Eterna MHDB Installation Instructions
Text of the manual
A guide for qualified electricians
Model:
MHDB
Mains Heat Detector With Battery Back-Up
These instructions are provided as a guideline to assist you.
PLEASE READ THESE INSTRUCTIONS BEFORE INSTALLATION
AND RETAIN FOR FUT
READ THIS FIRST:
Check the pack and make sure you have all of the parts listed
on the front of this booklet. If not, contact the outlet where
you bought this product.
This Heat Alarm must be installed by a competent person
in accordance with the building regulations and IEE wiring
regulations.
Switch off the mains before commencing installation and
remove th
TESTING YOUR HEAT ALARM:
After installation and after reoccupation of the dwelling after a
vacation etc; check all alarms for correct operation.
It is recommended that you test your heat alarm once a week
to ensure the detector is working correctly.
Push and hold the test button for approximately 3 seconds. A
loud pulsating alarm should sound and a red flash