ABB AutoLink Instruction Book

Brand: ABB
Category: Protection Device
Model: AutoLink (Instruction Book)
File Type: PDF
File Size: —
Pages: 12
Text of ABB AutoLink Instruction Book

TEHI95094 – Rev. 2

2/ 12 Do not perform any of the activities described on this document with the Sectionalizer energized. All the activities listed on this document it must be performed with the Sectionalizer completely de-energized and out of service. ALWAYS follow your company Safety procedures before performing any work on this equipment. This product is intended to be operated and maintained by qualified persons, thoroughly trained and know
TEHI95094 – Rev. 2 3/ 12 Table of Contents 1. Introduction .................................................................................................................................................... 4 2. Packing and Transportation ........................................................................................................................ 4 3. Checking on Reception .............................................................
TEHI95094 – Rev. 2 4/ 12 1. Introduction This document contains the required information to install medium voltage AutoLink Sectionalizer and put it into service. For a correct use of the product, please read it carefully. Like every apparatus we manufacture, AutoLink is designed for specific applications. Use only original spare parts. For further information, please read the technical catalogue. All installation, putting into service, commissi
TEHI95094 – Rev. 2 5/ 12 4. Storage When the apparatus is unboxed, it must be carefully unpacked and checked as described in Chapter 3 of this manual. If immediate installation is not possible, the product should be kept in its original packing. If immediate installation is not possible, store the equipment on its original packaging in a covered, well-ventilated, dry, dust-free, non-corrosive ambient, away from any flammable materials and at a t
TEHI95094 – Rev. 2 6/ 12 6.3 Initial Setting or Previous Setting Modification Instructions Remove the top cap (Fig. 1 A) using a 34mm fork spanner holding the tube with the hand (Fig. 1 B). Check condition of O-ring (Fig. 2 E), and replace it if necessary, applying grease on it. Set the dip-switches to calibrate the current (Fig. 2 C, 4 switches) and set counting operations (Fig. 2 D, 2 switches) using a small screwdriver according to table 1 se

ABB Protection Device Owners Instructions: