Tiger TIGERFLEX General Assembly Instructions

Specifications

Brand: Tiger
Category: Bicycle Accessories
Model: TIGERFLEX (General Assembly Instructions)
File Type: PDF
File Size: —
Pages: 16

Read Online

Read the Tiger TIGERFLEX General Assembly Instructions online using the built-in PDF viewer.

Text of the manual

BEFORE YOU GET STARTED

PLEASE READ INSTRUCTIONS CAREFULLY • Check the pack and make sure you have all the parts listed. • When you are ready to start, make sure you have the right tools at hand (not supplied). • Ensure there is plenty of space and a clean, dry area for assembly. TIMBER As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping, cupping or contraction of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be mitigated. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow. To validate your guarantee and ensure longevity of the product, it is ESSENTIAL that your building is treated with a suitable wood preserver or paint AFTER assembly, both internally and externally. BUILDING A BASE Care must be taken to ensure the product is placed on a suitable base. When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and annual treatment. Ensure the base is level and is built on firm ground, to prevent distortion. Refer to diagrams for the base dimensions which can be found on the product page at tigersheds.com, it is recommended that the base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above the surrounding ground level to avoid flooding. TYPES OF BASE • Durable plastic grid. • Slabs laid on 50mm of sharp sand. • Concrete 75mm laid on top of 75mm hard-core. • Timber Base - Self constructed/Buy pre-made. *We recommend a Fastfit EcoBase for your building. It is durable, lightweight, flexible and easy to put in place. Please see tigersheds.com for details. WOOD WARPING MAY OCCUR WINTER EXPANSION SUMMER CONTRACTION PLASTIC BASE SLAB BASE CONCRETE BASE TIMBER BASE BROKEN SLABS BARE SOIL LOOSE GRAVEL 02 tigersheds.com 0113 205 4189 [email protected]

Please retain instructions for future reference

CAUTION: All buildings should be erected by two competent adults. CAUTION: It is advisable to wear gloves during building installation. Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product. * TigerSkin® Water Based Treatment: The unique formula of our TigerSkin® pre-treatment provides a reassuring layer of protection for your shed or summer house. Each panel is carefully dipped and dried to provide maximum coverage, and ensure that your building will have protection from the moment it arrives and is assembled. A water repellent formula which is harmless to plants, not only does it help to shield the timber, it also gives it a warm tone that looks great on your property. Once erected, your building should be treated regularly. MADE IN THE UK SINCE 1913. We have been making our high quality, great value sheds here in Britain for decades. 03 ROOF COVERING OPTIONS All Tiger buildings are designed to use TigerFelt® high grade poly-backed durable mineral roofing felt. If you have chosen a different roof covering option – such as EPDM rubberised roof covering or Shed Shingles, please see their separate roofing instructions available on their product pages at tigersheds.com. MAINTENANCE To validate your guarantee and ensure longevity of the product, it is ESSENTIAL that your building is treated with a suitable wood preserver or paint either BEFORE or AFTER assembly, both internally and externally. For the continued protection for unpainted areas of your garden building we recommend maintaining your timber treat- ment with TigerSkin® preserver. This solvent based wood treatment will penetrate deep into the wood giving years of protection against the weather and also enhance timber grain with a rich long lasting protection. A water repellent formula which is harmless to plants when dry, it is available in a wide range of colours to refresh the look and feel of your garden building. Discover more at tigersheds.com.

BEFORE YOU GET STARTED

04 tigersheds.com 0113 205 4189 [email protected] TOOLS REQUIRED: We recommend using the following tools (not supplied): HAMMER DRILL LADDER TAPE MEASURE SHARP KNIFE SPIRIT LEVEL SCREWDRIVER + • Assembly is relatively straightforward if you follow these step by step instructions. • We recommend getting everything aligned properly before screwing together and that screw holes should be pre-drilled to avoid splitting the timber. (Do not come pre-drilled). IMPORTANT • Before assembly please make sure you have a suitable base ready to erect your building on. • This base MUST be firm and level to ensure that the building is assembled properly and lines up. • Please carefully unpack the components in your delivery, and remove the timber supports that make up the delivery pallet. • CAUTION: Parts may have moved during transportation. Be careful when unpacking supplied shed. • DO NOT start your build until you have checked that all the parts of your building are present, correct and in a suitable condition. • Pre-drilling screw holes is recommended to reduce the chances of the timber framing splitting. • If you are organising a third party to install your building, it is best practice not to schedule this immediately on receipt of your order, to give you time to check your delivery. RUBBER MALLET WOOD SAW CN13 FIXING KIT GUIDE: Clout Nails (13mm Galvanised - QTY 175) BS25 Black Drywall Screw (3.5x25mm - QTY 20) N40 Nail (40mm Galvanised - QTY 55) N65 Nail (65mm Bright - QTY 50) S50 Screws (4x50mm - QTY 50) S90 Screws (5x90mm - QTY 12) 2TBB Black Turnbutton (2 Inch - QTY 1) DB Drop Bolt (QTY 1)

Please retain instructions for future reference

05 • From the outside working in, cut banding holding all components together and remove the panels. Note: parts may have become loose or moved during transportation. • Large items like doors and windows are screwed into cross brace. Remove screws as you come to corresponding panel to reduce the risk of falling components. BUILDING PACK CONTENTS: For full details of what should be included please see the list that is supplied with the delivery. They are also available on request in pdf form from our helpful Customer Support team – please call 0113 2054189 for Customer Support or use the Items Delivered Query form at tigersheds.com/contact.

TIGERFLEX® SHIPLAP PENT BIKE STORE ASSEMBLY GUIDE

06 tigersheds.com 0113 205 4189 [email protected] Step 1: FLOOR PANEL INSTALLATION • Install Heavy Duty Bearers as shown • Check your product floor size for the correct diagram (opposite page). Please ensure floor panels are butted up tightly with no gaps • Secure bearers to floor panel using 2x 90mm (S90) screws per bearer. � NOTE�-�Make�sure�fixings�go�through�floor�joists. S90 S90 HEAVY DUTY BEARER HEAVY DUTY BEARER FLOOR PANEL S90

Please retain instructions for future reference

07 FLOOR PANEL HD BEARER HD BEARER SINGLE FLOOR 6x3*, 6x4* DOUBLE FLOOR 6x5*, 6x6* HD BEARER HD BEARER HD BEARER HD BEARER FLOOR PANEL FLOOR PANEL DOUBLE FLOOR 8x3*, 8x4* FLOOR PANELS HD BEARER HD BEARER HD BEARERS HD BEARERS FLOOR PANELS FLOOR PANELS HD BEARERS HD BEARERS MULTI FLOOR 8x6* Only MULTI FLOOR 8x5* Only

0113 205 4189

[email protected] TIGERFLEX® SHIPLAP PENT BIKE STORE ASSEMBLY GUIDE Step 2: SIDE PANEL INSTALLATION Make sure transport blocks have been removed. (Detail A) NOTE - Hammer off sideways. Do not prise off. • Secure blank back & blank side panel to each other in corners using 3x 50mm (S50) screws per joint. (Detail B) • Secure blank panels to the floor using 65mm (N65) nails (Detail C & D) NOTE - Make sure fixings go through floor joists or into heavy duty timber bearers. • Secure blank panels to each other in using 3x 50mm (S50) screws per join. Only applies to side panels butting against each other. (Detail E) S50 N65 Hit outwards with a hammer to remove block A

Please retain instructions for future reference

09 SIDE PANEL SIDE PANEL D E N65 S50 FLOOR JOIST SIDE PANEL B S50 N65 C SIDE PANEL SIDE PANEL SIDE PANEL FLOOR PANEL FLOOR PANEL

0113 205 4189

[email protected] TIGERFLEX® SHIPLAP PENT BIKE STORE ASSEMBLY GUIDE Step 3: DOOR SIDE PANEL INSTALLATION • Assemble door side panel as shown. (Before affixing to the shed). • Screw door header to the left and right hand sides as shown using 50mm (S50) screws. (Detail F) NOTE - Predrill holes to reduce chance of wood splitting • Screw door base to the left and right hand sides as shown using 50mm (S50) screws. (Detail G) • Check frame is square by measuring across corners. S50 F G DOOR HEADER DOOR BASE LEFT HAND DOOR SIDE RIGHT HAND DOOR SIDE S50 S50 S50 S50 MEASURE CORNER TO CORNER TO CHECK SQUARE

Please retain instructions for future reference

11 Step 4: DOOR INSTALLATION • Lay assembled door side panel on a flat surface • Place doors into opening. • Leave approx. 4mm gap at side between door and side panel. (Detail H) • Leave approx. 6mm gap at top between door and side panel. (Detail I) • Secure in place using 3x 25mm (BS25) screws per hinge - 6 hinges in total. (Detail H) • Mark position of Drop Bolt (DB) on the door header and door base and drill hole. (Detail I & J) • Secure Turn Button (2TBB) using 1x (BS25) screw (Detail K) H I K J 4mm 6mm DROP BOLT DROP BOLT BS25 2TBB DB N40

0113 205 4189

[email protected] TIGERFLEX® SHIPLAP PENT BIKE STORE ASSEMBLY GUIDE Step 5: COMPLETED DOOR SIDE PANEL INSTALLATION • Secure completed door side panel to existing built structure as shown.. • Secure in corners using 3x 50mm (S50) screws provided per joint. (Detail L) • Secure to floor using 4x 65mm (N65) nails. (Detail M) NOTE - Make sure fixings go through floor joists or into heavy duty timber bearers. S50 M N65 FLOOR JOIST L S50 SIDE PANEL DOOR PANEL N65

Please retain instructions for future reference

Step 6: PENT GABLE TOP INSTALLATION • Fix Pent Gable Tops to the existing built structure. • The bottom of the gable top will slot into the top of the cladding on the panel below. Please ensure the gable top is positioned centrally above the side panels before screwing in place. • Secure through top of side panels using 2x 50mm (S50) screws per gable top. (Detail N) Step 7: PENT HIGH SIDE TOP INSTALLATION • Fix Pent High Side Tops to existing built structure. The bottom of the High Side Top will slot into the top of the cladding on the panel below. Please ensure the High Side Top is positioned centrally above the side panels before screwing in place. • For all models, secure through top of side panels using 2x 50mm (S50) screws per High Side Top. (Detail O) • For all models, secure through side of High Side Top into the Pent Gable Top using 1x 50mm (S50) screw per gable top. (Detail P) • For models with High Side Tops butting together, secure through side using 1x 50mm (S50) screw per join. (Detail Q) S50 S50 N Q O P S50 S50 S50 S50

TIGERFLEX® SHIPLAP PENT BIKE STORE ASSEMBLY GUIDE

14 tigersheds.com 0113 205 4189 [email protected] Step 6: PENT ROOF PANEL INSTALLATION • Attach roof panels as shown. Rest Pent roof panel on the High Side Top and side panel on the opposite side. (Detail R1 & R2) • Butt Pent roof panel tightly against Pent Gable Top. • Make sure all panels are square before fixing together. • Secure to Pent Gable Tops using 2x 50mm (S50) screws per roof panel. (Detail S) • For multi roof models, secure Pent roof panels together using 2x 50mm (S50) screws per roof panel. (Detail T) R2 R1 S50 S T S50 S50 S50 S50 Step 7: FELT INSTALLATION • Roll out felt along lower part of roof, leaving sufficient overhang to fold down onto roof purlin, approx 75mm/3”. Do not fold underneath roof. • Use clout (CN13) nails to tack top of felt into the roof panel. • Repeat for the other side. Fold the overhang at gable ends under the roof panel and tack in place. • Ridge piece should overlap the lower strips and tack into place (if supplied). • Felt illustration for 8’x6’ model. CN13

Please retain instructions for future reference

15 Step 9: BARGE BOARD & FINIAL INSTALLATION • Fit Barge Boards to the roof, trapping overhanging end of the felt in between to create a weatherproof seal. • Secure together using 3x 40mm (N40) nails per Barge Board. • Fit soffit boards to the back of the shed as shown using 3x 40mm (N40) nails per finial. (Detail U) • Fit Finials at the apex point of the Barge Boards. Secure together using 2x 40mm (N40) nails per finial. N40 S50 U S50 Step 9: COVER LAT & CORNER STRIP INSTALLATION • Fit Corner Strips in the corners of the shed, these are plain profiled pieces. • Secure to the shed using 3x 40mm (N40) nails per Corner Strip. (Detail V) • Cut extra supplied piece to length to cover corners on high side. • Fit Cover Lats over joints where 2 panels butt against each other. These are grooved both sides. • Secure to the shed using 3x 40mm (N40) nails per Cover Lat. (Detail W) NOTE - Cover strips and Cover Lats may need trimmed to suit. N40 V N40 W N40 COVER LAT CORNER STRIPS CORNER STRIPS CORNER STRIPS

Woodlands DIY Store

Station Yard, Horsforth, Leeds, LS18 5NZ Telephone: 0113 205 4189 Website: tigersheds.com Email: [email protected] INS04

Other Bicycle Accessories Manuals