METHVEN 01-8444 Installation Manual
Read Online
Read the METHVEN 01-8444 Installation Manual online using the built-in PDF viewer.
Text of the manual
Methven Australia Pty Ltd
ABN 15 104 813 390
Melbourne, Australia
www.methven.com
WMKA21005
IMPORTANT
Please read all of the instructions before installation
MA018444
Waipori Wall Top Assembly
01-8444 (Pair)
Use of this product is recommended for domestic and commercial applications.
Domestic and commercial warranty terms and conditions vary. Please refer to the Methven website
for full warranty terms and conditions - www.methven.com
All pipework must be thoroughly flushed prior to the installation of the mixer.
Inline filter washers must be installed on both hot and cold supplies to prevent foreign particles
damaging the ceramic head works.
Do not remove the ceramic head works from the mixer when installing.
Damage caused by hydrostatic testing is not covered by Methven’s warranty.
Methven recommends a licensed plumber carry out all installations in compliance with
the requirements of AS/NZS 3500. This product complies with AS/NZS 3718 regulations.
JANUARY 2012
Installation Guide
www.methven.com
Customer Care Hotline: 1300 METHVEN (638 483)
Email: [email protected]
Note: It is the responsibility of the installer to ensure a water proof seal is achieved between the faceplate
and the finished surface of the wall. If in any doubt about the quality of the seal, the faceplate should be
removed and then reinstalled using silicone to ensure a seal is achieved.
Installation
Ø 35mm
Ø 35mm
Distance from mounting stud to
front of wall lining: Std - 54-64mm
Ext - 64-76mm
Hot
Cold
Do not discard screws
For deeper
installations, remove
short threaded
headworks collars,
replace with long
threaded headworks
collars and spindle
extensions.
1.
2.
3a
4.
3b.
5.
Please check every component in accordance
with the table below
No. Item description
Qty supplied
1
Headworks
2
2
Base ring
2
3
Grub screws
2
4
O-ring
2
5
Locking nut
2
6
Cold handle
2
7
Hot handle
2
THE METHVEN GUARANTEE
The warranty statement shall apply to all tapware & showers supplied by Methven
For more information visit www.methven.com
THIS WARRANTY ISSUED BY: Methven Australia Pty Ltd, Melbourne Australia
Technical Specification
Inlet Connections:
All 1/2" BSP
Operating Pressure:
150kPa - 500kPa
For optimum performance hot and cold water pressures should be equal.
AS/NZS 3500 stipulates a 500kPa maximum operating pressure at any outlet
within a building. Where normal pressure exceeds 500kPa, a pressure limiting
valve must be installed.
Operating Temperature:
Recommended hot water supply 50°C, maximum 70°C. AS/NZS 3500 requires all
hot water supplies to any sanitary fitting to be tempered to 50°C.
Ceramic cartridges:
Warranty claims will be void where the ceramic head works has malfunctioned due
to the presence of the following within the water supply:
Copper tube pieces
Plastic pieces
Sand, dirt or stones
Thread tape
Other objects not normally present in the potable water supplies
www.methven.com
Customer Care Hotline: 1300 METHVEN (638 483)
Email: [email protected]
04-9905
Hot 04-9752
Standard Spindle &
Handle Assembly Set Up
Spindle Handle
Extension 04-9837
Spindle Flange M x F
Extension 04-9875
SPARE PARTS
(NOT INCLUDED)
(NOT INCLUDED)
(NOT INCLUDED)
Cold 0
69
Handle Parts / Assembly
Care and Cleaning
Never use abrasives to clean this
product. Clean regularly with
contamination free warm soapy
water and a damp soft cloth.
Damage caused by using unsuitable
cleaning agents is not covered by
warranty.
Grub screws
Locking nut
Cold handle