Erreka ULTRA Quick Installation And Programming Manual

Text of the manual

Quick installation and programming guide

English WARNING This quick guide is a summary of the complete installation manual. The manual contains safety warnings and other explanations which must be taken into account. The most recent version of this guide and the installation manual are available at the "Downloads" section on Erreka's website: http://

Choosing the spring and anchoring orifice

The balancing spring and its anchoring orifice depend on the length (L) of the barrier arm: ULS3EC Barriers: • Arm 2.0m < L < 3.0m: spring D= 4.5mm, orifice 1 • Arm 1.5m < L < 2.0m: spring D= 4.5mm: orifice 2 ULS45EC Barriers: • Arm 2.5m < L < 4.0m: spring D= 5.5mm, orifice 2 • Arm 4.0m < L < 4.5m: spring D

Balancing the barrier

Unlock THE BARRIER MUST BE BALANCED FOR PROPER OPERATION. • In order to complete the balancing, connect the power supply and check operation: the barrier should move smoothly, without jolts or jerks. • If it does not move smoothly, without any jolts or jerks, reduce the tension of the spring using the tensioning han

Opening photocells (SG.A): place DIP6 in

ON to enable testing. Closing photocells (SG.C): place DIP9 in ON to enable testing. Photocell testing Encoder For the correct operation of the encoder, ensure DIP7 is in ON. (photocells without testing) (photocells with testing) 230V, máx. 60W F1 Motor fuse (5x20

SW2 functions during programming (DIP1 = ON)

DIP1=ON: programming enabled (DL3 lights up) DIP1=ON and DIP2=ON: open/close programming DIP1=ON and DIP4=ON: radio code programming Radio code programming (only with RSD receiver) 1 Connect the electrical power supply and close the barrier by keeping PUL1 pressed down. 2 Select the code in the transmit