Seakeeper 6 Unpacking Instructions

Specifications

Brand: Seakeeper
Category: Industrial Equipment
Model: 6 (Unpacking Instructions)
File Type: PDF
File Size: —
Pages: 3

Read Online

Read the Seakeeper 6 Unpacking Instructions online using the built-in PDF viewer.

Text of the manual

SEAKEEPER 6 / 5HD / 5

90369 4 1 of 3 Procedure: CRATE UNPACKING INSTRUCTIONS Description: Instructions for how to unpack the items in the Seakeeper crate. 1) Refer to instructions on page 2 for removing the metal clips. Clip removal tool is attached to the crate and circled in image below. Remove the clips at the top of the crate and carefully remove the lid. 2) Remove the 4 sides of the crate. 3) Keep the gyro bolted to the base until ready for installation. The base may be moved using a forklift or pallet jack if needed. To separate gyro from crate base, remove the lag screws at each corner of the frame shown circled below. A ¾” socket or wrench will be required. Additional bolts (shown with arrow below) inside the frame will need to be removed and require two, 9/16” wrenches. Attach slings or chains to lift eyes at top of enclosure as shown on page 3. Prior to lifting, read step 4. Note gyro may look different than illustrated below.

CRATE UNPACKING INSTRUCTIONS

90369 4 2 of 3

CRATE UNPACKING INSTRUCTIONS

90369 4 3 of 3 4) The following photographs containing green circles show acceptable methods to lift the gyro, such as a spreader bar or long lift slings. Keep the lifting lines as close to vertical as possible. Do NOT use short lines as shown in the red circle as the lift eyes may be damaged. (NOTE: GYRO MAY LOOK DIFFERENT THAN ILLUSTRATED.) Use caution when removing mounting bolts to keep from damaging cables and hoses on the gyro. REVISION HISTORY REVISION DESCRIPTION OF CHANGES DATE APPROVED 1 INITIAL RELEASE 03DEC2015 RSK 2 SEAKEEPER LOGO CHANGE 12OCT2016 BRD 3 COMBINED SK 6 / 5HD 27JUL2018 BRD 4 CHANGED CRATE, ADDED SK5 18JUN2019 BRD

Other Industrial Equipment Manuals