cross tube of the anchor side member using a 3/8” fender washer, 3/8” washer, and 3/8” locknut (REF. # 20, 21, & 22). At corner D slide a rubber stop tube (REF. # 11) onto the cable that is farthest from the upright tube. Fasten both cable studs to the winch side member at the horizontal stub with a 3/8” fender washer, 3/8” washer, and 3/8" locknut (REF. # 20, 21 & 22). While standing on the double cable corner of the lift bed, adjust the nuts on the cable studs until the cables have the same amount of tension and the bed is just off the 2” X 4”‘s. Repeat procedure on the other double cable corner; place a bolt cap (REF. # 27) onto each cable stud.

U:\Instructions - CURRENT\Lifts\A3 LIFT INST 1265 V FLB.doc

PG 4 OF 11 STEP 7. Find the four bunk mounting angles (1 ¾” X 1 ¾” X 9” angle with multiple holes), (REF. # 12). Bolt the angles to the bed as shown using 3/8” X 3” X 3 1/6” U-Bolts, washers, & nuts (REF. # 28. 21 & 23). Leave loose at this time. STEP 8. Set the bunk assembly (REF. # 12) on the bunk mounting angles. With the tabs on the bunk assembly to the outside of the angles. Bolt in place with 3/8” X 1 ½” bolts, washers, and locknuts (REF. # 29, 21, & 22). Before tightening the bolts, tip the bunks to the center of the bed. Adjust bunks to the desired width then tighten the nuts on the U-bolts.

U:\Instructions - CURRENT\Lifts\A3 LIFT INST 1265 V FLB.doc

PG 5 OF 11 STEP 9. Bolt the four diagonal braces (REF. # 14) into the four bottom corners of the lift by placing a 3/8” X 3” bolt and washer (REF. # 16 & 21) thru the round hole of the brace and into the hole of the bottom cross tube and finger tighten with washer & nut (REF. # 21 & 23). Place a 3/8” X 1 1/4” carriage bolt (REF. # 17) thru the square hole in the tab on the upright tube and through the slotted hole of the brace, secure with 3/8” washers and nuts (REF. # 21 & 23). Tighten bottom bolts at this time. Check to see if the side upright tubes are parallel with each other. Adjust if necessary by loosening the top bolt and pushing in or pulling out on the tube. When adjusted correctly, tighten the top bolts of the braces. STEP 10. Place the 2” square caps onto the three uprights that don’t have the winch on them and the stub with the gusset under it on the winch side. When placing lift in the lake, you must level the lift as close as possible for the lift to operate correctly. When tightening your set screws, finger tighten until tight and then tighten 2 ½ to 3 ½ turns after you start feeling resistance with a wrench. When raising your boat, check and see if the bed is raising evenly and that all cables have about the same tension. If the lift bed is coming up crooked, check the lift for levelness. If the lift is not level remove the boat and adjust the leveling legs to level it. Check the tension of the cables after the bed has had weight on it and been raised and lowered a few times. If there is excess slack in any of the cables tighten the nut on that cable.

U:\Instructions - CURRENT\Lifts\A3 LIFT INST 1265 V FLB.doc

PG 7 OF 11 210A 1265V FLB VERTICAL LIFT CHAIN DRIVE WINCH REF. # PART NO. DESCRIPTION QTY 1 75F SIDE MEMBER WINCH 1 2 74F SIDE MEMBER ANCHOR 1 3 3180 WINCH DL 1200 1 4 62H LEVELING LEG 4 5 20032 BOTTOM CROSS TUBE 2 6 78F WINCH END BED CROSS TUBE 1 7 79F ANCHOR CROSS TUBE 1 8 76F SIDE BED TUBE RIGHT 1 9 77F SIDE BED TUBE LEFT 1 10 23E LIFT WHEEL 1 11 4517 RUBBER STOP 3” 3 12 60300 BUNK MOUNTING ANGLE 4 13 16F BUNK 2 14 20030 DIAGONAL BRACE 4 15 3821 CAP 2” SQUARE GRAY 4 16 5084 3/8” X 3” BOLT 4 17 5187 3/8” X 1 1/4” CARRIAGE BOLT 4 18 5248 BOLT SS 3/8” X 2 ½” 4 19 5170 SET SCREW ½” X ¾” 4 20 5067 FENDER WASHER 3/8” 6 21 5070 WASHER 3/8” 53 22 5038 3/8 NYLOCK NUT 9 23 5056 3/8” NUT 25 24 5122 ½" X 3” BOLT 4 25 5071 ½" WASHER 8 26 5058 ½" NUT 4 27 3828 3/8” BOLT CAP 5 28 5103 U-BOLT 3/8” X 3 1/16” X 3” 4 29 5155 3/8” X 1 ½" BOLT 4

U:\Instructions - CURRENT\Lifts\A3 LIFT INST 1265 V FLB.doc

Pg. 8 OF 11 1265V TOP BED ASSEMBLY PARTS LIST REF. # Part # Description Qty 1. 18F Side Bed Tube Left 1265V 1 2. 19F Side Bed Tube Right 1265V 1 3. 10F Winch End Bed Cross Tube Sgl Cable 1265V 1 4. 11F Anchor End Bed Cross Tube Dbl Cable 1265V 1 5. 3319 2 1/2” Nylon Single Pulley 10 6. 4317 Brass Spacer Bushing 4 7. 5092 Hitch Pin 1/8” 8 8. 3191 Cable SS 3/16” x 118” 1265V 2 9. 3193 Cable SS 3/16” x 123 3/4” 1265V 2 10. 3194 Cable Galv. 1/4” x 200” 1265V 1 11. 5247 Clevis Pin SS .625” x 2.5” 4 12. 4994 Machine Flat Head 1/4” x 7/8” Screw 4 13. 5053 Locknut 1/4” Keps 4 14. 20038 Plastic Slide Angle 4 15. 5243 5/8” SAE Washer 16 16. 4313 Brass Bushing .502 I.D. X .6875 4 17. 5009 Clevis Pin .50 X 1.25 4 18. 4314 Brass Bushing .502 I.D. X 1.50 4

U:\Instructions - CURRENT\Lifts\A3 LIFT INST 1265 V FLB.doc

PG 9 OF 11 1265V WINCH & ANCHOR BED CROSS TUBE

U:\Instructions - CURRENT\Lifts\A3 LIFT INST 1265 V FLB.doc

PG 10 of 11 1265V SIDE BED TUBE LEFT & RIGHT

Other Lifting Systems Manuals