Keysight Technologies N5245-60106 Installation Note

Specifications

Brand: Keysight Technologies
Category: Measuring Instruments
Model: N5245-60106 (Installation Note)
File Type: PDF
File Size: —
Pages: 42

Read Online

Read the Keysight Technologies N5245-60106 Installation Note online using the built-in PDF viewer.

Text of the manual

Add 4-Port Capability

Upgrade Kit To Upgrade PNA-X N5244A or N5245A Option 219 to Option 419 For Analyzers with Serial Numbers Prefixed MY/SG/US5150 and Below Upgrade Kit Order Number: N5244AU- 942 and N5245AU- 942 Keysight Kit Number: N5245-60106

© Keysight Technologies, Inc.

2009-2017 No part of this manual may be reproduced in any form or by any means (including electronic storage and retrieval or translation into a foreign language) without prior agreement and written consent from Keysight Technologies, Inc. as governed by United States and international copyright laws. Trademark Acknowledgments Manual Part Number N5245-90012 Edition Edition 1, July 2017 Printed in USA/Malaysia Published by: Keysight Technologies 1400 Fountaingrove Parkway Santa Rosa, CA 95403 Warranty THE MATERIAL CONTAINED IN THIS DOCUMENT IS PROVIDED “AS IS,” AND IS SUBJECT TO BEING CHANGED, WITHOUT NOTICE, IN FUTURE EDITIONS. FURTHER, TO THE MAXIMUM EXTENT PERMITTED BY APPLICABLE LAW, KEYSIGHT DISCLAIMS ALL WARRANTIES, EITHER EXPRESS OR IMPLIED WITH REGARD TO THIS MANUAL AND ANY INFORMATION CONTAINED HEREIN, INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. KEYSIGHT SHALL NOT BE LIABLE FOR ERRORS OR FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES IN CONNECTION WITH THE FURNISHING, USE, OR PERFORMANCE OF THIS DOCUMENT OR ANY INFORMATION CONTAINED HEREIN. SHOULD KEYSIGHT AND THE USER HAVE A SEPARATE WRITTEN AGREEMENT WITH WARRANTY TERMS COVERING THE MATERIAL IN THIS DOCUMENT THAT CONFLICT WITH THESE TERMS, THE WARRANTY TERMS IN THE SEPARATE AGREEMENT WILL CONTROL. Technology Licenses The hardware and/or software described in this document are furnished under a license and may be used or copied only in accordance with the terms of such license. U.S. Government Rights The Software is “commercial computer software,” as defined by Federal Acquisition Regulation (“FAR”) 2.101. Pursuant to FAR 12.212 and 27.405-3 and Department of Defense FAR Supplement (“DFARS”) 227.7202, the U.S. government acquires commercial computer software under the same terms by which the software is customarily provided to the public. Accordingly, Keysight provides the Software to U.S. government customers under its standard commercial license, which is embodied in its End User License Agreement (EULA), a copy of which can be found at http://www.keysight.com/find/sweula The license set forth in the EULA represents the exclusive authority by which the U.S. government may use, modify, distribute, or disclose the Software. The EULA and the license set forth therein, does not require or permit, among other things, that Keysight: (1) Furnish technical information related to commercial computer software or commercial computer software documentation that is not customarily provided to the public; or (2) Relinquish to, or otherwise provide, the government rights in excess of these rights customarily provided to the public to use, modify, reproduce, release, perform, display, or disclose commercial computer software or commercial computer software documentation. No additional government requirements beyond those set forth in the EULA shall apply, except to the extent that those terms, rights, or licenses are explicitly required from all providers of commercial computer software pursuant to the FAR and the DFARS and are set forth specifically in writing elsewhere in the EULA. Keysight shall be under no obligation to update, revise or otherwise modify the Software. With respect to any technical data as defined by FAR 2.101, pursuant to FAR 12.211 and 27.404.2 and DFARS 227.7102, the U.S. government acquires no greater than Limited Rights as defined in FAR 27.401 or DFAR 227.7103-5 (c), as applicable in any technical data. Safety Notices A CAUTION notice denotes a hazard. It calls attention to an operating procedure, practice, or the like that, if not correctly performed or adhered to, could result in damage to the product or loss of important data. Do not proceed beyond a CAUTION notice until the indicated conditions are fully understood and met. A WARNING notice denotes a hazard. It calls attention to an operating procedure, practice, or the like that, if not correctly performed or adhered to, could result in personal injury or death. Do not proceed beyond a WARNING notice until the indicated conditions are fully understood and met.

Keysight Add 4-Port Capability Upgrade Kit

Upgrade Kit Number: N5245-60106 Installation Note Description of the Upgrade This upgrade converts your N5244A or N5245A Option 219 2-port analyzer to a N5244A or N5245A Option 419 4-port analyzer by adding: — an additional source — an additional source synthesizer — two additional doublers — an additional mixer brick — two additional reference couplers — two additional test port couplers — two additional bias tees — two additional source attenuators — two additional receiver attenuators — a splitter — a modified front panel — many new cables

4 Installation Note N5245-90012

Getting Assistance from Keysight - Getting Assistance from Keysight Installing this upgrade kit requires special skills and experience. If you think you may not be qualified to do the work, or need advice, contact Keysight. Contacting Keysight Assistance with test and measurements needs and information on finding a local Keysight office are available on the Web at: http://www.keysight.com/find/assist If you do not have access to the Internet, please contact your Keysight field engineer. If You Have Problems With the Upgrade Kit Contents Keysight stands behind the quality of the upgrade kit contents. If you have problems with any item in the kit, refer to www.keysight.com and the Contact Keysight link. In any correspondence or telephone conversation, refer to the Keysight product by its model number and full serial number. With this information, the Keysight representative can determine whether your product is still within its warranty period.

Installation Note N5245-90012 5

Getting Prepared Getting Prepared To successfully install this upgrade kit, you will need the following: — A license key - refer to “License Key Redemption” below. — A PDF copy or a paper copy of the PNA Service Guide - refer to “Downloading the Online PNA Service Guide” below. — An ESD-safe work area - refer to “Protecting Your Workspace from Electrostatic Discharge” below. — Correct tools - refer to “Tools Required for the Installation” on page 7. — Enough time - refer to “About Installing the Upgrade” on page 7 — Test equipment for the post-upgrade adjustments and full instrument calibration. To view the equipment list, click the Chapter 3 bookmark “Tests and Adjustments” in the PDF Service Guide1 License Key Redemption To enable the option product, you must request a license key from: http://www.keysight.com/find/softwarelicense. To complete the request, you will need to gather the following information: — From the certificate — Order number — Certificate number — From your instrument — Model number — Serial number — Host ID The PNA contains extremely sensitive components that can be ruined if mishandled. Follow instructions carefully when making cable connections, especially wire harness connections. The person performing the work accepts responsibility for the full cost of the repair or replacement of damaged components. 1. See “Downloading the Online PNA Service Guide” on page 6. The enclosed Option Entitlement Certificate is a receipt, verifying that you have purchased a licensed option for the PNA of your choice. You must now use a Keysight Web page to request a license key for the instrument that will receive the option.

6 Installation Note N5245-90012

Getting Prepared - The instrument information is available on the network analyzer – on the analyzer’s Help menu, click About Network Analyzer. If you provide an email address, Keysight will promptly email your license key. Otherwise, you will your receive your license key via postal mail. Downloading the Online PNA Service Guide To view the online Service Guide for your PNA model number, use the following steps: 1. Go to www.keysight.com. 2. In the Search box, enter the model number of the analyzer (Ex: N5245A) and click Search. 3. Click Technical Support > Manuals. 4. Click Service Manual. 5. Click the service guide title to download the PDF file. 6. When the PDF of the Service Guide is displayed, scroll through the Contents section bookmarks to locate the information needed. Protecting Your Workspace from Electrostatic Discharge For information, click on the Chapter 1 bookmark, “Electrostatic Discharge Protection” in the PDF Service Guide1. ESD Equipment Required for the Installation Description Keysight Part Number ESD grounding wrist strap 9300-1367 5-ft grounding cord for wrist strap 9300-0980 2 x 4 ft conductive table mat and 15-ft grounding wire 9300-0797 ESD heel strap (for use with conductive floors) 9300-1308

Installation Note N5245-90012 7

Getting Prepared Tools Required for the Installation About Installing the Upgrade Description Qty Part Number T-6 TORX driver - set to 4 in-lbs (0.45 N.m) 1 N/A T-10 TORX driver - set to 9 in-lbs (1.02 N.m) 1 N/A T-20 TORX driver - set to 21 in-lbs (2.38 N.m) 1 N/A 5/16-in (8 mm) nutsetter or open end torque wrench - set to 10 in-lbs (1.13 N.m) 1 N/A 5/16-in (8 mm) nutsetter or open end torque wrench - set to 21 in-lbs (2.38 N.m) 1 N/A 3/16-in (5 mm) nutsetter or open end torque wrench - set to 6 in-lbs (0.68 N.m) 1 N/A 5/8-in (16 mm) nutsetter or open end torque wrench - set to 21 in-lbs (2.38 N.m) 1 N/A 9 mm nutsetter or open end torque wrench - set to 21 in-lbs (2.38 N.m) 1 N/A 1-in (25.4 mm) torque wrench - set to 72 in-lbs (8.15 N.m) 1 N/A 1/4-in (6 mm) open end wrench 1 N/A Use a 5/16-in torque wrench set to 10 in-lbs on all cable connections except the front and rear panel cable connectors. On these, use a 9 mm nutsetter or open end torque wrench set to 21 in-lb. Products affected N5244A and N5245A Option 219 Installation to be performed by Keysight service center or personnel qualified by Keysight Estimated installation time 5 hours Estimated adjustment time 0.5 hours Estimated full instrument calibration time 4.5 hours

8 Installation Note N5245-90012

Items Included in the Upgrade Kit - Items Included in the Upgrade Kit Check the contents of your kit against the following list. If any part is missing or damaged, contact Keysight Technologies. Refer to “Getting Assistance from Keysight” on page 4. Table 1 Contents of Upgrade Kit N5245-60106 Ref Desig. Description Qty Part Number - Installation note (this document) 1 N5245-90012 A10 26.5 GHz source (2) assembly 1 5087-7780 A12 Doubler assembly, port 3 2 5087-7349 A13 Doubler assembly, port 4 A17 13.5 GHz source 2 synthesizer boarda 3 N5240-60076 A28 Mixer brick (2) 1 5087-7323 A30 Test port 3 reference coupler 2 5087-7760 A31 Test port 4 reference coupler A34 Test port 3 coupler 2 5087-7793 A35 Test port 4 coupler A39 Test port 3 source attenuator 2 33325-60022 A40 Test port 4 source attenuator A43 Test port 3 bias tee (includes wire harness) 2 5087-7789 A44 Test port 4 bias tee (includes wire harness) A47 Test port 3 receiver attenuator 2 33325-60023 A48 Test port 4 receiver attenuator A26 Splitter 1 5067-4086 A69 3 dB pad, attached to R4 connector on A28 mixer brick 1 08490-60010 - Front frame, diecast, 4-port 1 N5247-20141 - Test set front plate, 4-port 1 N5224-00005 - Machine screw, M3.0 x 6, flat head (to attach lower front dress panel to the test set front plate) 4 0515-1227 - Machine screw, M2.0 x 6, flat head (to attach 2 reference couplers to brackets) 8 0515-1602 - Machine screw, M3.0 x 25, pan head (to attach mixer brick A28 to mounting block) 3 0515-0667

Installation Note N5245-90012 9

Items Included in the Upgrade Kit - Machine screw, M4.0 x 10, pan head (2 to attach source 2 to chassis; 2 to attach A12 doubler 3 to chassis; 2 to attach A13 doubler 4 to chassis) 6 0515-0380 - Machine screw, M3.0 x 8, pan head (3 to attach shield to mixer brick; 8 to attach 2 src attn and 2 rcvr attn to brackets; 4 to attach 2 bias tee brackets to chassis; 1 to attach cable bracket to deck) 16 0515-0372 - Machine screw, M2.5 x 16, pan head (to attach splitter to mixer brick) 2 0515-2007 - Machine screw, M3.0 x 6, pan head (4 to attach 2 receiver attenuator/bracket assy. to deck; 4 to attach 2 source attenuator/bracket assy to deck) 8 0515-0430 - Machine screw, M3.0 x 10, pan head (4 to attach 2 reference coupler/bracket assemblies to deck) 4 0515-0374 - Machine screw, M3.0 x 14, pan head (to attach 2 bias tees to brackets) 4 0515-2994 - Front panel overlay (label), 4-port 1 N5242-80003 - Nameplate, N5245A 1 N5245-80003 - Nameplate, N5244A 1 N5244-80001 - Gap pad (between each coupler and test set front sub panel) 4 E4403-20033 - Gap pad (between mixer brick A28 and shield) 4 N5245-20125 - Power button overlay (label) 1 N5242-80007 - 50 ohm load, attached to W58 (N5245-20095) 1 1810-0118 - Vibration mount (between couplers 1 & 3, and 2 & 4) 2 0460-2725 - Mounting nuts (for port 3 & 4 test port couplers) 2 5022-1087 - Cable guard, center jumper cables 1 N5242-00030 - Cable tie wrap, 1 to secure W21 (N5245-20008) to side of deck 5 1400-0249 - Cable clamp, 1 to secure W25 (N5245-20116) to deck 5 1400-1334 - Bracket for bias tee 2 N5245-00011 - Bracket for reference coupler 2 N5245-00017 - Bracket for cables 1 N5245-00022 - Bracket for source attenuator and receiver attenuator 4 N5245-00015 - Dust caps for test ports 4 1401-0214 W2 A10 (source 2) P1 to A17 13.5 GHz source (2) synthesizer J1207 1 N5245-20100 W7 A10 (source 2) P5 to A12 port 3 doubler 1 N5245-20034 Table 1 Contents of Upgrade Kit N5245-60106 Ref Desig. Description Qty Part Number

10 Installation Note N5245-90012

Items Included in the Upgrade Kit - W8 A10 (source 2) P3 to A13 port 4 doubler 1 N5245-20035 W9 A10 (source 2) P4 to A12 port 3 doubler 1 N5245-20032 W10 A12 port 3 doubler to A13 port 4 doubler 1 N5245-20033 W13 A12 port 3 doubler to W14 1 N5245-20036 W14 A30 port 3 reference coupler to W13 1 N5245-20043 W15 A13 port 4 doubler to W16 1 N5245-20036 W16 A31 port 4 reference coupler to W15 1 N5245-20044 - 50 ohm load, attached to W58 (N5245-20095) 1 1810-0118 W21 A29 port 1 reference coupler to A37 reference mixer switch 1 N5245-20008 W22 A33 port 1 coupler to front-panel Port 1 CPLR ARM 1 N5245-20014 W25 A30 port 3 ref coupler to front-panel REF 3 SOURCE OUT 1 N5245-20116 W26 A34 port 3 coupler to front-panel Port 3 CPLR ARM 1 N5245-20015 W29 A31 port 4 ref coupler to front-panel REF 4 SOURCE OUT 1 N5245-20117 W30 A35 port 4 coupler to front-panel Port 4 CPLR ARM 1 N5245-20018 W34 A36 port 2 coupler to front-panel Port 2 CPLR ARM 1 N5245-20019 W36 Front panel jumper 6 N5245-20155 W44 REF 3 RCVR R3 IN to A28 mixer brick (R3) 1 N5245-20020 W45 REF 4 RCVR R4 IN to A69 3 dB pad on A28 mixer brick (R4) 1 N5245-20021 W46 REF 2 RCVR R2 IN to A27 mixer brick (R2) 1 N5245-20115 W52 A25 HMA26.5 to A26 splitter 1 N5245-20013 W53 A26 splitter to A27 mixer brick 1 N5245-20023 W54 A26 splitter to A28 mixer brick 1 N5245-20022 W58 A28 mixer brick to 50 ohm load (1810-0118) 1 N5245-20095 W62 A27 mixer brick (R1) to A24 IF multiplexer (P411) 1 N5242-60021 W63 A27 mixer brick (R2) to A24 IF multiplexer (P412) 1 N5242-60022 W65 A28 mixer brick (D) to A24 IF multiplexer (P801) 1 N5242-60024 W66 A28 mixer brick (R4) to A24 IF multiplexer (P414) 1 N5242-60019 W67 A28 mixer brick (R3) to A24 IF multiplexer (P413) 1 N5242-60020 W68 A28 mixer brick (C) to A24 IF multiplexer (P601) 1 N5242-60023 Table 1 Contents of Upgrade Kit N5245-60106 Ref Desig. Description Qty Part Number

Installation Note N5245-90012 11

Items Included in the Upgrade Kit W70 A20 IF multiplexer (P203) to A12 SPAM (J2) 1 N5242-60013 W72 A20 IF multiplexer (P603) to A12 SPAM (J5) 1 N5242-60015 W77 A14 frequency reference (J7) to A17 13.5 GHz (source 2) synth (J5) 1 N5242-60030 W84 A42 port 1 bias tee to front panel port 1 CPLR THRU 1 N5245-20085 W85 A30 port 3 reference coupler to A39 port 3 source attenuator 1 N5245-20026 W86 A39 port 3 source attenuator to front-panel Port 3 SOURCE OUT 1 N5245-20027 W87 Port 3 CPLR THRU to A43 port 3 bias tee 1 N5245-20089 W88 A43 port 3 bias tee to A34 port 3 coupler 1 N5245-20086 W89 A31 port 4 reference coupler to A40 port 4 source attenuator 1 N5245-20026 W90 A40 port 4 source attenuator to front-panel Port 4 SOURCE OUT 1 N5245-20028 W91 Port 4 CPLR THRU to A44 port 4 bias tee 1 N5245-20090 W92 A44 port 4 bias tee to A35 port 4 coupler 1 N5245-20088 W96 A45 port 2 bias tee to front panel port 2 CPLR THRU 1 N5245-20087 W99 Port 3 RCVR C IN to A47 port 3 receiver attenuator 1 N5245-20073 W100 A47 port 3 receiver attenuator to A28 mixer brick (C) 1 N5245-20066 W101 Port 4 RCVR D IN to A48 port 4 receiver attenuator 1 N5245-20074 W102 A48 port 4 receiver attenuator to A28 mixer brick (D) 1 N5245-20075 - Ribbon cable, A23 test set motherboard J547 to A39 port 3 source attenuator 2 N5245-60006 - Ribbon cable, A23 test set motherboard J548 to A40 port 4 source attenuator - Ribbon cable, A23 test set motherboard J206 to A47 port 3 receiver attenuator 2 N5245-60026 - Ribbon cable, A23 test set motherboard J207 to A48 port 4 receiver attenuator - Ribbon cable, A23 test set motherboard J552 to A28 mixer brick (2) J52 1 N5247-60015 - Wire assembly, A23 test set motherboard J221 to ports 1/3 LED board J1 2 N5225-60001 - Wire assembly, A23 test set motherboard J222 to ports 2/4 LED board J1 Table 1 Contents of Upgrade Kit N5245-60106 Ref Desig. Description Qty Part Number

12 Installation Note N5245-90012

Items Included in the Upgrade Kit - a. The three 13.5 GHz Synthesizer boards included in this kit are the RoHS compliant N5240-60076 boards. These new boards are not compatible with the old N5230-60002 13.5 GHz Synthesizer boards. If the boards installed in your PNA are the old N5230-60002, you must replace ALL of them with the N5240-60076 boards included in this kit - refer to your PNA Service Guide’s chap- ter 7 for instructions. If your PNA already contains the new boards, scrap the two extra N5240-60076 boards included in this kit. For the new N5240-60076 boards to function properly in your PNA, you must upgrade your PNA firmware to rev A09.33xx or above. Download PNA firmware at: http://na.support.key- sight.com/pna/firmware/firmware.html. Extra quantities of items such as protective plastic caps, screws, cable ties, and cable clamps may be included in this upgrade kit. It is normal for some of these items to remain unused after the upgrade is completed

Installation Note N5245-90012 13

Installation Procedure for the Upgrade Installation Procedure for the Upgrade The network analyzer must be in proper working condition prior to installing this option. Any necessary repairs must be made before proceeding with this installation. Overview of the Installation Procedure “Step 1. Obtain a Keyword and Verify the Information.” “Step 2. Remove the Outer Cover.” “Step 3. Remove the Inner Cover.” “Step 4. Remove the Front Panel Assembly.” “Step 5. Remove the A23 Test Set Motherboard.” “Step 6. Remove Some Cables.” “Step 7. Remove the A27 Mixer Brick Assembly.” “Step 8. Assemble the A28 Mixer Brick Assembly.” “Step 9. Install the A27/A28 Mixer Bricks Assembly.” “Step 10. Assemble the A30 and A31 Reference Coupler Assemblies.” “Step 11. Install the A30 and A31 Reference Coupler Assemblies.” “Step 12. Assemble the A47 and A48 Receiver Attenuator Assemblies.” “Step 13. Install the A47 and A48 Receiver Attenuator Assemblies.” “Step 14. Assemble the A39 and A40 Source Attenuator Assemblies.” “Step 15. Install the A39 and A40 Source Attenuator Assemblies.” “Step 16. Install the Bias Tee Brackets.” “Step 17.Install the A43 and A44 Bias Tees.” “Step 18. Assemble the A33 - A36 Test Port Coupler Assemblies.” “Step 19. Install the LED Boards and Test Port Coupler Assemblies to the Test Set Front Plate.” “Step 20. Install the Coupler Plate Assembly to the Deck.” “Step 21. Assemble the A10 26.5 GHz Source 2 Assembly.” “Step 22. Assemble and Install the A12 and A13 Doubler Assemblies.” This installation requires the removal of the analyzer’s protective outer covers. The analyzer must be powered down and disconnected from the mains supply before performing this procedure.

14 Installation Note N5245-90012

Installation Procedure for the Upgrade - “Step 23. Install the A10 26.5 GHz Source 2 Assembly and Cables.” “Step 24. Install the A17 13.5 GHz (Source 2) Synthesizer Board and Cables.” “Step 25. Install the Test Set Cables.” “Step 26. Secure the Front Panel Bulkhead Connectors.” “Step 27. Reinstall the A23 Test Set Motherboard.” “Step 28. Disassemble the 2-Port Front Panel and Assemble the 4-Port Front Panel.” “Step 29. Reinstall Front Panel Assembly.” “Step 30. Install the Overlays.” “Step 31. In stall the Front Panel Jumper Cables.” “Step 32. Position the Cables and Wires to Prevent Pinching.” “Step 33. Reinstall the Inner Cover.” “Step 34. Reinstall the Outer Cover.” “Step 35. Remove Option 219 License.” “Step 36. Enable Options P04 (400) and 419.” “Step 37. Perform Post-Upgrade Adjustments and Calibration.” “Step 38. Prepare the PNA for the User.” Step 1.Obtain a Keyword and Verify the Information Follow the instructions on the Option Entitlement Certificate supplied to obtain a license key for installation of this upgrade. Refer to “License Key Redemption” on page 5. Verify that the model number, serial number, and option number information on the license key match those of the instrument on which this upgrade will be installed. If the model number, serial number, or option number do not match those on your license key, you will not be able to install the option. If this is the case, contact Keysight for assistance before beginning the installation of this upgrade. Refer to “Contacting Keysight” on page 4. Once the license key has been received and the information verified, you can proceed with the installation at step 2. Step 2. Remove the Outer Cover For instructions, click the Chapter 7 bookmark “Removing the Covers” in the PDF Service Guide1. 1. See “Downloading the Online PNA Service Guide” on page 6.

Installation Note N5245-90012 15

Installation Procedure for the Upgrade Step 3.Remove the Inner Cover For instructions, click the Chapter 7 bookmark “Removing the Covers” in the PDF Service Guide1. Step 4.Remove the Front Panel Assembly For instructions, click the Chapter 7 bookmark “Removing and Replacing the Front Panel Assembly” in the PDF Service Guide1. Step 5.Remove the A23 Test Set Motherboard For instructions, click the Chapter 7 bookmark “Removing and Replacing the A23 test set motherboard” in the PDF Service Guide1. Step 6.Remove Some Cables 1. Place the analyzer bottom-side up on a flat surface. 2. Remove and discard the following gray flexible cables: — W130 A20 IF multiplexer (P203) to A12 SPAM (J5) — W129 A20 IF multiplexer (P603) to A12 SPAM (J2) Be careful not to damage the center pins of the semirigid cables. Some flexing of the cables may be necessary but do not over-bend them. Leave the gray flexible cables, the wire harnesses, and the ribbon cables connected where possible. Any that are removed should be labeled for reconnection later. When removing a cable, also remove the plastic cable clamp, if present. It is normal for some of the cable clamp’s adhesive to remain.

16 Installation Note N5245-90012

Installation Procedure for the Upgrade - 3. Remove all bottom-side (test set) semirigid cables except for those in the following table. Do not discard the cables that are removed because some will be reused later in the procedure. To see an image showing the location of cables W11, W17, and W51 click the Chapter 6 bookmark “Top Cables, All Cables - All Options” in the PDF Service Guide1. To see an image showing the location of cables W55, W56, and W57, click the Chapter 6 bookmark “Bottom RF Cables, 2-Port, Option 219” in the PDF Service Guide1. 4. Remove and discard the following gray flexible cables: — W62 (N5242-60025) A27 mixer brick (R1) to A24 IF multiplexer (P601) — W63 (N5242-60026) A27 mixer brick (R2) to A24 IF multiplexer (P801) 5. Leave the remaining gray flexible cables, the wire harnesses, and the ribbon cables connected where possible. Any that are removed should be labeled for reconnection later. Step 7.Remove the A27 Mixer Brick Assembly Remove the A27 mixer brick assembly from the PNA. For instructions, click the Chapter 7 bookmark, “Removing and Replacing the A27 and A28 Mixer Bricks” in the PDF Service Guide1. Step 8.Assemble the A28 Mixer Brick Assembly 1. Follow the two instructions shown in Figure 1. New parts are listed in Table 1 on page 8 of this document. Reference Designator Typea Part Number Qty Description W11 SR N5245-20036 1 A7 port 1 doubler to W12 W17 SR N5245-20036 1 A8 port 2 doubler to W18 W51 SR N5245-20101 1 A15 13.5 GHz (LO) synthesizer board J1207 to A25 W55 SR N5245-20102 1 A7 port 1 doubler to W56 W56 SR N5245-20103 1 W55 to rear-panel EXT TSET DRIVE RF OUT (J6) W57 SR N5245-20012 1 A27 mixer brick to EXT TSET DRIVE LO OUT (J5) a. SR = semirigid coaxial cable. 1. See “Downloading the Online PNA Service Guide” on page 6.

Installation Note N5245-90012 17

Installation Procedure for the Upgrade Figure 1 A28 Mixer Brick Assembly

18 Installation Note N5245-90012

Installation Procedure for the Upgrade - 2. Follow the four instructions shown in Figure 2. Figure 2 Shields, Splitter, and 3 dB Pad Installation

Installation Note N5245-90012 19

Installation Procedure for the Upgrade 3. Connect the gray flexible cables in the order shown in Figure 3. Figure3 A28 Mixer Brick Cable Installation Step 9. Install the A27/A28 Mixer Bricks Assembly Install the A27/A28 mixer brick assembly, reusing the 4 existing screws. For instructions, click the Chapter 7 bookmark, “Removing and Replacing the A27 and A28 Mixer Bricks” in the PDF Service Guide1. New parts are listed in Table 1 on page 8 of this document Graphics in this document such as Figure 3 use very brief text to instruct where to connect a cable. For example, text that reads “N5242-60018 IFMUX P201 - BRK1 B” means to connect the N5242-60018 gray flexible cable at the A24 IF MUX board connector P201 and at A27 Mixer Brick 1 connector B. 1. See “Downloading the Online PNA Service Guide” on page 6.

20 Installation Note N5245-90012

Installation Procedure for the Upgrade - Step 10.Assemble the A30 and A31 Reference Coupler Assemblies Follow the instruction shown in Figure 4. New parts are listed in Table 1 on page 8 of this document. Figure 4 A30 and A31 Reference Coupler Assembly

Installation Note N5245-90012 21

Installation Procedure for the Upgrade Step 11.Install the A30 and A31 Reference Coupler Assemblies Install the A30 and A31 reference coupler assemblies. For instructions, click the Chapter 7 bookmark, “Removing and Replacing the A29-A32 Reference Couplers and Reference Coupler Mounting Brackets” in the PDF Service Guide1. New parts are listed in Table 1 on page 8 of this document. Step 12.Assemble the A47 and A48 Receiver Attenuator Assemblies Assemble the A47 and A48 receiver attenuator assemblies. For instructions, click the Chapter 7 bookmark, “Removing and Replacing the A38-A41 Source Attenuators and the A46-A49 Receiver Attenuators” in the PDF Service Guide1. New parts are listed in Table 1 on page 8 of this document. Step 13.Install the A47 and A48 Receiver Attenuator Assemblies Install the A47 and A48 receiver attenuator assemblies. For instructions, click the Chapter 7 bookmark, “Removing and Replacing the A38-A41 Source Attenuators and the A46-A49 Receiver Attenuators” in the PDF Service Guide1. New parts are listed in Table 1 on page 8 of this document. Step 14.Assemble the A39 and A40 Source Attenuator Assemblies Assemble the A39 and A40 source attenuator assemblies. For instructions, click the Chapter 7 bookmark, “Removing and Replacing the A38-A41 Source Attenuators and the A46-A49 Receiver Attenuators” in the PDF Service Guide1. New parts are listed in Table 1 on page 8 of this document. Step 15.Install the A39 and A40 Source Attenuator Assemblies Install the A39 and A40 source attenuator assemblies. For instructions, click the Chapter 7 bookmark, “Removing and Replacing the A38-A41 Source Attenuators and the A46-A49 Receiver Attenuators” in the PDF Service Guide1. 1. See “Downloading the Online PNA Service Guide” on page 6.

22 Installation Note N5245-90012

Installation Procedure for the Upgrade - Step 16.Install the Bias Tee Brackets Refer to Figure 5 for this step of the procedure. New parts are listed in Table 1 on page 8. Figure 5 Bias Tee Brackets

Installation Note N5245-90012 23

Installation Procedure for the Upgrade Step 17.Install the A43 and A44 Bias Tees Install the A43 and A44 bias tees. For instructions, click the Chapter 7 bookmark, “Removing and Replacing the A42-A45 Bias Tees” in the PDF Service Guide1. New parts are listed in Table 1 on page 8 of this document. Step 18.Assemble the A33 - A36 Test Port Coupler Assemblies 1. Remove the A33 test port 1 coupler and A36 test port 2 coupler from the PNA. For instructions, click the Chapter 7 bookmark, “Removing and Replacing the A33 - A36 Test Port Couplers” in the PDF Service Guide1. 2. Using pliers, remove the adhesive bumper on the A33 test port 1 coupler and on the A36 test port 2 coupler. 3. Follow the two instructions shown in Figure 6. New parts are listed in Table 1 on page 8 of this document. Figure 6 A33 - A36 Test Port Coupler Assembly 1. See “Downloading the Online PNA Service Guide” on page 6. Orient the port 3 bias tee so that the capacitor faces the capacitor on the port 1 bias tee. Likewise, port 2 and port 4 bias tee capacitors should face each other. Also, fasten each bias tee’s red wire lug nut using the screw on the side of the bias tee without a capacitor.

24 Installation Note N5245-90012

Installation Procedure for the Upgrade - Step 19.Install the LED Boards and Test Port Coupler Assemblies to the Test Set Front Plate 1. Remove two screws from each LED board and remove the boards from the 2-port test set front plate of the PNA. 2. Remove the 2-port test set front plate from the test set deck. 3. Follow the instructions shown in Figure 7. Figure 7 LED Board Assemblies and Test Port Coupler Assemblies Installation

Installation Note N5245-90012 25

Installation Procedure for the Upgrade Step 20.Install the Coupler Plate Assembly to the Deck Follow the four instructions shown in Figure 8. Figure 8 Coupler Plate Assembly Installation

26 Installation Note N5245-90012

Installation Procedure for the Upgrade - Step 21.Assemble the A10 26.5 GHz Source 2 Assembly Follow the four instructions shown in Figure 9. Figure 9 A10 Source 2 Assembly

Installation Note N5245-90012 27

Installation Procedure for the Upgrade Step 22. Assemble and Install the A12 and A13 Doubler Assemblies Follow the four instructions shown in Figure 10. Figure 10 A12 and A13 Doubler Assemblies Installation

28 Installation Note N5245-90012

Installation Procedure for the Upgrade - Step 23.Install the A10 26.5 GHz Source 2 Assembly and Cables Follow the four instructions shown in Figure 11. Figure 11 A10 Source 2 Assembly Installation Step 24.Install the A17 13.5 GHz (Source 2) Synthesizer Board and Cables 1. Install gray cable W77 (N5242-60030) to connector J5 of the A17 (source 2) synthesizer board (N5230-60002). The loose end of the cable will be connected on the A14 frequency reference board (J7) after the A17 board has been installed in the analyzer. 2. Install the A17 board into slot 2 in the motherboard. To see an image showing the location of the A17 board in the motherboard, click the Chapter 6 bookmark “Top Assemblies, All Options” in the PDF Service Guide1. 1. See “Downloading the Online PNA Service Guide” on page 6.

Installation Note N5245-90012 29

Installation Procedure for the Upgrade 3. Connect cable W2 (N5245-20100) between the A10 source 2 board and the A17 (source 2) synthesizer board, positioning the cable in the wire looms. Tighten the cable connectors to 10 in-lbs using a 5/16-in torque wrench. 4. Connect the loose end of new gray flex cable W77 (N5242-60030) on the A14 frequency reference board (J7). (The other end of this cable was previously connected to J5 of the source 2 synthesizer board.) Step 25.Install the Test Set Cables Flexible Cables Required for Upgrading to an Option 419 PNA Install the following flexible cables in the order listed. To see images showing the location of these cables, click either of the Chapter 6 bookmarks “Bottom RF Cables, 4-Port, Option 419” in the PDF Service Guide1. New parts are listed in Table 1 on page 8. — W62 (N5242-60021)A27 mixer brick (R1) to A24 IF multiplexer (P411) — W63 (N5242-60022)A27 mixer brick (R2) to A24 IF multiplexer (P412) The three 13.5 GHz Synthesizer boards included in this kit are the RoHS compliant N5240-60076 boards. These new boards are not compatible with the old N5230-60002 13.5 GHz Synthesizer boards. If the boards installed in your PNA are the old N5230-60002, you must replace ALL of them with the N5240-60076 boards included in this kit - refer to your PNA Service Guide’s chapter 7 for instructions. If your PNA already contains the new boards, scrap the two extra N5240-60076 boards included in this kit. For the new N5240-60076 boards to function properly in your PNA, you must upgrade your PNA firmware to rev A09.33xx or above. Download PNA firmware at: http://na.support.keysight.com/pna/firmware/firmware.html. Follow instructions carefully when making cable connections, especially wire harness connections. Incorrect connections can destroy components, resulting in additional customer costs. Be careful not to damage the center pins of the semirigid cables. Some flexing of the cables may be necessary but do not over-bend them. Use a 5/16-in torque wrench set to 10 in-lbs on all cable connections except the front and rear panel bulkhead connectors. On these, use a 9 mm nutsetter or open end torque wrench set to 21 in-lb.

30 Installation Note N5245-90012

Installation Procedure for the Upgrade - Semirigid Cables Required for Upgrading to an Option 419 PNA To see images showing the location of these cables, click the Chapter 6 bookmark “Bottom RF Cables, 4-Port, Option 419” in the PDF Service Guide1. New parts are listed in Table 1 on page 8. — Follow the two instructions shown in Figure 12 in this document. Figure 12 Semirigid Cables Installation — W96 (N5245-20087)A45 port 2 bias tee to port 2 CPLR THRU — W92 (N5245-20088)A44 port 4 bias tee to A35 port 4 coupler — W84 (N5245-20085)A42 port 1 bias tee to A33 port 1 coupler — W88 (N5245-20086)A43 port 3 bias tee to A34 port 3 coupler — W25 (N5245-20116)A30 port 3 ref coupler to front-panel REF 3 SOURCE OUT * As shown in Figure 13, install clamp part number 1400-1334 to secure W25. 1. See “Downloading the Online PNA Service Guide” on page 6.

Installation Note N5245-90012 31

Installation Procedure for the Upgrade Figure 13 Location of Cable Clamp to Secure W25 (N5245-20116) — W29 (N5245-20117)A31 port 4 ref coupler to front-panel REF 4 SOURCE OUT — W89 (N5245-20026)A31 port 4 reference coupler to A40 port 4 source attenuator — W85 (N5245-20026)A30 port 3 reference coupler to A39 port 3 source attenuator — W93 (reuse) (N5245-20029)A32 port 2 reference coupler to A41 port 2 source attenuator — W81 (reuse) (N5245-20029)A29 port 1 reference coupler to A38 port 1 source attenuator — W103 (reuse) (N5245-20055)Port 2 RCVR B IN to A49 port 2 receiver attenuator — W95 (reuse) (N5245-20030)Port 2 CPLR THRU to A45 port 2 bias tee — W34 (N5245-20019)A36 port 2 coupler to front-panel Port 2 CPLR ARM

32 Installation Note N5245-90012

Installation Procedure for the Upgrade - — W94 (reuse) (N5245-20031)A41 port 2 source attenuator to front-panel Port 2 SOURCE OUT — W46 (N5245-20115)REF 2 RCVR R2 IN to A27 mixer brick (R2) * Connect W46 to top R2 connector on the mixer bricks. — W33 (reuse) (N5245-20010)A32 port 2 ref coupler to front-panel REF 2 SOURCE OUT — W30 (5245-20018)A35 port 4 coupler to front-panel Port 4 CPLR ARM — W101 (N5245-20074)Port 4 RCVR D IN to A48 port 4 receiver attenuator — W90 (N5245-20028)A40 port 4 source attenuator to front-panel Port 4 SOURCE OUT — W91 (N5245-20090)Port 4 CPLR THRU to A44 port 4 bias tee — W45 (N5245-20021)REF 4 RCVR R4 IN to A28 mixer brick (R4) * Connect W45 to the A69 3 dB pad on the A28 mixer brick. — W99 (N5245-20073)Port 3 RCVR C IN to A47 port 3 receiver attenuator — W87 (N5245-20089)Port 3 CPLR THRU to A43 port 3 bias tee — W26 (N5245-20015)A34 port 3 coupler to front-panel Port 3 CPLR AR — W86 (N5245-20027)A39 port 3 source attenuator to front-panel Port 3 SOURCE OUT — W44 (N5245-20020)REF 3 RCVR R3 IN to A28 mixer brick (R3) * Connect W44 to top R3 connector on the mixer bricks. — W22 (N5245-20014)A33 port 1 coupler to front-panel Port 1 CPLR ARM — W97 (reuse) (N5245-20054)Front-panel Port 1 RCVR A IN to A46 port 1 receiver attenuator — W82 (reuse) (N5245-20077)A38 port 1 source attenuator to front-panel Port 1 SOURCE OUT — W83 (reuse) N5245-20076)Front-panel Port 1 CPLR THRU to A42 port 1 bias tee — W42 (reuse) (N5245-20007)REF 1 RCVR R1 IN to A37 reference mixer switch — W21 (N5245-20008)A29 port 1 reference coupler to A37 reference mixer switch * As shown in Figure 14, install cable tie part number 1400-0249 to secure W21.

Installation Note N5245-90012 33

Installation Procedure for the Upgrade Figure 14 Location of Cable Tie to Secure W21 (N5245-20008) — W43 (reuse) (N5245-20009)A37 reference mixer switch to A27 mixer brick (R1) * Connect W43 to bottom R1 connector on the mixer bricks. — W41 (reuse) (N5245-20006)A37 reference mixer switch to front-panel REF 1 SOURCE OUT — W102 (N5245-20075)A48 port 4 receiver attenuator to A28 mixer brick (D) * Connect W102 to top D connector on the mixer bricks. — W100 (N5245-20066)A47 port 3 receiver attenuator to A28 mixer brick (C) * Connect W100 to bottom C connector on the mixer bricks. — W104 (reuse) (N5245-20057)A49 port 2 receiver attenuator to A27 mixer brick (B) * Connect W104 to bottom B connector on the mixer bricks — W98 (reuse) (N5245-20056)A46 port 1 receiver attenuator to A27 mixer brick (A)

34 Installation Note N5245-90012

Installation Procedure for the Upgrade - * Connect W98 to top A connector on the mixer bricks. — W18 (reuse) (N5245-20049)A32 port 2 reference coupler to W17 — W12 (reuse) (N5245-20050)A29 port 1 reference coupler to W11 — W16 (N5245-20044)A31 port 4 reference coupler to W15 — W14 (N5245-20043)A30 port 3 reference coupler to W13 — W54 (N5245-20022)A26 splitter to A27 mixer brick — W53 (N5245-20023)A26 splitter to A27 mixer brick — W52 (N5245-20013)A25 HMA26.5 to A26 splitter — W58 (N5245-20095)A28 mixer brick to 50 ohm load (1810-0118) * After installing W58 to the mixer brick, attach the new 50 ohm load (1810-0118) using a 1/4 inch open end wrench to hold cable W58 in place. * Torque A26 splitter screws to 6 in-lbs. — W70 (N5242-60013) A20 IF multiplexer (P203) to A12 SPAM (J2) — W72 (N5242-60015) A20 IF multiplexer (P603) to A12 SPAM (J5)

Installation Note N5245-90012 35

Installation Procedure for the Upgrade Step 26.Secure the Front Panel Bulkhead Connectors Follow the instruction shown in Figure 15 in this document. Figure 15 Bulkhead Connections, Front Panel Step 27.Reinstall the A23 Test Set Motherboard 1. For instructions on reinstalling the board, click the Chapter 7 bookmark “Removing and Replacing the A23 test set motherboard” in the PDF Service Guide1. Follow instructions carefully when making cable connections, especially wire harness connections. Incorrect connections can destroy components, resulting in additional customer costs.

36 Installation Note N5245-90012

Installation Procedure for the Upgrade - 2. If not already done in a previous step, install the following new ribbon cables in the order listed. To see an image showing the location of these cables, click the Chapter 6 bookmark “Bottom Ribbon Cables and Wire Harnesses, 4-Port, Option 419” in the PDF Service Guide1. New parts are listed in Table 1 on page 8. — Ribbon cable, N5247-60015 from A23 test set motherboard J552 to A28 mixer brick (2) J52 — Ribbon cable (part of bias tee assembly), port 3 bias tee to A23 test set motherboard J543 — Ribbon cable (part of bias tee assembly), port 4 bias tee to A23 test set motherboard J544 — Ribbon cable (N5245-60026), A23 test set motherboard J206 to A47 port 3 receiver attenuator — Ribbon cable (N5245-60026), A23 test set motherboard J207 to A48 port 4 receiver attenuator — Ribbon cable (N5245-60006), A23 test set motherboard J547 to A39 port 3 source attenuator — Ribbon cable (N5245-60006), A23 test set motherboard J548 to A40 port 4 source attenuator — Wire harness (N5225-60001), A23 test set motherboard J221 to ports 1/3 LED board J1 — Wire harness (N5225-60001), A23 test set motherboard J222 to ports 2/4 LED board J1 Step 28. Disassemble the 2-Port Front Panel and Assemble the 4-Port Front Panel Before the front frame can be replaced, the items making up the back side of the front panel assembly must be removed. For instructions on removing these items, click the Chapter 7 bookmark “Removing and Replacing the A1-A3 and Other Front Panel Subassemblies” in the PDF Service Guide1. New parts are listed in Table 1 on page 8. 1. In the section “Removing the A2 USB Board,” perform the only step. 2. In the section “Removing the A1 Front Panel Interface Board and Keypad Assembly,” perform steps 1 - 5. 3. In the section “Removing the Power Switch Board and Power Button Keypad,” perform only steps 1 and 2. 4. Remove the braided gasket from the backside edges of the 2-port front frame and install it in the 4-port front frame (N5247-20141). 1. See “Downloading the Online PNA Service Guide” on page 6.

Installation Note N5245-90012 37

Installation Procedure for the Upgrade 5. Rebuild the front panel assembly with the new 4-port front frame by reversing the order of the instructions previously followed. Step 29.Reinstall Front Panel Assembly For instructions on reinstalling the front panel assembly, click the Chapter 7 bookmark “Removing and Replacing the Front Panel Assembly” in the PDF Service Guide1. In addition, attach the lower front dress panel to the test set front plate using 4x screws 0515-1227. Step 30.Install the Overlays To see an image of the front panel overlay (N5242-80003), keypad overlay (N5242-80005), and power button overlay (N5242-80007), click the Chapter 6 bookmark “Front Panel Assembly, Front Side, All Options” in the PDF Service Guide1. New parts are listed in Table 1 on page 8. 1. Remove the protective backing from the new front panel overlay (N5242-80003). 2. Loosely place the overlay in the recess on the lower front panel. 3. Placing two fingers at the middle, press the overlay firmly onto the frame while sliding your fingers in opposite directions towards the ends of the overlay. Repeat on all areas of the overlay. 4. Repeat steps 1-3 to install the keypad overlay (N5242-80005). 5. Repeat steps 1-3 to install the power button overlay (N5242-80007). 6. Install the new nameplate (N5245-80003). Step 31. Install the Front Panel Jumper Cables Install twelve W36 front panel jumper cables (N5245-20155) - use 6 old jumpers and 6 new jumpers. To see an image of the front panel jumper cables, click the Chapter 7 bookmark “Removing and Replacing the Front Panel Assembly” in the PDF Service Guide1. Step 32. Position the Cables and Wires to Prevent Pinching On the top side of the PNA, carefully position the grey flex cables so they can’t be pinched between the covers and the rails. On the bottom side of the PNA, carefully fold or push down the ribbon cables and wires so they can’t be pinched between the hardware and the outer cover. Ribbon cables and wires must never be positioned on top of hardware.

38 Installation Note N5245-90012

Installation Procedure for the Upgrade - Step 33.Reinstall the Inner Cover For instructions, click the Chapter 7 bookmark “Removing the Covers” in the PDF Service Guide1. Step 34.Reinstall the Outer Cover For instructions, click the Chapter 7 bookmark “Removing the Covers” in the PDF Service Guide1. Step 35.Remove Option 219 License Procedure Requirements — The analyzer must be powered up and operating to perform this procedure. — The Network Analyzer program must be running. — A keyboard and mouse must be connected to the network analyzer. Option 219 License Removal Procedure 1. To start the option enable utility, press UTILITY , then , then . An option enable dialog box will appear. 2. Click the arrow in the Select Desired Option box. A list of available options will appear. 3. In the Select Desired Option list, click 219. 4. Click Remove. 5. Click OK to confirm that you want to remove the license for the selected option. 6. Click Yes in answer to the displayed question in the Restart Analyzer? box. Step 36.Enable Options P04 (400) and 419 Procedure Requirements — The analyzer must be powered up and operating to perform this procedure. — The Network Analyzer program must be running. — A keyboard and mouse must be connected to the network analyzer. Option Enable Procedure 1. To start the option enable utility, press UTILITY , then , then . An option enable dialog box will appear. 2. Click the arrow in the Select Desired Option box. A list of available options will appear. System Service Option Enable System Service Option Enable

Installation Note N5245-90012 39

Installation Procedure for the Upgrade 3. In the Select Desired Option list, click P04 - 4-Ports. 4. Using the keyboard, enter the license key in the box provided. The license key is printed on the license message you received from Keysight. Enter this key exactly as it is printed on the message. 5. Click Enable. 6. Click Yes in answer to the displayed question in the Restart Analyzer? box. 7. Repeat steps 3-6 to enable Option 419, clicking 419 - Src/Rcvr Atten & Bias Ts 4-Port in step 3. 8. When the installation is complete, click Exit. Option Verification Procedure Once the analyzer has restarted and the Network Analyzer program is again running: 1. On the analyzer’s Help menu, click About Network Analyzer. 2. Verify that “P04” and “419” are listed, but “219” is not listed after “Options:” in the display. Click OK. Step 37.Perform Post-Upgrade Adjustments and Calibration Adjustments The following adjustments must be made due to the hardware changes of the analyzer. — EE default adjustment — synthesizer bandwidth adj. (only run when EE default adjust is not sufficient) — source adjustment — IF gain adjustment — receiver characterization — receiver adjustment — IF Response Adjustment (Option 090 Only) — Noise Adjustment (Option 029 Only) These adjustments are described in the PNA Service Guide and in the PNA on-line HELP. A list of equipment required to perform these adjustments is also found in the service guide. If the options have not been enabled or if the option 219 license has not been removed, perform the prior steps again. If the options are still not correct, contact Keysight Technologies. Refer to “Getting Assistance from Keysight” on page 4

40 Installation Note N5245-90012

Installation Procedure for the Upgrade - To view this service guide information, click the Chapter 3 bookmark “Tests and Adjustments” in the PDF Service Guide1. After the specified adjustments have been performed, the analyzer should operate and phase lock over its entire frequency range. Operator’s Check Perform the Operator’s Check to check the basic functionality of the analyzer. For instructions, click the Chapter 3 bookmark “Tests and Adjustments” in the PDF Service Guide1. If you experience difficulty with the basic functioning of the analyzer, contact Keysight. Refer to “Contacting Keysight” on page 4. Calibration Although the analyzer functions, its performance relative to its specifications has not been verified. It is recommended that a full instrument calibration be performed using the analyzer’s internal performance test software. To view information on the performance test software, click the Chapter 3 bookmark “Tests and Adjustments” in the PDF Service Guide1. Step 38.Prepare the PNA for the User 1. If necessary, reinstall front jumper cables. 2. Install the cable guards, pushing them over the front jumper cables until the cushioning material touches the front panel of the PNA. 3. Install the dust caps on the test ports. 4. Clean the analyzer, as needed, using a damp cloth. 1. See “Downloading the Online PNA Service Guide” on page 6.

This information is subject to change

without notice. © Keysight Technologies 2011-2017 Edition 1, July 2017 N5245-90012 www.keysight.com

Other Measuring Instruments Manuals