Quick Start Installation Guide
1
SLG 700 Quick Start Guide,
SmartLine Level Guided Wave Radar
34-SL-25-04, Revision 7.0, December 2017
This document provides descriptions
and procedures for the Quick
Installation of Honeywell’s SmartLine
Guided Wave Radar Level Transmitters.
The SmartLine Level Guided Wave
Radar is available as a family of SLG72x
models for liquid applications.
Copyrights, Notices and Trademarks
Copyright 2017 by Honeywell
Revision 7.0, December 2017
Trademarks
SFC, SmartLine and SLG 700 are U.S.
registered trademarks of Honeywell Inc.
HART® and FOUNDATION™ are
trademarks of FieldComm Group™
Revision History
1.0 – 1st release
2.0 – Updated display menus
3.0 – R101 release.
4.0 – R101 Fieldbus updates.
5.0 – R102 Updated display menus
6.0 – R102 Fieldbus updates.
7.0 – R200 Saturated Steam
References
The following list identifies all documents that may be sources of reference for
material discussed in this publication.
Document Title
Document #
SLG 700 SmartLine Guided Wave Radar Level Transmitter
User’s Guide
34-SL-25-11
SLG 700 SmartLine Level Guided Wave Radar, HART option
Manual
34-SL-25-06
SLG Pocket Configuration Guide, SmartLine Level Guided
Wave Radar
34-SL-00-01
SLG 700 Safety Manual
34-SL-25-05
SLG 700 SmartLine Level Guided Wave Radar, FOUNDATION
Fieldbus Manual
34-SL-25-07
SLG 700 Specifications
34-SL-03-03
Quick Start Installation Guide
February 2017
Table of Contents
INSTALLATION ........................................................................................................................... 4
Required tools .................................................................................................................. 4
Operating conditions ........................................................................................................ 5
Process connector ........................................................................................................... 5
See the WIRING section for more information on grounding. ........................................... 5
Rod probe assembly ........................................................................................................ 6
Wire probe assembly ....................................................................................................... 7
Coaxial probe assembly ................................................................................................... 8
SLG720 ................................................................................................................. 8
SLG726 ............................................................................................................... 13
Saturated Steam Application Probe Assembly ............................................................... 16
Trimming the probe ........................................................................................................ 17
MOUNTING THE TRANSMITTER .............................................................................................. 18
Flange mount ................................................................................................................. 18
Threaded mount ............................................................................................................. 19
Mounting on a bypass, bridle, or still well ....................................................................... 21
Mounting on a non-metallic container ............................................................................. 23
Remote mount ............................................................................................................... 24
Nozzle mount ................................................................................................................. 25
No probe option.............................................................................................................. 25
Conduit Entry Plugs and Adaptors ............................................................................................. 26
Procedures .................................................................................................................... 26
Conduit Entry Plugs ........................................................................................................ 26
Conduit Adapters ........................................................................................................... 27
WIRING ..................................................................................................................................... 27
WIRING PROCEDURE .................................................................................................. 30
HAZARDOUS LOCATION INSTALLATIONS ............................................................................. 31
Explosion-proof conduit seal .......................................................................................... 31
US Installations .............................................................................................................. 31
SET THE JUMPERS FOR HART ............................................................................................... 31
Set the Jumpers for FOUNDATION Fieldbus (FF) ......................................................... 34
CONFIGURATION GUIDE ......................................................................................................... 35
Quick Start Installation Guide
3
Tables
Table 1: Tools required ................................................................................................................... 4
Table 2: Operating Conditions ........................................................................................................ 5
Table 3: SLG720 bypass and stillwell recommended diameters ................................................... 22
Table 4: SLG726 bypass and stillwell recommended diameters ................................................... 22
Table 5: SLG720 recommended nozzle dimensions ..................................................................... 25
Table 6: Probe Diameters ............................................................................................................. 25
Table 7: Jumpers for HART .......................................................................................................... 31
Table 8: HART Jumper Settings .................................................................................................... 33
Table 9: FOUNDATION Fieldbus Write Protect ............................................................................... 34
Table 10: Advanced Display Configuration .................................................................................... 35
Figures
Figure 1: Transmitter components ................................................................................................... 5
Figure 2: Rod probe assembly ........................................................................................................ 6
Figure 3: SLG726 flanged process connection, probe nut installation position, mm [in] probe
selection ......................................................................................................................................... 6
Figure 4: Wire probe assembly ....................................................................................................... 7
Figure 5: SLG720 Coaxial Probe Assembly ................................................................................... 12
Figure 6: SLG726 Coaxial probe assembly................................................................................... 15
Figure 7 Saturated steam probe assembly ................................................................................... 16
Figure 8 Drill hole position on outer tube ......................................... Error! Bookmark not defined.
Figure 9: Flange mounting ............................................................................................................ 19
Figure 10: Tank roof mounting using a Threaded Mounting ........................................................... 19
Figure 11: Rotate the transmitter ................................................................................................... 20
Figure 12: Bypass Installation ....................................................................................................... 21
Figure 13: Mounting on a non-metallic vessel ............................................................................... 23
Figure 14: Mounting in concrete silos ........................................................................................... 23
Figure 15: Remote mount ............................................................................................................. 24
Figure 16: Electronic Housing Conduit Entries ............................................................................... 26
Figure 17: HART / 4-20mA Operating Voltage (Vdc) ..................................................................... 28
Figure 18: HART 3-Screw Terminal Board and Grounding Screw ................................................ 29
Figure 19: HART Jumper Location ................................................................................................ 32
Prior to installation, if the transmitter is required to be in storage, do not
keep the device in a vertical position. Doing so will damage the probe
and the device will not measure correctly.
•
Store the device in a dry and dust-free location.
•
Keep the housing out of the sunlight.
•
Store the device in its original packing.
Quick Start Installation Guide
December 2017
INSTALLATION
Evaluate the site selected for the SmartLine Level Guided Wave Radar (GWR)
installation with respect to the process system design specifications and
Honeywell’s published performance characteristics.
Required tools
Note: The following tools are not supplied with the Transmitter.
Table 1: Tools required
Mounting hardware (nuts and bolts for flanged unit) and tools
Allen keys:
•
Coaxial coupler (SCA, SCC, SCD)
AF 1.5 mm
•
Rook, Electronics housing
AF 2.0mm
•
End weight (SWA, SWB)
AF 2.5 mm
Wrenches:
•
Rod probe (8mm) (SRA, SRH, SRJ)
AF 7 mm
•
Rod probe (16mm) (SRC, SRK, SRL)
AF 14 mm
•
Saturated Steam reference reflector
AF 20 mm
•
Mounting thread ¾” and 1” (SLG 720)
AF 40 mm
•
Mounting thread 1½” (SLG 720)
AF 50 mm
•
Mounting thread 2” (SLG 720)
AF 60 mm
Mounting thread 1½”, 2” (SLG 726)
AF 60 mm
Coaxial probe outer process connector
(SCA, SCB)
Process compatible thread locking
compound (i.e. Loctite 242)
Coaxial probe outer process connector
(SLG 720, SCA, SCB)
Retaining ring pliers for internal
diameter 20 mm
Coaxial probe outer process connector
(SLG 720, SCA, SCB)
Retaining ring pliers for internal
diameter 40mm
Probe nut (8mm)
AF 8 mm
Probe nut (16mm)
AF 14 mm
Probe nut (saturated steam)
AF 20 mm
To shorten rod and coaxial probes
Saw
To shorten wire probes
Saw or bolt cutter
To drill hole in coaxial outer tube (SLG 720)
Drill and 6.0 mm drill bit
Wire cutter / stripper
M20 conduit entry plugs
10 mm hex wrench
½” NPT conduit entry
1¼” wrench
½” to ¾” NPT adapter
1¼” wrench
Quick Start Installation Guide
5
Operating conditions
Table 2: Operating Conditions
Parameter
Operative Limits
Transportation and Storage
°C
°F
°C
°F
Ambient Temperature1
-40 to 85
-40 to 185
-55 to 120
-67 to 248
Humidity
%RH
0 to 100
0 to 100
1 LCD Display operating temperature -20°C to +70°C. Storage temperature -30°C
to 80°C.
Process connector
Throughout this Quick Start Guide, there are references to the process
connector on the transmitter. See Step 5 of the probe assembly steps for
equipment specifications.
The process connector has three functions:
•
Separates the process environment from the external environment.
•
Attaches the transmitter to a tank with a threaded or flanged connection.
Brackets are not required.
•
Provides electrical feed-through to the probe.
Note: This Quick Start Guide uses the term “threaded”, which refers to
milling that allows a segment to be screwed into another segment.
Figure 1: Transmitter components
CAUTION: Ensure the Electronic Housing is grounded before
lowering a probe into a tank by using the internal terminal or
external terminal to connect the transmitter to earth ground.
See the WIRING section for more information on grounding.
Quick Start Installation Guide
December 2017
Rod probe assembly
Rod probes are shipped in segments. The segments are attached with a stud and a
lock washer.
Step
Action
1
Fully thread the nut onto the central conductor. Using a lock washer,
thread the first rod segment on to the central conductor.
Torque the nut against rod probe and lock washer to secure the connection.
2
Thread the stud into first rod segment end. Using a lock washer thread the
next segment onto the stud. Apply torque to secure the connection.
Note: Tighten each rod connection point to the following torques:
SLG720 6.0 Nm (4.4 ft-lbs)
SLG726 15 Nm (11 ft-lbs)
Note: For flanged SLG726 models, ensure the nut does not intrude into the process
connector. See Figure 3 for more information.
Figure 2: Rod probe assembly
Figure 3: SLG726 flanged process connection, probe nut installation position, mm
[in] probe selection
Quick Start Installation Guide
7
Wire probe assembly
Step
Action
1
Fully thread the nut onto the central conductor. Using a lock
washer, thread the wire swage on to the central conductor.
Torque the nut against probe and lock washer to secure the
connection.
Note: Tighten the wire stud and nut to the following torque:
SLG720 6.0 Nm (4.4 ft-lbs)
SLG726 15 Nm (11 ft-lbs)
2
If applicable, insert wire probe into end weight. Tighten the 3 set
screws to secure end weight to wire probe
Note: Torque set screws to 6 Nm (4.4 ft-lbs)
Note: For flanged SLG726 models, ensure the nut does not intrude into the
bore of the process connector. See Figure 3 for more information.
Figure 4: Wire probe assembly
Quick Start Installation Guide
December 2017
Coaxial probe assembly
Coaxial probes are constructed out of an inner rod and an outer tube. Depending on
the length of the coaxial probe it may be constructed out of several segments.
Note: For the flanged HTHP, when constructing the probe, the nut should not intrude
into the body of the process connector.
SLG720
Probe construction will depend on the length of the probe. In the case of the SLG 720
the inner rod is constructed out of 1.0m segments and the outer tube is constructed
out of 2.0m segments.
There are 2 types of rod segment: and extension segment and an end segment.
Extension segments have threads on both ends and the end segment has threads on
one end. Rod segments are joined to each other using a stud and lock washer.
There are 3 types of tube segment: Starter segments, extension segments and end
segments. Starter segments have an internal thread on one end and an external
thread on the other. Extension segments have external threads on both ends. End
segments have an external thread on one end and a clean end. The outer tube
segments are joined using tube couplers.
Probe Length ≤ 1.0m
Step
Action
1
Fully thread the nut onto the central conductor of the process
connector. Place a lock washer between the locknut and the rod
segment and torque the nut against the rod segment and lock
washer to secure the connection.
Note: Tighten rod connection point to the following torque:
SLG720 6.0 Nm (4.4 ft-lbs).
2
Slip the coaxial outer tube over the rod and spacer and tighten to the
process connector.
Note: Tighten connection point to the following torque:
SLG720 30 Nm (22 ft-lbs).
It is recommended that a process compatible
thread locking compound (i.e. Loctite 242) be
used on the outer conductor threaded joints.
3
Insert an end spacer into the end of tube. Align the holes in the end
spacer with the holes in the outer tube and insert the 2 locking pins.
Refer to Detail B of Figure 5.
Quick Start Installation Guide
9
Probe Length 1.0m to 2.0m
Step
Action
1
Fully thread the nut onto the central conductor of the process
connector. Place a lock washer between the locknut and the rod
segment and torque the nut against the rod segment and lock
washer to secure the connection.
Note: Tighten rod connection point to the following torque:
SLG720 6.0 Nm (4.4 ft-lbs)
2
Slide a spacer onto first rod. Connect the rod "end" segment to first
rod using a stud and lock washer. Refer to Detail A of Figure 5.
Note: Tighten rod connection point to the following torque:
SLG720 6.0 Nm (4.4 ft-bls)
3
Slip the coaxial outer tube over the rod and tighten to the process
connector.
Note: Tighten connection point to the following torque:
SLG720 30 Nm (22 ft-lbs)
It is recommended that a process compatible thread locking
compound (i.e. Loctite 242) be used on the outer conductor
threaded joints.
4
Insert an end spacer into the end of tube. Align the holes in the
end spacer with the holes in the outer tube and insert the 2 locking
pins. Refer to Detail B of Figure 5.
Figure 5: SLG720 Coaxial Probe
Assembly.
Quick Start Installation Guide
December 2017
Probe Length ˃ 2.0m
Probes over 2m in length will always have a starter tube segment and an end tube
segment. They may have 0 to 2 extension tube segments. It is advisable to build the
probe up 2m at a time. The assembly procedure starts as follows:
Step
Action
1
Fully thread the nut onto the central conductor of the process
connector. Place a lock washer between the locknut and the first
rod segment and torque the nut against the rod segment and lock
washer to secure the connection.
Note: Tighten rod connection point to the following torque:
SLG720 6.0 Nm (4.4 ft-lbs)
2
Prior to securing the next rod segment, place a Teflon spacer over
the rod segment end. The wrench flats on the rod end will index the
spacer.
3
Connect the subsequent rod segment using a stud and lock
washer.
Note: Tighten rod connection point to the following torque:
SLG720 6.0 Nm (4.4 ft-lbs)
4
Slip the starter coaxial outer tube with internal threads over the rod
and tighten to the process connector.
Note: Tighten connection point to the following torque:
SLG720 30 Nm (22 ft-lbs)
It is recommended that a process compatible thread locking
compound (i.e. Loctite 242) be used on the outer conductor
threaded joints.
5
If the probe length is over 4m. Repeat Step 2 and 3 to connect the
subsequent 2 rod extension segments. Then use a tube coupler
to attach the next tube extension segment. Insert 2 M3 set screws
into each coupler.
Note: Tighten M3 set screws to the 1.0Nm (8.8in-lb).
It is recommended that a process compatible thread locking
compound (i.e. Loctite 242) be used on each set screw.
6
If the probe length is over 6m. Repeat Step 5.
Quick Start Installation Guide
11
7
Install the rod end segment by repeating Step 2 and 3. Then use
a tube coupler to attach the tube end segment. Insert 2 M3 set
screws into each coupler.
Note: Tighten M3 set screws to the 1.0Nm (8.8in-lb).
It is recommended that a process compatible thread locking
compound (i.e. Loctite 242) be used on each set screw.
8
Insert and end spacer into the end of the tube. Align the holes in
the end spacer with the holes in the outer tube and insert the 2
locking pins. Refer to Detail B of Figure 5.
Quick Start Installation Guide
13
SLG726
Depending on the length of the probe there may be 0 to 3 2.0m rod segments.
Coaxial probes ≤ 2.0m are shipped with a single outer tube.
Coaxial probes ˃ 2.0m are shipped with the outer tube in segments.
Probe Length ≤ 2.0m
Step
Action
1
Thread the nut onto the central conductor of the process
connector. Refer to Figure 3 for nut position on flanged process
connectors. Place a lock washer between the locknut and the first
rod segment. Torque the nut against the rod segment and lock
washer to secure the connection.
Note: Tighten rod connection point to the following torque:
SLG726 15 Nm (11 ft-lbs)
2
Slip the coaxial outer tube over the rod and tighten to the process
connector.
Note: Tighten rod connection point to the following torque:
SLG726 15 Nm (1 1ft-lbs)
It is recommended that a process compatible thread
locking compound (i.e. Loctite 242) be used on the
outer conductor threaded joints.
3
Install end spacer between central conductor and outer tube in
counterbore. Secure end spacer using the retaining ring.
Probe Length ˃ 2.0m
Step
Action
1
Thread the nut onto the central conductor of the process
connector. Refer to Figure 3 for nut position on flanged process
connectors. Place a lock washer between the locknut and the first
rod segment. Torque the nut against the rod segment and lock
washer to secure the connection.
Note: Tighten rod connection point to the following torque:
SLG726 15 Nm (11 ft-lbs)
2
Slip the coaxial outer tube with internal threads over the rod and
tighten to the process connector.
Note: Tighten rod connection point to the following torque:
SLG726 15 Nm (11 ft-lbs)
It is recommended that a process compatible thread
locking compound (i.e. Loctite 242) be used on the
outer conductor threaded joints.
Quick Start Installation Guide
December 2017
3
Prior to securing the next rod segment, place a “star shaped”
spacer over the rod segment end. The wrench flats on the rod end
will index the spacer.
4
Depending on the probe length there could be 0 to 2 more rod
segments and 1 rod "end" segment to assemble. Connect the
subsequent rod segment to first, using a stud and lock washer.
Note: Tighten rod connection point to the following torque:
SLG726 15 Nm (11 ft-lbs)
It is recommended that a process compatible thread
locking compound (i.e. Loctite 242) be used on the outer
conductor threaded joints.
5
Slip a coaxial coupler over the last rod segment and spacer and
tighten onto the previous outer tube segment.
Note: Tighten rod connection point to the following torque:
SLG726 30Nm (22ft-lbs)
It is recommended that a process compatible thread
locking compound (i.e. Loctite 242) be used on the outer
conductor threaded joints.
6
Depending on probe length there may be 0 to 2 coaxial outer tube
"extension" segments and 1 coaxial tube "end" segment. Slip the
next coaxial tube "extension" segment over the last rod segment
and spacer and tighten to the coaxial coupler.
Note: Tighten rod connection point to the following torque:
SLG726 30 Nm (22 ft-lbs)
It is recommended that a process compatible thread
locking compound (i.e. Loctite 242) be used on the outer
conductor threaded joints.
7
Repeat steps 3-6 above until only the rod "end" segment and coax
tube "end" segment remain.
8
Attach the last "star shaped" spacer over the previous rod segment
end, as in step 3 above.
9
Attach rod "end" segment as in step 4 above.
10
Slip the coaxial coupler over the rod and spacer and tighten.
Note: Tighten rod connection point to the following torque:
SLG726 30 Nm (22 ft-lbs)
It is recommended that a process compatible thread
locking compound (i.e. Loctite 242) be used on the outer
conductor threaded joints.
Quick Start Installation Guide
15
11
Slip the coaxial end segment over the rod end segment and secure
to coaxial coupler.
Note: Tighten rod connection point to the following torque:
SLG726 30 Nm (22 ft-lbs)
It is recommended that a process compatible thread
locking compound (i.e. Loctite 242) be used on the outer
conductor threaded joints.
12
Install the end spacer between central conductor and outer tube in
counterbore. Secure end spacer using the retaining ring.
13
Insert 2 M3 set screws into each coupler.
Note:
Tighten M3 set screws to the 1.0 Nm (8.8 in-lb).
It is recommended that a process compatible thread
locking compound (i.e. Loctite 242) be used on each set
screw.
Figure 6: SLG726 Coaxial probe assembly
Quick Start Installation Guide
December 2017
Saturated Steam Application Probe Assembly
Saturated steam application is available with SLG726 rod and coax probes. The nut and
first inner rod segment have a larger diameter. The remaining hardware is identical. Refer
to Figure 7 for saturated steam hardware. To assemble the probes, thread the saturated
steam application nut to the central conductor, tapered end towards the process connector.
For flanged process connectors, ensure the nut position is as shown in Figure 3. Place a
lock washer between the locknut and the steam reference rod. Torque the connection to
15 Nm (11 ft-lbs). Proceed with the standard assembly procedures detailed above.
Figure 7 Saturated steam probe assembly
Saturated
steam hardware
Saturated steam
hardware
Quick Start Installation Guide
17
Trimming the probe
WARNING: Trimming the probe requires that the probe length
configured in the transmitter is changed accordingly.
Device
Action
Rod probe
Where clearance to the bottom of the tank is less than 0.4″
(10 mm), the rod must be shortened.
Rod probes are supplied in segments. Cut on the
terminating rod segment (the one with the unthreaded end).
Wire probe
(Supplied
with an
unattached
end weight)
1
Loosen the three set screws holding the end weight
to the wire.
2
Remove the end weight from the wire.
3
Measure the required wire length and apply
adhesive tape around the wire at the intended cut
location.
Note: The tape helps hold the wire strands together
when cutting.
4
Make the cut using a bolt cutter or saw.
5
Insert the wire back into the end weight and
tighten the three set screws.
Coaxial probe
Note: Applicable
only to SLG720
1
A Coaxial probe consists of an inner rod and
coaxial outer tube. To trim the coaxial probe, both
inner rod and coaxial outer tube need to be
trimmed. For trimming the inner rod, refer to rod
probe trimming instruction detailed above. Avoid
trimming the internal thread region of the inner
rod.
2
To trim the coaxial outer tube, start on the
terminating segment (the one with the unthreaded
end). Mark and trim the outer tube to the same
amount as the inner rod. Avoid trimming the
coupler region of the outer tube.
3
Drill a 6 mm hole through the end of the outer
tube at location shown in Error! Reference
source not found..
Quick Start Installation Guide
December 2017
Figure 8: Drill hole position on outer tube
MOUNTING THE TRANSMITTER
Flange mount
Step
Action
1
To mount a flange mounted transmitter, bolt the transmitter’s
flange to the flange on the roof of the tank.
2
On insulated tanks, remove enough insulation to accommodate
the flange extension.
Note: It is the End User’s responsibility to provide a flange gasket
and mounting hardware that are suitable for the transmitter’s
service condition.
3
Use unpainted, metal bolts to ensure a reliable electrical contact
between the tank and transmitter.
Quick Start Installation Guide
19
Figure 9: Flange mounting
Threaded mount
Figure 10: Tank roof mounting using a Threaded Mounting
Recommended nozzle diameter (D)
Recommended nozzle height (H)
Quick Start Installation Guide
December 2017
Step
Action
1
Transmitters with threaded process connectors can be screwed to
tanks or nozzles with threaded bosses. For tanks with BSP/G
threads, place a gasket on top of the tank, or use a sealant on the
threads of the tank connection.
The transmitter must be tightened to the appropriate torque setting. After this is
complete, the sensor and transmitter electronics housings can be rotated to the
relevant position. Loosen lower two set screws to rotate, see Figure 11.
Product damage can occur if the joint between the sensor and the
electronics housing is rotated. See Figure 1 for details.
Figure 11: Rotate the transmitter
Quick Start Installation Guide
21
Mounting on a bypass, bridle, or still well
The SLG 700 transmitter can be mounted in a new or existing bypass pipe, bridle, or a
side pipe, see Figure 12.
This type of installation is often simpler and allows the addition of radar level
measurement to an otherwise busy installation. A similar installation is also possible inside
the main container, when installing the SLG700 transmitter on a stilling well.
N = Pipe diameter
D = Bypass diameter (N < D)
L = Effective measurement range (L must be >= 12″
Figure 12: Bypass Installation
Quick Start Installation Guide
December 2017
Table 3: SLG720 bypass and stillwell recommended diameters
Probe type
Recommended diameter
Minimum diameter
Rod probe
3” or 4” (75 mm or 100 mm)
2” (50 mm)
Wire probe
4” (100 mm)
2” (50 mm)
Coaxial probe
N/A
1.5” (37.5 mm)
Table 4: SLG726 bypass and stillwell recommended diameters
Probe type
Recommended diameter
Minimum diameter
Rod probe
3” or 4” (75 mm or 100 mm)
2” (50 mm)
Wire probe
4” (100 mm)
2” (50 mm)
Coaxial probe
N/A
2” (50 mm)
Chambers, bypass pipes, and still wells with smaller diameter can lead to problems
with build-up. Chambers larger than 6" (150 mm) can be used, but offer little
advantage for radar measurement.
The probe must extend the full length of the chamber and not contact the bottom of
the chamber, or make contact with the chamber wall.
Clearance from the bottom of the chamber is recommended to be 1" (25 mm). Probe
selection is dependent on length.
For lengths less than 20′ 8″ (6.3 m): Rod probe is recommended.
For lengths more than 20′ 8″ (6.3 m): Wire probe with weight and centering disk is
recommended, only wire probes are available.
A centering disk is recommended for rod probes over 1m length to prevent excessive
movement caused by strong currents inside the pipe.
Quick Start Installation Guide
23
Mounting on a non-metallic container
To install a single lead probe into a non-metallic (plastic) vessel, the probe must be
mounted with a metal flange (>2″/DN50) or if a threaded process connection is in
use, the probe must be screwed into a metal sheet (diameter > 8″/200 mm).
Figure 13: Mounting on a non-metallic vessel
Figure 14 depicts an example of mounting in concrete silos, the placement of the concrete
versus the metal sheet used to secure the transmitter. Both Figure 13 and Figure 14 are
considered non-metallic mounts. Both types of mountings are subject to the same
specifications as described in Mounting on a non-metallic container.
Figure 14: Mounting in concrete silos
Quick Start Installation Guide
December 2017
Remote mount
In applications where a remotely mounted display is required, the remote mount allows
the electronics housing to be mounted 3m away from the process connector. This can
be useful when access to the mounting location is limited. To assemble the remote
mount, attach the process connector first, followed by securing the mounting bracket to a
pipe or wall. Secure the electronics module to the bracket with the 3 supplied M6
screws. Connect the cable and check bends for minimum radius (see Figure 15) to
prevent damage. Torque the 2 nuts to 6 Nm (4.4 ft-lbs).
Figure 15: Remote mount
Quick Start Installation Guide
25
Nozzle mount
The transmitter can be mounted to a tank nozzle using the appropriate flange.
See Figure 9 for an example. Table 5 shows recommended nozzle dimensions based on
probe type.
Table 5: SLG720 recommended nozzle dimensions
Single probe
(rod/wire)
Coaxial probe
Recommended nozzle
diameter (D)
6” (150 mm)
> probe diameter
Minimum nozzle
diameter (D)
2” (50 mm)
> probe diameter
Recommended nozzle
height (H)
4” (100 mm) + nozzle
diameter (*)
N/A
(*) When using a flexible probe in nozzles taller than 6” (150 mm) the SWB wire
probe with extension stud is recommended. SWB or PWB are options in the
model selection guide. These offer a 300 mm rod extension to keep the selection
of the wire probe that is in the nozzle, from moving.
Note: The Blocking Zone is an area on the transmitter where no measurements
are performed.
No probe option
The guided wave radar transmitter is available with a no probe option where
the transmitter is supplied with a nut and lock washer without a probe.
Table 6 provides recommendations for probe diameters and materials of
construction.
Table 6: Probe Diameters
Model
Thread
Probe
type
Recommended
probe diameter
Recommended
probe material
SLG720
M5x0.8
Rod
8 mm
ASTM A-276, Type
316L, condition A, or
ASTM B574 alloy UNS
N10276 solution
annealed.
Wire
4 mm
ANSI T316
SLG726
M10x1.5
Rod
16 mm
ASTM A-276, Type
316L, condition A
Wire
4 mm
ANSI T316 (7x7
construction)
Quick Start Installation Guide
December 2017
Conduit Entry Plugs and Adaptors
Procedures
It is the User/Installer’s responsibility to install the Transmitters in accordance
with national and local code requirements. Conduit entry plugs and adapters
shall be suitable for the environment, shall be certified for the hazardous location
when required and acceptable to the authority having jurisdiction for the plant.
CONDUIT ENTRY PRECAUTIONARY NOTICE
THE CONDUIT/CABLE GLAND ENTRIES OF THIS PRODUCT ARE SUPPLIED
WITH PLASTIC DUST CAPS WHICH ARE NOT TO BE USED IN SERVICE.
IT IS THE USER’S RESPONSIBILITY TO REPLACE THE DUST CAPS WITH
CABLE GLANDS, ADAPTORS AND/OR BLANKING PLUGS WHICH ARE
SUITABLE FOR THE ENVIRONMENT INTO WHICH THIS PRODUCT WILL BE
INSTALLED. THIS INCLUDES ENSURING COMPLIANCE WITH HAZARDOUS
LOCATION REQUIREMENTS AND REQUIREMENTS OF OTHER GOVERNING
AUTHORITIES AS APPLICABLE
Figure 16: Electronic Housing Conduit Entries
Use the following procedures for installation.
Conduit Entry Plugs
Step
Action
1
Remove the protective plastic cap from the threaded conduit entry.
2
To ensure the environmental ingress protection rating on tapered
thread (NPT), a non-hardening thread sealant may be used.
3
Thread the appropriate size conduit plug (M20 or ½” NPT) into the
conduit entry opening. Do not install conduit entry plugs in conduit
entry openings if adapters or reducers will be used.
4
Tighten adapters according to the following torque:
Torque: 32 Nm or 24 lb-ft
Quick Start Installation Guide
27
Conduit Adapters
Step
Action
1
Remove the protective plastic cap from the threaded conduit entry.
2
To ensure the environmental ingress rating on tapered threads (NPT),
a non-hardening thread sealant may be used.
3
Thread the appropriate size adapter (M20 or ½” NPT) into the conduit
entry opening
4
Tighten adapters according to the following torque:
Torque: 32 Nm or 24 lb-ft.
Note: Plugs do not come installed in the housings. All housings come with
temporary plastic dust protectors (red or blue) installed and are not certified for use
in any installation.
WIRING
Wiring must comply with local codes, regulations and ordinances.
Grounding may be required to meet various approval body
certification, for example CE conformity.
Refer to the SmartLine Level Guided Wave Radar User’s Manual,
Document #34-SL-25-11.
HART / 4-20mA Operating Ranges
The transmitter is designed to operate in a two-wire / current loop with loop resistance and
power supply voltage within the operating range for HART / 4-20 mA installations as
described in Figure 17.
Supply Voltage
(Vdc)
Max. Loop
Resistance (Ohms)
14
0
19.5
250
24
459
30
750
34
917
40
1200
42
1284
Note: A minimum of 250 Ohms of loop resistance is required to support HART
communications.
𝐿𝑛���𝑛���𝑛��� 𝑟𝑒𝑟���𝑖𝑟���𝑟���𝑎𝑛𝑎���𝑒 = 𝑎���𝑎𝑟𝑟𝑖𝑒𝑟 𝑟𝑒𝑟���𝑖𝑟���𝑟���𝑎𝑛𝑎���𝑒 + 𝑣���𝑖𝑟𝑒 𝑟𝑒𝑟���𝑖𝑟���𝑟���𝑎𝑛𝑎���𝑒 + 𝑟𝑒𝑎���𝑒𝑖𝑣𝑒𝑟 𝑟𝑒𝑟���𝑖𝑟���𝑟���𝑎𝑛𝑎���𝑒
For all HART installations, Honeywell recommends the HART resistor to be placed on
the positive side. Voltage should not exceed 42 VDC. See the process design system
documentation for specifics.
Quick Start Installation Guide
December 2017
Figure 17: HART / 4-20 mA Operating Voltage (VDC)
See the SLG 700 User’s Manual, Document #34-SL-25-11 for details on the voltage
calculation, and guidance when considering the resistance of intrinsic safety barriers.
Loop wiring is connected to the Transmitter by simply attaching
the positive (+) and negative (–) loop wires to the first two
terminals on the left, marked with LOOP+ and LOOP- on the
transmitter body in the Electronic Housing as shown in Figure
18. The third terminal to the right is a TEST terminal and is only
used for loop current diagnostics / measurements.
TIP: A current measurement device with low internal resistance
(< 10ohms) can be connected between the TEST terminal “+”
and the TEST terminal “-“ of the Transmitter Terminal Block to
acquire a readout of the loop current.
CAUTION
Loop current wiring should never be connected to the TEST “+”
terminal. This can damage the Transmitter.
Additionally, never connect the current measurement device
between the Loop “+” terminal and the TEST “+”terminal. This
also will damage the Transmitter.
Quick Start Installation Guide
29
Figure 18: HART 3-Screw Terminal Board and Grounding Screw
Note: The rightmost terminal as shown in Figure 18 is for a loop test and is not
available in the Fieldbus option.
Quick Start Installation Guide
December 2017
FOUNDATION Fieldbus Operating Ranges
The FOUNDATION Fieldbus SLG 700 transmitter requires a terminal voltage in the range
9Vdc to 32Vdc.
WIRING PROCEDURE
Step
Action
1
Ensure the loop power supply is off.
2
Remove the end cap cover from the terminal block end of the Electronics
Housing
3
Insert the power leads through each conduit entrance. The transmitter
accepts wire thicknesses up to 16AWG.
4
Plug the unused conduit entrance. See section above.
5
Connect the positive loop power lead to the positive (+) terminal and the
negative loop power lead to the negative (-) terminal.
See Note below
6
Replace the end cap, and secure it in place.
7
Optional: Transmitters that comply with the ATEX 4 directive for self-
declared approval per 94/9EC or 2014/34/EU, the power supply must
indicate a voltage limiting device.
The transmitter has internal and external terminals to connect to the ground (earth).
While it is not necessary to ground the transmitter for proper operation, grounding the
transmitter can minimize the possible effects of noise on the output signal and
protects the housing from lightning and static discharge, and may be required to
meet various approval body certifications, for example CE conformity.
An optional terminal block with lightning protection can be installed in place of the
non-lightning protection terminal block for Transmitters that will be installed in areas
susceptible to lightning strikes.
Note: The transmitter is polarity-insensitive with respect to loop power connection.
Nevertheless, to assist with troubleshooting and maintain same installation procedure,
it is recommended to connect loop wiring as per Step 5.
Quick Start Installation Guide
31
HAZARDOUS LOCATION INSTALLATIONS
For hazardous location installations, refer to the SmartLine Guided Wave Radar Level
Transmitter User’s Guide, Document #34-SL-23-11 for further information and
warnings.
Explosion-proof conduit seal
When installed as explosion-proof in a hazardous location, keep covers tight
while the transmitter is energized. Disconnect power to the transmitter in the
non-hazardous area prior to removing end caps for service.
When installed as non-incendive or non-sparking equipment in a hazardous
location, disconnect power to the transmitter in the non-hazardous area, or
determine that the location is non-hazardous before disconnecting or
connecting the transmitter wires.
US Installations
Transmitters installed as explosion proof in Class I, Division 1, Group A Hazardous
(classified) locations in accordance with ANSI/NFPA 70, the US National Electrical
Code, with ½ “conduits, do not require an explosion-proof seal for installation.
Conduits with a ¾” conduit, require a LISTED explosion-proof seal installed in the
conduit. The seal must be installed –SL-within 18” (457.2 mm) of the transmitter.
SET THE JUMPERS FOR HART
The SmartLine Level Transmitter (HART) provides two jumpers to set the desired
failsafe action and Write Protect option. See Figure 19.
Table 7: Jumpers for HART
Top Jumper
Bottom Jumper
Sets the Failsafe direction.
Sets the Write Protect
Default: Up-scale Failsafe
Default: OFF (Un-protected)
Up-scale drives the loop to a value
greater than 21 mA.
Note: Down-scale faults are
always latching.
ON (Protected) position: Changed
configuration parameters cannot be
written to the transmitter.
OFF (Un-protected) position:
Changed configuration parameters
can be written to the transmitter.
Quick Start Installation Guide
December 2017
ATTENTION: Electrostatic Discharge (ESD) hazards.
Observe precautions for handling electrostatic sensitive
devices.
Step
Action
1
Turn OFF Transmitter power.
2
Loosen the end-cap lock, and unscrew the end cap from the
Electronics side of t-he Transmitter housing.
3
If applicable, carefully depress the tabs on the sides of the
Display Module and pull it off.
If necessary, move the interface connector from the
Communication Module to the display module to provide the
preferred orientation of the display module in the window.
4
Set the Failsafe Jumper (top jumper) to the desired action
(UP or DOWN). And the Write Protect jumper (Bottom
jumper) to the desired behavior (Protected or Unprotected)
See
Table 8 for jumper positioning.
5
Screw on the end-cap and tighten the end-cap lock.
6
Turn ON Transmitter power.
Figure 19: HART Jumper Location
Quick Start Installation Guide
33
Table 8: HART Jumper Settings
Image
Description
Failsafe = UP (High)
Write Protect = OFF (Not Protected)
Failsafe = DOWN (Low)
Write Protect = OFF (Not Protected)
Failsafe = UP (High)
Write Protect = ON (Protected)
Failsafe = DOWN (Low)
Write Protect = ON (Protected)
Set the Jumpers for FOUNDATION Fieldbus (FF)
There is no Failsafe jumper on the FOUNDATION Fieldbus transmitters, but there
is a Write Protect jumper and a simulation-mode jumper (see manual 34-SL-25-
07).
ATTENTION: Electrostatic Discharge (ESD) hazards. Observe
precautions for handling electrostatic sensitive devices.
Step
Action
1
Turn OFF Transmitter power.
2
Loosen the end-cap lock, and unscrew the end cap from the
Electronics side of the Transmitter housing.
3
If applicable, carefully depress the tabs on the sides of the Display
Module and pull it off.
4
Set the Write Protect jumper (Bottom jumper) to the desired behavior
(Protected or Unprotected). See Table 9 for jumper positioning.
5
Replace the Display Module, if applicable.
6
Screw on the end cap and tighten the end-cap lock.
7
Turn ON Transmitter power.
Table 9: FOUNDATION Fieldbus Write Protect and Simulation Mode jumper positions.
Image
Description
Fieldbus SIM Mode = OFF
Write Protect = OFF (Not Protected)
Fieldbus SIM Mode = OFF
Write Protect = ON (Protected)
Fieldbus SIM Mode = ON
Write Protect = OFF (Not Protected)
Fieldbus SIM Mode = ON
Write Protect = ON
Quick Start Installation Guide
35
CONFIGURATION GUIDE
The SLG 700 transmitters have two display options:
Advanced LED Display: Multi-line display.
No Display: Configuration is not available.
Use Table 10 to configure Advanced Display transmitters. See the SLG 700 SmartLine
Level User’s Manual, Document #34-SL-25-11 for more information.
(R) = Read only
Table 10: Advanced Display Configuration
Display Configuration sub-menu
LCD Contrast
Set Contrast
Common Setup
Set Password (HART only)
Language (FF read only)
Rotation Time
Screen Rotate
Screens 1-8
Screen Format (FF read only)
Trend Hours (FF read only)
PV Selection (FF read only)
Display Units (FF read only)
Custom Units (R) (FF only)
Decimals (FF read only)
Disp High Limit (FF read only)
Disp Low Limit (FF read only)
Custom Tag (FF read only)
Basic Configuration sub-menu
General
Short Tag (HART only)
Length Unit
Temp Unit
Velocity Unit
Volume Unit
Process
Measured Prod
Vapor DC (single and two liquids, non-flooded only)
Product DC (single liquids only)
Upper Prod DC (two liquids only)
Lower Prod DC (two liquids only)
Vapor Atten (single and two liquids, non-flooded only)
Product Atten (single liquid only)
Lower Prod Atten (two liquids only)
Upper Prod Atten (two liquids only)
Max Fill Rate
Measurement
Sensor Height
Max Product Level
Level Offset
Echo Lost Time
Dynm Variables
Measured Prod
PV
SV
TV
QV
SmartLine Level Guided Wave Radar
36
Quick Start Installation Guide
Decemeber 2017
Basic Configuration sub-menu (continued)
4-20 mA
Output (HART
only)
LRV
URV
Damping
NAMUR Output
Loop Curr Mode
Latching Mode
BDH/BDL Loop
Set LRV
(HART only)
Set LRV
Set URV
Install Date
Year
Month
Day
Install Date
Write Date
Advanced Configuration sub-menu
Mounting
Note: Loop must
be removed from
Automatic
Control
Transmtr Model (R)
Sensor Conn Type (R)
Proc Conn Type (R)
Mounting Loc
Mounting Angle (Visible for Tank, Bracket or Nozzle mounting
location only)
Nozzle Height (Nozzle Mounting Loc only)
Nozzle Dia (Nozzle Mounting Loc only)
Bypass Dia (Bypass Mounting Loc only)
Stillwell Dia (Stillwell Mounting Loc only)
Backgrnd Type
Dynm Bkgd Updt (Field and Obstacle Backgrnd Type only)
Full Tank Det
Backgrnd
Capture
(Measured Prod
not Saturated
Steam)
Backgrnd Type
Use Level (Obstacle Backgrnd Type only)
Start Capture (capture process is inactive)
Cancel Capture (capture process is active)
Probe
Note: Loop must
be removed from
Automatic
Control.
Probe Type
Probe Length
Probe End Type
CenterDiskType
CenterDisk Dia (Center Disk Type is not None)
PropagtnFactor
Block Dist Hi
Block Dist Low
SteamRefPrbTyp (Saturated Steam Measured Prod only)
Steam Ref Len (Saturated Steam Measured Prod only)
Probe Length Cal
(SingleLiqLowDC
Measured Prod
only)
Start Cal (calibration process is inactive)
Stop Cal (calibration process is active)
Quick Start Installation Guide
37
Steam Ref Cal
(Saturated Steam
Measured Prod
only)
Start Cal (calibration process is inactive)
Stop Cal (calibration process is active)
Volume
Vol Calc Type
Tank Shape
Tank Diameter
Volume (continued)
Tank Length
Tank Width
Tank Height
Volume Offset (Vol Calc Type is Tank Shape only)
Reflectn Model
Ampl Tracking
Location
Width
Attenuation
Gain
ObjFuncThrshld
DAC Trim
(HART only)
Trim Zero
Trim Span
Set DAC Normal
Loop Test
(HART only)
Set DAC Output
Set DAC Normal
HART Params
(HART only)
Poll Address
Final Assy Num
Show Date
Year
Month
Day
Write Date
Monitor sub-menu
Critical Diag (R)
Active Diags (R)
Sensor Module (R)
Comm Module (R)
Sensor Comm (R)
Measurement (R)
Reset Required (R)
Soft Reset
Detail Diag (items below are only visible when Yes)
Sensor Int RAM (R)
Sensor Ext RAM (R)
Sensor Flash CRC (R)
Sensor Pwr Vosc (R)
Sensor Pwr 2.5V (R)
Sensor Pwr 3.3V (R)
Sensor Pwr Accum (R)
Sensor Code Flow (R)
Sensor Oscillator (R)
Factory Mode (R)
Low Power Mode (R)
Reflectn Ref Loc (R)
Ref Plane Offset (R)
SmartLine Level Guided Wave Radar
38
Quick Start Installation Guide
Decemeber 2017
Critical Diag (R)
Unlic Intf Meas (R)
Unlic Sat Steam (R)
Unlic Low DC App (R)
ModelNumMismatch (R)
Sensr DB Corrupt (R)
Reset Sensr DB (Sensor DB corrupt only)
Comm DB Corrupt (R)
Reset Comm DB (Comm DB corrupt only)
Non-Crit Diag
Active Diags (R)
Supply Voltage (R)
Elec Module Temp (R)
DAC Temp Comp (R) (HART only)
Sensor Comm (R)
Display Setup (R) (HART only)
Characterized (R)
Charact. Status(R)
PV Range (R)
Sensor Over Temp (R)
Surface Sgnl Str (R)
Surfac Sgnl Qlty (R)
Interfc Sgnl Str (R)
Interfc Sgnl Qlty (R)
Sensing Section (R)
Blk Dist Hi Zone (R) (single liquid only)
Blk Dist Lo Zone (R) (single liquid only)
Surface in BDH (R) (two liquids only)
Surface in BDL (R) (two liquids only)
Interface in BDH (R) (two liquids only)
Interface in BDL (R) (two liquids only)
Snsr Calibrated (R)
Calibration Type (R)
FldBkgdNotCompat
Backgrnd Not Set
FldgBkgdLoadError
Device Vars
Measurd Prod Lvl (R)
Surface Sgnl Str (R)
Surface Sgnl Qlty (R)
Interfc Sgnl Str (R) (two liquids only)
Interfc Sgnl Qlty (R) (two liquids only)
Int Elec Temp (R)
Display Info
Firmware Version (R)
Comm Info
Protocol (R)
Universal Rev (R) (HART only)
Field Dev Rev (R) (HART only)
Software Rev (R) (HART only)
PV Alarm Type (R) (HART only)
LRV (R) (FF only)
URV (R) (FF only)
Quick Start Installation Guide
39
Sensor Info
Firmware Version (R)
Model Key (R)
Device ID (R)
Echo Stem Plot
Duration
Show Stem Plot
Model Number
Model Number (R) (no mismatch only)
Comm Model Num (R) (mismatch only)
Sensor Model Num (R) (no mismatch only)
Matching Source (mismatch only)
Do Match (mismatch only)
Options
Interface Meas (R)
Saturated Steam (R)
Low DC Applic (R)
License Key
(R) Read-Only parameter
SmartLine Level Guided Wave Radar
40
Quick Start Installation Guide
Decemeber 2017
Sales and Service
For application assistance, current specifications, pricing, or name of the
nearest Authorized Distributor, contact one of the offices below.
ASIA PACIFIC
Honeywell Process
Solutions,
(TAC) hfs-tac-
[email protected]
Australia
Honeywell Limited
Phone: +(61) 7-3846 1255
FAX: +(61) 7-3840 6481
Toll Free 1300-36-39-36
Toll Free Fax:
1300-36-04-
70
China – PRC - Shanghai
Honeywell China Inc.
Phone: (86-21) 5257-4568
Fax: (86-21) 6237-2826
Singapore
Honeywell Pte Ltd.
Phone: +(65) 6580 3278
Fax: +(65) 6445-3033
South Korea
Honeywell Korea Co Ltd
Phone: +(822) 799 6114
Fax: +(822) 792 9015
EMEA
Honeywell Process
Solutions,
Phone: + 80012026455 or
+44 (0)1344 656000
Email: (Sales)
FP-Sales-
[email protected]
or (TAC)
hfs-tac-
[email protected]
AMERICAS
Honeywell Process
Solutions,
Phone: (TAC) 1-800-423-
9883 or 215/641-3610
(Sales) 1-800-343-0228
Email: (Sales)
FP-Sales-
[email protected]
or (TAC)
hfs-tac-
[email protected]
Honeywell Process Solutions
1250 West Sam Houston Pkwy S
34-SL-25-04 Rev. 7.0
Houston, USA, TX 77042
December 2017
www.honeywellprocess.com
2017 Honeywell International Inc.