Sharp 8M-B120 Installation Manuallines

File Specifications

Brand: Sharp
Category: Monitor
Model: 8M-B120 (Installation Manuallines), prxLWfN43K0Xg
File Info: Adobe Acrobat PDF (DjVu)
File Size:
Pages: 52 pages

Download PDF

Download Sharp 8M-B120 Manual (52 pages)

Read Online:

Read the Sharp 8M-B120 Installation Manuallines online using the built-in PDF viewer. This document explains how to operate the device, adjust settings and perform regular maintenance.

Key Pages of Document

Copyright © All rights reserved, SHARP CORPORATION

1. Assemble PIPE B & PIPE C/D CAUTION Please assemble PIPE D at bottom side PIPE C * 3sets PIPE D * 1set 2. Assemble STOPPER RING * 4pcs to PIPE C/D with M5 L=10mm screw *16pcs 3. FIX M5 (L=45mm) screw & M5 NUT to PIPE C/D 5.7 Wall hanging bracket (Assembling procedures) ...

Copyright © All rights reserved, SHARP CORPORATION

Confidential 2.8 Connecting devices 1 You can control monitor functions by PC by connecting LAN. (e.g. power on/off function) We recommend connecting LAN to monitors before installing them in higher place or other places where it is hard to connect cables after installation. They may need in future monitor maintenances. Please refer to Operation Manual on the page of “Operating the Monitor using a PC(IP control)” . -When you use light conversion cable to extend the transmission distance, EDID may not be read accurately. Not reading ...

Copyright © All rights reserved, SHARP CORPORATION

Confidential 3. Precautions for transportation ...

Copyright © All rights reserved, SHARP CORPORATION

Confidential 5. Precautions for Installation ...

Copyright © All rights reserved, SHARP CORPORATION

Confidential Precautions for unpacking - More than 2 persons are needed to move the boxed display. - Check the eyebolts on looseness. - This product cannot stand by itself if the enclosed items (stand or bracket) are taken out. When moving, please make sure that all the items are included. - Be sure to check the operation when unpacking. - The bottom pallet and packing box are integrated. Cannot be removed. 4.1 Precautions for unpacking Bottom pallet Forklift can be used from 4 directions Skylight window The box body-mounted eyebolts ca ...

Copyright © All rights reserved, SHARP CORPORATION

Confidential 5.5 Precautions when installing the stand (strength of anchor) The strength required when fixing the anchor is as follows. Calculation condition Anchor bolt pull-out force R 1836N Horizontal seismic intensity for design Kh 1G Vertical seismic intensity for design Kv 0.5G Horizontal seismic force for design Fh 2018.8N Vertical seismic force for design Fv 1009.4N Calculation results {Fh Hg-(g W-Fv) Lg }/{L Nt} Anchor bolt shear force Q 504.7N Fh/n It is assumed that the above force is applied to the anchor bolt. Please select ...

Copyright © All rights reserved, SHARP CORPORATION

Confidential Width Height Boxed display 973mm 1,870mm Cart 900 mm 150mm Margin - Upper 100mm Carry-in space > 1,800 mm > 2,200mm Ceiling Wall Wall 2,200mm 1,800mm 1,800mm * Width is calculated from the corner space Wall Wall Space for installation 3.1 Precautions for transportation of the boxed display A cart should be used for transportation. In order to carry the boxed product on a cart, the following space is necessary. (In case width of a cart is no more than 900mm and height of a cart is no more than150mm) Cart ...

Sharp 8M-B120 user guide recommended for: LC-52LE820E, PN-E601, PN-L501C, TINSE1181MPZZ(2), LL-153A.

⚠️ Download Safety

The Monitor Installation manuallines (52 pages) is completely safe to download (last scan date: 06/04/2026).

Related PDF Instructions for Sharp 8M-B120:

Monitor Equipment: Frequently Requested

Have some Questions about Sharp 8M-B120 Device?

Get valuable and actionable advices from other Sharp 8M-B120 device users. Describe your problem or question, regarding the using of 8M-B120, in as much detail as possible, and other users will be able to answer you.