Keysight Technologies N5245-60106 Installation Note
Read Online
Read the Keysight Technologies N5245-60106 Installation Note online using the built-in PDF viewer.
Text of the manual
Add 4-Port Capability
Upgrade Kit
To Upgrade PNA-X N5244A or N5245A Option 219 to Option 419
For Analyzers with Serial Numbers Prefixed MY/SG/US5150 and
Below
Upgrade Kit Order Number: N5244AU- 942 and N5245AU- 942
Keysight Kit Number: N5245-60106
© Keysight Technologies, Inc.
2009-2017
No part of this manual may be
reproduced in any form or by any
means (including electronic storage
and retrieval or translation into a
foreign language) without prior
agreement and written consent from
Keysight Technologies, Inc. as
governed by United States and
international copyright laws.
Trademark Acknowledgments
Manual Part Number
N5245-90012
Edition
Edition 1, July 2017
Printed in USA/Malaysia
Published by:
Keysight Technologies
1400 Fountaingrove Parkway
Santa Rosa, CA 95403
Warranty
THE MATERIAL CONTAINED IN THIS
DOCUMENT IS PROVIDED “AS IS,”
AND IS SUBJECT TO BEING
CHANGED, WITHOUT NOTICE, IN
FUTURE EDITIONS. FURTHER, TO
THE MAXIMUM EXTENT PERMITTED
BY APPLICABLE LAW, KEYSIGHT
DISCLAIMS ALL WARRANTIES,
EITHER EXPRESS OR IMPLIED WITH
REGARD TO THIS MANUAL AND
ANY INFORMATION CONTAINED
HEREIN, INCLUDING BUT NOT
LIMITED TO THE IMPLIED
WARRANTIES OF
MERCHANTABILITY AND FITNESS
FOR A PARTICULAR PURPOSE.
KEYSIGHT SHALL NOT BE LIABLE
FOR ERRORS OR FOR INCIDENTAL
OR CONSEQUENTIAL DAMAGES IN
CONNECTION WITH THE
FURNISHING, USE, OR
PERFORMANCE OF THIS
DOCUMENT OR ANY INFORMATION
CONTAINED HEREIN. SHOULD
KEYSIGHT AND THE USER HAVE A
SEPARATE WRITTEN AGREEMENT
WITH WARRANTY TERMS
COVERING THE MATERIAL IN THIS
DOCUMENT THAT CONFLICT WITH
THESE TERMS, THE WARRANTY
TERMS IN THE SEPARATE
AGREEMENT WILL CONTROL.
Technology Licenses
The hardware and/or software
described in this document are
furnished under a license and may be
used or copied only in accordance
with the terms of such license.
U.S. Government Rights
The Software is “commercial
computer software,” as defined
by Federal Acquisition Regulation
(“FAR”) 2.101. Pursuant to FAR
12.212 and 27.405-3 and
Department of Defense FAR
Supplement (“DFARS”) 227.7202,
the U.S. government acquires
commercial computer software
under the same terms by which
the software is customarily
provided to the public.
Accordingly, Keysight provides
the Software to U.S. government
customers under its standard
commercial license, which is
embodied in its End User License
Agreement (EULA), a copy of
which can be found at
http://www.keysight.com/find/sweula
The license set forth in the EULA
represents the exclusive authority
by which the U.S. government
may use, modify, distribute, or
disclose the Software. The EULA
and the license set forth therein,
does not require or permit,
among other things, that
Keysight: (1) Furnish technical
information related to
commercial computer software
or commercial computer
software documentation that is
not customarily provided to the
public; or (2) Relinquish to, or
otherwise provide, the
government rights in excess of
these rights customarily provided
to the public to use, modify,
reproduce, release, perform,
display, or disclose commercial
computer software or
commercial computer software
documentation. No additional
government requirements
beyond those set forth in the
EULA shall apply, except to the
extent that those terms, rights, or
licenses are explicitly required
from all providers of commercial
computer software pursuant to
the FAR and the DFARS and are
set forth specifically in writing
elsewhere in the EULA. Keysight
shall be under no obligation to
update, revise or otherwise
modify the Software. With
respect to any technical data as
defined by FAR 2.101, pursuant
to FAR 12.211 and 27.404.2 and
DFARS 227.7102, the U.S.
government acquires no greater
than Limited Rights as defined in
FAR 27.401 or DFAR 227.7103-5
(c), as applicable in any technical
data.
Safety Notices
A CAUTION notice denotes a
hazard. It calls attention to an
operating procedure, practice, or
the like that, if not correctly
performed or adhered to, could
result in damage to the product
or loss of important data. Do not
proceed beyond a CAUTION
notice until the indicated
conditions are fully understood
and met.
A WARNING notice denotes a
hazard. It calls attention to an
operating procedure, practice, or
the like that, if not correctly
performed or adhered to, could
result in personal injury or death.
Do not proceed beyond a
WARNING notice until the
indicated conditions are fully
understood and met.
Keysight Add 4-Port Capability Upgrade Kit
Upgrade Kit Number: N5245-60106
Installation Note
Description of the Upgrade
This upgrade converts your N5244A or N5245A Option 219 2-port analyzer to
a N5244A or N5245A Option 419 4-port analyzer by adding:
— an additional source
— an additional source synthesizer
— two additional doublers
— an additional mixer brick
— two additional reference couplers
— two additional test port couplers
— two additional bias tees
— two additional source attenuators
— two additional receiver attenuators
— a splitter
— a modified front panel
— many new cables
4 Installation Note N5245-90012
Getting Assistance from Keysight
-
Getting Assistance from Keysight
Installing this upgrade kit requires special skills and experience. If you think
you may not be qualified to do the work, or need advice, contact Keysight.
Contacting Keysight
Assistance with test and measurements needs and information on finding a
local Keysight office are available on the Web at:
http://www.keysight.com/find/assist
If you do not have access to the Internet, please contact your Keysight field
engineer.
If You Have Problems With the Upgrade Kit Contents
Keysight stands behind the quality of the upgrade kit contents. If you have
problems with any item in the kit, refer to www.keysight.com and the Contact
Keysight link.
In any correspondence or telephone conversation, refer to the Keysight
product by its model number and full serial number. With this information,
the Keysight representative can determine whether your product is still
within its warranty period.
Installation Note N5245-90012 5
Getting Prepared
Getting Prepared
To successfully install this upgrade kit, you will need the following:
— A license key - refer to “License Key Redemption” below.
— A PDF copy or a paper copy of the PNA Service Guide - refer to
“Downloading the Online PNA Service Guide” below.
— An ESD-safe work area - refer to “Protecting Your Workspace from
Electrostatic Discharge” below.
— Correct tools - refer to “Tools Required for the Installation” on page 7.
— Enough time - refer to “About Installing the Upgrade” on page 7
— Test equipment for the post-upgrade adjustments and full instrument
calibration. To view the equipment list, click the Chapter 3 bookmark “Tests
and Adjustments” in the PDF Service Guide1
License Key Redemption
To enable the option product, you must request a license key from:
http://www.keysight.com/find/softwarelicense. To complete the request, you
will need to gather the following information:
— From the certificate
— Order number
— Certificate number
— From your instrument
— Model number
— Serial number
— Host ID
The PNA contains extremely sensitive components that can be ruined if
mishandled. Follow instructions carefully when making cable connections,
especially wire harness connections.
The person performing the work accepts responsibility for the full cost of
the repair or replacement of damaged components.
1. See “Downloading the Online PNA Service Guide” on page 6.
The enclosed Option Entitlement Certificate is a receipt, verifying that you
have purchased a licensed option for the PNA of your choice. You must
now use a Keysight Web page to request a license key for the instrument
that will receive the option.
6 Installation Note N5245-90012
Getting Prepared
-
The instrument information is available on the network analyzer – on the
analyzer’s Help menu, click About Network Analyzer.
If you provide an email address, Keysight will promptly email your license key.
Otherwise, you will your receive your license key via postal mail.
Downloading the Online PNA Service Guide
To view the online Service Guide for your PNA model number, use the following
steps:
1. Go to www.keysight.com.
2. In the Search box, enter the model number of the analyzer (Ex: N5245A)
and click Search.
3. Click Technical Support > Manuals.
4. Click Service Manual.
5. Click the service guide title to download the PDF file.
6. When the PDF of the Service Guide is displayed, scroll through the
Contents section bookmarks to locate the information needed.
Protecting Your Workspace from Electrostatic Discharge
For information, click on the Chapter 1 bookmark, “Electrostatic Discharge
Protection” in the PDF Service Guide1.
ESD Equipment Required for the Installation
Description
Keysight Part Number
ESD grounding wrist strap
9300-1367
5-ft grounding cord for wrist strap
9300-0980
2 x 4 ft conductive table mat and 15-ft grounding wire
9300-0797
ESD heel strap (for use with conductive floors)
9300-1308
Installation Note N5245-90012 7
Getting Prepared
Tools Required for the Installation
About Installing the Upgrade
Description
Qty
Part Number
T-6 TORX driver - set to 4 in-lbs (0.45 N.m)
1
N/A
T-10 TORX driver - set to 9 in-lbs (1.02 N.m)
1
N/A
T-20 TORX driver - set to 21 in-lbs (2.38 N.m)
1
N/A
5/16-in (8 mm) nutsetter or open end torque wrench - set to
10 in-lbs (1.13 N.m)
1
N/A
5/16-in (8 mm) nutsetter or open end torque wrench - set to
21 in-lbs (2.38 N.m)
1
N/A
3/16-in (5 mm) nutsetter or open end torque wrench - set to 6
in-lbs (0.68 N.m)
1
N/A
5/8-in (16 mm) nutsetter or open end torque wrench - set to
21 in-lbs (2.38 N.m)
1
N/A
9 mm nutsetter or open end torque wrench - set to 21 in-lbs
(2.38 N.m)
1
N/A
1-in (25.4 mm) torque wrench - set to 72 in-lbs (8.15 N.m)
1
N/A
1/4-in (6 mm) open end wrench
1
N/A
Use a 5/16-in torque wrench set to 10 in-lbs on all cable connections
except the front and rear panel cable connectors. On these, use a 9 mm
nutsetter or open end torque wrench set to 21 in-lb.
Products affected
N5244A and N5245A Option 219
Installation to be performed by
Keysight service center or personnel qualified by Keysight
Estimated installation time
5 hours
Estimated adjustment time
0.5 hours
Estimated full instrument calibration time
4.5 hours
8 Installation Note N5245-90012
Items Included in the Upgrade Kit
-
Items Included in the Upgrade Kit
Check the contents of your kit against the following list. If any part is missing or
damaged, contact Keysight Technologies. Refer to “Getting Assistance from
Keysight” on page 4.
Table 1
Contents of Upgrade Kit N5245-60106
Ref
Desig.
Description
Qty
Part Number
-
Installation note (this document)
1
N5245-90012
A10
26.5 GHz source (2) assembly
1
5087-7780
A12
Doubler assembly, port 3
2
5087-7349
A13
Doubler assembly, port 4
A17
13.5 GHz source 2 synthesizer boarda
3
N5240-60076
A28
Mixer brick (2)
1
5087-7323
A30
Test port 3 reference coupler
2
5087-7760
A31
Test port 4 reference coupler
A34
Test port 3 coupler
2
5087-7793
A35
Test port 4 coupler
A39
Test port 3 source attenuator
2
33325-60022
A40
Test port 4 source attenuator
A43
Test port 3 bias tee (includes wire harness)
2
5087-7789
A44
Test port 4 bias tee (includes wire harness)
A47
Test port 3 receiver attenuator
2
33325-60023
A48
Test port 4 receiver attenuator
A26
Splitter
1
5067-4086
A69
3 dB pad, attached to R4 connector on A28 mixer brick
1
08490-60010
-
Front frame, diecast, 4-port
1
N5247-20141
-
Test set front plate, 4-port
1
N5224-00005
-
Machine screw, M3.0 x 6, flat head (to attach lower front dress panel to
the test set front plate)
4
0515-1227
-
Machine screw, M2.0 x 6, flat head (to attach 2 reference couplers to
brackets)
8
0515-1602
-
Machine screw, M3.0 x 25, pan head (to attach mixer brick A28 to
mounting block)
3
0515-0667
Installation Note N5245-90012 9
Items Included in the Upgrade Kit
-
Machine screw, M4.0 x 10, pan head (2 to attach source 2 to chassis; 2
to attach A12 doubler 3 to chassis; 2 to attach A13 doubler 4 to chassis)
6
0515-0380
-
Machine screw, M3.0 x 8, pan head (3 to attach shield to mixer brick; 8
to attach 2 src attn and 2 rcvr attn to brackets; 4 to attach 2 bias tee
brackets to chassis; 1 to attach cable bracket to deck)
16
0515-0372
-
Machine screw, M2.5 x 16, pan head (to attach splitter to mixer brick)
2
0515-2007
-
Machine screw, M3.0 x 6, pan head (4 to attach 2 receiver
attenuator/bracket assy. to deck; 4 to attach 2 source
attenuator/bracket assy to deck)
8
0515-0430
-
Machine screw, M3.0 x 10, pan head (4 to attach 2 reference
coupler/bracket assemblies to deck)
4
0515-0374
-
Machine screw, M3.0 x 14, pan head (to attach 2 bias tees to brackets)
4
0515-2994
-
Front panel overlay (label), 4-port
1
N5242-80003
-
Nameplate, N5245A
1
N5245-80003
-
Nameplate, N5244A
1
N5244-80001
-
Gap pad (between each coupler and test set front sub panel)
4
E4403-20033
-
Gap pad (between mixer brick A28 and shield)
4
N5245-20125
-
Power button overlay (label)
1
N5242-80007
-
50 ohm load, attached to W58 (N5245-20095)
1
1810-0118
-
Vibration mount (between couplers 1 & 3, and 2 & 4)
2
0460-2725
-
Mounting nuts (for port 3 & 4 test port couplers)
2
5022-1087
-
Cable guard, center jumper cables
1
N5242-00030
-
Cable tie wrap, 1 to secure W21 (N5245-20008) to side of deck
5
1400-0249
-
Cable clamp, 1 to secure W25 (N5245-20116) to deck
5
1400-1334
-
Bracket for bias tee
2
N5245-00011
-
Bracket for reference coupler
2
N5245-00017
-
Bracket for cables
1
N5245-00022
-
Bracket for source attenuator and receiver attenuator
4
N5245-00015
-
Dust caps for test ports
4
1401-0214
W2
A10 (source 2) P1 to A17 13.5 GHz source (2) synthesizer J1207
1
N5245-20100
W7
A10 (source 2) P5 to A12 port 3 doubler
1
N5245-20034
Table 1
Contents of Upgrade Kit N5245-60106
Ref
Desig.
Description
Qty
Part Number
10 Installation Note N5245-90012
Items Included in the Upgrade Kit
-
W8
A10 (source 2) P3 to A13 port 4 doubler
1
N5245-20035
W9
A10 (source 2) P4 to A12 port 3 doubler
1
N5245-20032
W10
A12 port 3 doubler to A13 port 4 doubler
1
N5245-20033
W13
A12 port 3 doubler to W14
1
N5245-20036
W14
A30 port 3 reference coupler to W13
1
N5245-20043
W15
A13 port 4 doubler to W16
1
N5245-20036
W16
A31 port 4 reference coupler to W15
1
N5245-20044
-
50 ohm load, attached to W58 (N5245-20095)
1
1810-0118
W21
A29 port 1 reference coupler to A37 reference mixer switch
1
N5245-20008
W22
A33 port 1 coupler to front-panel Port 1 CPLR ARM
1
N5245-20014
W25
A30 port 3 ref coupler to front-panel REF 3 SOURCE OUT
1
N5245-20116
W26
A34 port 3 coupler to front-panel Port 3 CPLR ARM
1
N5245-20015
W29
A31 port 4 ref coupler to front-panel REF 4 SOURCE OUT
1
N5245-20117
W30
A35 port 4 coupler to front-panel Port 4 CPLR ARM
1
N5245-20018
W34
A36 port 2 coupler to front-panel Port 2 CPLR ARM
1
N5245-20019
W36
Front panel jumper
6
N5245-20155
W44
REF 3 RCVR R3 IN to A28 mixer brick (R3)
1
N5245-20020
W45
REF 4 RCVR R4 IN to A69 3 dB pad on A28 mixer brick (R4)
1
N5245-20021
W46
REF 2 RCVR R2 IN to A27 mixer brick (R2)
1
N5245-20115
W52
A25 HMA26.5 to A26 splitter
1
N5245-20013
W53
A26 splitter to A27 mixer brick
1
N5245-20023
W54
A26 splitter to A28 mixer brick
1
N5245-20022
W58
A28 mixer brick to 50 ohm load (1810-0118)
1
N5245-20095
W62
A27 mixer brick (R1) to A24 IF multiplexer (P411)
1
N5242-60021
W63
A27 mixer brick (R2) to A24 IF multiplexer (P412)
1
N5242-60022
W65
A28 mixer brick (D) to A24 IF multiplexer (P801)
1
N5242-60024
W66
A28 mixer brick (R4) to A24 IF multiplexer (P414)
1
N5242-60019
W67
A28 mixer brick (R3) to A24 IF multiplexer (P413)
1
N5242-60020
W68
A28 mixer brick (C) to A24 IF multiplexer (P601)
1
N5242-60023
Table 1
Contents of Upgrade Kit N5245-60106
Ref
Desig.
Description
Qty
Part Number
Installation Note N5245-90012 11
Items Included in the Upgrade Kit
W70
A20 IF multiplexer (P203) to A12 SPAM (J2)
1
N5242-60013
W72
A20 IF multiplexer (P603) to A12 SPAM (J5)
1
N5242-60015
W77
A14 frequency reference (J7) to A17 13.5 GHz (source 2) synth (J5)
1
N5242-60030
W84
A42 port 1 bias tee to front panel port 1 CPLR THRU
1
N5245-20085
W85
A30 port 3 reference coupler to A39 port 3 source attenuator
1
N5245-20026
W86
A39 port 3 source attenuator to front-panel Port 3 SOURCE OUT
1
N5245-20027
W87
Port 3 CPLR THRU to A43 port 3 bias tee
1
N5245-20089
W88
A43 port 3 bias tee to A34 port 3 coupler
1
N5245-20086
W89
A31 port 4 reference coupler to A40 port 4 source attenuator
1
N5245-20026
W90
A40 port 4 source attenuator to front-panel Port 4 SOURCE OUT
1
N5245-20028
W91
Port 4 CPLR THRU to A44 port 4 bias tee
1
N5245-20090
W92
A44 port 4 bias tee to A35 port 4 coupler
1
N5245-20088
W96
A45 port 2 bias tee to front panel port 2 CPLR THRU
1
N5245-20087
W99
Port 3 RCVR C IN to A47 port 3 receiver attenuator
1
N5245-20073
W100
A47 port 3 receiver attenuator to A28 mixer brick (C)
1
N5245-20066
W101
Port 4 RCVR D IN to A48 port 4 receiver attenuator
1
N5245-20074
W102
A48 port 4 receiver attenuator to A28 mixer brick (D)
1
N5245-20075
-
Ribbon cable, A23 test set motherboard J547 to A39 port 3 source
attenuator
2
N5245-60006
-
Ribbon cable, A23 test set motherboard J548 to A40 port 4 source
attenuator
-
Ribbon cable, A23 test set motherboard J206 to A47 port 3 receiver
attenuator
2
N5245-60026
-
Ribbon cable, A23 test set motherboard J207 to A48 port 4 receiver
attenuator
-
Ribbon cable, A23 test set motherboard J552 to A28 mixer brick (2) J52
1
N5247-60015
-
Wire assembly, A23 test set motherboard J221 to ports 1/3 LED board
J1
2
N5225-60001
-
Wire assembly, A23 test set motherboard J222 to ports 2/4 LED board
J1
Table 1
Contents of Upgrade Kit N5245-60106
Ref
Desig.
Description
Qty
Part Number
12 Installation Note N5245-90012
Items Included in the Upgrade Kit
-
a. The three 13.5 GHz Synthesizer boards included in this kit are the RoHS compliant N5240-60076
boards. These new boards are not compatible with the old N5230-60002 13.5 GHz Synthesizer
boards. If the boards installed in your PNA are the old N5230-60002, you must replace ALL of
them with the N5240-60076 boards included in this kit - refer to your PNA Service Guide’s chap-
ter 7 for instructions. If your PNA already contains the new boards, scrap the two extra
N5240-60076 boards included in this kit.
For the new N5240-60076 boards to function properly in your PNA, you must upgrade your PNA
firmware to rev A09.33xx or above. Download PNA firmware at: http://na.support.key-
sight.com/pna/firmware/firmware.html.
Extra quantities of items such as protective plastic caps, screws, cable ties,
and cable clamps may be included in this upgrade kit. It is normal for some
of these items to remain unused after the upgrade is completed
Installation Note N5245-90012 13
Installation Procedure for the Upgrade
Installation Procedure for the Upgrade
The network analyzer must be in proper working condition prior to installing
this option. Any necessary repairs must be made before proceeding with this
installation.
Overview of the Installation Procedure
“Step 1. Obtain a Keyword and Verify the Information.”
“Step 2. Remove the Outer Cover.”
“Step 3. Remove the Inner Cover.”
“Step 4. Remove the Front Panel Assembly.”
“Step 5. Remove the A23 Test Set Motherboard.”
“Step 6. Remove Some Cables.”
“Step 7. Remove the A27 Mixer Brick Assembly.”
“Step 8. Assemble the A28 Mixer Brick Assembly.”
“Step 9. Install the A27/A28 Mixer Bricks Assembly.”
“Step 10. Assemble the A30 and A31 Reference Coupler Assemblies.”
“Step 11. Install the A30 and A31 Reference Coupler Assemblies.”
“Step 12. Assemble the A47 and A48 Receiver Attenuator Assemblies.”
“Step 13. Install the A47 and A48 Receiver Attenuator Assemblies.”
“Step 14. Assemble the A39 and A40 Source Attenuator Assemblies.”
“Step 15. Install the A39 and A40 Source Attenuator Assemblies.”
“Step 16. Install the Bias Tee Brackets.”
“Step 17.Install the A43 and A44 Bias Tees.”
“Step 18. Assemble the A33 - A36 Test Port Coupler Assemblies.”
“Step 19. Install the LED Boards and Test Port Coupler Assemblies to the Test
Set Front Plate.”
“Step 20. Install the Coupler Plate Assembly to the Deck.”
“Step 21. Assemble the A10 26.5 GHz Source 2 Assembly.”
“Step 22. Assemble and Install the A12 and A13 Doubler Assemblies.”
This installation requires the removal of the analyzer’s protective
outer covers. The analyzer must be powered down and
disconnected from the mains supply before performing this
procedure.
14 Installation Note N5245-90012
Installation Procedure for the Upgrade
-
“Step 23. Install the A10 26.5 GHz Source 2 Assembly and Cables.”
“Step 24. Install the A17 13.5 GHz (Source 2) Synthesizer Board and Cables.”
“Step 25. Install the Test Set Cables.”
“Step 26. Secure the Front Panel Bulkhead Connectors.”
“Step 27. Reinstall the A23 Test Set Motherboard.”
“Step 28. Disassemble the 2-Port Front Panel and Assemble the 4-Port Front
Panel.”
“Step 29. Reinstall Front Panel Assembly.”
“Step 30. Install the Overlays.”
“Step 31. In stall the Front Panel Jumper Cables.”
“Step 32. Position the Cables and Wires to Prevent Pinching.”
“Step 33. Reinstall the Inner Cover.”
“Step 34. Reinstall the Outer Cover.”
“Step 35. Remove Option 219 License.”
“Step 36. Enable Options P04 (400) and 419.”
“Step 37. Perform Post-Upgrade Adjustments and Calibration.”
“Step 38. Prepare the PNA for the User.”
Step 1.Obtain a Keyword and Verify the Information
Follow the instructions on the Option Entitlement Certificate supplied to obtain
a license key for installation of this upgrade. Refer to “License Key
Redemption” on page 5.
Verify that the model number, serial number, and option number information
on the license key match those of the instrument on which this upgrade will be
installed.
If the model number, serial number, or option number do not match those on
your license key, you will not be able to install the option. If this is the case,
contact Keysight for assistance before beginning the installation of this
upgrade. Refer to “Contacting Keysight” on page 4.
Once the license key has been received and the information verified, you can
proceed with the installation at step 2.
Step 2. Remove the Outer Cover
For instructions, click the Chapter 7 bookmark “Removing the Covers” in the
PDF Service Guide1.
1. See “Downloading the Online PNA Service Guide” on page 6.
Installation Note N5245-90012 15
Installation Procedure for the Upgrade
Step 3.Remove the Inner Cover
For instructions, click the Chapter 7 bookmark “Removing the Covers” in the
PDF Service Guide1.
Step 4.Remove the Front Panel Assembly
For instructions, click the Chapter 7 bookmark “Removing and Replacing the
Front Panel Assembly” in the PDF Service Guide1.
Step 5.Remove the A23 Test Set Motherboard
For instructions, click the Chapter 7 bookmark “Removing and Replacing the
A23 test set motherboard” in the PDF Service Guide1.
Step 6.Remove Some Cables
1. Place the analyzer bottom-side up on a flat surface.
2. Remove and discard the following gray flexible cables:
— W130 A20 IF multiplexer (P203) to A12 SPAM (J5)
— W129 A20 IF multiplexer (P603) to A12 SPAM (J2)
Be careful not to damage the center pins of the semirigid cables. Some
flexing of the cables may be necessary but do not over-bend them.
Leave the gray flexible cables, the wire harnesses, and the ribbon cables
connected where possible. Any that are removed should be labeled for
reconnection later.
When removing a cable, also remove the plastic cable clamp, if present. It
is normal for some of the cable clamp’s adhesive to remain.
16 Installation Note N5245-90012
Installation Procedure for the Upgrade
-
3. Remove all bottom-side (test set) semirigid cables except for those in the
following table. Do not discard the cables that are removed because some
will be reused later in the procedure.
To see an image showing the location of cables W11, W17, and W51 click
the Chapter 6 bookmark “Top Cables, All Cables - All Options” in the PDF
Service Guide1. To see an image showing the location of cables W55, W56,
and W57, click the Chapter 6 bookmark “Bottom RF Cables, 2-Port, Option
219” in the PDF Service Guide1.
4. Remove and discard the following gray flexible cables:
— W62 (N5242-60025) A27 mixer brick (R1) to A24 IF multiplexer (P601)
— W63 (N5242-60026) A27 mixer brick (R2) to A24 IF multiplexer (P801)
5. Leave the remaining gray flexible cables, the wire harnesses, and the
ribbon cables connected where possible. Any that are removed should be
labeled for reconnection later.
Step 7.Remove the A27 Mixer Brick Assembly
Remove the A27 mixer brick assembly from the PNA. For instructions, click the
Chapter 7 bookmark, “Removing and Replacing the A27 and A28 Mixer Bricks”
in the PDF Service Guide1.
Step 8.Assemble the A28 Mixer Brick Assembly
1. Follow the two instructions shown in Figure 1. New parts are listed in
Table 1 on page 8 of this document.
Reference
Designator
Typea
Part Number
Qty
Description
W11
SR
N5245-20036
1
A7 port 1 doubler to W12
W17
SR
N5245-20036
1
A8 port 2 doubler to W18
W51
SR
N5245-20101
1
A15 13.5 GHz (LO) synthesizer board J1207 to A25
W55
SR
N5245-20102
1
A7 port 1 doubler to W56
W56
SR
N5245-20103
1
W55 to rear-panel EXT TSET DRIVE RF OUT (J6)
W57
SR
N5245-20012
1
A27 mixer brick to EXT TSET DRIVE LO OUT (J5)
a. SR = semirigid coaxial cable.
1. See “Downloading the Online PNA Service Guide” on page 6.
Installation Note N5245-90012 17
Installation Procedure for the Upgrade
Figure 1
A28 Mixer Brick Assembly
18 Installation Note N5245-90012
Installation Procedure for the Upgrade
-
2. Follow the four instructions shown in Figure 2.
Figure 2
Shields, Splitter, and 3 dB Pad Installation
Installation Note N5245-90012 19
Installation Procedure for the Upgrade
3. Connect the gray flexible cables in the order shown in Figure 3.
Figure3
A28 Mixer Brick Cable Installation
Step 9. Install the A27/A28 Mixer Bricks Assembly
Install the A27/A28 mixer brick assembly, reusing the 4 existing screws. For
instructions, click the Chapter 7 bookmark, “Removing and Replacing the A27
and A28 Mixer Bricks” in the PDF Service Guide1. New parts are listed in Table
1 on page 8 of this document
Graphics in this document such as Figure 3 use very brief text to instruct
where to connect a cable. For example, text that reads “N5242-60018
IFMUX P201 - BRK1 B” means to connect the N5242-60018 gray flexible
cable at the A24 IF MUX board connector P201 and at A27 Mixer Brick 1
connector B.
1. See “Downloading the Online PNA Service Guide” on page 6.
20 Installation Note N5245-90012
Installation Procedure for the Upgrade
-
Step 10.Assemble the A30 and A31 Reference Coupler Assemblies
Follow the instruction shown in Figure 4. New parts are listed in Table 1 on
page 8 of this document.
Figure 4
A30 and A31 Reference Coupler Assembly
Installation Note N5245-90012 21
Installation Procedure for the Upgrade
Step 11.Install the A30 and A31 Reference Coupler Assemblies
Install the A30 and A31 reference coupler assemblies. For instructions, click
the Chapter 7 bookmark, “Removing and Replacing the A29-A32 Reference
Couplers and Reference Coupler Mounting Brackets” in the PDF Service
Guide1. New parts are listed in Table 1 on page 8 of this document.
Step 12.Assemble the A47 and A48 Receiver Attenuator Assemblies
Assemble the A47 and A48 receiver attenuator assemblies. For instructions,
click the Chapter 7 bookmark, “Removing and Replacing the A38-A41 Source
Attenuators and the A46-A49 Receiver Attenuators” in the PDF Service Guide1.
New parts are listed in Table 1 on page 8 of this document.
Step 13.Install the A47 and A48 Receiver Attenuator Assemblies
Install the A47 and A48 receiver attenuator assemblies. For instructions, click
the Chapter 7 bookmark, “Removing and Replacing the A38-A41 Source
Attenuators and the A46-A49 Receiver Attenuators” in the PDF Service Guide1.
New parts are listed in Table 1 on page 8 of this document.
Step 14.Assemble the A39 and A40 Source Attenuator Assemblies
Assemble the A39 and A40 source attenuator assemblies. For instructions,
click the Chapter 7 bookmark, “Removing and Replacing the A38-A41 Source
Attenuators and the A46-A49 Receiver Attenuators” in the PDF Service Guide1.
New parts are listed in Table 1 on page 8 of this document.
Step 15.Install the A39 and A40 Source Attenuator Assemblies
Install the A39 and A40 source attenuator assemblies. For instructions, click
the Chapter 7 bookmark, “Removing and Replacing the A38-A41 Source
Attenuators and the A46-A49 Receiver Attenuators” in the PDF Service Guide1.
1. See “Downloading the Online PNA Service Guide” on page 6.
22 Installation Note N5245-90012
Installation Procedure for the Upgrade
-
Step 16.Install the Bias Tee Brackets
Refer to Figure 5 for this step of the procedure. New parts are listed in Table 1
on page 8.
Figure 5
Bias Tee Brackets
Installation Note N5245-90012 23
Installation Procedure for the Upgrade
Step 17.Install the A43 and A44 Bias Tees
Install the A43 and A44 bias tees. For instructions, click the Chapter 7
bookmark, “Removing and Replacing the A42-A45 Bias Tees” in the PDF
Service Guide1. New parts are listed in Table 1 on page 8 of this document.
Step 18.Assemble the A33 - A36 Test Port Coupler Assemblies
1. Remove the A33 test port 1 coupler and A36 test port 2 coupler from the
PNA. For instructions, click the Chapter 7 bookmark, “Removing and
Replacing the A33 - A36 Test Port Couplers” in the PDF Service Guide1.
2. Using pliers, remove the adhesive bumper on the A33 test port 1 coupler
and on the A36 test port 2 coupler.
3. Follow the two instructions shown in Figure 6. New parts are listed in
Table 1 on page 8 of this document.
Figure 6
A33 - A36 Test Port Coupler Assembly
1. See “Downloading the Online PNA Service Guide” on page 6.
Orient the port 3 bias tee so that the capacitor faces the capacitor on the
port 1 bias tee. Likewise, port 2 and port 4 bias tee capacitors should face
each other. Also, fasten each bias tee’s red wire lug nut using the screw on
the side of the bias tee without a capacitor.
24 Installation Note N5245-90012
Installation Procedure for the Upgrade
-
Step 19.Install the LED Boards and Test Port Coupler Assemblies to
the Test Set Front Plate
1. Remove two screws from each LED board and remove the boards from the
2-port test set front plate of the PNA.
2. Remove the 2-port test set front plate from the test set deck.
3. Follow the instructions shown in Figure 7.
Figure 7
LED Board Assemblies and Test Port Coupler Assemblies Installation
Installation Note N5245-90012 25
Installation Procedure for the Upgrade
Step 20.Install the Coupler Plate Assembly to the Deck
Follow the four instructions shown in Figure 8.
Figure 8
Coupler Plate Assembly Installation
26 Installation Note N5245-90012
Installation Procedure for the Upgrade
-
Step 21.Assemble the A10 26.5 GHz Source 2 Assembly
Follow the four instructions shown in Figure 9.
Figure 9
A10 Source 2 Assembly
Installation Note N5245-90012 27
Installation Procedure for the Upgrade
Step 22. Assemble and Install the A12 and A13 Doubler Assemblies
Follow the four instructions shown in Figure 10.
Figure 10
A12 and A13 Doubler Assemblies Installation
28 Installation Note N5245-90012
Installation Procedure for the Upgrade
-
Step 23.Install the A10 26.5 GHz Source 2 Assembly and Cables
Follow the four instructions shown in Figure 11.
Figure 11
A10 Source 2 Assembly Installation
Step 24.Install the A17 13.5 GHz (Source 2) Synthesizer Board and
Cables
1. Install gray cable W77 (N5242-60030) to connector J5 of the A17 (source
2) synthesizer board (N5230-60002). The loose end of the cable will be
connected on the A14 frequency reference board (J7) after the A17 board
has been installed in the analyzer.
2. Install the A17 board into slot 2 in the motherboard. To see an image
showing the location of the A17 board in the motherboard, click the
Chapter 6 bookmark “Top Assemblies, All Options” in the PDF Service
Guide1.
1. See “Downloading the Online PNA Service Guide” on page 6.
Installation Note N5245-90012 29
Installation Procedure for the Upgrade
3. Connect cable W2 (N5245-20100) between the A10 source 2 board and
the A17 (source 2) synthesizer board, positioning the cable in the wire
looms. Tighten the cable connectors to 10 in-lbs using a 5/16-in torque
wrench.
4. Connect the loose end of new gray flex cable W77 (N5242-60030) on the
A14 frequency reference board (J7). (The other end of this cable was
previously connected to J5 of the source 2 synthesizer board.)
Step 25.Install the Test Set Cables
Flexible Cables Required for Upgrading to an Option 419 PNA
Install the following flexible cables in the order listed. To see images showing
the location of these cables, click either of the Chapter 6 bookmarks “Bottom
RF Cables, 4-Port, Option 419” in the PDF Service Guide1. New parts are listed
in Table 1 on page 8.
— W62 (N5242-60021)A27 mixer brick (R1) to A24 IF multiplexer (P411)
— W63 (N5242-60022)A27 mixer brick (R2) to A24 IF multiplexer (P412)
The three 13.5 GHz Synthesizer boards included in this kit are the RoHS
compliant N5240-60076 boards. These new boards are not compatible
with the old N5230-60002 13.5 GHz Synthesizer boards. If the boards
installed in your PNA are the old N5230-60002, you must replace ALL of
them with the N5240-60076 boards included in this kit - refer to your PNA
Service Guide’s chapter 7 for instructions. If your PNA already contains the
new boards, scrap the two extra N5240-60076 boards included in this kit.
For the new N5240-60076 boards to function properly in your PNA, you
must upgrade your PNA firmware to rev A09.33xx or above. Download PNA
firmware at:
http://na.support.keysight.com/pna/firmware/firmware.html.
Follow instructions carefully when making cable connections, especially
wire harness connections. Incorrect connections can destroy components,
resulting in additional customer costs.
Be careful not to damage the center pins of the semirigid cables. Some
flexing of the cables may be necessary but do not over-bend them.
Use a 5/16-in torque wrench set to 10 in-lbs on all cable connections
except the front and rear panel bulkhead connectors. On these, use a 9
mm nutsetter or open end torque wrench set to 21 in-lb.
30 Installation Note N5245-90012
Installation Procedure for the Upgrade
-
Semirigid Cables Required for Upgrading to an Option 419 PNA
To see images showing the location of these cables, click the Chapter 6
bookmark “Bottom RF Cables, 4-Port, Option 419” in the PDF Service Guide1.
New parts are listed in Table 1 on page 8.
— Follow the two instructions shown in Figure 12 in this document.
Figure 12
Semirigid Cables Installation
— W96 (N5245-20087)A45 port 2 bias tee to port 2 CPLR THRU
— W92 (N5245-20088)A44 port 4 bias tee to A35 port 4 coupler
— W84 (N5245-20085)A42 port 1 bias tee to A33 port 1 coupler
— W88 (N5245-20086)A43 port 3 bias tee to A34 port 3 coupler
— W25 (N5245-20116)A30 port 3 ref coupler to front-panel REF 3 SOURCE
OUT
* As shown in Figure 13, install clamp part number 1400-1334 to secure
W25.
1. See “Downloading the Online PNA Service Guide” on page 6.
Installation Note N5245-90012 31
Installation Procedure for the Upgrade
Figure 13
Location of Cable Clamp to Secure W25 (N5245-20116)
— W29 (N5245-20117)A31 port 4 ref coupler to front-panel REF 4 SOURCE
OUT
— W89 (N5245-20026)A31 port 4 reference coupler to A40 port 4 source
attenuator
— W85 (N5245-20026)A30 port 3 reference coupler to A39 port 3 source
attenuator
— W93 (reuse) (N5245-20029)A32 port 2 reference coupler to A41 port 2
source attenuator
— W81 (reuse) (N5245-20029)A29 port 1 reference coupler to A38 port 1
source attenuator
— W103 (reuse) (N5245-20055)Port 2 RCVR B IN to A49 port 2 receiver
attenuator
— W95 (reuse) (N5245-20030)Port 2 CPLR THRU to A45 port 2 bias tee
— W34 (N5245-20019)A36 port 2 coupler to front-panel Port 2 CPLR ARM
32 Installation Note N5245-90012
Installation Procedure for the Upgrade
-
— W94 (reuse) (N5245-20031)A41 port 2 source attenuator to front-panel Port
2 SOURCE OUT
— W46 (N5245-20115)REF 2 RCVR R2 IN to A27 mixer brick (R2)
* Connect W46 to top R2 connector on the mixer bricks.
— W33 (reuse) (N5245-20010)A32 port 2 ref coupler to front-panel REF 2
SOURCE OUT
— W30 (5245-20018)A35 port 4 coupler to front-panel Port 4 CPLR ARM
— W101 (N5245-20074)Port 4 RCVR D IN to A48 port 4 receiver attenuator
— W90 (N5245-20028)A40 port 4 source attenuator to front-panel Port 4
SOURCE OUT
— W91 (N5245-20090)Port 4 CPLR THRU to A44 port 4 bias tee
— W45 (N5245-20021)REF 4 RCVR R4 IN to A28 mixer brick (R4)
* Connect W45 to the A69 3 dB pad on the A28 mixer brick.
— W99 (N5245-20073)Port 3 RCVR C IN to A47 port 3 receiver attenuator
— W87 (N5245-20089)Port 3 CPLR THRU to A43 port 3 bias tee
— W26 (N5245-20015)A34 port 3 coupler to front-panel Port 3 CPLR AR
— W86 (N5245-20027)A39 port 3 source attenuator to front-panel Port 3
SOURCE OUT
— W44 (N5245-20020)REF 3 RCVR R3 IN to A28 mixer brick (R3)
* Connect W44 to top R3 connector on the mixer bricks.
— W22 (N5245-20014)A33 port 1 coupler to front-panel Port 1 CPLR ARM
— W97 (reuse) (N5245-20054)Front-panel Port 1 RCVR A IN to A46 port 1
receiver attenuator
— W82 (reuse) (N5245-20077)A38 port 1 source attenuator to front-panel Port
1 SOURCE OUT
— W83 (reuse) N5245-20076)Front-panel Port 1 CPLR THRU to A42 port 1
bias tee
— W42 (reuse) (N5245-20007)REF 1 RCVR R1 IN to A37 reference mixer
switch
— W21 (N5245-20008)A29 port 1 reference coupler to A37 reference mixer
switch
* As shown in Figure 14, install cable tie part number 1400-0249 to secure
W21.
Installation Note N5245-90012 33
Installation Procedure for the Upgrade
Figure 14
Location of Cable Tie to Secure W21 (N5245-20008)
— W43 (reuse) (N5245-20009)A37 reference mixer switch to A27 mixer brick
(R1)
* Connect W43 to bottom R1 connector on the mixer bricks.
— W41 (reuse) (N5245-20006)A37 reference mixer switch to front-panel REF 1
SOURCE OUT
— W102 (N5245-20075)A48 port 4 receiver attenuator to A28 mixer brick (D)
* Connect W102 to top D connector on the mixer bricks.
— W100 (N5245-20066)A47 port 3 receiver attenuator to A28 mixer brick (C)
* Connect W100 to bottom C connector on the mixer bricks.
— W104 (reuse) (N5245-20057)A49 port 2 receiver attenuator to A27 mixer
brick (B)
* Connect W104 to bottom B connector on the mixer bricks
— W98 (reuse) (N5245-20056)A46 port 1 receiver attenuator to A27 mixer
brick (A)
34 Installation Note N5245-90012
Installation Procedure for the Upgrade
-
* Connect W98 to top A connector on the mixer bricks.
— W18 (reuse) (N5245-20049)A32 port 2 reference coupler to W17
— W12 (reuse) (N5245-20050)A29 port 1 reference coupler to W11
— W16 (N5245-20044)A31 port 4 reference coupler to W15
— W14 (N5245-20043)A30 port 3 reference coupler to W13
— W54 (N5245-20022)A26 splitter to A27 mixer brick
— W53 (N5245-20023)A26 splitter to A27 mixer brick
— W52 (N5245-20013)A25 HMA26.5 to A26 splitter
— W58 (N5245-20095)A28 mixer brick to 50 ohm load (1810-0118)
* After installing W58 to the mixer brick, attach the new 50 ohm load
(1810-0118) using a 1/4 inch open end wrench to hold cable W58 in
place.
* Torque A26 splitter screws to 6 in-lbs.
— W70 (N5242-60013) A20 IF multiplexer (P203) to A12 SPAM (J2)
— W72 (N5242-60015) A20 IF multiplexer (P603) to A12 SPAM (J5)
Installation Note N5245-90012 35
Installation Procedure for the Upgrade
Step 26.Secure the Front Panel Bulkhead Connectors
Follow the instruction shown in Figure 15 in this document.
Figure 15
Bulkhead Connections, Front Panel
Step 27.Reinstall the A23 Test Set Motherboard
1. For instructions on reinstalling the board, click the Chapter 7 bookmark
“Removing and Replacing the A23 test set motherboard” in the PDF
Service Guide1.
Follow instructions carefully when making cable connections, especially
wire harness connections. Incorrect connections can destroy components,
resulting in additional customer costs.
36 Installation Note N5245-90012
Installation Procedure for the Upgrade
-
2. If not already done in a previous step, install the following new ribbon
cables in the order listed. To see an image showing the location of these
cables, click the Chapter 6 bookmark “Bottom Ribbon Cables and Wire
Harnesses, 4-Port, Option 419” in the PDF Service Guide1. New parts are
listed in Table 1 on page 8.
— Ribbon cable, N5247-60015 from A23 test set motherboard J552 to A28
mixer brick (2) J52
— Ribbon cable (part of bias tee assembly), port 3 bias tee to A23 test set
motherboard J543
— Ribbon cable (part of bias tee assembly), port 4 bias tee to A23 test set
motherboard J544
— Ribbon cable (N5245-60026), A23 test set motherboard J206 to A47
port 3 receiver attenuator
— Ribbon cable (N5245-60026), A23 test set motherboard J207 to A48
port 4 receiver attenuator
— Ribbon cable (N5245-60006), A23 test set motherboard J547 to A39
port 3 source attenuator
— Ribbon cable (N5245-60006), A23 test set motherboard J548 to A40
port 4 source attenuator
— Wire harness (N5225-60001), A23 test set motherboard J221 to ports
1/3 LED board J1
— Wire harness (N5225-60001), A23 test set motherboard J222 to ports
2/4 LED board J1
Step 28. Disassemble the 2-Port Front Panel and Assemble the 4-Port
Front Panel
Before the front frame can be replaced, the items making up the back side of
the front panel assembly must be removed. For instructions on removing these
items, click the Chapter 7 bookmark “Removing and Replacing the A1-A3 and
Other Front Panel Subassemblies” in the PDF Service Guide1. New parts are
listed in Table 1 on page 8.
1. In the section “Removing the A2 USB Board,” perform the only step.
2. In the section “Removing the A1 Front Panel Interface Board and Keypad
Assembly,” perform steps 1 - 5.
3. In the section “Removing the Power Switch Board and Power Button
Keypad,” perform only steps 1 and 2.
4. Remove the braided gasket from the backside edges of the 2-port front
frame and install it in the 4-port front frame (N5247-20141).
1. See “Downloading the Online PNA Service Guide” on page 6.
Installation Note N5245-90012 37
Installation Procedure for the Upgrade
5. Rebuild the front panel assembly with the new 4-port front frame by
reversing the order of the instructions previously followed.
Step 29.Reinstall Front Panel Assembly
For instructions on reinstalling the front panel assembly, click the Chapter 7
bookmark “Removing and Replacing the Front Panel Assembly” in the PDF
Service Guide1.
In addition, attach the lower front dress panel to the test set front plate using
4x screws 0515-1227.
Step 30.Install the Overlays
To see an image of the front panel overlay (N5242-80003), keypad overlay
(N5242-80005), and power button overlay (N5242-80007), click the Chapter 6
bookmark “Front Panel Assembly, Front Side, All Options” in the PDF Service
Guide1. New parts are listed in Table 1 on page 8.
1. Remove the protective backing from the new front panel overlay
(N5242-80003).
2. Loosely place the overlay in the recess on the lower front panel.
3. Placing two fingers at the middle, press the overlay firmly onto the frame
while sliding your fingers in opposite directions towards the ends of the
overlay. Repeat on all areas of the overlay.
4. Repeat steps 1-3 to install the keypad overlay (N5242-80005).
5. Repeat steps 1-3 to install the power button overlay (N5242-80007).
6. Install the new nameplate (N5245-80003).
Step 31. Install the Front Panel Jumper Cables
Install twelve W36 front panel jumper cables (N5245-20155) - use 6 old
jumpers and 6 new jumpers. To see an image of the front panel jumper cables,
click the Chapter 7 bookmark “Removing and Replacing the Front Panel
Assembly” in the PDF Service Guide1.
Step 32. Position the Cables and Wires to Prevent Pinching
On the top side of the PNA, carefully position the grey flex cables so they can’t
be pinched between the covers and the rails.
On the bottom side of the PNA, carefully fold or push down the ribbon cables
and wires so they can’t be pinched between the hardware and the outer cover.
Ribbon cables and wires must never be positioned on top of hardware.
38 Installation Note N5245-90012
Installation Procedure for the Upgrade
-
Step 33.Reinstall the Inner Cover
For instructions, click the Chapter 7 bookmark “Removing the Covers” in the
PDF Service Guide1.
Step 34.Reinstall the Outer Cover
For instructions, click the Chapter 7 bookmark “Removing the Covers” in the
PDF Service Guide1.
Step 35.Remove Option 219 License
Procedure Requirements
— The analyzer must be powered up and operating to perform this procedure.
— The Network Analyzer program must be running.
— A keyboard and mouse must be connected to the network analyzer.
Option 219 License Removal Procedure
1. To start the option enable utility, press UTILITY
, then
,
then
. An option enable dialog box will appear.
2. Click the arrow in the Select Desired Option box. A list of available options
will appear.
3. In the Select Desired Option list, click 219.
4. Click Remove.
5. Click OK to confirm that you want to remove the license for the selected
option.
6. Click Yes in answer to the displayed question in the Restart Analyzer? box.
Step 36.Enable Options P04 (400) and 419
Procedure Requirements
— The analyzer must be powered up and operating to perform this procedure.
— The Network Analyzer program must be running.
— A keyboard and mouse must be connected to the network analyzer.
Option Enable Procedure
1. To start the option enable utility, press UTILITY
, then
,
then
. An option enable dialog box will appear.
2. Click the arrow in the Select Desired Option box. A list of available options
will appear.
System
Service
Option Enable
System
Service
Option Enable
Installation Note N5245-90012 39
Installation Procedure for the Upgrade
3. In the Select Desired Option list, click P04 - 4-Ports.
4. Using the keyboard, enter the license key in the box provided. The license
key is printed on the license message you received from Keysight. Enter
this key exactly as it is printed on the message.
5. Click Enable.
6. Click Yes in answer to the displayed question in the Restart Analyzer? box.
7. Repeat steps 3-6 to enable Option 419, clicking 419 - Src/Rcvr Atten &
Bias Ts 4-Port in step 3.
8. When the installation is complete, click Exit.
Option Verification Procedure
Once the analyzer has restarted and the Network Analyzer program is again
running:
1. On the analyzer’s Help menu, click About Network Analyzer.
2. Verify that “P04” and “419” are listed, but “219” is not listed after
“Options:” in the display. Click OK.
Step 37.Perform Post-Upgrade Adjustments and Calibration
Adjustments
The following adjustments must be made due to the hardware changes of the
analyzer.
— EE default adjustment
— synthesizer bandwidth adj. (only run when EE default adjust is not
sufficient)
— source adjustment
— IF gain adjustment
— receiver characterization
— receiver adjustment
— IF Response Adjustment (Option 090 Only)
— Noise Adjustment (Option 029 Only)
These adjustments are described in the PNA Service Guide and in the PNA
on-line HELP. A list of equipment required to perform these adjustments is also
found in the service guide.
If the options have not been enabled or if the option 219 license has not been
removed, perform the prior steps again. If the options are still not correct, contact
Keysight Technologies. Refer to “Getting Assistance from Keysight” on page 4
40 Installation Note N5245-90012
Installation Procedure for the Upgrade
-
To view this service guide information, click the Chapter 3 bookmark “Tests
and Adjustments” in the PDF Service Guide1.
After the specified adjustments have been performed, the analyzer should
operate and phase lock over its entire frequency range.
Operator’s Check
Perform the Operator’s Check to check the basic functionality of the analyzer.
For instructions, click the Chapter 3 bookmark “Tests and Adjustments” in the
PDF Service Guide1.
If you experience difficulty with the basic functioning of the analyzer, contact
Keysight. Refer to “Contacting Keysight” on page 4.
Calibration
Although the analyzer functions, its performance relative to its specifications
has not been verified. It is recommended that a full instrument calibration be
performed using the analyzer’s internal performance test software. To view
information on the performance test software, click the Chapter 3 bookmark
“Tests and Adjustments” in the PDF Service Guide1.
Step 38.Prepare the PNA for the User
1. If necessary, reinstall front jumper cables.
2. Install the cable guards, pushing them over the front jumper cables until
the cushioning material touches the front panel of the PNA.
3. Install the dust caps on the test ports.
4. Clean the analyzer, as needed, using a damp cloth.
1. See “Downloading the Online PNA Service Guide” on page 6.
This information is subject to change
without notice.
© Keysight Technologies 2011-2017
Edition 1, July 2017
N5245-90012
www.keysight.com