Raypak 0133-4001 Installation And Operating Instructions Manual
Read Online
Read the Raypak 0133-4001 Installation And Operating Instructions Manual online using the built-in PDF viewer.
Text of the manual
CATALOG NO. 2000.50Z
Effective:
03-15-04
Replaces:
06-15-03
FOR YOUR SAFETY
WHAT TO DO IF YOU SMELL GAS
*Do not try to light any appliance.
*Do not touch any electrical switch; do not use any phone in your building.
*Immediately call your gas supplier from a neighbor's phone. Follow the gas supplier's
instructions.
*If you cannot reach your gas supplier, call the fire department.
This manual should be maintained in legible
condition and kept adjacent to the boiler or kept
in a safe place for future reference.
FOR YOUR SAFETY
Do not store or use gasoline or other flammable vapors and liquids or other combustible
materials in the vicinity of this or any other appliance. To do so may result in an explosion
or fire.
P/N 240035
INSTALLATION
AND OPERATING
INSTRUCTIONS
RAYTHERM™
HEATING BOILERS
Type H
Models 0133-4001
WARNING: Improper installation, adjustment, alteration, service or maintenance can cause
property damage, personal injury or loss of life. Refer to this manual. Installation and service
must be performed by a qualified installer, service agency or the gas supplier.
MODEL NUMBER EXAMPLE:
H 3 - 0 5 1 4 A
Series
Model Size
Representative of approximate MBTUH input
(Model 0514 has input of 511,500 BTUH)
Firing Mode
1
Mechanical Modulation
2
Motorized Modulation
3
2-Stage Firing / 4-Stage Firing Option
4
On-Off Firing
5
Low Temperature Mechanical Modulation
6
Motorized Modulation w/Electronic Outdoor Reset B6000
Application
H = Heating Boiler
Boiler rating plate showing model number
MODEL IDENTIFICATION
The model number of a boiler can be found on the Sales Order and the boiler's rating plate. The example below
identifies what the characters of the model number represent.
TABLE OF CONTENTS
MODEL IDENTIFICATION........................................................................................2
RECEIVING EQUIPMENT........................................................................................4
CERTIFICATIONS.................................................................................................... 4
BOILER TYPES........................................................................................................ 4
CALIFORNIA PROPOSITION 65 WARNING.......................................................... 4
INSTALLATION........................................................................................................ 5
Installation Codes...............................................................................................5
Installation Base................................................................................................. 5
Clearances......................................................................................................... 6
Combustion and Ventilation Air..........................................................................7
Venting................................................................................................................8
Plumbing.............................................................................................................15
CONTROLS.............................................................................................................. 21
Economaster Controls........................................................................................21
Electronic Ignition...............................................................................................21
Operating Controls............................................................................................. 21
Limit Controls......................................................................................................22
ELECTRICAL CONNECTIONS................................................................................24
START-UP................................................................................................................ 25
Before Start-up................................................................................................... 25
Lighting Instructions........................................................................................... 26
After Start-up...................................................................................................... 28
Inspections......................................................................................................... 29
LOW NOx BOILERS.................................................................................................30
Operation............................................................................................................30
Start-up...............................................................................................................30
Burner Adjustment............................................................................................. 30
Visual Inspection................................................................................................30
Electrical.............................................................................................................30
Flame Roll-out Safety Switch.............................................................................30
Service................................................................................................................31
TROUBLESHOOTING..............................................................................................32
Electrical.............................................................................................................32
Mechanical......................................................................................................... 35
SERVICE.................................................................................................................. 36
Tube Cleaning Procedure..................................................................................36
Burner Tray Removal.........................................................................................37
Gas Valve Removal........................................................................................... 37
Main Burner and Orifice Removal..................................................................... 37
Pilot Removal and Cleaning.............................................................................. 37
High Limit or Tankstat Removal........................................................................ 37
Heat Exchanger Removal..................................................................................37
Combustion Chamber Removal........................................................................ 38
Control Well Replacement.................................................................................39
Tube Replacement Procedure...........................................................................39
Cleaning Flue Gas Passageways......................................................................39
REPLACEMENT PARTS..........................................................................................39
WARRANTY............................................................................................................. 40
CALIFORNIA PROPOSITION 65
WARNING:
This product contains chemicals known to the State
of California to cause cancer, birth defects or other
reproductive harm.
BOILER TYPES
TYPE H1 - MECHANICAL MODULATING
Central heating boiler with 150°-210°F
mechanical modulating gas valves and pressure relief
valve. Standard on models 133-1826.
TYPE H2 - MOTORIZED MODULATING
Central heating boiler with a motorized
modulating gas valve. Standard on models 2100-
4001. Available as option on models 514-1826.
Modulating controller provided.
TYPE H3 - 2-STAGE CONTROLS
Central heating boiler with single two-stage gas
valve . Available as option on Models 183-4001. Two-
stage controller provided. Available with Y-1
sequencing option.
TYPE H4 - ON-OFF CONTROLS
Central heating boiler with on-off firing. Available
as option on Models 181-4001.
TYPE H5 - MECHANICAL MODULATING
Central heating boiler with 110°-170°F
mechanical modulating gas valves and pressure relief
valve. Standard on Models 133-1826.
TYPE H6 - B6000 SYSTEM CONTROL
Central heating boiler for use with the B6000
boiler management system. Available for Models
514-4001.
TYPE H9 - 4-STAGE
Central heating boiler for use with 4-stage firing.
Controller optional. Available option on Models 514-
4001.
RECEIVING EQUIPMENT
On receipt of the equipment, visually check for
external damage to the carton or the shipping crate. If
either is damaged, make a note on the Bill of Lading
and report the damage to the Carrier immediately.
Remove the boiler from the carton or the shipping
crate.
On occasion, items are shipped loose. Be sure
that you receive the number of packages indicated on
the Bill of Lading.
When ordering parts, you must specify the Model
and Serial Number of the boiler. When ordering under
warranty conditions, you must also specify the date of
installation.
Raypak recommends that this manual be
reviewed thoroughly before installing your Raypak
boiler. If there are any questions which this manual
does not answer, please contact the factory or your
local Raypak representative.
Claims for shortages and damages must be filed
with carrier by consignee. Permission to return goods
must be factory authorized and are subject to a
stocking charge.
Purchased parts are subject to replacement only
under the manufacturer's warranty. Debits for
defective replacement parts will not be accepted and
will be replaced in kind only per our standard
warranties.
CERTIFICATIONS
The Raypak hydronic boilers are design certified
and tested under the latest requirements of the
American National Standard, ANSI Z21.13 - latest
edition. Each boiler has been constructed and
pressure tested in accordance with the requirements
of Setion IV of the American Society of Mechanical
Engineers Code, and factory fire tested.
All models are National Board approved.
Temperature and pressure gauge is standard.
Model 0133 has a 4-pass heat exchanger, 1 tube
per pass.
Models 0181-1826 have 2-pass heat exchangers,
5 tubes first pass, 4 tubes second pass.
Models 2100-4001 have 2-pass heat exchangers,
9 tubes per pass.
Models 926-4001 have optional single-pass heat
exchangers with cast iron headers only.
The installation must conform with these instructions and the latest editions of the ANSI National Fuel Gas
Code Z223.1, the National Electric Code ANSI/NFPA 70 and local codes. All boiler installations must conform
to ASME boiler code. Hot water pipes must be installed with minimum clearances to combustible material as
required by code.
INSTALLATION BASE
The boiler should be mounted on a level, non-combustible surface. Boiler must not be installed on carpeting.
The boiler can be installed on a combustible surface only when a suitable floor shield base is provided. Raypak
offers an optional floor shield base which can be factory installed on all indoor models except Model 133; the
Model 133 floor shield base is shipped loose and must be installed by the contractor.
Do NOT use the shipping crate base as an installation base.
NOTE: The boiler should be located in an area where water leakage will not result in damage to the area adjacent
to the appliance or to the structure. When such locations cannot be avoided, it is recommended that a suitable
drain pan, adequately drained, be installed under the appliance. The pan must not restrict air flow.
In addition, the boiler shall be installed such that the gas ignition system components are protected from water
(dripping, spraying, rain, etc.) during appliance operation and service (circulator replacement, control
replacement, etc.).
Boiler Model No. Base Part No. Boiler Model No. Base Part No.
926*
1083*
1178*
1287*
1414*
1571*
1758*
962
1125
1223
1336
1468
1631
1826
001749
058313
058314
058315
058316
056199
056200
056201
056202
133
182/181
260/261
330/331
400/401
514
624
724
824
054597
054598
054599
054600
054601
058378
058379
059233
059234
059235
059236
059237
059238
059239
Combustible Floor Shield ordering information:
ALTERNATE METHOD FOR PROVIDING A NON-COMBUSTIBLE BASE
Fig. #8148.1
* Models with factory-installed floor shield as standard.
BOLD type indicates Low NOx models.
5
REDUCTION OF CLEARANCES TO PROTECTED
SURFACES
CLEARANCES
CLEARANCES FROM COMBUSTIBLE SURFACES
(All dimensions are in inches)
Note: The boiler shall be installed in a space large in
comparison to the size of the boiler. Large space is
defined as having a volume at least sixteen (16) times
the total volume of the boiler.
Note 1:
Combustible floor shield is required when boiler is to be
installed on a combustible surface. (See ordering infor-
mation on pg. 4.)
Note 2:
Servicing Clearances: Provide at least 24" (Models
133-1826), 48" (Models 2100-4001) in front of unit for
removal and servicing of the Controls & Burner Tray.
Provide at least 18" on side opposite water connections
for deliming of Heat Exchanger Tubes.
*Vent includes factory-supplied drafthood and does not
include field-supplied vent systems above the draft-
hood. On Models 2100-4001 drafthood is built into
boiler.
6
Derived from National Fuel Gas Code, Table 6.2.3(a)
Derived from National Fuel Gas Code, Table 6.2.3(b)
MODEL
133
181 to
401
514 to
824
926 to
1826
2100 to
4001
These boilers are designed certified for outdoor installation. Boilers must not be installed under an
overhang within three (3) feet from the top on the boiler. Three (3) sides must be open in the area under the
overhang. Roof water drainage must be diverted away from the boilers with the use of gutters.
The point from where the flue products exit the boiler must be a minimum of four (4) feet below, four (4) feet
horizontally from or one (1) foot above any door, window or gravity inlet to a building. The top surface of the boiler
shall be at least three (3) feet above any forced air inlet, or intake ducts located within ten (10) feet horizontally.
Fig. #8245
HIGH-WIND CONDITIONS (Outdoor Units Only)
In areas where high winds are frequent, it may be
necessary to locate the boiler a minimum of 3' from
high vertical walls, or install a wind break so the boiler
is not in direct wind current.
COMBUSTION AND VENTILATION AIR
(Indoor Units Only)
The boiler must have both combustion and venti-
lation air. Minimum requirements for net free air supply
openings are 12 inches from ceiling for ventilation and
12 inches from the floor for combustion air as outlined
in Z223.1 - latest edition and any local codes that may
have jurisdiction.
CAUTION: Combustion air must not be contaminated
by corrosive chemical fumes which can damage the
boiler and void the warranty.
a.
All Air From Inside The Building:
Each opening shall have a minimum net free
square inches as noted:
Model Square Inches Model Square Inches
133
136
1125
1125
182/181
181
1223
1223
260/261
264
1336
1337
330/331
334
1468
1467
400/401
399
1631
1630
514
512
1826
1826
624
627
2100
2100
724
726
2500
2499
824
825
3001
3000
962
962
3500
3500
4001
4000
b.
All Air From Outdoors:
When air is supplied directly from outside of build-
ing, each opening shall have a minimum net free
square inches as noted:
Model Square Inches Model Square Inches
133
34
1125
282
182/181
46
1223
306
260/261
66
1336
335
330/331
84
1468
367
400/401
100
1631
408
514
128
1826
457
624
157
2100
525
724
182
2500
625
824
207
3001
750
962
241
3500
875
4001
1000
7
Step 1: Remove the front (4) screws.
Step 2: Line up outdoor top vent opening over heater
vent opening.
Step 3: Lower outdoor top onto unit lining up slots in
the outdoor top with screws holes in jacket top.
Step 4: Reinstall (5) screws to secure jacket top and
outdoor top to unit.
Fig. #8114
MODELS 514 - 824
Step 1: Lower outdoor top onto unit. Position top so it
is centered on unit from side to side and front
to rear.
Step 2: Tighten the (4) screws (Shown below) until
they come in contact with the unit jacket top,
then evenly tighten all (4) screws to secure to
unit.
JACKET TOP
FASTENING
SCREW
Fig. # 8233
MODELS 926-1758
Boilers are shipped with outdoor vent terminal
factory installed.
Fig. # 8166.1
8
Fig. #RP8280.1
Outdoor Top
(Shipped Loose with Heater)
MODELS 181-401 and 182-400
Outdoor Top Installation
Step 1: Remove jacket top panel.
Step 2: Remove and discard inner stack adapter
panel.
Step 3: Install jacket top panel.
Step 4: Insert tabs of outdoor top into keyholes located
on jacket top panel (4 places). See Detail A
Step 5: Snap tabs on outdoor top into the locked
postion of the keyhole so the top will not pull
out. See Detail B
Detail A
Detail B
(Part of heater)
Fig. # 9389
Step 1. Shut-off main electrical power switch to boiler.
Step 2. Turn heater manual switch located in upper control panel to the "OFF" position.
Step 3. Shut-off gas supply and water supply to the boiler.
Step 4. Mount drafthood on boiler and attach with the 4 sheet metal screws provided. Drafthood should be
positioned with the vent sensor located on the front left side as shown below.
Step 5. Remove plastic plug from left side of boiler jacket and install the plastic grommet provided.
Step 6. Route flue sensor wire harness through the grommet installed in Step 5.
Fig. #8946
Step 7. Remove door and locate wire from roll-out sensor to high limit with the male/female connector.
Fig. #8947
Step 8. Disconnect male/female connector and attach to the 2 wires from drafthood vent sensor harness.
9
BOILER ON/OFF
SWITCH
BEFORE
INSTALLATION
OF DRAFTHOOD
AFTER
INSTALLATION
OF DRAFTHOOD
ROLL-OUT SENSOR
ROLL-OUT
ROLL-OUT SENSOR
Attach the three (3) mounting brackets to the
stack using the screws provided and the holes
that are pre-drilled in the stack. Make sure the
brackets are positioned with the flange near the
top side of the stack (see illustration).
Caution must be taken not to over tighten and
strip the screw threads.
7.
Turn the assembled stack and jacket top, right-
side up. The jacket top will be trapped between the
brackets and the top of the stack. Place the stack
over the inner stack adapter panel flanged hole
and lower the louvered jacket top panel back into
its original
position. Reinstall the four (4) #10
flathead screws removed in step 1 above.
MODELS 181-401 and 182-400
INDOOR STACK INSTALLATION
1.
Remove the louvered jacket top by removing
four (4) #10 flathead screws.
2.
If originally installed, remove outdoor top
from the louvered jacket top.
3.
Place the inner stack adapter panel over the
flue collector inside the heater. Make sure
the flanged side of the flue opening is up.
4.
Turn the stack (drafthood) upside
down and set it down bottom side up.
5.
Turn the jacket top panel (removed in step 1)
upside down and place it through the stack.
10
MODELS 181-401 and 182-400
Step 1. Shut-off main electrical power switch to boiler.
Step 2. Turn heater manual switch located in upper control panel to the "OFF" position.
Step 3. Shut-off gas supply and water supply to the boiler.
Step 4. Mount drafthood on top of boiler as shown on page 8. Drafthood should be positioned with the vent
sensor located on the front right side as shown.
Step 5. Remove plastic plug from left side of boiler jacket and install plastic grommet provided.
Step 6. Route flue sensor wire harness through the grommet installed in Step 5.
Step 7. Remove door and locate wire from roll-out sensor to high limit with the male/female connector.
Step 8. Disconnect male/female connector and attach to the 2 wires from drafthood vent sensor harness.
11
BOILER BEFORE
DRAFTHOOD
INSTALLATION
BOILER AFTER
DRAFTHOOD
INSTALLATION
Fig# 9349
Fig# 9351
Locate and assemble as shown below. Secure with
screws supplied in envelope in carton.
Fig. # 8165.0
VENT PIPING
WARNING: Indoor boilers require a drafthood that
must be connected to a vent pipe and properly vented
to the outside. Failure to follow this procedure can
cause fire or fatal carbon monoxide poisoning.
Vent piping the same size or larger than the
drafthood outlet is recommended, however, when the
total vent height is at least 10 ft. (drafthood relief
opening to vent terminal), the vent pipe size may be
reduced as specified in Chapter 10 of the latest edition
of the National Fuel Gas Code, ANSI Z223.1. As much
as possible avoid long horizontal runs of vent pipe and
too many elbows. If installation requires horizontal
non-vertical runs, the vent pipe must have a minimum
of 1/4 inch per foot rise and should be supported at not
more than 5 ft. intervals. Plumbers tape, criss-crossed,
will serve to space both horizontal and vertical piping.
Gas vents supported only by the flashing and extend-
ing above the roof more than 5 ft. should be securely
guyed or braced to withstand snow and wind loads. We
recommend the use of insulated vent pipe spacers
through the roof and walls.
For protection against rain or blockage by snow, the
vent pipe must terminate with a vent cap which com-
plies with the local codes or, in the absence of such
codes, to the latest edition of the National Fuel Gas
Code, ANSI Z223.1.
The discharge opening must be a minimum of 2 ft.
vertically from the roof surface and at least 2 ft. higher
than any part of the building within 10 ft.
MODELS 514-824
Locate and assemble as shown below. Secure with
screws supplied in envelope in carton.
MODELS 2100-4001
These models have built-in drafthoods. For proper
operation, the drafthood outlet must be connected to
the venting system.
Fig. # 8167.0
12
Vent stack shall be at least 5 ft. in vertical height
above the drafthood outlet. The vent cap location shall
have a minimum clearance of 4 feet horizontally from,
and in no case above or below, unless a 4-foot horizon-
tal distance is maintained, from electric meters, gas
meters regulators and relief equipment.
The weight of the vent stack or chimney must not rest
on boiler drafthood. Support must be provided in com-
pliance with applicable codes. The boiler top and
drafthood must be readily removable for maintenance
and inspection. Vent pipe should be adequately sup-
ported to maintain proper clearances from combustible
construction.
Type "B" double-wall or equivalent vent pipe is rec-
ommended. However single-wall metal vent pipe may
be used as specified in the latest edition of the National
Flue Gas Code ANSI Z223.1.
10' or less
5' min.
2' min.
2' min.
Vent Cap
Vent Pipe
Drafthood
Heater
appliance not connected to the common venting
system. Turn on any exhaust fans, such as range
hoods and bathroom exhausts, so they will oper-
ate at maximum speed. Do not operate a summer
exhaust fan. Close fireplace dampers.
(d) Place in operation the appliance being inspected.
Follow the lighting instructions. Adjust thermostat
so appliance will operate continuously.
(e) Test for spillage at the drafthood relief opening
after 5 minutes of main burner operation. Use the
flame of a match or candle, or smoke from a
cigarette, cigar or pipe.
(f)
After it has been determined that each appliance
remaining connected to the common venting sys-
tem properly vents when tested as outlined above,
return doors, windows, exhaust fans, fireplace
dampers and any other gas burning appliance to
their previous conditions of use.
(g) Any improper operation of the common venting
system should be corrected so that the installation
conforms with the latest edition of the National Fuel
Gas Code, ANSI Z223.1. When re-sizing any
portion of the common venting system, the com-
mon venting system should be re-sized to
approach the minimum size as determined using
the appropriate tables in Part 11 of the National
Fuel Gas Code, ANSI Z223.1.
For special venting applications that require reduced
vent sizes and through-the-wall venting, the Type D
Induced Draft Assembly can be used. Consult the
factory or your local Raypak representative.
Manifolds that connect more than one
boiler to a common chimney must be
sized to handle the combined load. Con-
sult available guides for proper sizing of
the manifold and the chimney. At no time
should the area be less than the area of
the largest outlet.
Fig. #8119.0
At the time of removal of an existing boiler, the following
steps shall be followed with each appliance remaining
connected to the common venting system placed in
operation, while the other appliances remaining con-
nected to the common venting system are not in
operation.
(a) Seal any unused openings in the common venting
system.
(b) Visually inspect the venting system for proper size
and horizontal pitch and make sure there is no
blockage or restriction, leakage, corrosion and
other deficiencies which could cause an unsafe
condition.
(c) Insofar as is practical, close all building doors and
windows and all doors between the space in which
the appliances remaining connected to the com-
mon venting system are located and other spaces
of the building. Turn on clothes dryers and any
Fig. #7043.1
13
VENT DAMPER INSTALLATION
(MODELS 133 THROUGH 261)
WHERE REQUIRED
LOCATION
The vent damper must be located in the vent so
that it serves only the appliance for which it is intended.
If improperly installed, a hazardous condition, such
as an explosion or carbon monoxide poisoning, could
result. Make certain that it is mounted in an accessible
location at least 6 inches from any combustible mate-
rial or the heat exchanger, and that the position indica-
tor is in a visible location.
The vent damper must be installed after the appli-
ance drafthood, as close to the drafthood as practi-
cable, and without modification of the drafthood.
Fig. # 8182.0
VENT DAMPER INSTALLATION
VENT DAMPER GENERAL WIRING DIAGRAM
Fig. # 8183.0
Fig. # 8615.0
WARNING: Do not use thermally actuated vent dampers on a modulating boiler. To do so, may result in
asphyxiation. Use only a mechanically actuated vent damper device that is electrically interlocked with the
modulating boiler operation.
On vertical vents, the vent damper may be mounted with the actuator in any position. On horizontal vents,
do not mount the actuator either directly above or directly below the vent pipe; mount the vent damper actuator
to the side of the vent.
The vent damper is set up for a continuous pilot system. If the vent damper is installed on an Intermittent
Pilot or Direct Spark Ignition equipped system, the energy savings of the vent damper can be improved by
plugging the hole in the vent damper blade using the knockout plug, Part No. 105612R, provided in the parts
envelope.
DO NOT plug the hole if installing the vent damper on a continuous pilot system as this will create a hazard.
NO
YES
NO
YES
INSTALL VENT
DAMPER WITH
ACTUATOR TO
SIDES OF VENT
ONLY. DO NOT
MOUNT ABOVE OR
BELOW VENT.
TO CHIMNEY
TO BOILER
D808
FLOW >
HORIZONTAL INSTALLATION
TO CHIMNEY
TO BOILER
D808
VERTICAL
INSTALLATION
ACTUATOR MAY BE
INSTALLED IN ANY
POSITION ON
VERTICAL PIPE.
Motor
End
Switch
C.
N.O.
N.C.
1K2
1K1
R
1R
1K3
1
2
3
4
5
D808
Thermostat or
Controller
Dual Valve
Combination Gas
Control or
Ignition System
Optional Limit
Location
Limit
Transformer
L1
(Hot)
L2
1
1
Yellow Blue
Power supply provide disconnect me
ans an overload protection as requ
ired.
Black Orange Red
14
Note: Model 133 drafthood shown.
Power supply provide disconnect means an overload protection as required.
INSTALL THE VENT DAMPER TO SERVICE ONLY THE SINGLE APPLIANCE FOR WHICH IT IS INTENDED. IF
IMPROPERLY INSTALLED, A HAZARDOUS CONDITION, SUCH AS AN EXPLOSION OR CARBON MONOXIDE
POISONING, COULD RESULT.
Fig. # 8181.0
1.
When the boiler is off, check that the vent damper
position indicator points to the closed position.
(See figure below.)
2.
Turn the thermostat or controller up to call for heat
and check that the vent damper indicator points to
the open position. (See figure below.)
3.
Turn the thermostat or controller down again and
check that the vent damper position indicator
returns to the closed position.
THE VENT DAMPER MUST BE INSPECTED AT LEAST
ONCE A YEAR BY A TRAINED, EXPERIENCED
SERVICE TECHNICIAN. THE NAME OF THE PERSON
WHO ORIGINALLY INSTALLED YOUR VENT DAMPER
IS SHOWN ON THE INSTALLATION LABEL. DAMPER
MUST BE IN OPEN POSITION WHEN BOILER MAIN
BURNERS ARE OPERATING.
Fig. # 8090.1
VENT DAMPER POSITON INDICATOR
CAUTION: The boiler and its manual shut-off valve must
be disconnected from the gas supply during any pressure
testing of that system at test pressures in excess of
1/2 PSIG. Dissipate test pressure in the gas supply line
before reconnecting the boiler and its manual shut-off
valve to gas supply line. FAILURE TO FOLLOW THIS
PROCEDURE MAY DAMAGE THE GAS VALVE. OVER
PRESSURED GAS VALVES ARE NOT COVERED BY
WARRANTY. The boiler and its gas connections shall be
leak tested before placing the appliance in operation. Use
soapy water for leak test do NOT use open flame.
NOTE: Do not use teflon tape on gas line pipe thread.
A flexible sealant is recommended.
DAMPER OPEN DAMPER CLOSED
15
Damper Position
Indicator
GAS SUPPLY CONNECTIONS
Gas piping must have a sediment trap ahead of the
boiler gas controls, and a manual shut-off valve located
outside the heater jacket. All gas piping should be
tested after installation in accordance with local codes.
VENT DAMPER
NORMAL OPERATION SUMMARY
For safe, efficient operation, the vent damper and all flue product carrying areas of the appliance must be
checked annually, with particular attention given to deterioration from corrosion or other sources. Check vent
damper operation as follows:
Damper Position
Indicator
EFFIKAL® RVGP
CONNECTION DIAGRAM FOR EFFIKAL®
VENT DAMPER
PLUMBING
A minimum of 7" W.C. and a maximum of 10.5" W.C. upstream pressure, under load and no-load conditions,
must be provided for natural gas, or a minimum of 12" W.C. and a maximum of 13" for propane.
Bleed Line Connection
GAS PRESSURE REGULATOR
The gas pressure regulator is preset nominally at 4" W.C. for natural gas, and 11" W.C. for propane. Between
the gas valve and the burners is a 1/8" pipe plug. The pressure at this point, taken with a manometer, should
be about 3.7" W.C. for natural gas and 10.5" W.C. for propane. Low NOx models should be 3.9" W.C., natural
gas only. If an adjustment is needed, turn adjustment screw clockwise to increase pressure, or counter-clockwise
to decrease pressure.
For boilers with mechanical modulation gas valves (Type H1 and H5) or two-stage gas valves (Type H3),
the gas pressure regulator is preset and sealed, and not field adjustable. Pressure tap is provided on the outlet
side of the gas valve for measurement of gas pressure in the manifold.
VENTING OF DIAPHRAGM GAS COMPONENTS
Gas valves that are equipped with a gas bleed must be vented to the outdoors as required by the National
Fuel Gas Code. Under NO circumstances shall bleed lines terminate in the gas utilization equipment flue or
exhaust system.
Fig. # 8185.2
16
GENERAL
Boiler should be located so that any water leaks will not cause damage to any adjacent areas or structures.
See piping diagrams for proper water connections for the type of boiler and system.
*Low NOx units not available for propane.
RECOMMENDED PURGE MANIFOLDS FOR
TYPICAL HYDRONIC SYSTEM HOOKUPS
The boiler piping system of a hot water heating
boiler connected to heating coils located in air handling
units where they may be exposed to refrigerated air
circulating, must be equipped with flow control valves
or other automatic means to prevent gravity circulation
of the boiler water during the cooling cycle.
TEMPERATURE & PRESSURE GAUGE
The temperature & pressure gauge is standard
equipment on all hydronic heating and hot water supply
boilers. All temperature & pressure gauges are factory
mounted in the in/out header except for residential
boilers, Models 133 and 181-401. On these models the
temperature & pressure gauge is shipped loose for
field installation, and located in the outlet water
connection. All fittings required to mount gauge to
piping system are supplied by others.
17
PUMP SELECTION
In order to ensure proper hydraulics in your
hydronic heating system, adequate pump size must be
selected. We recommend that the pump be sized for
20°F Delta T. (Delta T is the temperature difference
between the inlet and outlet water when the boiler is
firing at full rate). For some boilers, the Delta T is more
than 20°F (22°-33°F) at the recommended flow rates.
FEEDWATER REGULATOR
We recommend that a feedwater regulator be
installed and set at 12 PSIG minimum pressure. Install
a check valve or back flow device upstream of the
regulator, with a manual shut-off valve. Leave the
valve open.
PIPING - HEATING BOILERS
We recommend that all high points be vented and
that purge valves and a bypass valve be installed. A
boiler installed above radiation level must be provided
with a low water cut-off device. The boiler, when used
in conjunction with a refrigeration system, must be
installed so that the chilled medium is piped in parallel
with the boiler with appropriate valves to prevent the
chilled medium from entering the boiler.
NOTE: Expansion tanks (supplied by others) should be
installed per manufacturer's instructions.
7024e
DIAPHRAGM TANK SYSTEM
MULTI-ZONE HEATING SYSTEMS
MODELS 133 TO 4001
19
NOTE: Expansion tanks (supplied by others) should
be installed per manufacturer's instructions.
NOTE: Expansion tanks (supplied by others) should
be installed per manufacturer's instructions.
Fig.# 7027.1e
Fig.# 7024.1e
MULTIPLE-BOILER– REVERSE RETURN HOOK-UP
REVERSE RETURN PIPING IS A PROPER METHOD OF MANIFOLDING MULTIPLE BOILER HOOK-UPS TO
ENSURE BALANCED FLOW THROUGH EACH BOILER. VALVES ON SUPPLY AND RETURN ARE NEEDED
TO ISOLATE ANY BOILER, AS REQUIRED.
20
MODELS 133 TO 4001
Fig. #9495
Models 133-1826 with mechanical modulating
controls have one or more Robertshaw Unitrol 7000
Series hydraulic snap-on thermostatic combination
gas valves. These valves have the pressure regulator
and 24 volt operator built-in. The hydraulic actuator
will throttle the boiler input to adjust the firing rate and
meet the required load. This, in effect, prevents costly
fuel consumption, as compared to an on-off cycling
boiler. The valve has a remote capillary bulb im-
mersed in a well, at the header outlet, to maintain a
constant outlet water temperature. When multiple
valves are furnished, they can be staged to give
greater flexibility of control. Standard factory setting is
at position 5. Consult the dial setting tag attached to
the control for your desired temperature. See sample
tag drawings below.
LOW TEMP. RANGE
HIGH TEMP. RANGE
IGNITION MODULE
ELECTRONIC SAFETY
ACAD: ECONO. DWG.
Fig. #8645.1
Fig. #8645
Fig. # 8929.1
21
3/4
ELECTRONIC IGNITION
The intermittent ignition device conserves energy
by automatically extinguishing the pilot when desired
temperature is reached. When additional heat is
needed, the pilot re-ignites electrically, eliminating the
fuel costs of maintaining a constant pilot. To ensure
safe operation, the gas valve cannot open until the pilot
relights and is proven.
All units are shipped with lockout ignition module
as standard.
CONTROLS
ECONOMASTER CONTROLS
The Raytemp Economaster II is an electronic de-
vice that allows the operator to set the desired time for
the pump to run after the boiler shuts off. The time is
factory-set at 7 minutes and it can be re-adjusted in the
field anywhere from 3 to 10 minutes.
In a conventional system, when the aquastat is
satisfied, the main gas valve closes, but the pump
continues operating. With the new energy-conserving
Economaster II the boiler pump is programmed to
continue running for an optimum period of time in order
to absorb the residual heat from the combustion cham-
ber and use it in the system. The pump then shuts off
until the next call for heat is received from the aquastat.
NOTE: Pump will come on when power is first applied
to boiler.
rupted. Pilot flame is automatically lit when the device
is powered. Unit performs its own safety check and
opens the main valve only after the pilot is proven to be
lit.
LOW WATER CUT-OFF (OPTIONAL)
The low water cut-off automatically shuts down
burner whenever water level drops below probe. 90-
second time delay prevents premature lockout due to
temporary conditions such as power failure or air
pockets. Flush float type devices at beginning of each
heating season.
HIGH AND LOW GAS PRESSURE SWITCHES
These switches sense either high or low gas pres-
sures and automatically shut down burners if abnormal
pressures exist.
LIMIT CONTROLS
HIGH LIMIT
The boiler is equipped with a manual reset high
limit. Push the reset button and set the limit(s) to 30-
40 °F above desired operating temperature.
FLOW SWITCH
This dual purpose control shuts off the boiler in the
case of a pump failure or low water condition. It is
mounted and wired in series to the main gas valve.
Standard on all models except the 133.
NOTE: Flow switch will not operate if flow is less than
12 GPM.
100% PILOT SAFETY
All standard boiler models 514-4001 employ elec-
tronic devices which close the main gas valve within
8/10 of a second whenever the pilot flame is inter-
MANUAL RESET HIGH LIMIT
FLOW SWITCH
MODULATING VALVE LOCATION
Fig. #8643
THERMOSTAT CONTROL
Fig. #8644
Fig. 9317
22
MODULATING VALVES
W/ BUILT-IN REGULATOR
FLOW SWITCH CUTTING
MODULATING VALVE
LOW WATER CUT-OFF
GAS PRESSURE SWITCH
Fig. #8925
Fig. #8995
Fig. #8236
Fig. #8996
23
CAUTION: Label all wires prior to disconnection when
servicing controls. Wiring errors can cause improper
and dangerous operation. Verify proper operation after
servicing.
DANGER - SHOCK HAZARD
Make sure electrical power to the heater is discon-
nected to avoid potential serious injury or damage to
components.
The boiler is normally wired for 120 Volts. The
voltage is indicated on the tie-in leads. Consult the
wiring diagram shipped with the boiler in the instruction
packet. The "TH" leads are for the remote tank control
connection. 24 Volts are supplied to this connection
through the boiler transformer. DO NOT attach line
voltage to the "TH" leads on models 133-1826. Before
starting boiler check to ensure proper voltage to boiler
and pump.
Fig. #9138.2
Boiler must be electrically grounded in accordance
with National Electrical Code ANSI/NFPA No 70.
Fig. #9138.1
NOTES:
1.
Field install ground to inside of junction box.
2.
If any of the original wire as supplied with the boiler
must be replaced, it must be replaced with 105°C
wire or its equivalent.
24
-
Safe lighting and other performance criteria were
met with the gas manifold and control assembly pro-
vided on the boiler when the boiler underwent tests
specified in the latest edition of ANSI-Z21.13 Standard.
GENERAL
Before lighting up a new installation, water should
be flowing through the boiler. Regulator should be set
to minimum 12 PSI.
CAUTION:
Liquefied petroleum gas is heavier than air and
sinks to the ground. Exercise extreme care in lighting
boiler in confined areas.
FILLING SYSTEM - HEATING BOILERS
Fill system with water. Purge all air from the system
using purge valve sequence. After system is purged of
air, lower system pressure. Open valves for normal
system operation. Fill system through feed pressure.
Manually open air vent on the compression tank until
water appears, then close vent.
START-UP
Fig. #8991
ETHYLENE GLYCOL SYSTEMS -
HEATING BOILERS
Fill through filler opening on the top on the
Air-X Tank to solution desired. Always maintain solu-
tion level in sight glass.
INITIAL START-UP - PUMP AND MOTOR
Many pumps are now direct-drive. They have no
coupler or bearing assembly. These pumps do not
require lubrication. Others require SAE-30 non-deter-
gent oil to lubricate both the motor and the bearing
assembly. Check pump motor for type before attempt-
ing to oil.
Clean dust and lint from pump and motor. Check
pump coupler and tighten if necessary.
Flush system before putting into operation to en-
sure that foreign material does not damage pump
seals.
CAUTION:
A. Pump must be off to check oil in bearing assembly.
B. Do not run pump without water in system.
25
HIGH LIMIT
Set the thermostat to lowest setting.
2.
Turn off all electric power to the appliance.
3.
Remove boiler door.
4.
Push in gas control knob slightly and turn clock-
wise
to “OFF”. Do not force.
5.
Replace boiler door panel.
1.
STOP! Read the safety information above on
this label.
2.
Set the thermostat to lowest setting.
3.
Turn off all electric power to the appliance.
4.
Remove boiler door panel.
5.
Push in gas control knob slightly and turn
clockwise
to “OFF”.
NOTE: Knob cannot be turned from “PILOT” to “OFF”
unless knob is pushed in slightly. Do not force.
6.
Wait five (5) minutes to clear out any gas. Then
smell for gas, including near the floor. If you
smell gas, STOP! Follow “B” in the safety in-
formation above on this label. If you don’t smell
gas, go to next step.
7.
Locate pilot mounted
on the right side of the
burner tray, and right
of first burner.
8.
Turn knob on gas control
counter-clockwise
to "PILOT"
9.
Push in control knob all the way and hold in .
Immediately light the pilot with a match. Continue
to hold the control knob in for about one (1) minute
after the pilot is lit. Release knob and it will pop
back up. Pilot should remain lit. If it goes out, re-
peat steps 5 through 9.
•
If knob does not pop up when released, stop
and immediately call your service technician
or gas supplier.
•
If the pilot will not stay lit after several tries,
turn the gas control knob to “OFF” and call
your service technician or gas supplier.
10. Stand to the side of the boiler and turn the gas
control knob counter-clockwise
to "ON".
11 Replace boiler door panel.
12. Turn on all electric power to the appliance.
13 Set the thermostat to the desired setting.
PILOT
THERMO-
BURNER
COUPLE
A.
This appliance has a pilot which must be lighted
by hand. When lighting the pilot, follow these
instructions exactly.
B.
BEFORE LIGHTING smell all around the appli-
ance area for gas. Be sure to smell next to the
floor because some gas is heavier than air and
will settle on the floor.
WHAT TO DO IF YOU SMELL GAS
•
Do not try to light any appliance.
•
Do not touch any electric switch; do not use
any phone in your building.
•
Immediately call your gas supplier from a
neighbor’s phone. Follow the gas supplier’s
instructions.
•
If you cannot reach your gas supplier, call
the fire department.
C. Use only your hand to push in or turn the gas
control knob. Never use tools. If the knob will
not push in or turn by hand, don’t try to repair it,
call a qualified service technician. Force or at-
tempted repair may result in a fire or explosion.
D. Do not use this appliance if any part has been
under water. Immediately call a qualified
service technician to inspect the appliance and
to replace any part of the control system and
any gas control which has been under water.
WARNING: If you do not follow these instructions exactly, a fire or explosion may
result causing property damage, personal injury or loss of life.
START-UP
LIGHTING INSTRUCTIONS FOR BOILERS WITH STANDING PILOT. For Models 133, 182, 260, 330 & 400
Fig. # 8081.0
GAS CONTROL
KNOB SHOWN
IN "OFF"
POSITION
GAS INLET
Fig. # 8243.0
GAS CONTROL
KNOB SHOWN
IN "OFF"
POSITION
GAS INLET
26
TO TURN OFF GAS TO APPLIANCE
LIGHTING INSTRUCTIONS
FOR YOUR SAFETY READ BEFORE LIGHTING
LIGHTING INSTRUCTIONS FOR BOILERS WITH ELECTRONIC IGNITION (IID)
For Models with Manual Gas Valves
FOR YOUR SAFETY READ BEFORE OPERATING
WARNING: If you do not follow these instructions exactly, a fire or explosion may result causing
property damage, personal injury or loss of life.
A.
This appliance is equipped with an ignition device which
automatically lights the pilot. Do not try to light the pilot
by hand.
B.
BEFORE OPERATING smell all around the appliance
area for gas. Be sure to smell next to the floor because
some gas is heavier than air and will settle on the floor.
WHAT TO DO IF YOU SMELL GAS
*
Do not try to light any appliance.
*
Do not touch any electric switch; do not use any phone
in your building.
*
Immediately call your gas supplier from your neighbor’s
phone. Follow the gas supplier’s instructions.
*
If you cannot reach your gas supplier, call the fire de-
partment.
C.
Use only your hand to push in or turn the gas control
knob. Never use tools. If the knob will not push in or turn
by hand, do not try to repair it, call a qualified service
technician. Force or attempted repair may result in a fire
or explosion.
D.
Do not use this appliance if any part has been under
water. Immediately call a qualified service technician to
inspect the appliance and to replace any part of the
control system and any gas control which has been
under water.
OPERATING INSTRUCTIONS
For Honeywell gas valve: Turn gas control knob
counter-clockwise
from “OFF” until it
stops. Push in gas control knob and continue
rotating counter-clockwise
to “ON”
position. Make sure knob rests against stop.
For Honeywell gas valve (Models 40# only):
Turn gas control knob counter-clockwise
to “ON”.
9.
Replace boiler door panel.
10. Turn on all electrical power to the appliance.
11. Set thermostat to desired setting.
12. If the appliance will not operate, follow the instructions
“To Turn Off Gas To Appliance” and call your service
technician or gas supplier.
HONEYWELL
GAS CONTROL
KNOB SHOWN
IN "ON" POSITION
GAS INLET
ROBERTSHAW
GAS CONTROL
KNOB SHOWN
IN "ON" POSITION
GAS INLET
Fig. # 8080
TO TURN OFF GAS TO APPLIANCE
1.
Set the thermostat to the lowest setting.
2.
Turn off all the electrical power to the appliance if service
is to be performed.
3.
Remove door panel.
4.
For Robertshaw gas valve: Turn gas control knob
clockwise
to “OFF”.
For Honeywell gas valve (all models except 40#):
Turn gas control knob clock-wise
to “OFF”.
Make sure knob rests against stop.
For Honeywell gas valve (Models 40# only):
Push in gas control knob slightly and turn clockwise
to “OFF”.
5.
Replace heater door panel.
Fig. #8219
GAS CONTROL KNOB
SHOWN IN "ON"
POSITION
GAS INLET
Fig. # 8082
1.
STOP! Read the safety information above.
2.
Set the thermostat on the lowest setting.
3.
Turn off all electrical power to the appliance.
4.
This appliance is equipped with an ignition device which
automatically lights the pilot. Do not try to light the pilot
by hand.
5.
Remove boiler door panel.
6.
For Robertshaw gas valve: Turn gas control knob
clockwise
to “OFF”.
For Honeywell gas valve (all models except 40#):
Turn gas control knob clockwise
to “OFF".
Make sure knob rest against stop.
For Honeywell gas valve (Models 40# only):
Push in gas control knob slightly and turn clockwise
to “OFF”. Knob cannot be turned to “OFF”
unless knob is pushed in slightly. Do not force.
7.
Wait five (5) minutes to clear out any gas. Then smell
for gas, including near the floor. If you smell gas, STOP!
Follow “B” in the safety information above. If
you do not smell gas, go to the next step.
8.
For Robertshaw gas valve: Turn gas control knob
counter-clockwise
to “ON”.
27
FOR MODELS WITH AUTOMATIC GAS VALVES
LIGHTING INSTRUCTIONS
1.
Close all gas valves. Turn off electrical power
supply. Wait five (5) minutes.
2.
Open manual pilot valve. Turn on electrical
power. Pilot is automatically lighted.
PILOT
VALVE CONTROL
SHOWN IN THE
MAIN GAS SHUT-OFF
"ON" POSITION
VALVE SHOWN IN
THE "ON"
POSITION
GAS INLET
Fig. # 8220.0
IGNITION MODULE
Fig. # 8929.1
3.
Open main gas valve.
4.
Set temperature controls to desired temperature.
TO SHUT DOWN
Close all manual gas valves. Turn off electrical
power.
28
PILOT WITH
BURNER FLAME
AFTER START-UP
STANDING PILOT CHECKOUT PROCEDURE
1.
Turn on pilot gas supply, light pilot, and check
pilot tubing connections for leakage. With main
burner in operation, paint tubing connections
with a rich soap and water solution. Bubbles
indicate a gas leak.
2.
Adjust pilot to obtain a normal flame enveloping
3/8 to 1/2 inch [9.5 to 12.5 mm] of the
thermcouple or generator tip.
3.
Place system in operation, and:
a.
Check for satisfactory ignition of main
burner.
b.
Make certain the pilotstat "holds in", and
that shutdown occurs within 2-1/2 minutes
after the pilot flame is extinguished.
c.
Observe operation for at least three cycles
to be sure the system is functioning nor-
mally.
INTERMITTENT PILOT SYSTEM CHECKOUT
(S8600)
1.
Turn on power to the ignition systems and turn
gas supply off.
2.
Check ignition module as follows:
a.
Set the thermostat or controller above
room temperature to call for heat.
b.
Watch for continuous spark at the pilot
burner.
c.
Time the spark operation. Time must be
within the lockout timing period (15 or 90
seconds).
d.
Turn thermostat down to end call for heat
and wait 60 seconds on lockout models
before beginning step 3.
3.
Turn on gas supply.
4.
Set thermostat or controller above room temp-
erature to call for heat.
5.
Systems should start as follows:
a.
Spark will turn on and pilot gas valve will
open at once. Pilot burner should ignite
after gas reaches the pilot burner.
b.
Spark ignition should cut-off when pilot
flame is established.
c.
Main gas valve should open and main
burner should ignite after gas reaches the
burner port.
PILOT FLAME SHOULD ENGULF THERMOCOUPLE
Fig. # 8186.1
STANDING PILOT
PILOT BURNER FLAME (IID UNITS)
INSPECTIONS
BURNERS
Clean main burners and air louvers of dust, lint and
debris. Keep boiler area clear and free from com-
bustibles and flammable liquids. Do not obstruct the
flow of combustion and ventilation air. Make visual
check of burner and pilot flame. Yellow flame indicates
clogging of air openings. Lifting or blowing flame indi-
cates high gas pressure. Low flame indicates low gas
pressure.
TYPICAL MAIN BURNER FLAME Fig. # 8144
NOTE: Modulating burner flame varies in height from
approximately 1/4" at low fire to approximately 4" at
high fire.
CONTROLS
Check all controls to see that they are operational.
To check electronic safety (IID Models), turn off main
burner. Observe pilot burner when shutting off pilot
gas. Ignition spark should go on. Main gas valve will
also drop out.
To check high limit switch, turn dial setting down to
a point slightly below the temperature of the water
leaving the heater. The reset button should snap out
and the burner should shut-off. Reset dial to 30°F to
40°F above desired operating temperature, and push
reset button. Burner should light.
SUGGESTED INSPECTION SCHEDULE
The boiler should be inspected on the first and third
months after initial start-up and then on an annual
basis. If problems are found, refer to Troubleshooting
Guide for additional directions.
1.
Remove top of heater and inspect heat exchanger
for soot and examine venting system.
2.
Remove rear header and inspect for scale depos-
its, and/or accelerated erosion.
*3. Inspect pilot and main burner flame and firing rate.
*4. Inspect and operate all controls and gas valve.
*5. Visually inspect system for water leaks.
*6. a.
Oil pump motor and bearing assembly, if oil
cups are provided.
b.
Disconnect pump from header and check
condition of pump impeller. Check condition
of bearing by attempting to move impeller
from side to side. Replace any parts showing
wear.
c.
Check pump coupler for wear and vibration.
7.
Check flow switch paddle.
8.
Clean room air intake openings to ensure ad-
equate flow of combustion and ventilation air.
CAUTION: Combustion air must not be contaminated
by corrosive chemical fumes which can damage the
boiler and void the warranty.
9.
Keep boiler area clear and free from combustible
materials, gasoline, and other flammable vapors
and liquids.
*Should be checked monthly. (Takes approximately
15 minutes).
29
PILOT BURNER FLAME
(STANDING PILOT UNITS)
Fig #9336
Fig #8964.1
The boilers are certified and tested under the latest
edition of the ANSI Z21.13 standards for hot water
boilers.
The boiler should be installed to meet the latest edition
of all local codes, the National Fuel Gas Code Z223.1
and the National Electrical Code, ANSI/NFPA 70.
OPERATION
On call for heat, the ignition system, consisting of an
electronic spark module, and gas pilot system is ener-
gized. Providing pilot is proven, blower will start
running, the main gas valve will open and the boiler will
operate. When the operating control is satisfied the
boiler will shut down.
START-UP (S8610B)
1.Turn on power to the boiler with gas supply off.
2.Check ignition module as follows:
a. Set the thermostat or controller to call for heat.
b. Watch for continuous spark at the pilot burner.
c. Check the ignition spark operation. Time must be
within the lockout timing period (15 or 90 seconds).
d. Turn control down to end call for heat and wait 60
seconds on lockout models before beginning step
3.
3.Turn on gas supply.
4.Set controller to call for heat.
5.System should start as follows:
a. Spark will turn on and pilot gas valve will open and
the blower will begin running.
b. Heater will operate until call for heat is satisfied.
LOW NOx BOILERS Models 181 to 401
Fig # 9361
FLAME ROLL-OUT SAFETY SWITCH
The boiler is equipped with a cut-off device to prevent
flame roll-out in the event the heat exchanger becomes
blocked. This is a "manual reset" type roll-out switch,
that must be reset by a service technician after any over
temperature conditions have been fixed. Excessive
restriction in the heat exchanger flue passage may
cause the switch to disable the boiler.
BURNER ADJUSTMENT
This burner assembly does not require any primary air
adjustments.
VISUAL INSPECTION
Flame can be observed through the slot opening above
the plenum. Flame color is blue and evenly spread on
the top surface of the burner. At least every three
months a visual inspection should be made of the
burners. In case flame lifting is observed, check gas
pressure on manifold and static pressure in plenum.
Gas pressure in manifold should be 3.9" W.C. and
static pressure in plenum should be greater than 0.5"
W.C.
ELECTRICAL
Be sure that electrical service to the boiler has proper
overload fuse or circuit breaker protection and wire
size, and connections which comply with all applicable
codes.
Fig. # 9412
Use a long ½” socket wrench to remove orifices
from the gas manifold.
7.
Remove burners by raising the bracket on the back
end of the burners up and out of their slots.
8. Reverse above procedure to re-install.
Fig # 9362
Fig # 9363
IID PILOT
LOW NOx BURNER TRAY ASSEMBLY
BURNER TRAY REMOVAL
1.
Shut-off main electrical power switch to heater.
2.
Shut-off gas upstream of heater.
3.
Remove front door.
4.
Disconnect gas line from gas valve.
5.
Remove (2) screws that mount burner tray to the
base of the unit, and (2) screws that secure gas
valve to jacket.
6.
Disconnect wires that terminate at gas valve.
7.
Unscrew (4) screws that secure the control box.
8.
Disconnect pilot wire from the ignition module.
9.
Disconnect wire harness from the combustion
blower.
10. Carefully slide out the burner tray assembly.
11. Reverse above procedure to re-install.
GAS VALVE REMOVAL
1.
Remove burner tray. See Burner Tray Removal
procedure.
2.
Disconnect, pilot tubing from gas valve.
3.
Turn vertical gas pipe from manifold slightly and
unscrew gas valve.
4.
Reverse above procedure to re-install.
MAIN BURNER AND ORIFICE REMOVAL
1.
Remove burner tray. See Burner Tray Removal
procedure.
2.
Remove pilot. See Pilot Removal procedure.
3.
Remove (8) total screws from the hold-down brack-
ets, front and rear of tray.
4.
Remove (8) total screws from the left and right
sides of the manifold assembly. Detach the mani-
fold assembly from the burner tray assembly.
5.
Remove burners by raising the bracket on the back
end of the burners up and out of their slots.
PILOT REMOVAL
1.
Disconnect pilot tubing from gas valve.
2.
Remove (4) screws from control box. Open the
control box.
3.
Remove the pilot wire from the ignition wire.
4.
Remove (2) screws that mount the pilot bracket
to the air manifold assembly.
5.
Pull the pilot bracket slightly, then drop and pull
downwards and outwards.
6.
Reverse above procedure to re-install. Make
sure the pilot bracket is all the way up on the
pilot side, see drawing below.
COMBUSTION FAN REMOVAL
1.
Remove burner tray. See Burner Tray Removal
procedure.
2.
Remove (4) screws that mount the combustion
blower to the manifold assembly.
3.
Reverse above procedure to re-install.
FOR HEATERS
MADE IN OR AFTER
AUGUST 2001
SERVICE
ELECTRONIC IGNITION IID
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
1234567890123456789012345678901212345678901234567890123456789012
WARNING
HIGH VOLTAGE
For qualified technicians ONLY
NOTE: Some heaters may be equipped with
an ignition module that shuts off pilot gas if
pilot fails to light. To reset, interrupt power
to heater.
NOTE: Before troubleshooting, familiarize yourself with the start-up and checkout
procedure.
Check line voltage power, low voltage transformer, limit controller, thermostat
(controller) and wiring.
Pull ignition lead and check spark at module.
If spark Okay:
• Check ignition cable, ground wiring, ceramic insulator and gap, and correct.
• Check boot of the ignition cable for signs of melting or buckling. Take protective
action to shield cable and boot from excessive temperatures.
If not, replace module.
• Check that all manual gas valves are open, supply tubing and pressures are
good, and pilot burner orifice is not blocked.
• Check electrical connections between module and pilot operator on gas control.
• Check for 24 Vac across PV-MV/PV terminals on module. If voltage is
okay, replace gas control; if not, replace module.
NOTE: If S8600H goes into lockout, reset system. Lockout is used on propane
models.
• Check continuity of ignition cable and ground wire.
• Clean flame rod.
• Check electrical connections between flame rod and module.
• Check for cracked ceramic flame rod insulator.
• Check that pilot flame covers flame rod and is steady and blue.
• Adjust pilot flame.
• If problem persists, replace module.
• Check for 24 Vac across MV-MV/PV terminals. If no voltage, replace module.
• Check electrical connections between module and gas control. If okay, replace
gas valve or gas control operator, i.e. pilot gas valve, flow switch, etc.
NOTE: IF S8600H goes into lockout, reset system.
• Check continuity of ignition cable and ground wire.
NOTE: If ground is poor or erratic, shutdowns may occur occasionally even though
operation is normal at the time of checkout.
• Check that pilot flame covers flame rod and is steady and blue.
• If checks are okay, replace module.
• Check for proper thermostat (controller) operation.
• Remove MV lead at module; if valve closes, re-check temperature
controller and wiring; if not, replace gas valve.
START
TURN GAS SUPPLY OFF.
TURN THERMOSTAT
(CONTROLLER) TO CALL
FOR HEAT
POWER TO MODULE
(24 V NOMINAL)
YES
SPARK ACROSS
IGNITER/SENSOR GAP
YES
TURN GAS SUPPLY ON
PILOT BURNER LIGHTS?
YES
SPARK STOPS WHEN
PILOT IS LIT?
YES
MAIN BURNER LIGHTS?
YES
SYSTEM RUNS UNTIL
CALL FOR HEAT ENDS?
YES
CALL FOR HEAT ENDS
SYSTEM SHUTS OFF?
YES
TROUBLESHOOTING
ENDS
NO
NO
NO
NO
NO
NO
NO
Intermittent Pilot System
TROUBLESHOOTING HONEYWELL S8600
32
For Service Technicians
START BOILER
IF PILOT BURNER LIGHTS
IF PILOT BURNER
BUT MAIN BURNERS DO NOT
DOES NOT LIGHT
CHECK FOR 24 V
CHECK THERMOCOUPLE
AT GAS VALVE
IF NOT 24 V:
IF 24 V:
IF O.K.
IF DEFECTIVE
CHECK TRANSFORMER OUPUT
REPLACE
FOR 24 V
GAS VALVE
REPLACE
REPLACE
GAS VALVE
THERMOCOUPLE
IF NO
IF 24 V:
24V:
REPLACE
PROBLEM IN
TRANSFORMER
LIMIT
CIRCUITS
WARNING
HIGH VOLTAGE
For Qulified Techinicians ONLY
ELECTRICAL
STANDING PILOT
33
When boiler is turned on nothing
happens.
Thermostat in "ON" position causes
relay and pump to operate, but boiler
does not fire.
Continuous shut down of manual reset
high limit.
Sooting
CAUTION-Soot may be combustible.
Wet down and exercise caution when
cleaning.
Continuous shut down of low water cut-
off or flow switch.
Low flame.
Outer jacket very hot (blistered paint).
POSSIBLE CAUSE
Pilot is not lit………………………………
No power to the boiler…………………...
Bad transformer………………………….
Inoperative thermostat…………………..
Inoperative toggle switch………………..
Inoperative relay………………………….
Main gas valve is closed……………….
Plugged bleed line on gas valve or
gas pressure regulator…………………..
Broken pump coupler……………………
Shutdown by low water cut-off,
caused by air……………………………..
Gas valve defective………………………
Temperature setting too low…………….
Low water flow……………………………
Interrupted pump operation……………..
Modulating control set too high………..
Mechanical modulating control…………
Air starvation……………………………..
Condensation……………………………..
Toxic fumes which cause a chemical
reaction with copper tubes or destroy
combustion……………………………….
Improper venting…………………………
Insufficient system flow………………….
Low water due to leaking………………..
Air in system………………………………
Line strainer dirty…………………………
Lime in heat exchanger…………………
Gas supply………………………………..
Insects or debris clogging burners..........
Burner intake ports low gas pressure….
Venting or combustion air……………….
Broken refractory…..…………………….
CORRECTIVE ACTION
Light pilot. (Standing pilot models)
Check the circuit breaker, outdoor con-
troller, etc., upstream of boiler.
If power to Leads L1 and L2 of trans-
former, but no power on 24V side, re-
place.
Jumper thermostat. Replace with new if
boiler fires.
If power to toggle switch, but not
through switch, replace.
If power to relay, but not operating,
replace.
Open valve.
Loosen bleed line and clean.
Replace coupler. Inspect bearing as-
sembly, and if frozen, lubricate or re-
place.
Bleed air from system.
Check for power to gas valve. If valve
has power but will not open, check vent
tube for blockage. If clear, replace
valve.
Reset high limit to higher temperature.
Check system water pumps.
Check pump oil if necessary.
Reset modulator to a lower setting.
Check and replace if necessary.
Refer to installation instructions regard-
ing combustion air requirements.
Set bypass valve to prevent boiler inlet
temperature from dropping below
105 °F.
Remove all sources of fumes, such as
freon, chloride, or isolate the boiler.
Follow recommended vent installation
instructions.
Check pumps and piping.
Inspect for leakage and repair.
Inspect for leakage and repair. Install
an automatic air vent.
Clean.
Ream tubes.
Debris in gas line (pipe dope, rocks,
etc.). Gas line too small.
Improperly sized gas meter.
Gas regulator adjustment.
Clean burners.
Adjust gas pressure.
Refer to installation instructions regard-
ing combustion air requirement.
Replace refractory panels.
35
FAILURE TO PUMP
1.
Pump not properly primed.
2.
Wrong direction of rotation.
3.
Speed too low.
4.
Total head too high.
REDUCED CAPACITY AND/OR HEAD
1.
Air pockets or leaks in suction line.
2.
Clogged impeller.
3.
Foot valve strainer too small or clogged.
4.
Excessive suction lift (over 15 ft.).
5.
Insufficient positive suction head (for hot water).
6.
Total head more than that for which pump is
intended.
7.
Excessively worn impeller and wearing rings.
RAPID WEAR OF COUPLING
1.
Misalignment or a bent shaft.
2.
Sagging motor mounts (over-oiling).
REPAIR SECTION
TUBE CLEANING PROCEDURE
Establish a regular inspection schedule, the fre-
quency depending on the local water condition and
severity of service. Do not let the tubes clog up solidly.
Clean out deposits over 1/16" in thickness.
The boiler may be cleaned from the side opposite
the water connections as shown, without breaking pipe
connections. It is preferable, however, to remove both
RAYPAK TUBE CLEANING KIT
Extension Pieces (5)
Auger with Carbide Tip
Wire Brush
Fig. # 8154
headers for better visibility through the tubes and to be
sure the residue does not get into the system.
Note that you do not remove the top pan or the heat
exchanger generally.
After reaming with the auger, mount the wire brush
and clean out the debris remaining in the tubes.
Another method is to remove the heat exchanger,
ream tubes and immerse heat exchanger in non-
inhibited de-scale solvent.
PUMP LOSES PRIME
1.
Air leaks in suction line.
2.
Excessive amount of air in water.
3.
Water seal in stuffing box not functioning.
4.
Excessive suction lift and pump operating too
near shut-off point.
OVERLOADED DRIVING UNIT
1.
Head much lower than that for which pump is
designed.
2.
Speed too high or higher than that contem-
plated.
MECHANICAL TROUBLES AND NOISE
1.
Misalignment.
2.
Excessive suction lift or vapor binding (hot
water).
3.
Bent shaft and/or damaged bearings.
4.
Suction and discharge piping not properly
supported and anchored.
36
Fig# 9310
SERVICE
P/N 052871F - 5/8 DIA.
P/N 052870F - 7/8 DIA.
TYPICAL BURNER TRAY ILLUSTRATED
BURNER TRAY REMOVAL
1.
Shut-off power and gas supply to the boiler.
Disconnect union(s) and pilot tubing, then
loosen and remove burner hold-down screws.
2.
Disconnect wires at gas valve and slide burner
tray out.
GAS VALVE REMOVAL
1.
Shut-off gas supply to the boiler. Remove gas
piping to gas valve inlet.
2.
Disconnect wires, pilot tubing and bleed line, if
required.
3.
Turn vertical gas pipe from manifold slightly and
unscrew gas valve.
4.
Reverse above procedure to re-install.
MAIN BURNER AND ORIFICE REMOVAL
1.
Remove screws and burner hold-down bracket.
NOTE: If the heat exchanger is sooted badly, the
burner hold-down bracket and spacer can become
distorted from direct flame impingement and this usu-
ally necessitates replacement of these parts.
2.
Lift burners from slotted spacer and slide from
orifices. Clean with a wire brush.
3.
Clean orifice(s) as necessary.
PILOT REMOVAL AND CLEANING
1.
Disconnect pilot tubing at pilot and sensor/igniter
wire. Remove screws holding pilot bracket to
burner tray.
2.
Remove pilot and bracket, clean pilot of debris,
small bugs, etc., with wire or small brush.
3.
Replace pilot, pilot tubing, sensor ignition wires
and check for leaks.
HIGH LIMIT OR TANKSTAT REMOVAL
1.
Turn off electrical power.
2.
Remove front inspection panel.
3.
Remove wires to high limit and loosen screws
holding high limit to cabinet.
4.
Remove wedge clip holding sensing bulb in
control well.
5.
Remove high limit and install a new one.
6.
Check control operation before leaving job.
HEAT EXCHANGER REMOVAL
1.
Shut water, gas and electricity off, close valves
and relieve pressure, remove relief valve.
Remove side inspection panels.
2.
Remove top holding screws.
3.
Remove draft diverter, lift and remove top and
flue collector on stack type models. Remove
inspection panels.
4.
Loosen bolts and disconnect flange nuts on
in/out header, loosen union(s) at gas pipe, and
slide boiler away from piping until studs clear
the heater.
37
COMBINATION FLAME SENSOR/
IGNITER AND PILOT BURNER
Remove heat exchanger corner brackets.
6.
Remove combustion chamber clips at the four
corners of the heat exchanger.
7.
Lift heat exchanger straight up using caution not to
damage refractory.
IN/OUT
HEADER
HIGH LIMIT
ELECTRICAL
JUNCTION BOX
REDUNDANT
SAFETY
SHUT-OFF
VALVE
MANUAL GAS VALVE
MAIN GAS VALVE
SEDIMENT TRAP
Fig. # 8184
REFRACTORY PANELS TOP VIEW
8.
Shut down entire system and vent all radiation
units and high points in system piping. Check all
strainers for debris. Expansion tank water level
should be at the 1/4 mark and the balance of
the tank filled with air.
9.
Install flue collector, jacket top and inspection
panels. Install top holding screws. Install draft
diverter and vent piping if so equipped.
10. If gas piping was disconnected, reconnect gas
piping system and check for leakage using a
soapy solution.
12. Check for correct water pressure and water level in
the system. Make sure that system pump operates
immediately on the call for heat. The system is
ready for operation.
13. Within two (2) days of start-up, recheck all air vents
and expansion tank levels.
COMBUSTION CHAMBER REMOVAL
To remove combustion chamber you must first
remove the heat exchanger. Unbolt metal combustion
chamber retainer from top and remove combustion
chamber panels individually.
HEAT EXCHANGER RE-ASSEMBLY
1.
Heat exchanger water header O-rings should be
replaced with new ones.
2.
Install in/out and return water headers and install
header retainer nuts and torque nuts evenly.
3.
Install the four (4) corner clips between tube
sheets and refractory. Replace "V" baffles.
4.
Install thermostat sensing bulbs in header wells
and replace bulb retaining clips.
5.
Install inlet and return pipes in water headers
using pipe thread sealant.
6.
Install water pressure relief valve, flow switch, and
low water cut-off devices if so equipped.
7. Open water supply and return shut-off valves. Fill
boiler and water piping system with water. Check
boiler and piping system for leaks at full line pres-
sure. Run system circulating pump for a minimum
of 1/2 hour with boiler off.
MODEL 2100-4001 BOILER ILLUSTRATED
38
CONTROL WELL REPLACEMENT
Remove top, sensing bulb and clip. Collapse well
tube at the opening with a chisel, push through into
header and remove the well through header. Insert a
new well and roll into place. If a roller is not available,
solder the well in place with silver solder.
TUBE REPLACEMENT PROCEDURE
1.
Remove heat exchanger from boiler following
instructions outlined under HEAT EXCHANGER
REMOVAL above.
2.
Remove in/out and return headers. Remove
"V" baffle from damaged tube.
3.
Remove damaged tube by cutting with a hack saw
or shearing with a chisel adjacent to each tube
sheet.
4.
Collapse stub ends in tube sheets using a chisel or
screwdriver. DO NOT cut into tube sheet or mar
surface in tube hole in any way.
5.
Insert replacement tube by inserting the end with
the most fins removed in the opening of one tube
sheet. Slide tube until the opposite end clears the
other tube sheet and fit the tube into the hole.
6.
Insert the tube roller into tube opening up to stop,
making certain that 1/8" of tube projects beyond
the tube sheet.
7.
Attach drill to tube roller, holding it straight and
level.
Note: Use a 3/8" heavy duty, reversible, electric drill or
larger. Proceed to expand tube until tool starts to grab.
Approximately 1/2 to 1" of the tool shank will be visible.
8.
Reverse drill motor and withdraw tube roller. If
necessary wrench out by hand.
9.
DO NOT apply excessive torque during rolling
operation and avoid thinning any wall of the tube
beyond 0.015".
10. Use same procedure on opposite end.
11. Apply line pressure test. Re-roll if necessary.
12. Reinstall as outlined under HEAT EXCHANGER
RE-ASSEMBLY.
CLEANING FLUE GAS PASSAGEWAYS
Soot will clog areas behind fins and cause eventual
tube failure. Any sign of soot at base of burners or
around outer jacket indicates a need for cleaning.
1.
Lift off drafthood and flue collector by removing
bolts and screws.
2.
Remove "V" baffles from heat exchanger.
3.
Remove burner tray.
4.
Take garden hose and wash heat exchanger,
making sure soot is removed from between fins.
(Avoid excessive water against refractory).
5.
Reassemble; when boiler is fired, some steam
will form from wet refractory. This is normal.
6.
Correct reason for soot formation.
NOTE: In extreme cases it may be necessary to re-
move the heat exchanger completely for cleaning. The
simplest method is steam cleaning at a local car wash.
DO NOT WIRE BRUSH!
CAUTION:
Soot is combustible, so exercise extreme care.
REPLACEMENT PARTS
See separate parts sheet in instruction envelope.
NOTE: To supply the correct part it is important that you
supply the model number, serial number and type of
gas when applicable.
Any part returned for replacement under standard
company warranties must be properly tagged with
Raypak return parts tag, completely filled in with the
heater serial number, model number, etc., and shipped
to Raypak freight prepaid.
If determined defective by Raypak and within war-
ranty, the part will be returned in kind or equal substi-
tution, freight collect. Credit will not be issued.
RAYPAK, INC.
2151 Eastman Avenue
Oxnard, CA 93030
39
Raypak, Inc., 2151 Eastman Avenue, Oxnard CA 93030 (805) 278-5300 Fax (800) 872-9725
Raypak Canada LTD, 2805 Slough Street, Mississauga, Ontario, Canada L4T 1G2 (905) 677-7999 Fax (905) 677-8036
Litho in U.S.A.
www.raypak.com