ICP H8MPT100J20A1 Installation Instructions
Read Online
Read the ICP H8MPT100J20A1 Installation Instructions online using the built-in PDF viewer.
Text of the manual
This kit is designed to replace the blower door on the N8MPN, N8MPL, N9MP1, N9MP2, *8MPN, *8MPL, *8DNL,
*9MPD, *8MPT, *9MPT, *8MPV, *9MPV, H8UHh, MUF, HL, and FUH series furnace.
* Denotes
Brand
(T, H or C)
Read
the
entire
instructions
completely
before
starting
the
installation.
Examine
kit to determine
that the following
parts
are
present
with
the
replacement
blower
door:
Parts
List
Description
Part#
Qty
Model: Entry
Level,
C, H
Door Screw *
1014488
2
Wiring Label
Single Stage
1014484
1
2-Stage
1014485
1
Variable
Speed (050)
1014486
1
Variable
Speed
1014487
1
Export 50 Hz
1014495
1
Warning
Label
1013810
1
Operating
Instruction
1013494
1
Seal Strip
1013144
3
Instructions
441 06 1047 00
1
Model: Tempstar
Door Screw *
1014488
2
Wiring Label
Single Stage
1014484
1
2-Stage
1014485
1
Variable
Speed (050)
1014486
1
Variable
Speed
1014487
1
Export 50 Hz
1014495
1
Warning
Label
1013810
1
Operating
Instruction
1013494
1
Instructions
441 06 1047 00
1
Diagnostic
Label
Single Stage
1012899
1
2-Stage
1013348
1
Seal Strip
1013144
3
Faceplate
1013489
or
1013490
or 1013491
1
Trim
Strip
1013487
2
Hole
Plug
1/4"Diameter
1010714
2
If any
part
is
missing,
immediately
contact
your
parts
supplier.
Note
all parts
will
be used.
* Denotes
parts
available
through
Fast
Parts.
Others
are
available
only
through
Blower
Door
Kits.
Installation
Model:
N9MP1,
N8MPN,
N8MPL,
FUH
(SeeFigure 1)
1.
Place
one
Wiring
Label
part
1014484
on the
inside
of the
door.
2.
Place
seal strips
(2) along
the side edge
on the inside
of the
door.
Trim
seal
strip
to length.
3.
Place
Warning
Label
part
1013810
on the
outside
of the
door.
4.
Place
Operating
Instruction
part
1013494
below
the warn-
ing label
on the
outside
of the
door.
5.
Insert
door
screws
(2) into screw
holes
located
at the front
bottom
of the door.
Figure 1 I
N9MP1,
N8MPN,
N8MPL,
FUH
g Label
asshown
InstallWarningLabel&
OperatingInstructions
25-24-63-4
as shown
Model:
*SMPN,
*SMPL,
*8DNL,
*8MPT,
*SMPV,
H8UHh,
MUF, H (SeeFigure2)
* Denotes
Brand
*8MPN,
*SMPL,
*SDNL,
*SMPT,
Figure 2
*SMPV, H8UHh,
MUF, HL
InstallFaceplate& TrimStrips (Tempstaronly)
r_
_
/Install
SealStrips (3)
\\\
\_"_,_
"':
_
as shown
InstalIWarning Label & \ _
Operating Instructions
_]- "
Label as shown
asshown
1.
Place
one
Wiring
Label
on the
inside
of the door.
NOTE:
Part
1014484
for
*8MPN,
*8MPL,
*8DNL
Part
1014485
for
*8MPT
Part
1014486
for
*8MPV050B12
Part
1014487
for
*8MPV
Part
1014495
for
H8UHh,
MUF,
HL
2.
Place
seal strips
(2) along
the side edge
on the inside
of the
door
and trim
to length.
3.
Place another
seal strip
along
the bottom
edge on the inside
of the door
and trim
to length.
4.
Place
Warning
Label
part
1013810
on the
outside
of the
door.
5.
Place
Operating
Instruction
part
1013494
below
the warn-
ing label
on the outside
the door.
6.
Install
the door
on the furnace.
441 06 1047 00 (7/03)
on the designated
holes
on the front
of the door.
7.
Install
Hole
Plugs
(2) on faceplate.
8.
(Tempstar
only)
Place
Trim
Strips
(2) along
the
front
side
edge
of the
door.
9.
Insert
door
screws
(2) into screw
holes
located
at the front
bottom
of the door.
10.
Install
the door
on the furnace.
Model:
N9MP2,
*9MPD,
*9MPT,
*9MPV
(SeeFigure3)
* Denotes
Brand
Figure 3
N9MP2,
*9MPD,
*9MPT,
*9MPV
_
\_
_
/
(3) asshown
///
1.
Place
one
Wiring
Label
on
the
inside
of the
door.
NOTE:
:Part1014484forN9MP2,*9MPD
Part
1014485
for *9MPT
Part
1014486
for *9MPV050F12
Part
1014487
for *9MPV
2,
3.
4.
5.
6.
7.
8.
9.
Place
seal strips
(2) along
the side edge
on the inside
of the
door
and trim
to length.
Place
another
seal
strip
along
the top edge
on the inside
of
the door
and trim
to length.
Place
Warning
Label
part
1013810
on the
outside
of the
door.
(Tempstar
only)
Insert
Face
Plate
on the designated
holes
on the
front
of the
door.
(Tempstar
only)
Install
Hole
Plugs
(2) on faceplate.
(Tempstar
only)
Place
Trim
Strips
(2) along
the front
side
edge
of the door.
Insert
door
screws
(2) into screw
holes
located
at the front
bottom
of the door.
Install
the door
on the furnace.
CUTS AND ABRASION
HAZARD.
Failure
to
follow
this
caution
could
results
in
bodily
injury.
Sheet metal parts may have sharp edges or burrs.
Use care and wear appropriate
protective
clothing
and gloves
when handling
parts.
NOTE:
If replacing
blower
door
with
machine
thread
thumb-
screws,
drill new door
screw
holes
from
1/8" diameter
to 1/4" diam-
eter
before
inserting
thumbscrews.
Use
machine
thread
thumb-
screws
from
original
(old)
door.
Discard
black
door
screws
in-
cluded
with this
kit.
If door
screws
from original
door are not available,
use 10-32
UN F
thread
screws
available
at local
hardware
stores.
-2-