Weber Summit 475 Step-by-step Manual

Brand: Weber
Category: Grill
Model: Summit 475 (Step-by-step Manual)
File Type: PDF
File Size: 0.22 Mb
Pages: 16
Text of Weber Summit 475 Step-by-step Manual

NOTICE TO INSTALLER: These instructions

must be left with the owner and the owner should keep them for future use. WARNING: F o l l ow all leak ch e ck pro c e d u r e s carefully in this manual prior to barbecue operation. Do this even if barbecue was dealer assembled. WARNING: Do not try to light this appliance without reading "Lighting" instructions section of this manual. THIS GAS APPLIANCE IS DESIGNED FOR OUTDOOR USE ONLY. FOR YOUR SAFETY If you smell

Weber Summit 475 INSTALL GAS SUPPLY

Gas line piping I If the length of line required does not exceed 50 feet, use a 5/8" O.D. tube. One size larger should be used for lengths greater than 50 feet. I Gas piping may be copper tubing, type K or L; polyethylene plastic tube, with a minimum wall thickness of .062 inch; or standard weight (schedule 40) steel or wrought iron pipe. I Copper tubing must be tin-lined if the gas contains more than 0.3 grams of hydrogen sulfide per 10

BUILT-IN CONSTRUCTION GENERAL INFORMATION

WARNING A Weber-Stephen Products Co. insulated s l e eve must be used for any bu i l t - i n installation. CLEARANCE FROM COMBUSTIBLE SURFACES OR STRUCTURES Warning: Clearance from the outside walls of the sides and back of the insulated sleeve must be a minimum of 24 inches from a combustible surface. Measure from the outside wall of the insulated surface to the combustible surface. Figure 2. Refer to “Instal

Weber Summit 475 BUILT-IN CUTOUT DIMENSIONS

BUILT-IN STRUCTURE SLEEVE DIMENSIONS 475 675 Tolerances A 311⁄2” 431⁄2” B 211⁄16” 211⁄16” C 2415⁄16” 2415⁄16” WT 240 285 + 1⁄4” - 0 + 3⁄16” - 0 + 3⁄16” -0 BUILT-IN INSULATED SLE

Weber Summit 475 BUILT-IN SLEEVE GAS

LINE LOCATIONS 475 675 Tolerances A 5.0” 5.0” B 10.1” 10.1” C 2.5” 2.5” + 1⁄16 - 1⁄16 + 1⁄16 - 1⁄16 + 1⁄32 - 1⁄32 BUILT-IN SLEEVE GAS LINE LOCATIONS The dimensions shown indicate the location of the gas line inlet flange in the insulated sleeve. The support members of the built-in structure must not impede passage of the gas lines. Area should be kept clear of sharp, jagged, or extremely abrasive surfaces to av

Burner control knob

(4) (Summit 475) (6) (Summit 675) Cooking grate (2) (Summit 475) (3) (Summit 675) Flavorizer bar (7) (Summit 475) (11) (Summit 675) Catch pan holder Bottom tray Optional Steam-N-Chips smoker Warm-up basket Tool holder (4) Drip pan Catch pan SUPPLIES NEEDED You will need a soap and water solution to check for gas leaks. (See Step "Check for gas leaks.") Note - The hardware size of nuts, bolts and screws is giv

ADD COOKING MODULE

Figure 7 Figure 8 Caution: Use two people to lift and install the cooking module. Lift the cooking module out of the packaging. The gas line will hang below the module. Lower the module on an angle into the sleeve so the control panel is under the front top rail. Figure 7. Guide the gas line through he access hole in the sleeve while lowering the module. Lower the back of the cooking module down so it sets on the rear rail. Figure 8. B

Weber Grill Owners Instructions: