Thomas & Betts LDAP 1200 Installation & Operation Manual
Read Online
Read the Thomas & Betts LDAP 1200 Installation & Operation Manual online using the built-in PDF viewer.
Text of the manual
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 1
APPLIES TO:
Model LDAP
Installation/Operation FORM RZ-NA I-LDAP
Index (by page)
Burners ....................................... 13, 33
Burner Orifice ................................... 35
California Warning Label .................... 2
Clearances ........................................... 6
Installation Codes ............................... 2
Combustion Air .................................... 6
Confined Space .................................... 6
Destratification ................................. 18
Dimensions .......................................... 4
Electrical Connections ..................... 13
Fan ............................................. 20, 36
Fan Control (Destratification) ....18, 38
Fan Motor....................................21, 36
Gas Piping and Pressures................... 10
Gas Valve......................................21, 37
General ................................................ 2
Hazard Intensity Levels ...................... 2
Heat Exchanger Maintenance ........... 33
High Altitude ..................................3, 12
High Limit Control......................17, 38
Ignition System ...........................18, 35
LED Flash Codes ............................... 38
Limit Control ..............................17, 38
Location (Heater) ................................ 7
Louvers ................................... 3, 10, 32
Maintenance Schedule ................ 32-33
Nozzle (Option) ............................3, 32
Pressure Switch
(Combustion Air) ............... 5, 17, 37
Replacement Parts.... See Form P-LDAP
Sound Data........................................... 8
Startup................................................ 30
Suspending Heater .............................. 8
Technical Data ..................................... 4
Thermostat (Option) .......................... 14
Throw Data .......................................... 7
Transformer ...................................... 38
Troubleshooting ......................... 38-40
Uncrating and Preparation ................. 3
Valve Outlet Pressure ......................... 12
Vent System Maintenance ................ 38
Venter Motor (Heat Section)............ 35
Venter Motor (Main) ........................ 36
Venting ............................................... 26
Wall Mounting ..................................... 9
Warranty .............................................. 2
Weights ................................................ 8
Wiring Diagrams .......................... 22-25
Table of Contents
Page
Warnings ......................................... 1
Installation/Operation ............... 2-29
Check/Test/Startup .................. 30-31
Accessories..................................... 32
Maintenance/Service ............... 32-40
FOR YOUR SAFETY
If you smell gas:
1. Open windows.
2. Don't touch electrical switches.
3. Extinguish any open flame.
4. Immediately call your gas supplier.
FOR YOUR SAFETY
The use and storage of gasoline or other flammable vapors and
liquids in open containers in the vicinity of this appliance is
hazardous.
WARNING: Improper installation, adjustment, alteration, service,
or maintenance can cause property damage, injury, or death. Read
the installation, operation, and maintenance instructions
thoroughly before installing or servicing this equipment.
WARNING: Gas-fired appliances are not designed for use in
hazardous atmospheres containing flammable vapors or
combustible dust, in atmospheres containing chlorinated or
halogenated hydrocarbons, or in applications with airborne silicone
substances. See Hazard Levels, page 2.
WARNING: Should overheating occur, or the gas supply fail to
shut off, shut off the manual gas valve to the appliance before
shutting off the electrical supply.
WARNING: Do not use this appliance if any part has been under
water. Immediately call a qualified service technician to inspect
the appliance and replace any gas control that has been under water.
Indirect Fired,
Indoor, Downflow,
Packaged Heaters
Reznor®
Model
LDAP 1200
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 2
Hazard Levels of
Warnings in this
Manual
HAZARD INTENSITY LEVELS
1. DANGER: Failure to comply will result in severe personal injury or death
and/or property damage.
2. WARNING: Failure to comply could result in severe personal injury or
death and/or property damage.
3. CAUTION: Failure to comply could result in minor personal injury and/or
property damage.
1. General
All Model LDAP high bay packaged heaters are design certified by ITS for use in
industrial and commercial installations. All models and sizes are available for use
with either natural or propane gas. The type of gas, the input rate, and the electrical
supply requirement are shown on the heater rating plate. Check the rating plate to
determine if the heater is appropriate for the intended installation.
The instructions in this manual apply only to Reznor® Model LDAP heaters.
Installation should be done by a qualified agency in accordance with these instruc-
tions. The qualified service agency installing this heater is responsible for the instal-
lation.
2. Installation
Codes
These heaters must be installed in accordance with local building codes. In the ab-
sence of local codes, in the United States, the heater must be installed in accordance
with the National Fuel Gas Code, ANSI Z223.1. A Canadian installation must be in
accordance with the CSA B149 Installation Codes. These codes are available from
CSA Information Services, 1-800-463-6727. Local authorities having jurisdiction
should be consulted before installation is made to verify local codes and installation
procedure requirements.
Special Installations
(Aircraft Hangars/
Repair Garages/
Parking Garages)
Installations in aircraft hangars should be in accordance with ANSI/NFPA No. 409
(latest edition), Standard for Aircraft Hangars; in public garages in accordance with
ANSI/NFPA No. 88A (latest edition), Standard for Parking Structures; and for repair
garages in accordance with ANSI/NFPA No. 88B (latest edition), Standard for Repair
Garages. In Canada, installations in aircraft hangars should be in accordance with the
requirements of the enforcing authorities, and in public garages in accordance with
CSA B149 codes.
If the heater is being installed in the state of California, the installer MUST attach a
warning label on the outside of the access door. The California Warning label is shipped
in the owner’s envelope along with this manual, the warranty form, and any other
paperwork that applies.
If installation is in California, select a location on the heater access panel. Be sure the
surface is clean and dry and adhere the label.
If the heater is being installed in the Commonwealth of Massachusetts, this heater
must be installed by a licensed plumber or licensed gas fitter.
3. Warranty
California Warning
Label
Massachusetts
Requirement
Refer to the limited warranty information on the Warranty Card in the "Owner's En-
velope".
Warranty is void if ...
a. Wiring is not in accordance with the diagram furnished with the heater.
b. The heater is installed without proper clearance to combustible materials.
c. The heater is connected to a duct system or if the air delivery system is
modified by other than manufacturer-designed accessories.
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 3
4. Uncrating and
Preparation
This heater was test operated and inspected at the factory prior to crating and was in
operating condition. If the heater has incurred any damage in shipment, document
the damage with the transporting agency and contact an authorized Reznor Distribu-
tor. If you are an authorized Distributor, follow the FOB freight policy procedures as
published by Thomas & Betts for Reznor products.
Check the rating plate for the gas specifications and electrical characteristics of the
heater to be sure that they are compatible with the gas and electric supplies at the
installation site.
IMPORTANT: The crate bottom should be removed after the heater is lifted.
Shipping brackets are attached with cabinet screws. When removing shipping
brackets, re-insert ALL screws into the cabinet.
Read this booklet and become familiar with the installation requirements of your
particular heater. If you do not have knowledge of local requirements, check with the
local gas company or any other local agencies who might have requirements con-
cerning this installation. If the installation is above 2000 ft (610M) elevation, follow
the instructions in Paragraph 5 and Paragraph 12.
Before beginning, make preparations for necessary supplies, tools, and manpower.
Locate the hardware kit supplied with the heater. The plastic bag contains spring
nuts, hex nuts, “U”-shape fittings, lock washers, louvers, and compression springs.
Be sure that all shipped-separate options that were ordered are at the installation site.
Shipped-separate items could include a vent cap, louvers, nozzles, hanger kit, a manual
shutoff valve, a thermostat, multiple heater controls, high temperature tape, and/or a
high altitude kit.
If the heater is being installed at an elevation above 2000 ft (610M), the input rate
will have to be derated. This is done by adjusting the outlet pressure of the gas valve
and can only be done after the heater is in operation. Follow the instructions in Para-
graph 12.
If the heater is being installed at an elevation above 6000 ft (1830M), the heat section
pressure switch(es) will need to be changed. If ordered with the heater as Option
DJ20, the pressure switch is shipped separately.
5. High Altitude
Operation
Instructions for Changing
Heat section Pressure
Pressure Switch
Start-up Cold
Equilibrium Hot Setpoint OFF Setpoint ON
400
1
1.75 to 1.45
1.00 to 0.80
0.60
0.78
Lt. Blue
197029
800
2
1.85 to 1.55
1.05 to 0.85
0.60
0.78
Lt. Blue
197029
1200
3
2.35 to 1.85
1.50 to 0.95
0.60
0.78
Lt. Blue
197029
Label
Color
Switch
Part No.
Differential Pressure (in. w.c.)
High Altitude Unit Pressure Switch(es)
Qty
Size
Switch(es)
1. In the control compartment of the first heat section, locate the pressure switch.
2. Mark and disconnect the two wires attached to the pressure switch.
3. Mark and disconnect the sensing tubes from the pressure switch.
4. Locate the two screws holding the switch mounting bracket. Remove the screws
(save screws) and the pressure switch.
5. Using the same screws, install the high altitude pressure switch. Attach the
sensing tubes and wires.
6. If installing a Model LDAP 400, the pressure switch change for high altitude is
complete. If installing a Model LDAP 800, repeat Steps 1-5 to change the
pressure switch on the second heat section. If installing a Model LDAP 1200,
repeat Steps 1-5 to change the pressure switches on the second and third heat
sections.
NOTE: Do not change the
main pressure switch located
on top of a Size 800 and Size
1200 heater. It is the same for
all elevations.
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 4
6. Technical Data
Model LDAP 1200
One Heater
with Two
Downflow
Heat
Sections
Model
LDAP
400
One
Downflow
Heater
Model LDAP 800
One Heater with
Three Downflow
Heat Sections
7. Dimensions
FIGURE 1A - Model LDAP 400
!
"##$
%#
###$
# %&
#& $
$#
&%#'
%
!
(
NOTE: If an optional
nozzle is added to the
discharge opening,
see dimensions on
page 32.
!
!
(
#
&
) %
#'
#
400
800
1200
btuh
400,000
800,000
1,200,000
kw/h
117.1
234.2
351.4
83
83
83
btuh
332,000
664,000
996,000
kw/h
97.2
194.4
291.6
1
1-1/4
1-1/4
6
8
8
1.0
2.0
3.0
5.6
13.6
19.4
5.5
12.8
18.5
1150
2448
3730
1230
2597
3959
55
55
55
cfm
5589
11178
16768
m
3/minute
158
317
475
ft
2
3.67
7.35
11.02
m
2
0.34
0.68
1.02
fpm
1521
1521
1521
m/minute
464
464
464
cfm
4650
9300
13950
m
3/minute
132
263
395
fpm
1266
1266
1266
m/minute
386
386
386
cfm
3250
6500
9750
m
3/minute
92
184
276
fpm
885
885
885
m/minute
270
270
270
1 (1)
1 (2)
1 (3)
1050
1050
1050
24
24
24
Model LDAP Size
Input Heating Capacity
Thermal Efficiency (%)
Output Heating Capacity
Gas Connection (Inches)
Vent Connection Diameter (Inches)
Control Amps (24 volt)
Full Load Amps (208 volt)
Full Load Amps (230 volt)
Normal Power Consumption @ 208V (watts)
Normal Power Consumption @ 230V (watts)
Discharge Air Temperature Rise (°F)
Air Volume (Heat @ High Speed)
Discharge Air Opening Area
Outlet Velocity (Heat @ High
Speed)
Air Volume (Destratification @
Medium Speed)
Fan Motor RPM
Fan Diameter (Inches)
Outlet Velocity (Destratification
@ Medium Speed)
Air Volume (Destratification @
Low Speed)
Outlet Velocity (Destratification
@ Low Speed)
Fan Motor HP (Qty)
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 5
FIGURE 1B - Model LDAP800 and Model LDAP1200
A Model LDAP1200 with three heat sections is illustrated. A Model LDAP800 has two heat sections. A Model LDAP800
is the same layout as illustrated less the middle heat section.
&%#'
!
!
NOTE: If optional
nozzles are added to the
discharge openings, see
dimensions on page 32.
%#
###$
# %&
#& $
$#
(
(
"#$
#
*
Size
A
B
inches
46
69
mm
1168
1753
inches
80
103-3/4
mm
2032
2635
800
1200
* #*+#*
!
(
%
#
&
) %
#'
#
!
!
#'
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 6
Confined Space:
A space whose volume is
less than 50 cubic feet
per 1000 BTUH of the
installed appliance input
rating
Combustion Air Requirements for a Heater
Located in a Confined Space
FIGURE 2 - Definition of
Confined Space and
Required Openings for
Combustion Air
!"
#$%!
Heaters must be installed so that the clearances in the table are provided for combus-
tion air space, inspection and service, and for proper spacing from combustible con-
struction. Clearance to combustibles is defined as the minimum distance from the
heater to a surface or object that is necessary to ensure that a surface temperature of
90°F above the surrounding ambient temperature is not exceeded.
8. Clearances
9. Combustion
Air
This heater must be supplied with the air that enters into the combustion process and
is then vented to the outdoors. Sufficient air must enter the equipment location to
replace that exhausted through the heater vent system. In the past, the infiltration of
outside air assumed in heat loss calculations (one air change per hour) was assumed
to be sufficient. However, current construction methods using more insulation, vapor
barriers, tighter fitting and gasketed doors and windows, weather-stripping, and/or
mechanical exhaust fans may now require the introduction of outside air through wall
openings or ducts.
The requirements for combustion and ventilation air depend upon whether the heater
is located in a confined or unconfined space. An "unconfined space" is defined as a
space whose volume is not less than 50 cubic feet per 1000 BTUH of the installed
appliance. Under ALL conditions, enough air must be provided to ensure there will
not be a negative pressure condition within the equipment room or space.
WARNING: A Model LDAP power-vented heater is designed to take
combustion air from the space in which the heater is installed and is
not designed for connection to outside combustion air intake ducts.
Connecting outside air ducts voids the warranty and could cause
hazardous operation. See Hazard Levels, page 2.
Clearances -
inches/mm
inches mm inches
mm
inches
mm
inches
mm
inches
mm
inches
mm
inches
mm
400
12
305
6
152.4
18
457
2
50.8
18
457
2
50.8
60
1524
800
12
305
6
152.4
18
457
2
50.8
18
457
2
50.8
60
1524
1200
12
305
6
152.4
18
457
2
50.8
18
457
2
50.8
60
1524
Bottom
Disconnect
Side
Side
Size
Top
Flue
Connector
Front
(Access Panel)
Rear
Do not install a heater in a confined space without providing wall openings leading to
and from the space. Provide openings near the floor and ceiling for ventilation and air
for combustion as shown in FIGURE 2, depending on the combustion air source as
noted in Items 1, 2, and 3 below.
Add total BTUH of all appliances in the confined space and divide by figures below
for square inch free area size of each (top and bottom) opening.
1. Air from inside the building - openings 1 square inch free area per 1000 BTUH.
Never less than 100 square inches free area for each opening. See (1) in FIGURE 2.
2. Air from outside through duct - openings 1 square inch free area per 2000 BTUH.
See (2) in FIGURE 2.
3. Air direct from outside - openings 1 square inch free area per 4000 BTUH. See
(3) in FIGURE 2.
NOTE: For further details on supplying combustion air to a confined space, see the
National Fuel Gas Code ANSI Z223.1a (latest edition).
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 7
10. Heater
Location
Use the clearances in Paragraph 8; the combustion air requirements in Paragraph 9;
the mounting height requirements, throw information, sound data, and location rec-
ommendations below; the weights in Paragraph 11; and the venting requirements in
Paragraph 24 to determine where to suspend the heater.
Mounting Height
Locate the heater so that it is a minimum of 15 feet (4.6M) above the floor and in
compliance with the clearances in Paragraph 8.
WARNING: If touched, the vent pipe and internal heater surfaces
that are accessible from outside the heater will cause burns. Suspend
the heater a minimum of 15 feet (4.6M) above the floor.
CAUTION: Do not locate the heater where it may be exposed to
water spray, rain, or dripping water.
Heater Throw -
All Models
NOTES:
• X = Distance from “0” to beginning
of floor coverage.
• Y = Distance from “0” to end of
floor coverage.
• Length of floor coverage = Y - X.
• Z = Distance from “0” to the point
where the air velocity drops below
50 feet (15.2M) per minute.
• Throws listed are with standard
louvers facing one direction and
fully open. Throw pattern changes
with louver angle, 2-way louver
direction, and or optional 4-way
louvers.
Throw (feet and meters)
FIGURE 3 - Model LDAP Air Throw (Heat Mode @ High Speed) - Applies to All Sizes
0 = “Rear” of Heater Discharge
Mounting
Height
Standard Louvers
30° Nozzle
60° Nozzle
X
Y
Z
X
Y
Z
X
Y
Z
Standard
Louvers
30° Nozzle
60° Nozzle
0
X
Y
Z
X
Y
Z
X
Y
Z
20
5
55
134
40
90
146
70
125
158
30
8
53
121
44
86
133
76
119
145
40
12
49
109
47
81
120
N/A
N/A
N/A
50
17
45
96
N/A
N/A
N/A
N/A
N/A
N/A
X
Y
Z
X
Y
Z
X
Y
Z
6.1
1.5
16.8
40.8
12.2
27.4
44.5
21.3
38.1
48.2
9.1
2.4
16.2
36.9
13.4
26.2
40.5
23.2
36.3
44.2
12.2
3.7
14.9
33.2
14.3
24.7
36.6
N/A
N/A
N/A
15.2
5.2
13.7
29.3
N/A
N/A
N/A
N/A
N/A
N/A
Mounting
Height
(Meters)
Standard Louvers
30° Degree Nozzle
60° Degree Nozzle
Throw (meters)
Mounting
Height
(feet)
Standard Louvers
30° Degree Nozzle
60° Degree Nozzle
Throw (feet)
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 8
11. Hanging or
Mounting
the Heater
and
Installing
Louvers
Before installing the heater, check the supporting
structure to be used to verify that it has sufficient load-
carrying capacity to support the weight.
Weight (lbs/kg)
WARNINGS: Check the supporting structure to be used to verify
that it has sufficient load carrying capacity to support the weight of
the heater. Suspend the heater only from the threaded nut retainers
or with a manufacturer provided kit. Do NOT suspend from the
heater cabinet.
Suspending the Heater
Size
400
800
1200
lbs
375
805
1195
kg
170
365
542
See FIGURE 1A or 1B for the appropriate hanging locations, and install the ½”-13
spring nuts in the strut that is attached to the top of the unit. Comply with the require-
ments in FIGURE 4A when using threaded rod. If ordered with swivel connectors
for 1” pipe, Option CK10, attach the swivels to the spring nuts according to illustra-
tion in FIGURE 4B and suspend with 1” pipe.
Locate the hardware kit shipped with the heater. The kit contains spring nuts, hex
nuts, “U”-shape fittings, and lock washers for suspending the heater. It also includes
louvers and the compression springs needed to install them.
When the heater is lifted for suspension, support the bottom of the heater with the
crate bottom. If the bottom is not supported, damage could occur. Before hanging or
mounting, verify that any screws used for holding shipping brackets were re-installed
in the cabinet.
Location
Recommendations
NOTE: Venting
requirements may affect
location. Consult
requirements in Paragraph 24
before making final
determination.
Hazards of Chlorine
For best results, the heater should be placed with certain rules in mind. In general, a
heater should be located from 15-40 feet (4.6-12.2 M) above the floor. If two or more
heaters are installed in the same room, a general scheme of air circulation should be
maintained for best results.
Suspended heaters are most effective when located as close to the working zone as
possible, and this fact should be kept in mind when determining the mounting heights
to be used. However, care should be exercised to avoid directing the discharged air
directly on the room occupants.
Partitions, columns, counters, or other obstructions should be taken into consider-
ation when locating the heater so that a minimum quantity of airflow will be deflected
by such obstacles.
The presence of chlorine vapors in the combustion air of gas-fired heating equipment
presents a potential corrosion hazard. Chlorine found usually in the form of freon or
degreaser vapors, when exposed to flame will precipitate from the compound, and go
into solution with any condensation that is present in the heat exchanger or associated
parts. The result is hydrochloric acid which readily attacks all metals including 300
grade stainless steel. Care should be taken to separate those vapors from the combus-
tion process. This may be done by wise location of the heater with regard to exhaust-
ers or prevailing wind directions. Chlorine is heavier than air. Keep these facts in
mind when determining installation location of the heater in relation to building ex-
haust systems.
10. Heater
Location
(cont’d)
Sound Data
db
Pa
µbar
db
Pa
µbar
db
Pa
µbar
db
Pa
µbar
db
Pa
µbar
400
69 0.058
0.580 65 0.037 0.371 62 0.026 0.258 60 0.019 0.189 57 0.015
0.145
800
72 0.080
0.800 68 0.051 0.512 65 0.036 0.356 62 0.026 0.261 60 0.020
0.200
1200
74 0.100
1.000 70 0.064 0.640 67 0.044 0.444 64 0.033 0.327 62 0.025
0.250
µbar = microbar
Pa = Pascal
Sound Chart - Model LDAP
Model
LDAP
Size
DISTANCE
20 ft (6.1M)
25 ft (7.6M)
30 ft (9.1M)
35 ft (10.7M)
40 ft (12.2M)
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 9
FIGURE 4B- Swivel Connectors to
Suspend the Heater from 1” Pipe, Option
CK10
Be sure the threaded swivel connectors are locked
to the heater as illustrated.
WARNING: All heaters must be level for proper operation. Do not
place or add additional weight to the suspended heater. Hazard
Levels, page 2.
Be sure the threaded hanger rods are locked to the heater as
illustrated. Recommended maximum hanger rod length is 6
feet (1.8M).
The heater may be attached to a wall. Place supports as shown in FIGURE 5 and
comply with all guidelines listed.
FIGURE 5 - Wall Mounting
(All structural supports and angles are field supplied.)
Wall Mounting
Guidelines for Wall Mounting
Model LDAP Heaters
Mounting is the responsibility of the
installer. Verify that the supporting
structure has sufficient load-carrying
capacity to support the weight. (See
weights, page 8.)
Prior to installation, be sure that the
method of support is in agreement with
all local building codes. Check for
service platform requirements.
Maintain a minimum of 2” (51mm)
clearance from the discharge air
openings to structural supports. Addi-
tional clearance will be required if an
optional nozzle is to be field installed.
Determining the need for installing
vibration or noise isolation is the
responsibility of the installer.
To prevent potential movement, field-
supplied angles must be placed around
the perimeter of the heater to anchor it
to the structural supports.
Structural supports must be placed as
shown to prevent damage to the heater.
All structural supports must be non-
combustible materials.
Strut
attached to
top of heater.
1/2”-13
Threaded Rod
Hex Nut
Lockwasher
“U”-shape
Fitting
Spring
Nut
Strut
attached to
top of heater.
Lockwasher
“U”-shape
Fitting
Hex Nut
Pipe Coupling
Assembly
Spring
Nut
!!
"#
$%
&"!!
'#
$%
(!!
&
#
$%
$%
)
#
)
*+
,
'(''-.(/
00))
'(''-.(/
00))
'(''-.(/
00))
'(('-.(/
&))
'(''-.(/
00))
'(&&-'"/
0"))
" &-(/
0& ))
("&-"/
&! !))
)
) )#
#
FIGURE 4A -
Suspending the
Heater with Rods
from the Threaded
Nut Retainers
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 10
Installing Louvers
NOTE: Do not install louvers
if installing a nozzle. Follow
the instructions shipped with
the nozzle.
Louver Installation Instructions:
1) With the wider section of the louver facing out of the heater, place one of the compres-
sion springs over the tab on the notched end of a louver. The end of the louver with the
spring will fit in any direction in the square opening. How the louver turns depends on
which end of the louver is inserted first.
2) Depending on the throw pattern selected, push the louver tab with the spring into a
hole in the discharge opening and insert the louver tab on the other end into the
corresponding hole on the opposite side.
3) Continue until all louvers are installed.
Adjust the louvers to provide the
desired throw pattern.
FIGURE 6 - Use
Compression Springs to
Install Louvers in the
Discharge Opening(s)
CAUTION: To avoid getting
burned, adjust louvers while
heater is not operating. If
adjusting louvers while
heater is operating, wear
gloves.
After the unit is suspended/mounted, install the air directional louvers or optional
nozzle. If an optional nozzle is being installed, follow the instructions included with
the nozzle. If a nozzle is not being used, install the louvers in the discharge opening(s).
Louvers and springs are in the hardware kit shipped with the heater.
Before actually installing the louvers, note the louver curve and determine how the
louvers should be positioned to provide the optimal throw pattern. Opening is square
so louvers may be installed either horizontal or vertical. Louvers may be installed
with the curve all the same direction (either way) or the right half one way and left
the other as illustrated in FIGURE 6.
Airflow direction depends on
how the louvers are installed.
WARNING: This appliance is equipped for a maximum gas supply
pressure of 1/2 psi, 3.5 kPa, or 14 inches water column. Supply
pressure greater than 1/2 psi requires installation of an additional
lockup-type service regulator external to the heater.
WARNING: PRESSURE TESTING SUPPLY PIPING
Test Pressures Above 1/2 PSI: Disconnect the heater and manual valve from the
gas supply line which is to be tested. Cap or plug the supply line.
Test Pressures Below 1/2 PSI: Before testing, close the manual valve on the heater.
12. Gas Piping
and
Pressures
Sizing Gas Supply
Line
Capacity of Piping - Cubic Feet per Hour based on 0.3" w.c. Pressure Drop
Specific Gravity for Natural Gas -- 0.6 (Natural Gas -- 1000 BTU/Cubic Ft)
Specific Gravity for Propane Gas -- 1.6 (Propane Gas -- 2550 BTU/Cubic Ft)
Length
Diameter of Pipe
of
1"
1-1/4"
1-1/2"
2"
2-1/2"
Pipe
Natural Propane Natural Propane Natural Propane Natural Propane Natural Propane
20'
350
214
730
445
1100
671
2100
1281
3300
2013
30'
285
174
590
360
890
543
1650
1007
2700
1647
40'
245
149
500
305
760
464
1450
885
2300
1403
50'
215
131
440
268
670
409
1270
775
2000
1220
60'
195
119
400
244
610
372
1105
674
1850
1129
70'
180
110
370
226
560
342
1050
641
1700
1037
80'
170
104
350
214
530
323
990
604
1600
976
90'
160
98
320
195
490
299
930
567
1500
915
100'
150
92
305
186
460
281
870
531
1400
854
125'
130
79
275
168
410
250
780
476
1250
763
150'
120
73
250
153
380
232
710
433
1130
689
175'
110
67
225
137
350
214
650
397
1050
641
200'
100
61
210
128
320
195
610
372
980
598
Note: When sizing supply lines, consider possibilities of future expansion and increased requirements.
Refer to National Fuel Gas Code for additional information on line sizing.
WARNING: All com-
ponents of a gas supply
system must be leak
tested prior to placing
equipment in service.
NEVER TEST FOR
LEAKS WITH AN OPEN
FLAME. Failure to
comply could result in
personal injury, property
damage or death.
11. Installing
Heater and
Louvers
(cont’d)
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 11
Valve Outlet or
Orifice Pressure
Setting
Measuring valve outlet gas pressure cannot be done until the heater is in operation. It
is included in the steps of the "Check-Test-Start" procedure in Paragraph 25. The
following warnings and instructions apply. Model LDAP 400 has one gas valve;
Model LDAP 800 has two gas valves; and Model LDAP 1200 has three gas valves.
WARNING: Valve outlet
gas pressure must never
exceed 3.5" w.c. for
natural gas and 10" w.c.
for propane gas.
For Natural Gas: When the heater leaves the factory, the combination gas valve(s)
is set so that the valve outlet gas pressure for a single stage valve or high fire of a two
stage valve is regulated to 3.5" w.c. Low fire on a two-stage valve (Size 400 only) is
set to 1.8” w.c. Inlet supply pressure to the heater for natural gas must be a minimum
of 5" w.c. or as noted on the rating plate and a maximum of 14" w.c.
For Propane Gas: When the heater leaves the factory, the combination gas valve(s)
is set so that the valve outlet gas pressure for a single stage valve or high fire of a two
stage valve is regulated to 10" w.c. Low fire on a two-stage valve (Size 400 only) is
set to 5.0” w.c. Inlet supply pressure to the heater for propane gas must be a mini-
mum of 11" w.c. and a maximum of 14" w.c.
Before attempting to measure or adjust valve outlet gas pressure, the inlet
supply pressure must be within the specified range both when the heater is in opera-
tion and on standby. Incorrect inlet pressure could cause excessive valve outlet gas
pressure immediately or at some future time. If natural gas supply pressure is too
high, install a regulator in the supply line before it reaches the heater. If natural gas
supply pressure is too low, contact your gas supplier.
FIGURE 7 - Gas
connection is at the pipe
nipple that extends outside
the cabinet.
IMPORTANT: Two pipe
wrenches are required when
installing gas piping. The gas
pipe that is supplied with the
heater MUST be held with a
pipe wrench to prevent damage
to the heater.
! "
#
$
%
& '
#
& '
#
(
)
$
%
(
)
Horizontal Supply
Vertical Supply
Gas Connection Size
All piping must be in accordance with requirements outlined in the National Fuel
Gas Code ANSI/Z223.1a (latest edition) or CSA-B149.1 and B149.2 (See Paragraph
2). Gas supply piping installation should conform with good practice and with local
codes. Support gas piping with pipe hangers, metal strapping, or other suitable mate-
rial; do not rely on the heater to support the gas pipe.
The heater is orificed for operation with natural gas having a heating value of 1000
(± 50) BTUH per cubic ft or propane gas with a heating value of 2500 (± 100) BTUH
per cubic ft. If the gas at the installation does not meet these specifications, consult
the factory for proper orificing.
Pipe joint compounds (pipe dope) shall be resistant to the action of liquefied petro-
leum gas or any other chemical constituents of the gas being supplied.
Install a ground joint union and manual shutoff valve upstream of the heater control
system, as shown in FIGURE 7. Installation of a trap with a minimum 3" (76mm)
drip leg is required.
To connect the gas, the heater is equipped with a nipple that extends outside the
cabinet.
Leak-test all connections by brushing on a leak-detecting solution.
Gas Connection - inches/mm
Natural
Gas
Propane
Gas
inches
1
1
mm
25.4
25.4
inches
1-1/4
1-1/4
mm
31.8
31.8
inches
1-1/4
1-1/4
mm
31.8
31.8
Size
400
800
1200
NOTE: Gas Conversion Kits
are available for changing
from propane gas to natural
gas or natural gas to propane
gas. A factory-authorized
conversion kit MUST be
used.
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 12
12. Gas
Pressures
(cont’d)
Derate by Valve Outlet Pressure Adjustment for High
Altitude Operation
Instructions for High Altitude Derate
1. Determine the required valve outlet pressure for the elevation where the heater
will be operating. If unsure of the elevation, contact the local gas supplier.
Check Valve Outlet
Pressure (can only
be done after heater
is operating)
NOTE: If operating at high
altitude, outlet pressure
requires adjustment. Follow
instructions below.
Valve Outlet Pressure Settings by Elevation
NOTES: If installation is
above 6000 ft (1830M), a
high altitude pressure switch
is required on each heat
section (all sizes). See
Paragraph 5.
The main combustion air
pressure switch (Sizes 800
and 1200 only) does not need
to be changed for high
altitude installation.
FIGURE 8 - Top View of
Valves showing Outlet
Pressure Tap and
Adjustment Locations
2. Locate the 1/8” output pressure tap on the first valve (See FIGURE 8). Turn
the knob on the top of the valve to “OFF”. Connect a manometer to the 1/8"
pipe outlet pressure tap in the valve. Use a water column manometer that is
readable to the nearest tenth of an inch.
3. Single-Stage and Two-Stage High Fire - Turn the knob on the top of the
valve to “ON”. Remove the cap from the pressure adjusting screw and adjust
the gas train pressure to the pressure selected from the table above. Adjust
pressure by turning the regulator screw IN (clockwise) to increase pressure or
OUT (counterclockwise) to decrease pressure.
Two-Stage Low Fire - Disconnect the wire from the “HI” terminal on the gas
valve and check the low fire pressure. Turn the regulator screw to adjust the low
fire outlet pressure to the “Low Fire” pressure selected from the table. Re-
connect the wire to the gas valve.
Instructions
1) Locate the 1/8” output pressure tap on the first valve (See FIGURE 8). With
the manual valve turned off to prevent flow to the gas valve, connect a manom-
eter to the 1/8" pipe outlet pressure tap in the valve. NOTE: A manometer (fluid-
filled gauge) is recommended rather than a spring type gauge due to the difficulty
of maintaining calibration of a spring type gauge.
2) Open the manual valve and operate the heater. Measure the outlet pressure of
the gas valve. To measure low-stage pressure on a Size 400 unit equipped with a
two-stage valve, disconnect the wire from the “HI” terminal on the valve. (Be
sure to reconnect wire after testing.)
Normally when operating at sea level, adjustments should not be necessary to the
factory setting(s). (For high altitude settings, see below.) If adjustment is neces-
sary, remove the cap from the adjustment screw(s). Set pressure to correct
settings by turning the regulator screw IN (clockwise) to increase pressure. Turn
regulator screw OUT (counterclockwise) to decrease pressure.
3) If installing a Model LDAP 800, repeat to verify outlet pressure on second valve.
If installing a Model LDAP 1200, repeat to verify outlet pressure check on
second and third valve.
Feet
Meters
Single-Stage and
Two-Stage High Fire
Two-Stage
Low Fire
Single-Stage and
Two-Stage High Fire
Two-Stage
Low Fire
0-2000
0-610
3.5
2.0
10.0
5.6
2001-3000
611-915
3.1
1.7
8.8
5.0
3001-4000
916-1220
3.0
1.7
8.5
4.8
4001-5000
1221-1525
2.8
1.6
8.1
4.6
5001-6000
1526-1830
2.7
1.5
7.7
4.4
6001-7000
1831-2135
2.6
1.5
7.4
4.2
7001-8000
2136-2440
2.5
1.4
7.1
4.0
8001-9000
2441-2745
2.4
1.3
6.7
3.8
9001-10000
2746-3045
2.4
1.3
6.7
3.6
Feet
Meters
Single-Stage and
Two-Stage High Fire
Two-Stage
Low Fire
Single-Stage and
Two-Stage High Fire
Two-Stage
Low Fire
0-2000
0-610
3.5
2.0
10.0
5.6
2001-4500
611-1373
2.8
1.6
8.1
4.6
Manifold Pressure Settings by Altitude for the UNITED STATES
Manifold Pressure Settings by Altitude for CANADA
Altitude
Natural Gas (inches w.c.)
Propane Gas (inches w.c.)
Altitude
Natural Gas (inches w.c.)
Propane Gas (inches w.c.)
Single-Stage Valve
1/8” Output
Pressure
Tap
Adjust Low
Pressure
Output
Adjust High
Pressure
Output
1/8” Output
Pressure Tap
Inlet
Pressure
Tap
Inlet
Pressure
Tap
Two -Stage Valve (optional
on Model LDAP 400 only)
Output
Adjustment
Screw
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 13
All electrical wiring and connections, including electrical grounding MUST be made
in accordance with the National Electric Code ANSI/NFPA No. 70 (latest edition) or,
in Canada, with CSA Standard C22.1. In addition, the installer should be aware of
any local ordinances or gas company requirements that might apply.
Check the rating plate on the heater for the supply voltage and current requirements.
A dedicated line voltage supply with disconnect switch should be run directly from
the main electrical panel to the heater. All external wiring must be within approved
14. Electrical
Supply and
Connections
13. Burners
Each heat section in this heater has a one-piece TCORE2® burner assembly (U.S.
Patent No. 6,889,686) designed to provide controlled flame stability without lifting or
flashback with either natural or propane gas.
The burner can be removed as a unit for inspection or service; see Maintenance
Section for removal instructions.
High Altitude
Capacity Changes
The input and/or the capacity of the heater changes with the derate. The tables below
list inputs and capacities at altitudes from sea level to 10,000 ft (3045M) for the U.S.
and to 4500 ft (1373M) for Canada.
Normal
Input
Thermal Output
Capacity
Minimum
Input
Normal
Input
Thermal Output
Capacity
Minimum
Input
Normal
Input
Thermal Output
Capacity
Minimum
Input
Feet
Meters
0 - 2000
0 - 610
400000
332000
300000
800000
664000
400000
1200000
996000
400000
2001 - 3000
611 - 915
376000
312080
282000
752000
624160
376000
1128000
936240
376000
3001 - 4000
916 - 1220
368000
305440
276000
736000
610880
368000
1104000
916320
368000
4001 - 5000
1221 - 1525
360000
298800
270000
720000
597600
360000
1080000
896400
360000
5001 - 6000
1526 - 1830
352000
292160
264000
704000
584320
352000
1056000
876480
352000
6001 - 7000
1831 - 2135
344000
285520
258000
688000
571040
344000
1032000
856560
344000
7001 - 8000
2136 - 2440
336000
278880
252000
672000
557760
336000
1008000
836640
336000
8001 - 9000
2441 - 2745
328000
272240
246000
656000
544480
328000
984000
816720
328000
9001 - 10000
2746 - 3045
320000
265600
240000
640000
531200
320000
960000
796800
320000
Normal
Input
Thermal Output
Capacity
Minimum
Input
Normal
Input
Thermal Output
Capacity
Minimum
Input
Normal
Input
Thermal Output
Capacity
Minimum
Input
Feet
Meters
0 - 2000
0 - 610
400000
332000
300000
800000
664000
400000
1200000
996000
400000
2001 - 4500
611 - 1373
360000
298800
270000
720000
597600
360000
1080000
896400
360000
BTUH Inputs & Capacities by Altitude in the UNITED STATES for Model LDAP
BTUH Inputs & Capacities by Altitude in the CANADA for Model LDAP
Size 400
Size 800
Size 1200
Altitude
Altitude
Size 800
Size 1200
Size 400
Supply Wiring
4. Turn up the thermostat. Cycle the burners once or twice to properly seat the
adjustment spring in the valve.
Re-check the pressure(s). When the outlet pressure is right for the installation,
remove the manometer and replace the cap.
Check for leak at the pressure tap fitting.
5. If installing a Model LDAP 800, repeat the adjustment at the second single-stage
gas valve. If installing a Model LDAP 1200, repeat the adjustment at the second
and third single-stage gas valves.
6. With the heater operating determine that the inlet pressure to the heater for
natural gas is between 5 and 13.5 inches w.c. and for propane between 10 and
13.5 inches w.c. Take this reading at the inlet pressure tap of the first gas valve.
If the inlet pressure is not within the specified range, the inlet pressure must be
corrected and Steps 3 - 5 repeated.
7. Find the High Altitude Adjustment label in the plastic bag that contained these
instructions. Using a permanent marker, fill-in the appropriate information from
the “BTUH Input & Capacity by Altitude” Table, below. Select a location for the
label on the outside of the heater main access panel so that it will be conspicuous
to anyone operating or servicing the heater. Be sure the surface is clean and dry
and adhere the label.
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 14
15. Thermostat
and
Connections
Use either an optional thermostat available with the heater or a field-supplied 24-volt
thermostat. Install according to the thermostat manufacturer's instructions, paying
particular attention to the requirements regarding the location of the thermostat.
Make sure that the heat anticipator setting on the thermostat is 0.6 amps (or in accor-
dance with the amperage value noted on the wiring diagram of your heater).
Make thermostat connections at the terminal strip on the front of the heater. The strip
has seven terminals, R, G, C, Y1, Y2, W1, and W2. Refer to the wiring diagram on
the heater.
IMPORTANT: All heaters MUST be operated by a 24-volt thermostat. Never
use a line voltage disconnect switch as a means of operating the heater. Operating by
means other than a 24-volt thermostat may result in the high limit control tripping
and may cause damage to the heater from excessive heat.
Connections for Reznor optional thermostats are shown in FIGURE 10 for LDAP
400; in FIGURE 11 for LDAP 800; and in FIGURE 12 for LDAP 1200.
24V Control Wiring
Connections
Disconnect Switch
FIGURE 9 - Built-in
Disconnect Switch
• Option CL1 - Single-Stage Thermostat, 40-80°F
• Option CL2 - Single-Stage Thermostat with Fan Switch, 40-80°F
• Option CL3 - Single-Stage Thermostat, 40-90°F
• Option CL7 - Two-Stage Thermostat (for use with optional two-stage gas valve
on Size 400 or for staging heat sections on Sizes 800 and 1200)
• Option CL18 - Two-Stage Thermostat with Fan Switch (for use with optional
two-stage gas valve on Size 400 or for staging heat sections on Sizes 800 and
1200)
conduit and have a minimum temperature rise rating of 60°C. Conduit must be run so
as not to interfere with the heater access panel.
CAUTION: Route wires so that they do not contact the flue wrapper
or venter housing. When running electrical conduit, be careful that
it is clear of all access panels.
The heater is equipped with a built-in, non-fusible, lockable disconnect switch (FIG-
URE 8). If a fusible disconnect is required, it must be field supplied. The built-in
disconnect switch requires copper wiring with ampacity based on 60°C maximum
temperature rating at the line side terminals.
WARNING: To prevent injury or death due to electrocution or
contact with moving parts, lock disconnect switch open. See Hazard
Levels, page 2.
WARNING: If you turn off the power supply, turn off the gas. See
Hazard Levels, page 2.
Model LDAP supply wiring enters above and connects directly to the disconnect
switch (See FIGURE 1A or 1B in Paragraph 7 and FIGURE 9). A circuit board (See
FIGURE 13 in Paragraph 20) is located in the control compartment of each heat
section. The circuit boards are polarity sensitive. It is advisable to check the electrical
supply to be certain that the black wire is the “hot” wire and that the white wire is the
neutral wire. The supply connection made to “L1” on the disconnect switch must be
the “hot” wire.
Each heat section in the heater has a terminal strip for 24-volt thermostat connec-
tions. The terminal strip is located on the outside of the cabinet at the front of each
heat section (See FIGURE 1A or 1B in Paragraph 7). Wires from the terminal strip(s)
are factory wired to the circuit board(s).
14. Electrical
Supply and
Connections
(cont’d)
Supply Wiring
(cont’d)
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 15
&''()
&''()
*
+*,)
&,-,)
+*,)
&--,)
&-,)
# #%
)# #%
&
./
&,-,)
+*,) .)0./
&--,)
&
&
# #%
) %#
& )((
&
.-1/()'.
& )((2!3456$6#6 &7
&7&7&,3&-
!
"#
"$
%
!
"#
"$
&
'
(
)
&
&
&
.
.
&-
&-
&,
&,
.)0./
+*,)
. .
.
&''()
&''()
*
+*,)
&,-,)
+*,)
&--,)
&-,)
&
.
&
.
.
&
& .
&
+*,)
&,-,)
+*,)
&--,)
)
# #%
)# #%
& .
) %#
# #%
.
& -((
&
.-1/(/'.
& -((2!3456$6#6 &7
&7&7&,3&-
!
"#
"$
%
!
"#
"$
&
'
(
)
.
&
&
&
./
&-
&,
.)0./
&-
&,
. .
.
.
FIGURE 11 - Thermostat
Connections for Model
LDAP 800 with Option
CL1, CL2, CL3, CL7, or
CL18
FIGURE 10 - Thermostat
Connections for Model
LDAP 400 with Option CL1,
CL2, CL3, CL7, or CL18
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 16
Multiple Heater
Control - Option
CL31 and Option
CL32
If the heater was ordered with a multiple heater control option, one thermostat can be used
to control multiple heaters. The option will control a maximum of six Size 400 heaters, a
maximum of three Size 800 heaters, or a maximum of two Size 1200 heaters.
The option includes a 40 VA transformer that replaces the standard transformer in the
”master” heater and a relay assembly that attaches to the “slave” heater. Option CL31
provides for control of two heaters. If control of additional heaters is desired, Option CL32
which is the relay assembly only must be added to each of the “slave” heaters.
The option packages are shipped separately and include complete instructions for installa-
tion and wiring.
&''()
&''()
*
+*,)
&,-,)
+*,)
&--,)
&-,)
.
&
.
&
&
.
&
.
& .
.
&
&
+*,)
&,-,)
+*,)
&--,)
# #%
# #%
) %#
)# #%
.
&
.
& .
&
& ((
&
.-1/(*'.
& ((2!3456$6#6 &7
&7&7&,3&-
*
%+
,-#
!.
+
!!
/
*
0+
,-#
!.
+
!!
/
%
(
!
"#
"$
!
"#
"$
&
'
1
)
.
&
&
&
.,
&-
&,
.*0.,
.
&-
&,
.) ./
.)
FIGURE 12 - Thermostat
Connections for Model
LDAP 1200 with Option
CL1, CL2, CL3, CL7, or
CL18
15. Thermostat and Connections (cont’d)
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 17
18. High Limit
Control
Each heat section is equipped with a temperature activated, manually reset high limit
control. The high limit control is located at the top of each heat section. It is factory
set and is non-adjustable. If the setpoint is reached, the high limit control acts to
interrupt the electric supply to the gas valve in that heat section. If the high limit
control activates, identify and correct the cause before resetting the switch. Refer to
16. Combustion
Air Proving
[Pressure
Switch(es)]
17. Limit Control
Each heat section is equipped with a temperature activated auto reset limit control.
The control is factory set and is non-adjustable. If the setpoint is reached, the limit
control will interrupt the electric supply to the gas valve in that heat section. This
safety device provides protection in the case of motor failure or lack of airflow due to
a restriction at the inlet or outlet. (For location, see FIGURE 22, page 33.)
CAUTION: The auto reset limit control will shut down the heater
until the cause is corrected. Do not bypass the limit control;
hazardous conditions could result. See Hazard Intensity Levels, page
2.
The combustion air proving switch is a pressure sensitive switch that monitors air
pressure to ensure that proper combustion airflow is available. The switch is a single
pole/normally open device which closes when a differential pressure is sensed be-
tween the venter housing and the flue collection box. Each section in the heater has a
pressure switch. (For switch location, see FIGURE 22, page 33.) In addition, heaters
with more than one heat section (Size 800 and Size 1200) have a main pressure switch
which senses the negative pressure in the main venter housing.
On startup when the heater is cold, the sensing pressure is at the highest level, and as
the heater and flue system warm up, the sensing pressure becomes less. After the
system has reached equilibrium (about 20 minutes), the sensing pressure levels off.
If a restriction or excessive flue length or turns cause the sensing pressure to be out-
side the switch setpoint, the pressure switch will function to shutoff the burner. If the
main combustion air pressure switch opens, it will interrupt the electric supply to all
gas valves. If a heat section pressure switch opens, it will interrupt the electric supply
to the gas valve in that heat section. The burner(s) will remain off until the system has
cooled and/or the flue system resistance is reduced.
The Table below lists the approximate water column differential pressure settings of
the heat section pressure switch(es) and the negative pressure readings of the main
pressure switch.
Pressure Switch Settings
DANGER: Safe operation of this heater requires proper venting flow. NEVER bypass combustion
air proving switch(es) or attempt to operate the heater without the venter running and the proper
flow in the vent system. Hazardous conditions could result. See Hazard Intensity Levels, page 2.
NOTE: For high altitude,
follow instructions in
Paragraph 5 to change heat
section pressure switch(es).
The main combustion air
pressure switch (Sizes 800
and 1200 only) does not need
to be changed for a high
altitude installation.
Start-up Cold
Equilibrium
Hot
Setpoint
OFF
Setpoint
ON
Start-up
Cold
Equilibrium
Hot
Setpoint
OFF
Setpoint
ON
400
1
1.80 to 1.50
1.05 to 0.85
0.65
0.83
Yellow
197028
800
-1.30 to -1.00
-0.85 to -0.65
-0.15
-0.33
Gray
205445
2
1.90 to 1.60
1.10 to 0.90
0.65
0.83
Yellow
197028
1200
-1.40 to -0.90
-0.97 to -0.59
-0.15
-0.33
Gray
205445
3
2.40 to 1.90
1.55 to 1.00
0.65
0.83
Yellow
197028
Start-up Cold
Equilibrium
Hot
Setpoint
OFF
Setpoint
ON
Qty
Start-up
Cold
Equilibrium
Hot
Setpoint
OFF
Setpoint
ON
400
1
1.75 to 1.45
1.00 to 0.80
0.60
0.78
Lt. Blue 197029
800
-1.25 to -0.95
-0.80 to -0.60
-0.15
-0.33
Gray
205445
2
1.85 to 1.55
1.05 to 0.85
0.60
0.78
Lt. Blue 197029
1200
-1.35 to -0.85
-0.92 to -0.54
-0.15
-0.33
Gray
205445
3
2.35 to 1.85
1.50 to 0.95
0.60
0.78
Lt. Blue 197029
Sea Level Pressure Switch Settings (Applies to elevations up to 6000ft/1830M)
Model
LDAP
Model
LDAP
Heat Section Pressure Switch(es)
Heat Section Pressure Switch(es)
Qty
Main Pressure Switch
Label
Color
Switch
Part No.
Label
Color
Switch
Part No.
Negative Pressure (in. w.c.)
Differential Pressure (in. w.c.)
High Altitude Pressure Switch Settings, Units Above 6000ft/1830M
Switch
Part No.
Negative Pressure (in. w.c.)
Differential Pressure (in. w.c.)
Main Pressure Switch
Label
Color
Switch
Part No.
Label
Color
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 18
Each heat section in this heater is equipped with a direct spark integrated control
module (circuit board). The module monitors the safety devices and controls the
operation of the fan and venter motors and the gas valve between heat cycles.
20. Ignition
System
FIGURE 13 – DSI
Integrated Control
Module (circuit
board) in Each
Heat Section
2
$!
3!
*
$
*4,!.
5!6
7
)
LED
Lights
Dip
Switch
Supply
Voltage
Connections
19. Adjustable
Air Destrati-
fication Fan
Control
An adjustable fan control is located on top of the first heat section. It is adjacent to the
circulating air fan and motor and controls the fan motors in all heat sections. The
purpose of the fan control is to energize the fan motor(s) when the ambient air tem-
perature around the heater reaches the setting on the control. The fan motor(s) will be
de-energized when the fan control is satisfied. The fan(s) re-circulates the heated air
near the ceiling down to the floor level (destratification) and improves heat recovery.
A call for heat by the thermostat overrides the air destratification fan control.
Set the adjustable fan control for the desired temperature setting for energizing the
circulating air fan(s). The fan control setting should be set 5 to 10°F higher than the
wall-mounted thermostat setting. The heater is factory wired to energize the fan(s) at
medium speed when energized by the adjustable fan control. For lower mounting
heights it may be desirable to operate the fan(s) at low speed. Switching the blue
(medium speed) and red (low speed) fan motor wires on each heat section will change
the fan motor(s) speed. Refer to the wiring diagram for the wire locations.
To manually override the fan control, the heater may be tuned off at the circuit breaker
in the main electrical panel, or a field-installed electrical box with a SPST switch can
be located near the wall thermostat with the switch wired in series with the fan con-
trol.
The air destratification can also be a benefit in the summer time. Using the fan(s) in
the summer time can improve working conditions by alleviating stagnant air condi-
tions and creating a cooling effect for the occupants.
the Maintenance Section for information on probable causes . (For location, see FIG-
URE 22, page 33.)
DANGER: If a manual reset high limit control activates, identify
and correct the cause before resetting the switch. Never bypass the
high limit control; hazardous conditions could result. See Hazard
Intensity Levels, page 2.
18. High Limit
Control
(cont’d)
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 19
Abnormal Heat
Cycle Functions
Normal Heat
Cycle Operating
Sequence
1) Call for Heat - The thermostat calls for heat by energizing the “W” terminal. The
control checks to see that the limit and high limit switches are closed and the heat section
pressure switch is open and the main combustion air pressure switch (Sizes 800 and
1200) is open. If the limit or high limit switch is open, the control responds as defined in
the “Abnormal Heat Cycle, Limit Switch Operation”. If the heat section pressure switch
or main combustion air pressure switch are closed, the control will do four flashes on the
green LED and wait indefinitely for the heat section pressure switch or main combustion
air pressure switch to open. If the heat section pressure switch and main combustion air
pressure switch are open, the control proceeds to prepurge.
2) Prepurge - The control energizes the heat section venter motor and main venter motor
(Sizes 800 and 1200) and waits for the heat section pressure switch and main combustion
air pressure switch to close. If the heat section pressure switch or main combustion air
pressure switch does not close within 30 seconds of the heat section venter motor and
main venter motor energizing, the control will do two flashes on the green LED. The
control will leave the heat section venter motor and main venter motor energized indefi-
nitely as long as the call for heat remains and the heat section pressure switch or main
combustion air pressure switch is open.
When the heat section pressure switch and main combustion air pressure switch are proven
closed, the control begins the prepurge time. If flame is present any time while in prepurge,
the prepurge time is restarted. If flame is present long enough to cause lockout, the con-
trol responds as defined in “Fault Modes, Undesired Flame”.
The control runs the heat section venter motor and main venter motor for a 20 second
prepurge time, then proceeds to the ignition trial period.
3) Ignition Trial Period - The control energizes the spark and main gas valve. The venter
remains energized. If flame is sensed during the first 16 seconds, the spark is de-ener-
gized and the control proceeds to heat fan on delay. If flame has not been sensed during
the first 16 seconds, the control de-energizes the spark output and keeps the gas valve
energized for an additional one second flame proving period. If flame is not present after
the flame proving period, the control de-energizes the gas valve and proceeds with igni-
tion re-tries as specified in “Abnormal Heat Cycle, Ignition Re-try”. If flame is present,
the control proceeds to the fan on delay.
4) Fan On Delay - The control waits for 30 seconds from the time the gas valve opened
and then energizes the fan motor. The gas valve, heat section venter motor, and main
venter motor remain energized. The control proceeds to steady heat mode.
5) Steady Heat - Control inputs are continuously monitored to ensure limit, high limit,
heat section pressure switch, and main combustion air pressure switch are closed, flame
is established, and the thermostat call for heat remains. When the thermostat call for heat
is removed, the control de-energizes the gas valve and begins post-purge and fan off
delay timing.
6) Post Purge - The heat section venter motor and main venter motor outputs remain on
for a 45 second post-purge period after the thermostat is satisfied.
7) Fan Off Delay - The fan motor is de-energized after a fan off delay as selected by the
dip switches. Timing begins when the thermostat is satisfied. Delay times are as in the
table on the left. The factory default when shipped is 120 seconds.
Interrupted Thermostat Call for Heat - If the thermostat demand for heat is removed
before the flame is recognized, the control will run the heat section venter motor and
main venter motor for the post purge period and de-energize all outputs.
If the thermostat demand for heat is removed after successful ignition, the control will
de-energize the gas valve, run the heat section venter motor and main venter motor through
post purge, and run the fan motor on heat speed for the selected delay off time.
NOTE: All LED Flash
Codes are on page 38.
Ignition Retry - If flame is not established on the first trial for ignition period, the control
de-energizes the gas valve and the heat section venter motor and main venter motor
TIME
SW1
SW2
90 sec
OFF
ON
120 sec
OFF
OFF
160 sec
ON
OFF
45 sec
ON
ON
Switch Settng Chart for Fan
OFF Delay (See SW1 on W.D.)
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 20
Continuous Fan
Operation
remain energized for an inter-purge period of 10 seconds. The spark and gas valve are
then re-energized, and the control initiates another trial for ignition.
If flame is not established on the second trial for ignition, the control de-energizes the gas
valve, energizes the fan motor on heat speed, and the heat section venter motor and main
venter motor remain energized. The fan motor is shut off after the longest selectable fan
delay time (160 seconds). When the fan motor de-energizes, the spark and gas valve are
re-energized and the control initiates another trial for ignition. (This fan delay is a self-
healing feature for an open auxiliary limit switch).
If flame is not established on the third trial for ignition period, the control de-energizes
the gas valve, and the heat section venter motor and main venter motor remain energized
for an inter-purge period of 10 seconds. The control then re-energizes the gas valve and
spark and initiates another trial for ignition.
If flame is not established on the fourth trial for ignition (initial try plus 3 re-tries), the
control de-energizes the gas valve and goes into lockout. The control goes to one flash on
the green LED to indicate ignition failure lockout.
Limit and High Limit Switch Operation - The high limit and limit switch are ignored
unless a call for heat is present (W energized). If the high limit or limit switch are open
and a call for heat is present, the control de-energizes the gas valve and turns the fan
motor on heat speed and runs the heat section venter motor and the main venter motor.
When the switch re-closes or the call for heat is lost, the control runs the heat section
venter motor and main venter motor through post purge and runs the fan motor through
the selected fan off delay. The control will return to normal operation after fan off delay
is completed.
Heat Section Pressure Switch (all sizes) and Main Combustion Air Pressure Switch
(Sizes 800 and 1200) - If the heat section pressure switch or main combustion air pres-
sure switch opens before the trial for ignition period, the heat section venter motor and
main venter motor will run through the heat section pressure switch and main combus-
tion air pressure switch recognition delay (2 seconds), the gas valve will be de-energized,
and the heat section venter motor and main venter motor will run through the postpurge
time. The control will re-start the heat cycle at the heat section pressure switch and main
combustion air pressure switch proving state if the call for heat still exists.
Heat section pressure switch or main combustion air pressure switch opening for less
than 2 seconds during the trial for ignition period shall not interrupt the heat cycle. (Gas
valve will de-energize while the heat section pressure switch and main combustion air
pressure switch is open.)
If the heat section pressure switch or main combustion air pressure switch opens after a
successful ignition, the control will de-energize the gas valve. If flame is lost before the
end of the 2 second pressure switch recognition delay, the control will respond to the loss
of flame. If the heat section pressure switch and main combustion air pressure switch
remains open for 2 seconds and the flame remains, the control de-energizes the gas valve,
the heat section venter motor and main venter motor runs through postpurge, and the fan
motor runs on heat speed through the selected fan off delay. When the fan off delay is
over, the fan motor is de-energized, and a heat cycle is begun if the call for heat still
exists.
When the thermostat calls for continuous fan (G) without a call for heat, the fan motor is
energized after a .25 second delay. NOTE: This brief on delay is to allow the “G” termi-
nal to energize slightly before “Y” and an external changeover relay to switch from “G”
to “W” without causing momentary glitches in the fan motor output. The fan remains
energized as long as the call for fan remains without a call for heat.
If a call for heat (W) occurs during continuous fan, the fan will de-energize.
A call for fan is ignored while in lockout.
20. Ignition
System
(cont’d)
Abnormal Heat
Cycle Functions
(cont’d)
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 21
The main operating gas valve(s) is powered by the 24-volt control circuit through the
thermostat and safety controls. The gas valve is of the diaphragm type providing
regulated gas flow preset at the factory. (For location, see FIGURE 22, page 33.)
WARNING: The operating valve is the prime safety shutoff. All gas
supply lines must be free of dirt or scale before connecting the heater
to ensure positive closure. See Hazard Levels, page 2.
Each heat section in the heater has a fan motor. Each fan motor(s) is equipped with
thermal overload protection of the automatic reset type. Should the motor(s) refuse to
run, it may be because of improper current characteristics. Make certain that the cor-
rect voltage is available at the motor(s).
Fan Motor Wiring
White = Neutral
Black = High (Heat Speed)
Blue = Medium (Destratification Speed, Factory Wired)
Red = Low (Optional Destratification Speed, Field Wired)
21. Gas Valve(s)
Lockout
Undesired Flame - If flame is sensed longer than 20 seconds while the gas valve is de-
energized, the control shall energize the heat section venter motor, the main venter motor,
and the fan motor on heat speed. When flame is no longer sensed, the heat section venter
motor and main venter motor will run through postpurge, and the fan motor will run
through the selected heat fan off delay time. The control will do a soft lockout, but will
still respond to open limit and flame. The FLAME (yellow) LED shall flash rapidly when
lockout is due to undesired flame.
Gas Valve Relay Fault - If the control senses the gas valve as energized for more than
one second when the control is not attempting to energize the gas valve, or the gas valve
is sensed as not energized when it is supposed to be energized, then the control will
lockout with the green LED off. The control assumes either the contacts of the relay
driving the gas valve have welded shut, or the sensing circuit has failed. The heat section
venter motor is forced off to open the heat section pressure switch to stop gas flow unless
flame is present.
If the gas valve was sensed as closed when it should be open, and has not de-energized
after the heat section venter motor and main venter motor was shutoff for 15 seconds,
then the heat section venter motor and main venter motor are re-energized to vent the
unburned gas.
Soft Lockout - The control shall not initiate a call for heat or call for continuous fan while
in lockout. The control will still respond to an open limit and undesired flame. Lockout
shall automatically reset after one hour. Lockout may be manually reset by removing
power from the control for more than one second or removing the thermostat call for heat
for more than one and less than 20 seconds.
Hard Lockout (Green LED - steady off) - If the control detects a fault on the control
board, the status LED will be de-energized, and the control will lockout as long as the
fault remains. A hard lockout will automatically reset if the hardware fault clears.
Power Interruption - During a momentary power interruption or at voltage levels below
the minimum operating voltage (line voltage or low voltage), the system will self-recover
without lockout when voltage returns to the operating range.
Power interruptions of less than 80mS shall not cause the control to change operating
states. Power interruptions greater than 80mS may cause the control to interrupt the cur-
rent operating cycle and re-start. Power interruption during a heat cycle may trip the
manual reset high limit switch.
Fault Modes
22 Fan Motor(s)
• Size 400 has 1 valve.
• Size 800 has 2 valves.
• Size 1200 has 3 valves.
• Size 400 has 1 fan motor.
• Size 800 has 2 fan motors.
• Size 1200 has 3 fan motors.
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 22
Operating Sequence
Wiring Diagram
NOTES
1. Set thermostat at lowest setting. With Opt CL2 or CL18, set fan switch at
“AUTO” position.
2. Turn on the manual gas valve(s).
3. Turn on power to the heater.
4. Set thermostat at desired setting.
5. Thermostat calls for heat, energizing the venter motor(s).
6. Main combustion air pressure switch (Sizes 800 and 1200) and heat section
pressure switch(es) close, firing heat section(s) (Unit fires at low fire when
using two-stage thermostat).
7. Burner flame is sensed, and in 30 seconds the fan motor(s) is energized.
8. High stage of thermostat calls for heat, firing all heat sections at full rate (on
heaters with a two-stage thermostat).
9. With Opt CL2 or CL18, set fan switch at “ON” position for continuous fan
operation.
10. If the flame is extinguished during main burner operation, the integrated
control system closes the main valve of that heat section and must be reset by
interrupting power to the control circuit (see lighting instructions).
1. The following controls are field-installed options: Thermostat
2. Dotted wiring installed by others.
3. CAUTION: If any of the original wiring as supplied with the appliance must be
replaced, it must be replaced with wiring material having a temperature rating of
at least 105°C, except for sensor lead wire and limit wiring which must be
150°C.
4. Use 18 gauge wire for all wiring on the heater.
5. Line and fan motor branch wire sizes should be of a size to prevent voltage
drops beyond 5% of supply line voltage.
6. Size 400, see thermostat wiring diagram in FIGURE 10, page 15. Size 800, see
thermostat wiring diagram in FIGURE 11, page 15. Size 1200, see thermostat
wiring diagram in FIGURE 12, page 16.
7. The control transformer has a dual voltage primary.
For 230V heaters, the black lead goes to the “240” terminal. Cap the “208”
terminal.
For 208V heaters, the black lead goes to the 208” terminal. Cap the “240”
terminal.
8. When providing or replacing fuses in the fusible disconnect switch, use dual
elements time delay fuses and size according to 1.25 times the maximum total
input amps.
9. The line side of the lockable disconnect switch must be connected to the incom-
ing power supply such that the voltage between Terminal L1 and Ground is the
greater value.
Operating Sequence, Notes, Codes, Keys, etc for ALL three typical wiring
diagrams (FIGURES 14, 15, and 16) on pages 23-25.
23. Wiring
Diagrams
• Operating Sequence, Notes, Codes, Keys, etc. for ALL three typical wiring
diagrams (FIGURES 14, 15, and 16 on pages 23, 24, and 25), pages 22-23.
• FIGURE 14 - Model LDAP 400, page 23.
• FIGURE 15 - Model LDAP 800, page 24.
• FIGURE 16 - Model LDAP 1200, page 25.
CAUTION: If any of the original wire as supplied with the appliance must be replaced, it must be replaced
with wiring material having a temperature rating of at least 105°C, except for limit control, high limit
control, and sensor lead wires which must be 150°C. See Hazard Levels, page 2.
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 23
FIGURE 14 – Typical Wiring Diagram for Model LDAP 400 (Reference W. D. 189374, Rev 2)
Terminal Block - Heat Section #1
Terminal Block - Heat Section #2
Terminal Block - Heat Section #3
Factory Wiring
Field Wiring
Total Wire
Length
Distance from Unit
to Control
Minimum Recommended
Wire Gauge
150 ft (46M)
75 ft (23M)
18 Gauge
250 ft (76M)
125 ft (38M)
16 Gauge
350 ft (107M)
175 ft (53M)
14 Gauge
Field Control Wiring
Key
8
&
&
)
8
&
&
8
&
&
&
&
&
&
-
*
/
,
1
8
)
&
&
&
'(
)
)9
:
8
/
8
(-(::*(
:&
&
8
8
(9
:
8
&
)
/
&
&
&
&
&
,
&
&&
,#$;!'
)( '&
&
-
&
&
&
&
-
&
,
#$;!'
&
&
&
<&
&8 & :
8
(
-
&
,
&
= &
)
&
&
&
&
&
&&
&
&
&
8
123
*
,
-
1
(
)
/
*
,
-
1
(
)
/
*
,
-
1
(
)
/
&
&
/
&
&
-
&
&
*
,
&
)
&
&
&
&&
&'
&
&
&
&
&
&
&&
&'
Wiring
Color
Codes
Black - BK
Brown - BR
Red - R
Orange - O
Yellow - Y
Green - G
Blue - BL
Purple - PR
White - W
Fan Motor Wiring
White = Neutral
Black = High (Heat Speed)
Blue = Medium (Destratification Speed, Factory Wired)
Red = Low (Optional Destratification Speed, Field Wired)
TIME
SW1
SW2
90 sec
OFF
ON
120 sec
OFF
OFF
160 sec
ON
OFF
45 sec
ON
ON
Switch Settng Chart for Fan
OFF Delay (See SW1 on W.D.)
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 24
23. Wiring Diagrams (cont’d)
FIGURE 15 – Typical Wiring Diagram for Model LDAP 800 (Reference W.D. 189375, Rev 2)
(-(::*(
0
8
&
.
&
)
8
&
&
8
&
.
)
8
8
8
&
,
8
&
-
-
&
&
,
&
&
8
#$;!'
&
&
&
<&
&8 & :
8
8
&
&&
!!,#$;!'
)( '&
8
&
)( '&
&
&
&
&
&
&
1
,
)
8
4
5
62172
&
8
&
&
8
=
)9
:
8
8
-
&
8
&
&
&
.
&
&
&
&
&
)
*
/
-
/
)
-
-
&
&
= &
&
&
&
.
'(
&
&
(
)
&
&
:&
&
8
8
)
&
(
1
1
&
(9
8
8
:
8
8
/
&
&
&
.
8
,
,
,
,
,
,
&
8
&
8
&
8
*
,
-
1
(
)
/
*
,
-
1
(
)
/
*
,
-
1
(
)
/
1
)(
*
,
-
)*
)/
))
)
)
)
(
&
&
.
&
&
*
.
-
&
&
.
&
&
.
/)
(
&
&
)
.
&
.
&
&
)
1
&
&
.
)/
,
&
.
(
.
&
&
*
&
,
&
-
&
&
&
8
),
/
/(
)1
)-
,
8
*
'
&&
!!,#$;!'
8
&
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 25
FIGURE 16 – Typical Wiring Diagram for Model LDAP 1200 (Reference W. D. 189376, Rev 2)
(-(::*(
0
&
8
&
&
8
-
,
8
&
&
1
1
1
,
-
-
-
&
&
,
,
&
&
&
#$;!'
&
&
&
<&
&8 & :
8
(
(
(
&
,
,
,
&
= &
,
,
,
,
&
)( '&
*
*
*,
$
#-#
*
&
8
)( '&
8
8
&
&
&
&
&
&
-
*
/
,
1
8
)
&
&
&
)
)9
:
8
/
8
.
&
)
=
8
:&
&
8
8
8
(9
&
:
8
&
)
/
&
&
.
&
&
&
&
&
-
&
,
&
.
)
&
&
&
&
&
&
8
'(
&
8
&
&
8
&
8
.
&
&
&
8
8
&
8
&
8
&
8
)
.
&
)
.
&
8
8
)
8
*
,
-
1
(
)
/
*
,
-
1
(
)
/
*
,
-
1
(
)
/
1
)(
*
,
-
)*
)/
))
)
)
)
.
.
)
.
&
&
/*
.
&
&
&
&
&
&
*)
)
&
&
.
-*
.
&
&
,-
/
)
*
,
&
.
)-
,
)-
),
)1
.
&
&
.
.
&
&
&
&
)/
.
&
&
)
&
)(
)*
123
&&
,#$;!'
4
5
62172
8
&&
,#$;!'
&&
,#$;!'
&
&
-
-
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 26
2) Vent Pipe Diameter
and Length
• Use only one diameter of vent pipe on an installation.
• Minimum vent length is 3 feet (1M).
• Minimum of 1 ft (0.3M) of vertical vent required on venter outlet before installing
an elbow.
Vent pipe diameters and maximum vent lengths in the table apply to both Horizontal
and Vertical vents. Add all straight sections and equivalent lengths for elbows. The
total combined length must not exceed the Maximum Vent Length.
Model LDAP heaters are certified as Category III heaters.
WARNING: Each heater requires its own individual vent pipe run
and vent cap. Manifolding of vent runs can cause recirculation of
combustion products into the building. Failure to comply could
result in severe personal injury or death and/or property damage.
Venting must be in accordance with local codes and the National Fuel Gas Code
Z223.1 or CSA B149.1 and B149.2, Installation Code for Gas Burning Appliances
and Equipment. Local requirements supersede national requirements.
These power-vented heaters are designed to operate safely and efficiently with either
a horizontal or vertical vent. Comply with the specific requirements and instructions.
If this heater is replacing an existing heater, be sure that the vent is sized properly for
the heater being installed and that the existing vent is in good condition. A properly
sized vent system is required for safe operation of the heater. An improperly sized
vent system can cause unsafe conditions and/or create condensation. Do not vent into
an existing gravity vent or chimney.
Installation should be done by a qualified agency in accordance with these instruc-
tions. The qualified service agency installing this system is responsible for the instal-
lation.
1) Type of Vent Pipe
The type of vent pipe is determined by whether the vent is horizontal or vertical.
Horizontal
• Vent pipe approved for a Category III appliance, OR
• Appropriately sealed 26-gauge or heavier galvanized
steel or equivalent single-wall pipe
Vertical
• Vent pipe approved for a Category III appliance, OR
• Appropriately sealed 26-gauge or heavier galvanized
steel or equivalent single-wall pipe
OR, if at least 75% of the equivalent length of the vent run is vertical
• Double-wall (Type B) vent pipe
24. Venting
Venting
Requirements
inches
mm
inches
mm
feet
M
feet
M
feet
M
6
152
45
13.7
15
4.6
7.5
2.3
None
7
178
60
18.3
8
2.4
4
1.2
6" to 7" (152 to 178mm) Increaser
8
203
50
15.2
15
4.6
7.5
2.3
None
10
254
45
13.7
5
1.5
2.5
0.8
8" to 10" (203 to 254mm) Increaser
8
203
50
15.2
15
4.6
7.5
2.3
None
10
254
45
13.7
5
1.5
2.5
0.8
8" to 10" (203 to 254mm) Increaser
1 Includes one 90° elbow at venter outlet.
1200
8
203
400
6
152
800
8
203
Equivalent
Straight Length
for 45° Elbow
Field-Supplied Taper Type
Connection Required at the Venter
Outlet
Model
LDAP
Size
Venter
Outlet
Diameter
Vent Pipe
Diameter
Maximum
Vent Length
1
Eqivalent
Straight Length
for 90° Elbow
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 27
3) Venter (Flue)
Outlet
Venter Outlet Attachment Requirements:
inches
mm
400
6
152
800
8
203
1200
8
203
Model
LDAP
Size
Venter Outlet
Diameter
Depending on the size of vent pipe
as determined in Step No. 2, attach
either the vent pipe directly to the
venter collar or a taper-type enlarger.
4) Joints and Sealing
Provide field-supplied vent pipe as specified in Requirement No. 1.
• If using single wall, 26-gauge or heavier galvanized pipe, secure slip-fit connec-
tions using sheetmetal screws or rivets. Seal pipe joints either with tape suitable for
550°F (such as Option FA1, P/N 98266) or high-temperature silicone sealant.
• If using Category III vent pipe, follow pipe manufacturer's instructions for join-
ing pipe sections. When attaching Category III pipe to the venter outlet or the vent
cap, make secure, sealed joints following a procedure that best suits the style of
Category III pipe being used.
• If installing a double-wall (Type B) terminal pipe, follow the instructions in FIG-
URE 17C to join the double-wall pipe to a single-wall or Category III vent pipe
run. To attach the vent cap, follow instructions in FIGURE 17B.
• If using double-wall (Type B) vent pipe in the vent pipe run (at least 75% of the
equivalent vent length must be vertical), follow the pipe manufacturer's instruc-
tions for joining pipe sections. For attaching double-wall pipe to the heater, see
FIGURE 17A. To attach the vent cap, see FIGURE 17B.
FIGURE 17A -
Attaching Double-
Wall (Type-B) Vent
Pipe to the Venter
Outlet
A double-wall pipe
run is allowed only if
at least 75% of the
vent length is vertical.
Figure 17A - STEP 1
To secure the connection,
spaced equal distance around
the pipe, drill and insert three
3/4” long sheetmetal screws
through the pipe and into the
collar. Do not over tighten the
screws.
Venter
Collar
Double-
Wall
Pipe
Slide the
double-wall
pipe over
the collar
so that the
collar is
inside the
inner pipe.
Figure 17A - STEP 2
Figure 17B - STEP 1
Place a continual 3/8” bead of
silicone sealant around the
circumference of the vent cap collar.
This will prevent any water inside
the vent cap from running down the
double-wall pipe.
Figure 17B - STEP 2
Secure the vent cap to the
double-wall pipe by drilling
and inserting a
3/4” long sheetmetal screw
into the vent cap collar. Do
not over tighten screw.
Insert the collar on the vent cap inside the
inner wall of the double-wall pipe. Insert as
far as possible. Add additional silicone sealant
to fully close any gaps between the vent cap
and the double-wall pipe. This is necessary to
prevent water from entering the double-wall
pipe.
Figure 17B - STEP 3
Do STEP 2
immediately
following
STEP 1.
FIGURE 17B - Attaching Double-Wall (Type B) Pipe to a Vent Cap
*
)
#
%
Follow instructions in Requirement No. 4. below to make
the connection for the type of pipe being used.
Fill inside the pipe, around the collar, with
silicone sealant being sure there are no gaps.
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 28
7) Vent Terminal
(Pipe and Vent
Cap)
Horizontal Vent Terminal Clearances
A vent cap is required. Maintain a minimum
clearance of 12 inches (305mm) from the wall
to the vent terminal cap for stability under
wind conditions.
Products of combustion can cause discolora-
tion of some building finishes and deteriora-
tion of masonry materials. Applying a clear
silicone sealant that is normally used to pro-
tect concrete driveways can protect masonry
materials. If discoloration is an esthetic prob-
lem, relocate the vent or install a vertical vent.
Support horizontal vent runs every six feet (1.8M). Support vertical runs of Type
“B” double-wall or Category III vent pipe in accordance with the requirements of
the pipe manufacturer. Support single-wall pipe in accordance with accepted indus-
try practices. Do not rely on the heater for support of either horizontal or vertical
vent pipe. Use non-combustible supports on vent pipe.
5) Vent System
Support
6) Condensation
Any length of single-wall vent pipe exposed to cold air or run through an unheated
area or an area with an ambient temperature of 45°F or less must be insulated along
its entire length with a minimum of 1/2" foil-faced fiberglass, 1-1/2# density insu-
lation. Where extreme conditions are anticipated, install a means of condensate
disposal.
FIGURE 17C - Attaching
Double-Wall (Type B)
Terminal Pipe to a Single
Wall or Category III Vent
Pipe Run
Figure 17C - STEP 1
On the single-wall pipe or Category
III pipe, place a continual
1/4 inch bead of silicone sealant
around the circumference.
Do STEP 2 immediately after
STEP 1.
Figure 17C - STEP 2
Insert the pipe with the sealant into the
inner pipe of the double-wall pipe until
the bead of sealant contacts the inner
pipe creating a sealed joint.
Figure 17C - STEP 3
Spaced equally around the double-wall
pipe, drill three small holes below the
sealant ring. Insert 3/4 inch long
sheetmetal screws to secure the joint. Do
not over tighten screws.
Vent
Pipe
with
Sealant
Double-
Wall
Pipe
Single-
Wall or
Category
III Vent
Pipe
4) Joints and Sealing
(cont’d)
The vent terminal pipe must be either Category III vent pipe or double-wall (Type
B). Heaters must be equipped with a Reznor vent cap, a Type L Breidert Air-x-
hauster® vent cap or equivalent. A different style vent cap could cause nuisance
problems or unsafe conditions. The vent cap must be the same diameter as the vent
pipe.
See the clearance table below and FIGURE 18 for requirements of a horizontal
vent terminal. See FIGURE 19 for requirements of vertical vent termination.
Structure
Minimum Clearances for Vent Termination
Location (all directions unless specified)
Forced air inlet within 10 ft (3.1M)
3 ft (0.9M) above
Combustion air inlet of another appliance
6 ft (1.8M)
4 ft (1.2M) horizontally
4 ft (1.2M) below
1 ft (305mm) above
U.S. - 4 ft (1.2M) horizontally
Canada - 6 ft (1.8M) horizontally)
Gas regulator *
U.S. - 3 ft (0.9M); Canada - 6 ft (1.8M)
Adjoining building or parapet
6 ft (1.8M)
Adjacent public walkways
7 ft (2.1M) above
Grade (ground level)
1 ft (305mm) above**
*Do not terminate the vent directly above a gas meter or service regulator.
Electric meter, gas meter*, gas regulator*,
and relief equipment
** Consider local snow depth conditions. The vent must be at least 6” (152mm) higher than
anticipated snow depth.
Door, window, or gravity air inlet (any
building opening)
24. Venting
(cont’d)
Venting
Requirements
(cont’d)
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 29
FIGURE 18 - Horizontal Vent Terminal
NOTE: Read all measurements; drawing is not proportional.
# *
"
#
#
*
#
+
!
,+-.
/
01&23
,4.
567
8
9 :
1
5
,
;
,<
9 1
==,
2*
'
= /
!
> :
$#/8? =
@@@
& '
!
'
9
=
9/
*
0 , A 4
47
?
@)92 ,;:
,;=B
4;
4CB
>
#/
/
;. ,74
9 /
6
-7D
# *
"
#
#
*
#
+
'
"
# ;. ,74
#
4
;,6 #
9
;. ,74
!
> :
;
,<
$#/8? =
@@@
& '
!?
9 1
==,
*
'
! =
9*
0 ,
4 47
?
@)92 ,;:
,;=B 4;
4CB
>
#/
/
FIGURE 19 - Vertical Vent Terminal
NOTE: Read all measurements; drawing is not proportional.
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 30
25. Check
Installation
and Startup
Check to be sure that all screws used to hold shipping brackets were re-installed
in the heater cabinet.
Check suspension. Heater must be secure and level.
Check clearances from combustibles. Requirements are in Paragraph 8.
Check vent system to be sure that it is installed according to the instructions in
Paragraph 24.
Check piping for leaks and proper gas line pressure. Bleed gas lines of trapped
air. See Paragraph 12.
Check electrical wiring. Be sure all wire gauges are as recommended. Verify that
fusing or circuit breakers are adequate for the load use.
Check polarity. Verify that line voltage exists between the black “L1” and earth
ground.
If installed in California, verify that California Warning Label is displayed
WARNINGS: For your safety, read before operating. If you do
not follow these instructions exactly, a fire or explosion may
result causing property damage, personal injury, or loss of life.
• This appliance does not have a pilot. It is equipped with an ignition
device which automatically lights the burner(s). Do not try to light the
burner(s) by hand.
• Before operating, smell all around the appliance area for gas. Be sure to
smell next to the floor because some gas is heavier than air and will settle
on the floor.
WHAT TO DO IF YOU SMELL GAS
• Open windows.
• Don’t touch electrical switches.
• Extinguish any open flame.
• Immediately call your gas supplier.
• Use only your hand to turn the gas control ON/OFF knob on the gas
valve. Never use tools. If the valve ON/OFF knob will not turn by hand,
do not try to repair it. Call a qualified service technician. Force or
attempted repair may result in a fire or explosion.
• Should overheating occur, or the gas supply fail to shut off, turn off the
manual gas valve to the appliance before shutting off the electrical
supply.
• Do not use this appliance if any part has been under water. Immediately
call a qualified service technician to inspect the appliance and to replace
any part of the control system and any gas control which has been under
water.
1. Set thermostat at lowest setting.
2. Turn off all electric power to the appliance.
3. This appliance is equipped with an ignition device which automatically lights the
burner. Do not try to light the burner by hand. Open the access door(s) and
locate the gas control (ON/OFF) knob on the gas valve(s). (See FIGURE 20.)
4. Turn each gas control knob(s) clockwise to "OFF".
5. Wait five (5) minutes to clear out any gas. Then smell for gas, including near the
floor. If you smell gas, STOP! and follow the steps in the WARNINGS printed
above or on the Operating Label on the heater. If you do not smell gas, proceed
to the next step.
6. Turn the gas control knob(s) counterclockwise to "ON".
7. Close the access door(s).
8. Turn on the electric power to the heater.
9. Set the thermostat to the desired setting.
Check the
installation prior
to startup:
Heater
Startup and
Warnings:
Operating
Instructions and
Operating Sequence
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 31
&
$!
89
:
.
&
*!.
&
*!.
;.
;.
FIGURE 20 - Gas Valve
ON/OFF Control Knob
Check installation
after startup:
Vent System Testing Procedure
1. Seal any unused openings in the venting system.
2. Inspect the venting system for proper size and horizontal pitch, as required in
the National Fuel Gas Code, ANSI Z223.1 or CSA B149.1 and B149.2,
Installation Code for Gas Burning Appliances and Equipment, and this
manual. Determine that there is no blockage or restriction, leakage, corrosion
or other deficiencies that could cause an unsafe condition.
3. In so far as practical, close all building doors and windows and all doors
between the space where the heater is and other spaces of the building. Turn
on exhaust fans so they shall operate at maximum speed. Do not operate a
summer exhaust fan.
4. Light the heater following the lighting instructions. Adjust the thermostat for
continued operation. Verify that combustion products are venting properly.
After determining that the heater vents properly, return doors, windows, and
exhaust fans to their previous conditions. If improper venting is observed, the
venting system must be corrected.
With the heater in operation, measure valve outlet gas pressure. If operated at
high altitude, adjust outlet gas pressure for altitude. See information and instruc-
tions in Paragraph 12.
Using the thermostat, turn the heater off and on, pausing two minutes between
each cycle. Observe for smooth ignition.
NOTE: If the appliance does not operate, follow the instructions "To Turn Off Gas
to Appliance" printed below (and on the Operating Label on the heater) and call
your service technician.
10. Thermostat calls for heat, energizing the venter motor(s).
11. The main combustion air pressure switch (Sizes 800 and 1200) and each heat
section pressure switch close, firing the heater.
12. Burner flame is sensed and in 30 seconds after the gas valve is energized, the
fan motor(s) is energized.
13. If the flame is extinguished during the main burner operation, the integrated
control system closes the main valve and must be reset by interrupting power
to the control circuit. (See lighting instructions on the heater.).
TO TURN OFF GAS TO THE APPLIANCE
1) Set thermostat to lowest setting
2) If service is to be performed, turn off all electric power to the appliance.
3) Open the access door(s).
4) Turn the gas control knob(s) clockwise to "OFF". Do not force.
5) Close the access door(s).
DANGER: The gas burner in this gas-fired equipment is designed and equipped to provide safe controlled
complete combustion. However, if the installation does not permit the burner to receive the proper supply
of combustion air, complete combustion may not occur. The result is incomplete combustion which
produces carbon monoxide, a poisonous gas that can cause death. Safe operation of indirect-fired gas
burning equipment requires a properly operating vent system that vents all flue products to the outside
atmosphere. FAILURE TO PROVIDE PROPER VENTING WILL RESULT IN A HEALTH HAZARD
WHICH COULD CAUSE SERIOUS PERSONAL INJURY OR DEATH.
Always comply with the combustion air requirements in the installation codes and in Paragraph 9.
Combustion air at the burner should be regulated only by manufacturer-provided equipment. NEVER
RESTRICT OR OTHERWISE ALTER THE SUPPLY OF COMBUSTION AIR TO ANY HEATER.
Heaters installed in a confined space must be supplied with air for combustion as required by Code and
in Paragraph 9 of this heater installation manual. MAINTAIN THE VENT SYSTEM IN
STRUCTURALLY SOUND AND PROPER OPERATING CONDITION.
Place the "Owner's Envelope"
containing the Limited
Warranty, this booklet, and
any control or optional
information in an accessible
location near the heater.
Follow the instructions on the
envelope.
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 32
MAINTENANCE
AND SERVICE
The material contained in the MAINTENANCE AND SERVICE Section of this
manual is designed to aid a qualified service person in maintaining and servicing this
equipment. This heater will operate with a minimum of maintenance. To ensure long
life and satisfactory performance, a heater that is operated under normal conditions
should be inspected and cleaned at the start of each heating season. If the heater is
operating in an area where an unusual amount of dust or soot or other impurities are
present in the air, more frequent maintenance is recommended.
When any service is completed, be careful to reassemble correctly to ensure that no
unsafe conditions are created. When re-lighting, always follow the lighting instructions
on the heater.
Maintenance Schedule - The following procedures should be carried out at least
annually. Refer to illustrations and follow the instructions in Paragraphs 29-42.
• Clean all dirt, lint, and grease from all combustion air openings and the venter
assemblies.
• Clean all dirt, lint, and grease from all fan blades, fan guards, and motors.
• Check all heat exchangers both internally and externally.
• Check all burners for scale, dust, or lint accumulation. Clean if needed.
• Check gas valve(s) to ensure that gas flow is being shutoff completely.
• Check the vent system for soundness. Clean openings. Replace any parts that
do not appear sound.
28. Maintenance
Schedule
NOTE: If replacement
parts are required, use only
factory-authorized parts.
WARNING: If you turn off
the power supply, turn off
the gas. See Hazard Levels,
page 2.
OPTIONAL
ACCESSORIES
26. 4-Way
Discharge
Louvers,
Option CD32
All Model LDAP heaters have discharge louvers but are available with additional
louvers and/or nozzle discharge air options. Optional louver and discharge nozzles
are shipped separately for field installation. Model LDAP 800 and 1200 heat sections
have independent airflow and do not require the same discharge options. Each pack-
age includes illustrated installation instructions.
Option CD32 consists of additional louvers that are installed perpendicular to the
standard individually adjustable louvers. By installing the optional perpendicular lou-
vers, the two sets of louvers can be adjusted to direct airflow in any of the four
directions, enabling the installer to select and increase or decrease the coverage area.
27. Nozzles
Option CD57 is a 30° discharge nozzle. Option CD58 is a 60° discharge nozzle.
Option CD59 is a 30° discharge nozzle with 4-way louvers. A nozzle may be installed
at each discharge air opening in any direction. NOTE: Do not install 4-way louvers
with a 60° nozzle.
Nozzles should be attached after the unit is suspended. Follow the installation instruc-
tions in the nozzle package.
FIGURE 21A - One heat
section with Option CD58,
60° Nozzle
,-/,+<.
5;6
,;/,+4.
-,E
4-/5+<.
;,<
1
=$7CB
56D 0
1
=$7
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 33
F
!
'
=
=
F %
=
>
# $
=
$
&
'
$@ =
=
:
! 9
@
F
! 9
<66
,466
& :
%
=
'
! 9
<66
,466
9
$
9
$
9
4-' &
& :
: #
'
FIGURE 22 - Location of Controls
30. Burner
Maintenance
Each section of this heater is equipped with a TCORE2® burner (U.S. Patent No.
6,889,686). Size 400 has one; Size 800 has two; and Size 1200 has three.
Inspect each burner/control compartment annually to determine if cleaning is neces-
sary. If there is an accumulation of dirt, dust, and/or lint, clean the compartment and
follow the instructions below to remove and clean the burner.
1. Outside the cabinet, shut the gas supply off at the manual valve ahead of the
union.
2. Turn off electric supply.
3. Disconnect the gas supply at the union outside of the cabinet.
4. Remove the access panel.
5. Disconnect the Gas Train and Move It Out of the Way - At the gas valve,
mark and disconnect the wires. Disconnect the union on one or both sides of the
gas line inside of the heater. Carefully remove the burner orifice and orifice
adapter locking nut. Slide the orifice adapter out through the bracket on the
burner.
Burner Removal
Instructions
(Refer to
FIGURE 23.)
29. Heat
Exchanger
Maintenance
Each section of this heater is equipped with a TCORE2® heat exchanger (U.S.
Patent No. 6,889,686). Size 400 has one; Size 800 has two; and Size 1200 has three.
Remove any external dirt or dust accumulation. Visually check each heat exchanger
for cracks and holes. If a crack or hole is observed, replace the heat exchanger.
NOTE: Inspection of the lower portion of the heat exchanger is done with the burner
removed. See the Burner Service section below for information on inspecting the
lower portion of the heat exchanger.
CAUTION: Use of eye
protection is
recommended.
• Check the wiring for any damaged wire. Replace damaged wiring. (See
Paragraph 14 for replacement wiring requirements.)
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 34
Instructions to Re-Install the Burner (Refer to FIGURE 23.)
1. Attach the Burner Assembly - Holding the venturi tube, slide the entire burner
assembly into position. Align the supports on the bottom with the slots in the
burner shield; sliding the supports into the slots. On the top, re-attach each
burner body support to the burner shield.
Re-Install the Burner
With the burner assembly removed, shine a flashlight on the burner ribbons. Look for
carbon buildup, scale, dust, lint, and/or anything that might restrict flow through the
spaces between the burner ribbons. Holding the burner assembly so that any foreign
material will fall away from the burner, use a stiff bristle brush to loosen and remove
any foreign material(s). If the burner is excessively dirty, remove one of the burner
end caps. Remove the four screws that hold the end cap to the burner housing. Lightly
tap the end cap to remove it.
Clean all foreign material from the burner and venturi. After the burner is thoroughly
clean, replace the end cap making certain that it is tight against the burner housing.
Inspect and Clean
the Burner
Inspect the Lower Portion
of the Heat Exchanger
(with burner assembly
removed)
At the burner flame entrance of each tube, shine a bright light into each heat ex-
changer section. With the light shining into the heat exchanger, observe the outside
for visible light. Repeat this procedure with each heat exchanger section. If any light
is observed, replace the heat exchanger.
6. Remove Burner Assembly
a) Locate the three upper burner body supports. At each support, remove the
one screw that attaches it to the burner shield.
b) Holding the venturi tube, slide the entire burner assembly slightly upward to
disengage the burner from the supports on the bottom. Then rotate the open
end of the venturi tube outward toward the access door opening. Carefully
pull the burner assembly out of the cabinet.
Burner Removal Instructions (cont’d)
$
! "# $
%
! "#
"#
&
' / G
9
G
9
#
#G
'
&#
&
:
#
%
$
:
: :
/
'
FIGURE 23 - Burner Removal
• Size 400 has 1 burner.
• Size 800 has 2 burners.
• Size 1200 has 3 burners.
NOTE: If any of the burner
components are damaged or
deteriorated, replace the burner
assembly.
30. Burner
Maintenance
(cont’d)
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 35
Ignitor - Refer to FIGURE 22 and locate the ignitor. Disconnect the wire; remove
the screw and the ignitor. Clean the ignitor assembly with an emery cloth.
Spark gap must be maintained to 1/8". See FIGURE 25.
CAUTION: Due to high
voltage on the spark
wire and electrode, do
not touch when
energized. See Hazard
Levels, page 2.
FIGURE 25 - Ignitor
showing required
Spark Gap
measurement
40
:
IMPORTANT: When re-assembling, the brown ground wire must remain attached
to the ignitor.
CAUTION: Due to high voltage on the spark wire and electrode,
do not touch when energized. See Hazard Levels, page 2.
Flame Sensor - Refer to FIGURE 22 and locate the flame sensor. Disconnect the
wire; remove the screw and the flame sensor. Clean with an emery cloth.
Flame Sensor
Ignitor
FIGURE 24 - DSI
Integrated Control
Module (Circuit
Board)
Only replaceable
part is a Type ATC
or ATO 3 amp fuse
(Color Code
Violet), P/N 201685
32. Ignition
System
DSI Integrated Control Module (circuit board) - See FIGURE 24. The module
monitors the operation of the heater including ignition. The only replaceable compo-
nent is the 3 amp Type ATC or ATO fuse. If the fuse is blown, the problem is most
likely an external overload. Correct the problem and replace the fuse.
Do not attempt to disassemble the control mod-
ule. However, each heating season check the
lead wires for insulation deterioration and good
connections. Size 400 has one control mod-
ule; Size 800 has two control modules; and Size
1200 has three control modules.
Proper operation of the direct spark ignition
system requires a minimum flame signal of 1.0
microamps as measured by a microampmeter.
For further information and check out proce-
dure on the direct spark ignition system, refer
to Paragraph 19 and the Troubleshooting Flow
Chart in Paragraph 43.
31. Burner
Orifice(s)
A burner orifice usually only needs to be replaced when installing a gas conversion
kit. If ordering replacement orifice(s) only, give BTUH content and specific gravity
of gas, as well as the model and serial number of the heater. When removing or
replacing a burner orifice, use two wrenches being careful not to damage the venturi
tube and/or the bracket.
2. Attach the Gas Train - Slide the gas train so that the orifice adapter is through
the bracket. Fasten the gas train to the bracket with the locking nut. Install the
gas orifice. Re-connect the wires to the gas valve. Re-connect the union(s)
inside of the control compartment.
3. Reconnect the gas supply at the union outside of the cabinet. Turn on the gas
supply and leak test the connections with leak detecting solution.
4. Close the access panel.
5. Turn on the electric. Check for proper operation.
33. Heat Section
Venter Motor
and Wheel
Remove dirt and grease from the motor casing, the venter housing, and the venter
wheel. Venter motor bearings are permanently lubricated. Follow these instructions
for replacement of the venter motor and wheel assembly. Keep all hardware re-
moved to be used in re-assembling and installing the replacement parts.
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 36
34. Main Venter Motor and Wheel (Models 800 and 1200 only)
The main venter motor and wheel is located on the top of the first heat section of a
Model LDAP 800 and 1200. The vent system attaches to the collar on the top of the
main venter housing.
Remove dirt and grease from the motor casing, the venter housing, and the venter
wheel. Venter motor bearings are permanently lubricated.
Follow the instructions in Paragraph 33 for replacement of the venter motor and wheel
assembly. Keep all hardware removed to be used in re-assembling and installing the
replacement parts. See FIGURE 27 for venter wheel and motor spacing.
35. Fan Motor(s),
Fan Blades,
and Guard(s)
FIGURE 28- Fan Blade
Position on the Shaft
5.
C;
:
'
8
=#
8
F" 0
2"
:
8
,/,+-. 54
Main Combustion
Air Pressure
Switch
Venter Housing
Venter
Motor
FIGURE 27- Venter Motor
and Wheel Spacing on
Main Venter (Size 800 and
1200)
33. Heat Section
Venter Motor
and Wheel
(cont’d)
Replacement Instructions
C+,;. ,,
FIGURE 26 - Venter Wheel
Position on Shaft - applies
to all heat section venter
assemblies
Remove dirt and grease from each motor, fan guard, and blades. Use care when
cleaning the fan blades to prevent causing misalignment or imbalance. Check that the
hub of the fan blades is secure to the shaft.
Follow these instructions for replacement of the fan guard, fan motor and/or fan blades.
Repeat the procedure for each heater section.
1. If the heater is installed, turn off the gas and disconnect the electric power.
2. Open the access door and disconnect the fan motor wires, capacitor wires at the
capacitor, and ground screw.
3. Remove the assembled parts (the fan guard, the motor and the fan blade).
4. Disassemble and replace whatever parts are needed and reassemble using
whatever part(s) are being replaced and the original parts.
Be sure the fan blade is in the proper position on the shaft; refer to the illustration
in FIGURE 28.
Position the assembly on the heater. Attach the fan guard.
Rotate the fan blade to check for adequate clearance. If adjustment is required,
loosen the mounting screws, re-position the fan guard, and tighten the screws.
1. Turn off the gas and disconnect the electric power.
2. Open the burner/control compartment access panel.
3. Disconnect the three venter motor wires at the DSI control, capacitor wires at
the capacitor, and ground screw (located on the control panel).
4. Holding the venter motor, remove the six screws that attach the venter motor
mounting plate to the venter housing. Remove the motor and wheel assembly
from the heater.
5. Re-assemble with the replacement venter motor and
wheel assembly. See FIGURE 26.
6. Follow the wiring diagram to connect the venter wires.
7. Replace the access panel. Restore power to the heater
and turn on the gas. Light, following the instructions on
the lighting instruction plate. Check for proper opera-
tion.
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 37
37. Combustion
Air Pressure
Switch(es)
See FIGURE 22, page 34, for location of the heat section
pressure switch. If it is determined that a pressure switch
needs replacing, use only the factory-authorized replacement
part that is designed for the model and size of heater being
serviced.
Size 400 has one pressure switch; Size 800 has two heat sec-
tion pressure switches and a main combustion air pressure
switch; and Size 1200 has three heat section pressure switches
and a main combustion air pressure switch. The main com-
bustion air pressure switch is located on the top of the first
heat section (see the illustration in Paragraph 34, page 36).
NOTE: A heater operating above 6000 ft elevation requires
high altitude heat section pressure switch(es). See Paragraph
5.
Main
Combustion
Air Pressure
Switch -
Models 800
and 1200
Heat Section
Pressure
Switch
36. Operating
Gas Valve(s)
Carefully remove external dirt accumulation and check the wiring connections. Size
400 has one valve; Size 800 has two valves; Size 1200 has three valves.
WARNING: The
operating valve is the
prime safety shutoff. All
gas supply lines must be
free of dirt or scale
before connecting to the
heater to ensure
positive closure. See
Hazard Levels, page 2.
The combination gas valve must be checked annually to ensure that the valve is
shutting off gas flow completely.
Instructions:
1) Locate the 1/8” NPT pressure tap on the combination valve.
Single-Stage Valve
1/8” Outlet
Pressure Tap
1/8” Outlet
Pressure Tap
Two -Stage Valve (optional
on Model LDAP 400 only)
Rotate the fan blade and re-check for adequate clearance. Repeat this procedure
until the assembly is positioned properly.
5. Reconnect the fan motor wires according to the wiring diagram and close the
access panel.
6. When finished with all sections, restore power to the heater and turn on the gas.
Light, following the instructions on the lighting instruction plate. Check for proper
operation.
NOTE: Operational pressure
settings and instructions for
checking pressure settings are
in Paragraph 12.
FIGURE 29 - Pressure Tap for Checking Gas Flow Shutoff
2) With the manual valve turned off to prevent flow to the gas valve, connect a ma-
nometer to the 1/8” outlet pressure tap in the valve. NOTE: A manometer (fluid-
filled gauge) is recommended.
3) Turn the manual valve to the ON position and the heater OFF. Use your finger to
fully block the main burner orifice for several seconds. Observe the manometer
with the orifice blocked, and if any pressure is indicated, the gas valve is leaking. A
leaking gas valve must be replaced before the heater is placed back in
operation.
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 38
The integrated circuit board monitors the operation of the heater and includes two
LED signal lights that indicate normal operation and various abnormal conditions. If
the heater fails to operate properly, check this signal to determine the cause and/or to
eliminate certain causes. See operating sequence in Paragraph 19.
Do not attempt to repair the DSI integrated control module; the only field replaceable
component is the fuse.
Check the Lights on
the DSI Integrated
Control Module
(Circuit Board)
IMPORTANT: When using a
multimeter to troubleshoot the
24 volt circuit, place the meter’s
test leads into the 5 or 9 pin
connectors located on the
ignition control. Do not remove
connectors or terminals from
the electrical components.
Doing so can result in misinter-
preted readings due to the
ignition control board’s fault
mode monitoring circuits.
43. Troubleshooting
Steady On Normal Operation - No call for heat. Steady On
Flame is sensed.
Fast Flash Normal Operation - Call for heat.
Slow Flash
Weak flame (current below
1.0 microamps ±50%)
1 Flash
System Lockout (failed to detect or
sustain flame)
Fast Flash
2 Flash
Main combustion air pressure
switch or heat section pressure
switch does not close with 30
seconds of venter being energized.
3 Flash
Limit or high limit switch open.
4 Flash
Main combustion air pressure
switch or heat section pressure
switch is closed before venter is
energized.
Steady Off Blown fuse; No power; or Defective
board
Undesired flame (valve
open and no call for heat).
Control Status - GREEN LED Codes
Flame Status - YELLOW LED Codes
40. Transformer
See FIGURE 22, page 34, for location. Use a voltmeter to verify
that there are 24 volts output from the transformer. If the trans-
former is not functioning, it must be replaced. Use a replacement
transformer identical to the factory-installed model.
39. High Limit
Control
A manual reset high limit control is located at the top of each heat
section. Do not reset high limit control without correcting the prob-
lem. If it is determined that the limit control needs replacing, use
only a factory-authorized replacement part that is designed for the
size of heater.
42. Vent System
Check the complete vent system at least once a year. Inspection should include all
joints, seams, and the vent terminal cap. Clean openings. Replace any defective parts.
41. Adjustable
Fan Control
See FIGURE 22, page 34, for location. Check the wiring connec-
tions and the adjustment knob.
If it is determined that the destratification fan control needs re-
placing, use only a factory-authorized replacement part that is de-
signed for the heater.
38. Limit
Control
If it is determined that the automatic reset limit control needs re-
placing, use only a factory-authorized replacement part that is de-
signed for the size of heater.
For approximate limit location, see FIGURE 22, page 34.
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 39
Trial for
Ignition
Call for Heat
Is there a
spark across gap at
ignitor?
Does gas
ignite?
Is there minimum
flame current at the flame
sensor?
Is there
minimum flame current
at the control
module?
Replace control
module.
Check connections to
flame sensor or
moisture in bulkhead
connector.
Is the flame sensor
corroded?
Clean
flame
sensor.
Is the sensor
located in flame
correctly?
Replace flame
sesnsor.
Repositon flame
sensor.
Is gas flowing?
Is the ignitor
position correct in the
gas flow?
Check gas pressure and
supply voltage. If either
are low, correct and
repeat startup.
Reposition spark
ignitor.
Is there
24VAC at the gas
valve?
Is there 24VAC from
gas valve output on control
module to chassis?
Check wiring and
connections to gas
valve.
Replace ignition
control module.
Replace gas valve.
Is there
spark voltage at
control?
Check high
voltage wire
continuity.
Is there
24V P1-2 to power
control?
Replace control
module.
Check wiring and/or
24VAC transformer
output.
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
NO
YES
YES
NO
YES
NO
YES
NO
DSI Integrated
Control Module
(Circuit Board) Trial
Troubleshooting
Flowchart
PROBLEM
PROBABLE CAUSE
REMEDY
1. No power to unit.
1. Turn on power; check supply fuses or main circuit breaker.
2. No 24 volt power to integrated circuit board.
2. Turn up thermostat; check control transformer output.
3. Integrated circuit board fuse blown.
3. Correct cause. Replace fuse (type ATC or ATO, 32VDC, 3A).
4. No power to venter motor.
4. Tighten connections at circuit board and/or motor terminals.
5. Integrated circuit board defective.
5. Replace intergrated circuit board.
6. Defective venter motor.
6. Replace venter motor. See Paragraph 32.
Burner will
1. Manual valve not open.
1. Open manual valve.
not light
2. Air in the gas line.
2. Bleed gas line (initial startup only).
3. Gas pressure too high or too low.
3. Supply pressure should be 5" - 14" w.c. for natural gas or 11" - 14"
w.c. for propane gas.
4. No Spark:
4.
a) Loose wire connections.
a) Be certain all wire connections are solid.
b) Transformer failure.
b) Be sure 24 volts is available.
c) Incorrect spark gap.
c) Maintain spark gap at 1/8".
d) Spark cable shorted to ground.
d) Replace worn or grounded spark cable.
e) Spark electrode shorted to ground.
e) Replace if ceramic spark electrode is cracked or grounded.
f) Burner not grounded.
f) Make certain integrated circuit board is grounded to ignitor.
g) Circuit board not grounded.
g) Make certain integrated circuit board is grounded to furnace chassis.
h.) Unit not properly grounded.
h.) Make certain unit is properly field grounded to earth ground and
properly phased (L1 to hot lead L2 to neutral).
i) Integrated circuit board fuse blown.
i) Correct cause. Replace fuse (type ATC or ATO, 32VDC, 3A).
j.) Faulty intergrated circuit board.
j) If 24 volt is available to the integrated circuit board and all other causes
have been eliminated, replace board.
5. Lockout device interrupting control circuit by above causes. 5. Reset lockout by interrupting control at the thermostat or main power.
6. Combustion air proving switch
6.
not closing.
a) Make sure unit is properly vented.
b) Remove obstructions from vent.
c) Replace faulty tubing to pressure switch.
7. Faulty combustion air proving switch.
7. Replace combustion air proving switch.
8. Main valve not operating.
8.
a) Defective valve.
a) If 24 volt is measured at the valve connections and valve remains
closed, replace valve.
b) Loose wire connections
b) Check and tighten all wiring connections.
9. Integrated circuit board does not power main valve.
9.
a) Loose wire connections.
a) Check and tighten all wiring connections.
b) Flame sensor grounded.
b) Be certain flame sensor lead is not grounded or insulation or ceramic is
not cracked. Replace as required.
c) Incorrect gas pressure.
c) Supply pressure should be 5" - 14" w.c. for natural gas or 11" - 14"
w.c. for propane gas.
d) Cracked ceramic at sensor.
d) Replace sensor.
Venter motor will
not start
General Troubleshooting
Form RZ-NA-I-LDAP, P/N 207733 (Rev 2), Page 40
FOR SERVICE OR REPAIR, FOLLOW THESE STEPS IN ORDER:
FIRST:
Contact the Installer
Name __________________________________________________________
Address_________________________________________________________
__________________________________________________________
__________________________________________________________
Phone _____________________________________
SECOND:
Contact the nearest distributor (See Yellow Pages). If no listing,
contact Authorized Factory Representative, 1-800-695-1901 (Press 1).
THIRD:
Contact
REZNOR®/ Thomas & Betts Corporation
150 McKinley Avenue
Mercer, PA 16137
Phone: (724) 662-4400
Model No. _________________________________
Heater Serial No._____________________________
Date of Installation ___________________________
(800) 695-1901; www.RezSpec.com
©2005 Thomas & Betts Corporation, All rights reserved.
MANUFACTURER OF HEATING, COOLING, AND VENTILATING SYSTEMS
Trademark Note: Reznor® and TCORE2® are trademarks of Thomas & Betts.
9/05 Form RZ-NA I-LDAP (Version .2)
General Troubleshooting (cont’d)
PROBLEM (cont'd)
PROBABLE CAUSE (cont'd)
REMEDY (cont'd)
1. Gas pressure too high or too low.
1. Supply pressure should be 5" - 14" w.c. for natural gas or 11" - 14"
w.c. for propane gas.
2. Burner not grounded
2. Make certain integrated circuit board is grounded to ignitor.
3. Circuit board not grounded.
3. Make certain integrated circuit board is grounded to furnace chassis.
4. Faulty integrated circuit board
4. If 24 volt is available to the integrated circuit board and all other
causes have been eliminated, replace board.
5.
a) Make sure unit is properly vented.
b) Remove obstructions from vent.
c) Replace faulty tubing to pressure switch.
6. Faulty combustion air proving switch.
6. Replace combustion air proving switch.
7. Flame sensor grounded.
7. Be certain flame sensor lead is not grounded or insulation or ceramic
is not cracked. Replace as required.
8. Cracked ceramic at sensor.
8. Replace sensor.
9. Incorrect polarity.
9. Reverse line volt leads to integrated circuit board.
1. Incorrect valve outlet pressure or orifice.
1. Check valve outlet pressure. See Rating plate for manifold pressure.
2. Cycling on limit control.
2. Check air throughput.
3. Improper thermostat location or adjustment.
3. See thermostat manufacturer's instructions.
1. Circuit open.
1. Check wiring and connections.
2. Defective integrated circuit board.
2. Replace board.
3. Defective motor.
3. Replace motor.
Fan or venter motor turns
on and off while burner is
operating
1. Motor overload device cycling on and off.
1. Check motor load against motor rating plate. Replace motor if needed.
1. Low or high voltage supply.
1. Correct electric supply.
2. Defective motor.
2. Replace motor.
3. Poor airflow.
3. Clean motor, fan, fan guard, filter, and coils.
4. Defective bearing or lubrication.
4. Lubricate bearings (motor permitting) or replace motor.
Fan or venter motor will
not run
Fan or venter motor cuts
out on overload
Burner cycle on and off
5. Combustion air proving switch(es) not
closing.
No heat (Heater
Operating)