ICP H8MPT100J20A1 Installation Instructions

Specifications

Brand: ICP
Category: Furnace
Model: H8MPT100J20A1 (Installation Instructions)
File Type: PDF
File Size: —
Pages: 2

Read Online

Read the ICP H8MPT100J20A1 Installation Instructions online using the built-in PDF viewer.

Text of the manual

This kit is designed to replace the blower door on the N8MPN, N8MPL, N9MP1, N9MP2, *8MPN, *8MPL, *8DNL,

*9MPD, *8MPT, *9MPT, *8MPV, *9MPV, H8UHh, MUF, HL, and FUH series furnace. * Denotes Brand (T, H or C) Read the entire instructions completely before starting the installation. Examine kit to determine that the following parts are present with the replacement blower door: Parts List Description Part# Qty Model: Entry Level, C, H Door Screw * 1014488 2 Wiring Label Single Stage 1014484 1 2-Stage 1014485 1 Variable Speed (050) 1014486 1 Variable Speed 1014487 1 Export 50 Hz 1014495 1 Warning Label 1013810 1 Operating Instruction 1013494 1 Seal Strip 1013144 3 Instructions 441 06 1047 00 1 Model: Tempstar Door Screw * 1014488 2 Wiring Label Single Stage 1014484 1 2-Stage 1014485 1 Variable Speed (050) 1014486 1 Variable Speed 1014487 1 Export 50 Hz 1014495 1 Warning Label 1013810 1 Operating Instruction 1013494 1 Instructions 441 06 1047 00 1 Diagnostic Label Single Stage 1012899 1 2-Stage 1013348 1 Seal Strip 1013144 3 Faceplate 1013489 or 1013490 or 1013491 1 Trim Strip 1013487 2 Hole Plug 1/4"Diameter 1010714 2 If any part is missing, immediately contact your parts supplier. Note all parts will be used. * Denotes parts available through Fast Parts. Others are available only through Blower Door Kits. Installation Model: N9MP1, N8MPN, N8MPL, FUH (SeeFigure 1) 1. Place one Wiring Label part 1014484 on the inside of the door. 2. Place seal strips (2) along the side edge on the inside of the door. Trim seal strip to length. 3. Place Warning Label part 1013810 on the outside of the door. 4. Place Operating Instruction part 1013494 below the warn- ing label on the outside of the door. 5. Insert door screws (2) into screw holes located at the front bottom of the door. Figure 1 I N9MP1, N8MPN, N8MPL, FUH g Label asshown InstallWarningLabel& OperatingInstructions 25-24-63-4 as shown Model: *SMPN, *SMPL, *8DNL, *8MPT, *SMPV, H8UHh, MUF, H (SeeFigure2) * Denotes Brand *8MPN, *SMPL, *SDNL, *SMPT, Figure 2 *SMPV, H8UHh, MUF, HL InstallFaceplate& TrimStrips (Tempstaronly) r_ _ /Install SealStrips (3) \\\ \_"_,_ "': _ as shown InstalIWarning Label & \ _ Operating Instructions _]- " Label as shown asshown 1. Place one Wiring Label on the inside of the door. NOTE: Part 1014484 for *8MPN, *8MPL, *8DNL Part 1014485 for *8MPT Part 1014486 for *8MPV050B12 Part 1014487 for *8MPV Part 1014495 for H8UHh, MUF, HL 2. Place seal strips (2) along the side edge on the inside of the door and trim to length. 3. Place another seal strip along the bottom edge on the inside of the door and trim to length. 4. Place Warning Label part 1013810 on the outside of the door. 5. Place Operating Instruction part 1013494 below the warn- ing label on the outside the door. 6. Install the door on the furnace. 441 06 1047 00 (7/03)

on the designated

holes on the front of the door. 7. Install Hole Plugs (2) on faceplate. 8. (Tempstar only) Place Trim Strips (2) along the front side edge of the door. 9. Insert door screws (2) into screw holes located at the front bottom of the door. 10. Install the door on the furnace. Model: N9MP2, *9MPD, *9MPT, *9MPV (SeeFigure3) * Denotes Brand Figure 3 N9MP2, *9MPD, *9MPT, *9MPV _ \_ _ / (3) asshown /// 1. Place one Wiring Label on the inside of the door. NOTE: :Part1014484forN9MP2,*9MPD Part 1014485 for *9MPT Part 1014486 for *9MPV050F12 Part 1014487 for *9MPV 2, 3. 4. 5. 6. 7. 8. 9. Place seal strips (2) along the side edge on the inside of the door and trim to length. Place another seal strip along the top edge on the inside of the door and trim to length. Place Warning Label part 1013810 on the outside of the door. (Tempstar only) Insert Face Plate on the designated holes on the front of the door. (Tempstar only) Install Hole Plugs (2) on faceplate. (Tempstar only) Place Trim Strips (2) along the front side edge of the door. Insert door screws (2) into screw holes located at the front bottom of the door. Install the door on the furnace. CUTS AND ABRASION HAZARD. Failure to follow this caution could results in bodily injury. Sheet metal parts may have sharp edges or burrs. Use care and wear appropriate protective clothing and gloves when handling parts. NOTE: If replacing blower door with machine thread thumb- screws, drill new door screw holes from 1/8" diameter to 1/4" diam- eter before inserting thumbscrews. Use machine thread thumb- screws from original (old) door. Discard black door screws in- cluded with this kit. If door screws from original door are not available, use 10-32 UN F thread screws available at local hardware stores. -2-

Other Furnace Manuals