INSTALLATION, COMMISSIONING & SERVICING
FLOOR STANDING EXTERNAL OIL FIRED CONDENSING
COMBINATION BOILER USING BALANCED FLUE SYSTEM
GREENSTAR HEATSLAVE EXTERNAL
12/18, 18/25 & 25/32
FOR OPEN VENT & SEALED CENTRAL HEATING SYSTEMS WITH
MAINS FED DOMESTIC HOT WATER
UK
THE APPLIANCE IS FOR USE WITH KEROSENE
(28 SECOND OIL) ONLY
8 716 113 389d 30/3/10 14:01 Page 1
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
2
SYMBOLS USED IN THIS MANUAL:
Domestic hot water
Central heating
Room thermostat
Frost thermostat
Wait time period
Programmer/timer OFF
INSTALLATION & SERVICING INSTRUCTIONS
IMPORTANT HANDLING INSTRUCTIONS:
It is advised that more than one person is involved
in the transfer of the packaged appliance from the
van to the point of installation.
It is advised that no attempt should be made to
move the packaged appliance without the use of
a suitable truck.
At all times the correct method for handling
heavy objects should be strictly observed.
GENERAL HANDLING GUIDELINES:
•
Lift only a manageable weight, or ask for
help.
•
When lifting, bend the knees, and keep the
back straight and feet apart.
•
Do not lift and twist at the same time.
•
Lift and carry items close to the body.
•
Wear protective clothing and gloves to
protect from any sharp edges.
Programmer ON CH only
Programmer ON DHW only
Programmer ON CH and DHW
Cold water main supply
Electricity supply
WATER TREATMENT:
FERNOX
01799 550811
fernox.com
SENTINEL
0800 389 4670
sentinel-solutions.net
FLUE TERMINAL GUARD:
Part No. 7 716 190 050
PLEASE READ THESE INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION.
THESE INSTRUCTIONS ARE APPLICABLE TO THE WORCESTER APPLIANCE MODEL(S)
STATED ON THE FRONT COVER OF THIS MANUAL ONLY AND MUST NOT BE USED WITH
ANY OTHER MAKE OR MODEL OF APPLIANCE.
THE INSTRUCTIONS APPLY IN THE UK AND EIRE ONLY AND MUST BE FOLLOWED
EXCEPT FOR ANY STATUTORY OBLIGATION.
THIS APPLIANCE MUST BE INSTALLED BY A COMPETENT PERSON. FAILURE TO INSTALL
CORRECTLY COULD LEAD TO PROSECUTION.
COMPLYING WITH THE BUILDING REGULATIONS:
This heating appliance forms part of the controlled services for the building. It is law that all controlled
services for buildings must comply with building regulations. You must be able to satisfy your Local
Authority Building Control Body (LABC) that the work carried out concerning the installation and
commissioning of this heating appliance has been carried out to a satisfactory standard.
OFTEC operate a competent persons scheme and registered installers are able to certify that their
work complies with building regulations. Under the scheme;
� OFTEC must be informed about every installation.
� OFTEC will issue a building regulations compliance certificate to the householder and will
notify the LABC.
OFTEC provide controlled document forms CD10 and CD11 for use during installation and
commissioning respectively.
Other organisations operate self-certification schemes e.g. NAPIT and BESCA Ltd. and it may be
possible for installers who are members of these organisations to self certify their work.
Alternatively you must submit a building control notice to the LABC before installing any boiler. The
LABC will then arrange regular inspection visits during the work to ensure that the installation
complies with the regulations.
IF YOU ARE IN ANY DOUBT CONTACT THE WORCESTER TECHNICAL HELPLINE.
DISTANCE LEARNING AND TRAINING COURSES ARE AVAILABLE FROM WORCESTER.
PLEASE LEAVE THESE INSTRUCTIONS WITH THE COMPLETED COMMISSIONING FORM
AND THE USER MANUAL WITH THE OWNER OR WITH THE APPLIANCE AFTER
INSTALLATION OR SERVICING. THE SERVICE INTERVAL RECORD CAN BE FOUND ON
THE BACK PAGE OF THIS MANUAL.
ABBREVIATIONS USED IN THIS MANUAL:
Ø
Diameter
CH
Central Heating
DHW
Domestic Hot Water
DCW
Domestic Cold Water
TRV
Thermostatic Radiator Valve
IP
Ingress Protection
CF
Conventional flue
BF
Balanced flue
N/A
Not allowed
SEDBUK
Seasonal Efficiency of Domestic Boilers in the United Kingdom
OFTEC
Oil Firing Technical Association for the Petroleum Industry
IEE
Institute of Electrical Engineers
LABC
Local Authority Building Control Body
STORE THE APPLIANCE IN A DRY AREA PRIOR TO INSTALLATION.
8 716 113 389d 30/3/10 14:01 Page 2
SAFETY & REGULATIONS
IMPORTANT INFORMATION AND SYMBOLS
2
SAFETY PRECAUTIONS AND INSTALLATION REGULATIONS
4
APPLIANCE INFORMATION
GENERAL INFORMATION
5
TECHNICAL DATA
6
LAYOUT & COMPONENTS
7
PRE-INSTALLATION
CLEANING PRIMARY SYSTEMS
8
MAINS SUPPLIES
9
OIL SUPPLY
10
WATER SYSTEMS & PIPEWORK
11
PRESSURE RELIEF PIPEWORK
12
CONDENSATE PIPEWORK
13
CABINET MOUNTED LOW LEVEL FLUE TERMINAL POSITIONS
14
HIGH LEVEL FLUE TERMINAL POSITIONS
15
BOILER LOCATION & CLEARANCES
16
BALANCED EXTERNAL OILFIT FLUE OPTIONS
17
CABINET MOUNTED BALANCED HORIZONTAL FLUE OPTIONS
18
INSTALLATION
UNPACKING THE BOILER
19
PIPEWORK & FLUE POSITIONS
20
BOILER INSTALLATION
21
FLUE INSTALLATION
22
COMBUSTION CHAMBER
23
PIPEWORK CONNECTIONS
24
OIL BURNER AND PUMP
26
REFITTING COMPONENTS
27
ELECTRICS
28
COMMISSIONING
PRE-COMMISSIONING CHECKS - APPLIANCE
30
FILLING THE SYSTEM
31
STARTING THE APPLIANCE
32
WATER TREATMENT
37
FINISHING COMMISSIONING - APPLIANCE
38
SERVICING & SPARES
INSPECTION AND SERVICE
39
SHORT PARTS LIST BENTONE STERLING 40 - 12/18
43
SHORT PARTS LIST BENTONE STERLING 50 - 18/25
44
SHORT PARTS LIST RIELLO RDB 1 - 12/18
45
SHORT PARTS LIST RIELLO RDB 2.2 - 18/25
46
SHORT PARTS LIST RIELLO RDB 2.2 - 25/32
47
FAULT FINDING & DIAGNOSIS
FAULT FINDING
48
RIELLO CONTROLBOX OPERATION
50
FAULT FINDING LOGIC FOR SATRONIC CONTROL BOX
51
FAULT FINDING LOGIC FOR RIELLO CONTROL BOXES
52
ELECTRICAL SCHEMATIC
53
COMMISSIONING & SERVICE RECORDS
OIL BOILER COMMISSIONING CHECKLIST
54
SERVICE INTERVAL RECORD
55
CONTENTS
CONTENTS
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
3
SAFETY &
REGULATIONS
APPLIANCE
INFORMATION
PRE -
INSTALLATION
INSTALLATION
COMMISSIONING
SERVICING
& SPARES
FAULT FINDING
& DIAGRAMS
8 716 113 389d 30/3/10 14:01 Page 3
& INSTALLATION REGULATIONS
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
4
SAFETY &
REGULATIONS
SAFETY PRECAUTIONS
INSTALLATION REGULATIONS
OIL FUMES OR LEAKS FROM THE APPLIANCE:
�Extinguish any naked flames.
�Isolate the electrical supply.
�Isolate the fuel supply to the boiler.
�Rectify fault.
HEALTH & SAFETY:
The appliance contains no asbestos and no substances have been used in the construction
process that contravene the COSHH Regulations (Control of Substances Hazardous to Health
Regulations 1988). Where applicable, the CE mark indicates compliance with relative EU
Directives.
COMBUSTIBLE AND CORROSIVE MATERIALS:
Do not store or use any combustible materials (paper, thinners, paints etc.) inside or within the
vicinity of the appliance.
The combustion air must be free from chemically aggressive substances which can corrode the
appliance and invalidate any warranty.
FITTING & MODIFICATIONS:
Fitting the appliance and any controls to the appliance may only be carried out by a competent
engineer in accordance with these instructions and the relevant Installation Regulations.
Flue systems must not be modified in any way other than as described in the fitting instructions.
Any misuse or unauthorised modifications to the appliance, flue or associated components and
systems could invalidate the warranty. The manufacturer accepts no liability arising from any
such actions, excluding statutory rights.
SERVICING:
Advise the user to have the system regularly serviced by a competent, qualified engineer (such
as OFTEC registered personnel) using approved spares, to help maintain the economy, safety
and reliability of the appliance.
IMPORTANT:
This boiler must only be operated by a responsible adult who has been instructed in,
understands and is aware of the boiler’s operating conditions and effects.
Failure to install appliances correctly could lead to
prosecution.
The appliance should be installed by a competent
person. The person installing the appliance should
be aware of the Health and Safety at Work Act and
take appropriate action to ensure that the
regulations are adhered to. In order to give
optimum efficiency and trouble free operation the
appliance must be commissioned by a qualified
OFTEC engineer.
The compliance with a British Standard does not,
in itself, confer immunity from legal obligations. In
particular the installation of this appliance must be
in accordance with the relevant requirements of the
following British Standards and regulations in
respect of the safe installation of equipment:
BS 5410: part 1: Code of practice for Oil Fired
Boilers.
BS 799: part 5: Specification for Oil Storage
Tanks.
BS 7593: Code of Practice for treatment of water
in domestic hot water central heating systems.
BS 5449: part 1: Specification for forced
circulation hot water central heating for domestic
premises.
BS 5955: part 8: Specification for the installation
of thermoplastic pipes and associated fittings for
use in domestic hot and cold water services and
heating systems.
BS 7291: Thermoplastic pipes and associated
fittings for hot and cold water for domestic
purposes and heating installations in buildings.
BS 7074: part 1: Application, selection and
installation of expansion vessels and ancillary
equipment for sealed water systems.
BS 7671: IEE Wiring Regulations, current edition.
BS 1362: Specification for general purpose fuse
links for domestic and similar purposes.
The Building Regulations Part G, Part J and L1
England and Wales; Part F and Part J Section III
Scotland; Part L and Part F Northern Ireland.
Local water company bye-laws.
The Control of Pollution (Oil) Regulations.
OFTEC Standards.
Where no specific instruction is given, reference
should be made to the relevant codes of practice.
Installations in Eire (Republic of Ireland)
The Installation must be performed by a
competent and suitably trained person in
accordance with the following Eire regulations.
Current building regulations -
Part J Republic of Ireland
ETCI rules for electrical installation
For further guidance see:
OFTEC Technical book three -
Regional requirements: Republic of Ireland
8 716 113 389d 30/3/10 14:01 Page 4
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
5
APPLIANCE
INFORMATION
A
B
770mm
950mm
640mm
C
D
GENERAL INFORMATION
STANDARD PACKAGE:
A - Floor standing oil fired condensing boiler for
open vent and sealed domestic central heating
and mains fed hot water.
B - Literature pack.
C -100mmØ services duct.
D - Cabinet key
Check List
Item
Qty
Greenstar Heatslave External Installation/Servicing Instructions........1
Users Instructions ..........................................................................................1
100mm Ø Services Duct...............................................................................1
Warranty Return Envelope ............................................................................1
Cabinet Key.......................................................................................................1
8 716 113 389d 30/3/10 14:01 Page 5
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
6
TECHNICAL DATA
Central Heating
Primary water capacity (total)
litres
Maximum static head
metres
Minimum static head
metres
Available pump head (20°C difference) at max. output
metres water
Max. permissible sealed system operating pressure
bar
in accordance with WRAS guidelines
Flow restrictor
colour
Domestic Hot Water
Optimum flow rate (±15%)
litres/min
Minimum inlet pressure (dynamic) for optimum flow rate
bar
Maximum hot water rise for 90 litres draw off (@optimum flow rate)
°C
Flue
Exit flue gas mass flow
kg/hr
Pipework connections
Fuel line (compression)
mm
CH flow
mm
CH return
mm
Water main inlet
mm
DHW outlet
mm
Combined feed and expansion and open vent (optional)
BSP
Condensate (polypropylene)
mm
Electrical
Electrical power supply voltage
AC...V
Frequency
Hz
Max. power consumption
W
Thermostats
CH control thermostat range (cut in/cut out)
°C
DHW control thermostat range (cut in/cut out)
°C
CH & DHW control thermostat differential
°C
Boiler high limit thermostat set point
°C
Boiler manual reset overheat thermostat set point
°C
Tank manual reset overheat thermostat set point
°C
Flue reset overheat thermostat set point
°C
General Data
Maximum hearth temperature
°C
SEDBUK (Band A)
%
Appliance protection rating
IP
Weight (excluding packaging)
kg
DESCRIPTION
UNITS
12/18
18/25 25/32
APPLIANCE
INFORMATION
69
30
1
4.7
2.5
Lime
15
1.5
40
29
10
22
22
15
22
1
21.5
230
50
240
55/81
55/72
5
92
105
94
110
<100
90.2
45
195
69
30
1
4.0
2.5
—
18
1.2
40
40
10
22
22
15
22
1
21.5
230
50
240
55/81
55/72
5
92
105
94
110
<100
90.1
45
195
72
30
1
4.2
2.5
—
22
0.9
40
51
10
28
28
15
22
1
21.5
230
50
263
55/81
55/72
5
92
105
94
110
<100
90.3
45
206
8 716 113 389d 30/3/10 14:01 Page 6
LAYOUT & COMPONENTS
The diagram opposite excludes the top, front
and RH side casing panels.
1. CONTROL BOX ASSEMBLY
2. DIVERTER VALVE
3. PRESSURE GAUGE
4. AUTO AIR VENT
5. CH CONTROL AND MANUAL RESET
OVERHEAT THERMOSTAT PHIAL
6. CASING SIDE PANEL
7. CIRCULATING PUMP
8. AUTO-RESET HIGH LIMIT
THERMOSTAT PHIAL
9. PUMP AUTO AIR VENT (under
protective cap)
10. DHW FLOW SWITCH
11. PRESSURE RELIEF VALVE
12. DHW HEAT EXCHANGER
13. FLUE GAS SAMPLING POINT
14. FLUE OVERHEAT THERMOSTAT
PHIAL
15. CASING SUPPORT PANEL
16. FLUE MANIFOLD ACCESS COVER
17. AIR INLET DUCT AND CASING
18. SECONDARY HEAT EXCHANGER
BLEED POINT (ONE ON EITHER SIDE)
19. SECONDARY HEAT EXCHANGER
20. SECONDARY HEAT EXCHANGER
DRAIN
21. EXPANSION VESSEL
22. COMBINED FEED & EXPANSION &
OPEN SAFETY VENT PIPE OUTLET
23. CONDENSATE OUTLET
24. PRIMARY HEAT EXCHANGER
25. TRAY
26. OIL ISOLATION VALVE
27. CONDENSATE TRAP
28. CONDENSATE TRAP BRACKET
29. PRIMARY HEAT EXCHANGER DRAIN
COCK
30. COMBUSTION CHAMBER ACCESS
DOOR
31. HEATSLAVE TANK DRAIN
32. HEATSLAVE TANK
33. DATA LABEL
34. MODE SWITCH
35. BOILER MODE INDICATOR
36. LOCKOUT INDICATOR
37. MANUAL RESET TANK OVERHEAT
THERMOSTAT (behind plastic cover)
38. OVERHEAT RESET BUTTONS (boiler &
flue temperature)
39. LOCKOUT RESET BUTTON
40. SERVICE CONNECTION
41. CH TEMPERATURE CONTROL
42. DHW TEMPERATURE CONTROL
43. FROST THERMOSTAT SENSORS
44a. BENTONE STERLING BURNER
(12/18 & 18/25)
i) CONTROL BOX
ii) MOTOR
iii) AIR INTAKE CASING
iv) OIL PUMP
v) COMBUSTION HEAD
44b. RIELLO RDB 1 (12/18) &
RDB 2.2 (18/25 & 25/32)
i) CONTROL BOX
ii) MOTOR
iii) AIR INTAKE CASING
iv) OIL PUMP
v) COMBUSTION HEAD
45. CLIP - AIR INTAKE HOSE
46. AIR INTAKE HOSE
LAYOUT & COMPONENTS
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
7
APPLIANCE
INFORMATION
1
6
2
4
8
7
5
10
21
12
15
3
14
16
13
17
18
20
22
29
23
19
24
25
30
33
31
32
34
35
9
38/39
42
41
44a
44b
45
46
45
46
v)
iv)
iii)
ii)
i)
v)
iii)
i)
ii)
iv)
43
26
27
28
40
37
11
36
8 716 113 389d 30/3/10 14:01 Page 7
CLEANING PRIMARY SYSTEMS
BEFORE CLEANING THE SYSTEM:
ENSURE THE SYSTEM AND PIPEWORK IS
IN GOOD WORKING ORDER.
FLUSH THE EXISTING SYSTEM WITH A
POWER FLUSHING MACHINE OR WITH A
CHEMICAL CLEANER BEFORE
INSTALLING NEW COMPONENTS.
CLEANING THE PRIMARY SYSTEM:
� Cleanse the system in accordance with
BS 7593.
� Fill the system with cold mains water to the
recommended pressure and check for leaks.
� Open all drain cocks and drain the system.
� Close drain cocks and add a suitable flushing
agent at the correct strength for the system
condition in accordance with the manufacturer's
instructions.
� Circulate the flushing agent before the boiler
is fired up.
� Run the boiler and system at normal operating
temperature in accordance with the
manufacturer's instructions.
� Drain and thoroughly flush the system to
remove the flushing agent and any debris.
IMPORTANT: All the following Pre-Installation sections must be read and
requirements met before starting boiler or flue installation.
CAUTION: ISOLATE THE MAINS SUPPLIES BEFORE STARTING ANY WORK AND
OBSERVE ALL RELEVANT SAFETY PRECAUTIONS.
IMPORTANT: Debris from the system can
damage the boiler and reduce efficiency.
Failure to comply with the guidelines for
the use of water treatment with the
appliance will invalidate the appliance
warranty.
CLEANING PRIMARY SYSTEMS
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
8
PRE -
INSTALLATION
8 716 113 389d 30/3/10 14:01 Page 8
• Supply: 230V - 50Hz.
• Cable: PVC insulated 0.75mm
2 (24 x
0.2mm) temperature rated to 90°C.
• Protection IP45.
• External 5A fuse to BS 1362.
• The appliance must be earthed.
• Please refer to IEE regulations for cross
bonding requirements.
• It must be possible to isolate the appliance
from the electrical supply with at least a 3mm
contact separation in both poles supplying
the appliance.
• Wiring between the appliance and the
electrical supply must comply with IEE wiring
regulations and any local regulations which
may apply for fixed wiring to a stationary
appliance.
• Any system connected to the boiler must not
have a separate electrical supply.
WATER SUPPLY:
The following are general requirements and if
necessary the advice of the local water company
should be sought before fitting the appliance.
• The appliance cold water supply should be
the first connection off the water main where
possible.
• Maximum mains fed water pressure 10 bar.
If necessary, fit a pressure reducing valve.
IMPORTANT: Non-return, back flow
prevention devices (including those
associated with water meters) fitted to the
mains water supply can cause a pressure
build up which could damage the boiler
and other household appliances.
• Where the water main supply has a non-
return, back flow prevention valve fitted, a
mini expansion vessel (A) must be connected
to the mains water inlet pipe (B) between the
non-return valve (C) and the boiler (D) as
shown opposite.
Use in hard water areas:
Normally there is no need for water treatment to
prevent scale formation as the maximum
temperature of the heat exchanger is limited by
the control circuit.
In areas where the temporary water hardness
exceeds 200ppm, consideration may need to
be given to the fitting of a scale prevention
device. In such circumstances, the advice of
the local water authority should be sought.
MAINS WATER EXPANSION VESSEL:
A - Mini expansion vessel, part No. 7 716 192 105
B - Mains water inlet
C - Non-return valve
D - Boiler
A
B
C
D
MAINS SUPPLIES
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
9
PRE -
INSTALLATION
12/18kW
Water Mains Pressure:
Minimum dynamic mains water pressure for
optimum performance.
1.5 bar
1.2 bar
0.9 bar
18/25kW
25/32kW
IMPORTANT: The appliance provides a permanent external electrical supply
for servicing and must therefore be fed via a circuit breaker incorporating
earth leakage protection.
8 716 113 389d 30/3/10 14:01 Page 9
This appliance is suitable for kerosene (28
second oil) only, no other fuel must be used.
• Plastic or steel tanks should be installed to
BS 5410. A steel tank should conform to
BS 799: part 5 and have a slope of 1 in 24
away from the outlet valve with a sludge cock
at its lower end.
• Do not use galvanised steel tanks or
pipework for the oil supply system.
• Do not use soldered joints on the oil
supply pipework.
a) Single pipe gravity feed system:
The oil storage tank (A) must be positioned so
that the oil level does not exceed 4 metres above
the level of the burner oil pump (J) and in addi-
tion the oil level must be at least 300mm above
the oil pump (J). Where the maximum oil level in
the oil storage tank exceeds 4 metres, a head
breaking device must be installed between the
tank (A) and the burner oil pump (J).
b) Double pipe sub-gravity feed system:
Maximum suction height 3.5 metres. Non-return
valves must be fitted to the inlet and return oil
line between the oil pump (J) and oil storage
tank (A).
c) Single pipe suction lift with de-aerator
Maximum suction height 3.5 metres. The oil
tank (A) must be positioned below the oil pump
(J). Create an inlet and return loop between the
de-aerator (M) and oil pump (J).
A non-return valve must be incorporated within
the de-aerator or fitted to the oil line between
the oil storage tank (A) and the de-aerator (M).
A top feed oil tank fitted with a de-aerator
using an internal non-return valve should have
any non-return valves fitted in the base of the
tank to the suction line removed to assist
purging air from the oil line.
Pipework
� Use copper pipe of the correct diameter
according to the information shown opposite.
Use flexible hoses to connect to the oil pump (J).
� Lay the oil supply pipe (H) as straight and
level as possible to avoid air pockets and
unnecessary friction losses. Route away
from the boiler access door or other hot
surfaces.
� Install a manual isolating valve (B) to the oil
supply pipe (H), as close to the oil storage
tank (A) as possible.
� Fit an oil strainer and water separator (C) to
the oil supply pipe, near the oil storage tank.
Fit an additional oil filter (N, 16µm max
filtration size) close to the boiler, but not
inside the boiler casing.
� Fit a fire valve in accordance with BS 5410.
The fire valve (D) must be fitted externally
at least 1 metre from the appliance with the
fire valve sensor (F) located within the
appliance case.
A fire valve with a shut-off temperature of
85oC or higher must be fitted to avoid
nuisance shut offs.
A capillary type valve provides a neat and
simple installation. Alternatively, a fusible
link or electrical system may be used.
Under no circumstances should a
combination isolating/fire valve be used
as the sole fire protection device.
A
F
B N
G
J
4m max
.
K
a)
H
300mm
min.
B D
B C
MAXIMUM PIPE RUN FOR SINGLE PIPE GRAVITY FEED SYSTEM
B
A
D
B
C
E
K
3.5m max
.
L
L
b)
H
F
G
B
150mm
MAXIMUM PIPE RUN FOR DOUBLE PIPE SUB-GRAVITY FEED SYSTEM
N
J
B
A
M
B
F
C
G
J
3.5m max .
E
D
c)
MAXIMUM PIPE RUN FOR SINGLE PIPE SUCTION LIFT WITH DE-AERATOR
H
FUEL FLOW RATE
FUEL FLOW RATE
K
1m min
.
1m min
.
1m min
.
E
OIL SUPPLY
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
10
PRE -
INSTALLATION
A
- Oil storage tank
B
- Isolating valve
C
- Oil strainer & water separator
D
- Fire valve to BS5410
E
- External casing
F
- Fire valve sensor
G
- Oil burner
H
- Oil supply pipe
J
- Oil pump
K
- Full base (plastic tanks)
L
- Non-return valve
M
- De-aerator
N
- Oil filter (16µm max filtration size)
NOTE: All dimensions are in metres unless stated otherwise.
The maximum pipe run figures are based on using copper pipe with an inside diameter of
2mm less than the Ø.
HEAD
10mmØ
12mmØ
0.5
12
30
1.0
25
69
1.5
37
91
2.0
49
100
HEAD
10mmØ
12mmØ
2.5
62
100
3.0
74
100
3.5
87
100
4.0
99
100
HEAD
10mmØ
12mmØ
0
50
100
0.5
44
100
1.0
38
95
1.5
32
80
HEAD
10mmØ
12mmØ
2.0
26
66
2.5
20
50
3.0
14
37
3.5
8
22
HEAD
2.5kg/h 5kg/h
10kg/h
10kg/h
8mmØ 8mmØ
8mmØ 10mmØ
0
100
55
26
100
0.5
95
45
23
100
1.0
80
40
20
90
1.5
70
35
17
75
HEAD
2.5kg/h 5kg/h
10kg/h
10kg/h
8mmØ 8mmØ
8mmØ 10mmØ
2.0
60
30
14
65
2.5
45
25
11
50
3.0
35
15
8
35
3.5
25
10
5
20
The table and illustration above is a guide only and does not in any way override the de-
aerator manufacturers instructions.
8 716 113 389d 30/3/10 14:01 Page 10
WATER SYSTEMS & PIPEWORK
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
11
PRE -
INSTALLATION
WATER SYSTEMS & PIPEWORK
A - Appliance expansion vessel
B - Extra expansion vessel
C - Automatic bypass valve
D - Drain cock
E - Feed & expansion cistern
F - Combined feed & expansion
and open vent safety pipe.
G - Appliance
L - Lockshield valve
P - Pressure relief discharge
R - Radiators
S - Static head
T - TRV
U - To filling system
PRIMARY SYSTEM PLASTIC PIPEWORK:
• Any plastic pipework used for the CH system
must have a polymeric barrier, complying with
BS 7921 and installed to BS 5955 with
1000mm (minimum) length of copper or steel
pipe connected to the boiler.
• Plastic pipework used for underfloor heating
must be correctly controlled with a
thermostatic blending valve limiting the
temperature of the circuits to approx. 50°C
with 1000mm (minimum) length of copper or
steel pipe connected to the boiler.
PRIMARY SYSTEM/CONNECTIONS/VALVES:
• Do not use galvanised pipes or radiators.
• All system connections, taps and mixing
valves must be capable of sustaining a
pressure of 3 bar.
• Radiator valves should conform to
BS 2767:10.
• All other valves should conform to BS 1010.
• On new installations TRVs must be used on
all radiators except the radiator where the
room thermostat is sited, this must be fitted
with lockshield valves and left open. All
installations should have TRVs fitted to
radiators within the sleeping accommodation.
• An automatic bypass valve must be connected
between the heating flow and return pipes
where TRVs are used on radiators. This must
be fitted to give at least a 3m circuit when
activated.
• Drain cocks are required at all the lowest
points on the system.
• Air vents are required at all high points on the
system.
OPEN VENT PRIMARY SYSTEM:
• In order to comply with BS 5449 the
combined feed and vent pipe must
be connected to the BSP outlet on the
right hand side of the primary heat exchanger.
• The feed and expansion cistern (E) must be
positioned to provide a static head (S) of at
least 1 metre above the highest point in the
heating system to the water level in the feed
and expansion cistern (E).
• No valve shall be fitted in the combined feed
and expansion and open vent pipe (F).
• The combined feed and expansion and open vent
pipe (F) must be at least 22mmØ.
SEALED PRIMARY SYSTEM:
• Where the system volume is more than 180
litres at 0.5 bar or exceeds 2.65 bar at
maximum heating temperature an extra
expansion vessel (B) must be fitted as close
as possible to the appliance in the central
heating return.
• Pressurise the extra expansion vessel (B) to
the same figure as the expansion vessel (A)
built into the appliance.
IMPORTANT: The boiler should not be
allowed to operate with a return
temperature of less than 40°C when the
system is up to operating temperature.
8 716 113 389d 30/3/10 14:01 Page 11
WATER SYSTEMS & PIPEWORK
FILLING PRIMARY SEALED SYSTEMS:
• Filling the system must comply with one of
the methods shown opposite.
• The filling point must be at low level and must
never be a permanent direct fixing to the
mains water supply.
• Filling loops must be WRAS approved.
SHOWERS/BIDETS:
• If a shower head can be immersed in water or
comes closer than 25mm from the top edge
of a bath or shower tray spill over level then
an anti-siphon device must be fitted to the
shower hose.
• Only thermostatically controlled showers are
suitable for use with this appliance.
• Bidets with direct hot & cold mains water can
be used (with the approval of the local water
authority) and must be the over rim flushing
type with shrouded outlets to prevent the
fitting of hand held sprays.
DOMESTIC HOT WATER:
• Plastic pipework must not be used for
the DHW system.
• Taps and mixing valves must be capable of
sustaining a pressure up to 10 bar in
accordance with the Water Regulations as
they will be operating at mains water
pressure.
• Hot water temperature and flow rate are
affected by the size and insulation of
pipework making up the distribution system
and are controlled by the hot water tap and
the water main inlet pressure. A mixing valve
can be fitted if a more permanent setting is
required.
• If using more than one outlet at once causes
water flow starvation, fit flow balancing valves
or Ball-O-Fix valves to the appropriate outlets.
Heating return
Hose
return
Non return
valve
Non return
valve
Test cock
Stop
cock
Water main
supply
Stop
cock
Temporary hose
Heating return
Auto air
vent
Non return
valve
Stop
cock
Make up
vessel
1000mm above
the highest point
of the system
Fill Point
INSTALLATION
COMMISSIONING
WATER SYSTEMS & PIPEWORK
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
12
PRE -
INSTALLATION
8 716 113 389d 30/3/10 14:01 Page 12
PRESSURE RELIEF PIPEWORK
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
13
PRE -
INSTALLATION
K
J
b
E
C
Invert
450 min.
A
c
D
A
C
75mm
min.
a
A
B
C
D
400mm
min.
500mm min.
d
F
I
H
G
A
C
25mm
min.
200mm min.
(Unsuitable for clay soil types)
CONDENSATE PIPEWORK:
• All national and, where appropriate, local
regulations for the discharge and
neutralisation of condensate should be
followed.
• The condensate pipe must be a minimum of
21.5mmØ polypropylene pipe.
• The condensate pipework must fall at least
50mm per metre towards the outlet and
should take the shortest practicable route
• Support the pipe at least every 0.5m for near
horizontal runs and 1m for vertical runs.
• When a boiler is to be installed in an unheated
location, such as a garage, all condensate
pipes should be considered as external.
External pipework:
• The 21.5mmØ pipe must not exceed 3 metres
outside the building. If a run greater than 3m is
required, 32mmØ pipe must be used.
• Any pipe exposed to windchill or extreme cold
must be 32mmØ.
• Protect all external pipes with weather resistant
insulation and box-in, if necessary to reduce the
risk of freezing.
• Terminate as close to the ground or drain as
possible (below the grating and above the
water level) while still allowing for safe
dispersal of the condensate. This will help
reduce windchill freezing.
Connection of a condensate pipe to a drain may
be subject to to local building regulations.
Making it safe:
• Condensate pipework must not leak, freeze or
block up.
• Condensate traps must be filled before starting
up the boiler to prevent potentially harmful flue
products escaping via the condensate route.
• Do not dispose of condensate into water
recovery systems.
Condensate can be discharged into a rain water
hopper which is part of a sewer system carrying
both rain water and foul water.
• The pipework must follow one of the options
shown opposite:
a - Internal waste drainage system
b - Soil/vent stack
c - External drainage system
d - External condensate absorption point
A - Condensate from the boiler internal
condensate trap which has a 75mm
minimum water seal.
B -
Sink.
C -
21.5mm Ø polypropylene condensate pipe.
D -
Gully.
E -
Internal soil and vent stack.
F -
300mm x 100mm Ø sealed plastic tube.
G - Ground level.
H -
Drainage holes 50mm from base of tube
(12mm Ø at 25mm centres) facing away
from building.
I -
Limestone chippings.
PRESSURE RELIEF PIPEWORK:
• The pressure relief drain pipe (K) should be
at least 15mm diameter copper pipe and run
downwards away from the boiler and discharge
away from any electrics or other hazard,
preferably to an external drain or soakaway.
• Pipe (K) should be finished with a partial
bend, near the outlet to face the external wall
(as shown) to help prevent freezing.
CONDENSATE &
PRESSURE RELIEF PIPEWORK
IMPORTANT: The pressure relief valve is a
safety device for the boiler and if activated
may discharge boiling water or steam
through the relief valve drain pipe.
Care should be taken when siting the outlet
pipe so that it does not cause an obstruc-
tion or discharge into a public area where it
could cause a hazard.
8 716 113 389d 30/3/10 14:01 Page 13
CABINET MOUNTED LOW LEVEL
FLUE TERMINAL POSITIONS
CABINET MOUNTED LOW LEVEL
FLUE TERMINAL POSITIONS
14
PRE -
INSTALLATION
Minimum dimensions of flue terminal positions for oil fired appliances:
TERMINAL POSITION B(H)
A
1
Directly below an opening, air brick, opening windows, etc 600mm
B
1
Horizontally to an opening, air brick, opening window, etc 600mm
C
Below a plastic/painted gutter, drainage pipe or eaves if 75mm
combustible material protected
D
2
Below a plastic/painted gutter, drainage pipe or eaves without 600mm
protection to combustible material
E From vertical sanitary pipework 300mm
F From an external or internal corner or from a surface or boundary 300mm
alongside the terminal
G Above ground or balcony level 300mm*
H
A
From a surface or boundary facing the terminal with 2500mm 1200mm
clearance to both sides of the terminal
H
B
From a surface or boundary facing the terminal with less than
2500mm
2500mm clearance to either side of the terminal
I
A
From a terminal facing the terminal with 2500mm clearance to 1200mm
clearance to both sides of the terminal
I
B
From a terminal facing the terminal with less than 2500mm 2500mm
clearance to either side of the terminal
K Horizontally from a terminal 750mm
B(H) Balanced Horizontal flue
1 An opening means an openable
element, such as an openable
window, or a permanent opening
such as a permanently open air vent.
Notwithstanding the dimensions
above, a terminal should be at least
300mm from combustible material,
e.g. a window frame.
2 A way of providing protection of
combustible material would be to fit
a heat shield at least 750mm wide.
• Flue terminals must be positioned to avoid
combustion products entering into buildings.
• The flue must be fitted and terminated in
accordance with the recommendations of
BS5410.
• The flue must not cause an obstruction.
• Discharge from the flue outlet must not be a
nuisance.
• Flue gases have a tendency to plume and in
certain weather conditions a white plume of
condensation will be discharged from the flue
outlet which could be regarded as a
nuisance, for example, near security lighting.
• There should be no restriction preventing the
clearance of combustion products from the
terminal.
• The air inlet/outlet duct and the terminal of
the boiler must not be closer than 25mm to
any combustible material. Detailed
recommendations on protection of
combustible materials are given in BS 5410:1
• A protective terminal guard must be fitted if
the terminal is 2m or less above a surface
where people have access.
Stainless steel terminal guard.
Part No: 7 716 190 050
• The following additional guidelines (from part
L Exceptions Guidance Document) are
recommended when determining the flue
outlet position:
• Avoid discharging flue gases into car ports
or narrow passageways.
• *Minimum distance of the flue terminal from
above ground is 2100mm where directed to a
public footpath, private access route or a
frequently used area and 2500mm from a
car parking area.
boundary
F
I
H
B
A
G
E
C, D
F
F
J
K
boundary
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 106 389c (01/2009)
8 716 113 389d 30/3/10 14:01 Page 14
HIGH LEVEL FLUE TERMINAL
POSITIONS
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
15
PRE -
INSTALLATION
HIGH LEVEL FLUE TERMINAL
POSITIONS
• Flue terminals must be positioned to avoid
combustion products entering into buildings.
• The flue must be fitted and terminated in
accordance with the recommendations of
BS 5410.
• The flue must not cause an obstruction.
• Discharge from the flue outlet must not be a
nuisance.
• Flue gases have a tendency to plume and in
certain weather conditions a white plume of
condensation will be discharged from the flue
outlet which could be regarded as a
nuisance, for example, near security lighting.
• There should be no restriction preventing the
clearance of combustion products from the
terminal.
• The air inlet/outlet duct and the terminal of
the boiler must not be closer than 25mm to
any combustible material. Detailed
recommendations on protection of
combustible materials are given in BS 5410:1
• A protective terminal guard must be fitted if
the terminal is 2m or less above a surface
where people have access.
The guard must be spaced equally (minimum
50mm) around the flue and fixed to the wall
with plated screws.
Stainless steel terminal guard.
Part No: 7 716 190 050
The following additional guidelines (from part
L Exceptions Guidance Document) are
recommended when determining the flue
outlet position:
• Avoid discharging flue gases into car ports
or narrow passageways.
• *Minimum distance of the flue terminal from
above ground is 2100mm where directed to a
public footpath, private access route or a
frequently used area and 2500mm from a
car parking area.
• **Minimum distance of the flue terminal to a
facing wall, fence, building or property
boundary is 2500mm.
boundary
F
J
H
B
A
G
E
M
C, D
N
F
F
K
L
boundary
Q
Q
Q
R
Q
Q
Q
Q
Pitched roof
Flat roof
P
O
Key: — Not applicable, N/A Not allowed, B(H) Balanced Horizontal flue, B(V) Balanced Vertical flue.
Notes:
1. Terminals should be positioned so as to avoid products of combustion accumulating in stagnant pockets around the building
or entering into buildings.
2. Vertical structure in N, O and P includes tank or lift rooms, parapets, dormers etc.
3. Terminating positions should be at least 1.8m from an oil storage tank unless a wall with at least 30 min fire resistance and
extending 300mm higher and wider than the tank is provided between the tank and the terminating position.
4. Where a flue is terminated less than 600mm away from a projection above it and the projection consists of plastics or has a
combustible or painted surface, then a heat shield of at least 750mm wide should be fitted.
5. If the lowest part of the terminal is less than 2m above the ground, balcony, flat roof or other place to which any person has
access, the terminal should be protected by a guard.
6. Notwithstanding the dimensions given above, a terminal should not be sited closer than 300mm to combustible material. In the
case of a thatched roof, double this separation distance should be provided. It is also advisable to treat the thatch with a fire
retardant material and close wire in the vicinity of the flue.
7. It is essential that a flue or chimney does not pass through the roof within the shaded area delineated by dimensions Q and R.
8. Where protection is provided for plastic components, such as guttering, it is essential that this is to the standard specified by
the manufacturer of the plastic components.
TERMINAL POSITION
B(H)
B(V)
A
1 4
Directly below an opening, air brick, opening window, etc
600mm
N/A
B
1 4
Horizontally to an opening, air brick, opening window, etc
600mm
N/A
C
8
Below a plastic/painted gutter, drainage pipe or eaves if
combustible material protected
75mm
N/A
D
8
Below a plastic/painted gutter, drainage pipe or eaves with-
out protection to combustible material
600mm
N/A
E
From vertical sanitary pipework
300mm
N/A
F
3
From an external or internal corner or from a surface or
boundary alongside the terminal
300mm
N/A
G
3
Above ground or balcony level
300mm*
N/A
H
3
From a surface or boundary facing the terminal
600mm**
N/A
J
From a terminal facing the terminal
1200**mm
—
K
Vertically from a terminal on the same wall
1500mm
N/A
L
Horizontally from a terminal on the same wall
750mm
—
M
Above the point of highest intersection with the roof
600mm
N
2
From a vertical structure on the side of the terminal
—
750mm
O
2
Above a vertical structure less than 750mm from the side of the
terminal
—
600mm
P
2
From a ridge terminal to a vertical structure on the roof
—
—
Q
Above or to the side of any opening on a flat or sloping roof
—
300mm
R
Below any opening on a sloping roof
—
1000mm
Minimum dimensions of flue terminal positions for oil fired appliances:
8 716 113 389d 30/3/10 14:01 Page 15
BOILER LOCATION &
CLEARANCES
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
16
PRE -
INSTALLATION
BOILER LOCATION &
CLEARANCES
WARNING:
This appliance should not be installed where
there is a potential for excessive ground
water coverage.
This boiler is only suitable for installing
externally at a suitable location onto a fixed
permanent rigid surface capable of
supporting the boiler weight.
There must be a sufficient hard standing
around the appliance to allow for servicing.
The boiler must be installed on a flat level
surface to ensure that condensate does not
enter the primary heat exchanger.
Tarmac and wood hardstandings are not
recommended.
CLEARANCES: Min service & flue clearances
Above
600mm
Front
600mm
RH/LH flue outlet on opposite side 10mm
RH flue outlet on rear 85mm
LH flue outlet on rear 10mm
Rear = flue outlet on side
150mm**
Rear = rear flue outlet
2500mm*
It is strongly recommended that the flue
terminal faces away from walls to reduce
the possibility of wetting occurring.
*This can be reduced to 1200mm if there is at
least 2500mm clearance on both sides of the
flue.
** 200mm if a high level terminal is used exiting
through the rear panel.
600mm
2500mm*
600mm
BASE
FRONT
FRONT
2500mm*
150mm**
85mm
10mm
600mm
10mm
600mm
2500mm*
FRONT
FRONT
2500mm*
10mm
600mm
150mm**
Plan
view
Plan
view
Plan
view
600mm
(min)
8 716 113 389d 30/3/10 14:01 Page 16
L = 4000mm
125mmØ x4
L
L = 2000mm
125mmØ x2
B
D
D
B
E
E
B
C
D
L
F
F
L = 5000mm
125mmØ x5
L
E
B
L = 4000mm
125mmØ x4
B
E
L
C
BALANCED EXTERNAL OILFIT
FLUE OPTIONS
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
17
PRE -
INSTALLATION
IMPORTANT: The weather seal (supplied)
must be fitted to every flue joint to give
the required level of weather protection.
The diagrams (opposite) show the components
used and the maximum flue length (L) for
each flue configuration.
In all cases L is measured from the outside of
the boiler casing.
• To achieve the maximum flue length (L), a flue
section will have to be reduced in length.
• Only the straight flue extensions can be
reduced in length by cutting.
IMPORTANT: All horizontal sections must
rise away from the boiler by 52mm per
metre (3°) to allow the condensate to
drain back to the boiler.
B - Straight flue extension
C - Flue bend 90°
D - Flue bend 45°
E - Vertical Terminal Kit (incl. 90° elbow)
F - Horizontal terminal kit (incl. 90° elbow)
Calculating the flue length:
Measure the total flue length required, noting
that the maximum straight flue length including
the terminal is:
Horizontal: 2000mm.
Vertical 80/125mmØ: 5000mm.
Then reduce the total straight flue length for
each extra flue bend (excluding the vertical flue
kit 90° elbow) by:
1000mm for 90°
500mm for 45°
Flue Extension lengths:
Horizontal & Vertical: 1000mm overall length.
Effective length when engaged into sockets
within the flue run is 950mm.
Flue Terminal lengths:
Horizontal oilfit external = 305mm
Vertical oilfit external 80/125mmØ =
185mm + cage
* Rear exit only.
** Horizontal flue runs should be kept as
short as possible. For satisfactory flue
performance we recommend that no more
than two metres of the vertical flue is run
horizontally.
BALANCED EXTERNAL OILFIT
FLUE OPTIONS
High level horizontal terminal (rear outlet)
*
**
Vertical terminal (rear outlet)
Vertical terminal (rear outlet)
Vertical terminal (side outlet)
**
**
**
8 716 113 389d 30/3/10 14:01 Page 17
BALANCED FLUE OPTIONS
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
18
PRE -
INSTALLATION
CABINET MOUNTED BALANCED
HORIZONTAL FLUE OPTIONS
• The horizontal flue is fitted to the rear or
either side of the cabinet.
IMPORTANT:
It is strongly recommended that the flue
terminal faces away from walls to
minimise the occurrence of wetting.
A - External horizontal flue kit
Part No. 7 716 190 084
B - 90° inline elbow 80/125mm
Part No. 7 716 190 034
C - Stainless steel terminal guard
Part No. 7 716 190 050
NOTE: The flue terminal and services duct must
not exit through the same panel.
FRONT
FRONT
FRONT
Plan
view
Plan
view
Plan
view
REAR FLUE OUTLET
A + C
LEFT HAND FLUE OUTLET
A + B + C
RIGHT HAND FLUE
OUTLET
A + B + C
8 716 113 389d 30/3/10 14:01 Page 18
It is advised that two or more persons are involved
in the transfer of the packaged boiler from the van
to the point of delivery.
1 � Once the packaged boiler has been
delivered, the outer carton is removed first.
Care should be taken when releasing the
straps. If a sharp implement is used make sure
the outer carton is not pierced and that the
implement is used in such a way so that it may
not cause personal injury. All sharp objects
must be covered or the blade retracted after
use and put away in a safe place.
2 � Lift carton up and away from the boiler.
� Remove the plastic bag from the boiler and
place safely aside.
UNPACKING THE BOILER
LIFTING AND CARRYING PRECAUTIONS:
• Lift only a manageable weight, or ask for
help.
•
When lifting or putting things down, bend
the knees, and keep the back straight
and feet apart.
•
Do not lift and twist at the same time.
•
Lift and carry objects close to the body.
•
Wear protective clothing and gloves to
protect from any sharp edges.
IMPORTANT: All the previous Pre-Installation sections must be read
and requirements met before starting boiler or flue installation.
1
2
UNPACKING THE BOILER
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
19
INSTALLATION
8 716 113 389d 30/3/10 14:01 Page 19
All dimensions in mm
256
650
58
802
258
81
105
171
374
161
650
787
670
518
105 94 55
269
658
669
705
715
650
794
670
518
158
124 89.5 55
658
679
698
718
528
230
INSTALLATION
COMMISSIONING
SAFETY:
All relevant safety precautions must be undertaken.
Protective clothing, footwear, gloves and safety
goggles must be worn as appropriate.
PIPEWORK CONNECTIONS:
CH flow 22mmØ copper (28mmØ on
25/32kW model)
DHW flow 22mmØ copper
Mains water inlet 15mmØ
CH return 22mmØ copper (28mmØ on
25/32kW model)
Optional combined feed and expansion and
open vent pipe 1'' BSP
Services duct 100mmØ
Pressure relief pipe 15mmØ
Condensate outlet 21.5mmØ
NOTE: For servicing purposes, keep the
condensate and pressure relief
discharge pipes away from components
and pipework connections.
CAUTION: Ensure there are no pipes,
electric cables, damp proof courses or
other hazards before drilling.
PIPEWORK & FLUE POSITIONS
PIPEWORK & FLUE POSITIONS
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
20
Condensate
Flue
Services
PRV
Fire valve capillary
Flue
Services
Condensate
PRV
Oil
Flue
Services
Condensate
Oil
PRV
LEFT HAND SIDE
RIGHT HAND SIDE
REAR
Fire valve capillary
8 716 113 389d 30/3/10 14:01 Page 20
NOTE: The cabinet is not load bearing
and only provides weather
protection for the boiler.
1�Mark position of the 100mm services
duct on the exterior wall and make a hole
through.
2�Remove the key for the door fasteners
from its transport position in the left hand
side panel flue outlet aperture.
Undo the screws at the bottom of
the front panel (using the key provided)
and remove the screws from the rear
panel pulling both panels out and down
to remove. Store safely away from the
installation point.
3�Remove the screws from the top panel
and lift up to remove, store safely away
from the installation point.
4�Loosen the flexible air duct clamp (A)
and remove the air duct from the burner.
�Depress the locking ears to unplug the
burner lead (B) from the control box (C).
�Unscrew the burner retainers (D), then
withdraw the burner (E) from the boiler and
store safely away from the installation point.
5�Remove the screws securing the base
panel to the transit pallet and lift the boiler
off the pallet and into its installation
position taking care not to scrape the
base panel across the hard standing.
Do not attempt to lift and position the
boiler on your own. Do not use the
copper pipes to move the boiler.
�Fasten the base to the hard standing
using the holes provided. Care should be
taken to ensure that the base is level.
6�Measure the 100mmØ services duct to
give at least 10mm inside the casing and
to finish flush with the interior wall
surface, cut to size and fit the duct. Fit the
100mm sealing ring where the duct
enters the casing and seal the joint to the
exterior wall and inside the cabinet with a
suitable sealant.
BOILER INSTALLATION
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
21
INSTALLATION
2
3
2
5
4
B
C
D
E
A
WARNING: THIS APPLIANCE IS SERVICED AND REPAIRED EXTERNALLY.
EXTERNAL EQUIPMENT OPERATED AT 230V SHOULD NOT BE INSTALLED, SERVICED OR
REPAIRED UNDER ADVERSE WEATHER CONDITIONS.
THIS APPLIANCE IS INSTALLED AND SERVICED EXTERNALLY TO THE PROPERTY, BUT
THE ENGINEER MUST HAVE ACCESS TO THE INSIDE OF THE PROPERTY WHEN
INSTALLING OR SERVICING THE APPLIANCE.
8 716 113 389d 30/3/10 14:01 Page 21
� Ensure all the seals are in good condition
and seated properly.
� To ease assembly of flue components,
grease seals lightly with the solvent free
grease supplied.
� A terminal guard must be fitted if the
terminal is 2m or less above a surface where
people have access.
Refer to separate flue installation manual
supplied with the flue kits available for this
boiler.
NOTE: All horizontal flue sections must rise by
52mm for each metre away from the
boiler to ensure that the condensate
flows back to the boiler for safe
disposal via the condensate waste
pipe.
FLUE INSTALLATION
FLUE INSTALLATION
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
22
INSTALLATION
Balanced external oilfit flue kits and components 80/125mm Ø
(not supplied):
External horizontal flue kit
7 716 190 084
In-line elbow 90° x 1
7 716 190 034
Stainless steel terminal guard
7 716 190 050
80/125mmØ High level horizontal external flue kit
7 716 190 057
80/125mmØ Vertical External flue kit
7 716 190 053
80/125mmØ Balanced external flue 1m extension kit
7 716 190 054
80/125mmØ Balanced external flue 90° swept elbow kit
7 716 190 055
80/125mmØ Balanced external flue 45° elbow (2 off) kit
7 716 190 056
8 716 113 389d 30/3/10 14:01 Page 22
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
23
INSTALLATION
Combustion chamber:
1� Release retaining nuts and washers (B).
� Remove combustion chamber access
door (A).
2� Ensure the baffles (C) and baffle retainer
(D) are correctly fitted for the boiler output
as shown in the plan views opposite.
3� Refit combustion chamber door (A).
IMPORTANT: Secure with nuts and
washers (B) and tighten, using the
sequence shown in figure 3a, until the
chamber door is firmly secured, do not
over tighten the nuts.
4� Unscrew screws (E) and remove flue
manifold access cover (F).
5� Check that all the baffles (G) and baffle
retainer (H) or ( J ) are correctly fitted to the
secondary heat exchanger.
COMBUSTION CHAMBER
H
F
2
E
4
G
5
A
B
1
3
D
C
12/18 & 18/25kW
Plan sectional view
D
C
25/32kW
Plan sectional view
J
Hook the
retainer ( J )
over the
end two
baffles
or
1
2
4
3
3a
FRONT FRONT
8 716 113 389d 30/3/10 14:01 Page 23
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
24
INSTALLATION
Q
O
PIPEWORK CONNECTIONS
A -
CH flow 22mmØ copper (28mmØ on
25/32 models)
B -
DHW flow 22mmØ
C -
Water main inlet 15mmØ
D -
CH return 22mmØ copper (28mmØ on
25/32 models)
E
-
10mmØ oil supply pipe connection
F
-
Oil isolating valve (10mmØ)
G -
Flexible oil hose
N -
Optional combined feed and expansion
and open vent
O -
CH flow pipe 22mmØ
P - Fixing point for optional return oil pipe
Q - Drain
WATER CONNECTIONS:
�All service pipes into the property must pass
through the services duct.
�Insulate all the system/supply pipes where
the pipes pass through the duct with at least
22mm insulation around the pipes.
�Remove the transit bungs from the pipework
connections on the boiler.
NOTE: That surplus water may be present due
to factory testing.
�Ensure all pipework is clean.
�Remove the central heating flow pipe (O)
from its packaging. Grease the flat washer
with the grease supplied and fit the pipe and
washer onto the isolation valve as shown.
�Align water pipework through the 100mm Ø
duct and connect, ensuring that the
expansion tank and control box fit correctly
before permanently connecting the pipework.
�Check that all unused sockets have been
capped.
OIL SUPPLY CONNECTIONS:
NOTE: Oil filters and de-aeration devices are
not to be fitted within the casing and
the fire valve body must be at least
1 metre from the external casing.
�Route the oil supply pipe through the
appropriate casing hole as required and
connect to the isolating valve (F) and ensure
the valve is closed.
�Connect the flexible oil hose (G) to the
isolating valve (F).
�Pass the fire valve sensor through the most
appropriate casing hole and locate the
capillary in the cut out at the bottom of the
hole.
�Clip the sensor into the clip provided at the
rear of the control box.
�Rotate the cover plate and seal so it does not
cover the capillary, then secure with the screws
provided.
CAUTION: ISOLATE THE OIL & WATER MAINS SUPPLY BEFORE STARTING ANY
WORK AND OBSERVE ALL RELEVANT SAFETY PRECAUTIONS.
8 716 113 389d 30/3/10 14:01 Page 24
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
25
INSTALLATION
s
T
U
PIPEWORK CONNECTIONS
H -
Flue manifold condensate outlet
J
-
Condensate outlet (21.5mmØ) - supplied
K -
Condensate pipe - not supplied
L
-
Internal condensate trap
M -
Pressure relief (15mmØ)
CONDENSATE CONNECTION:
�Connect 21.5mm polypropylene pipe (K)
(not supplied) to the condensate pipe flexible
push fit connector (J) before terminating
to waste.
�Do not use any solvents, adhesives or
lubricants when pushing the pipe into the
rubber connector (J).
�Ensure that the condensate pipe runs away
from the boiler at a constant fall of 50mm
(min.) for every metre.
�Carefully pour 500ml of water into the
condensate collection (S) to fill condensate trap.
�Check the water is running away and the
condensate pipework joints are water tight.
�Check the flue manifold seal is undamaged
and seated correctly.
�Refit flue manifold access cover ( T ) and
secure with screws (U).
IMPORTANT: The condensate trap must be
correctly filled to prevent the possibility of
potentially harmful flue products escaping
via the condensate pipework.
PRESSURE RELIEF CONNECTION:
�Connect the pressure relief pipe (M) to a
copper discharge pipe (15mmØ min.) and
terminate externally to the appliance casing.
�Blank all unused casing holes with the bungs
or cover plates and seals supplied. The
drain/fire valve capillary hole covers should
be rotated so that the unused capillary slot is
covered by the cover plate and seal.
�Refit rear panel.
�Seal all joints where pipes pass through the
casing, with suitable waterproof sealant.
IMPORTANT: Insulate all
external condensate pipe
work or run in 32mm pipe
work to prevent freezing.
8 716 113 389d 30/3/10 14:01 Page 25
OIL BURNER & PUMP
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
26
INSTALLATION
CAUTION: ISOLATE THE OIL & WATER
MAINS SUPPLY BEFORE STARTING ANY
WORK AND OBSERVE ALL RELEVANT
SAFETY PRECAUTIONS.
OIL BURNER:
1� Check the nozzle (A) and electrode (B)
settings are correct for the relevant burner
as shown opposite.
� Ensure nozzle (A) is aligned centrally within
the combustion head (C).
� Inspect for any visible defects.
IMPORTANT: Whenever replacing the
combustion head, ensure that the photocell
is lined up with the sight hole.
OIL PUMP:
Connecting the oil pump for a single pipe
system:
The pump is factory set for single pipe
operation with the flexible oil hose fitted.
Check connections before use.
Converting the oil pump for a double pipe
system:
1� Check the inlet hose connection.
a) DANFOSS BFP 11 L3:
� Remove pump front cover (A) ensuring a
suitable receptacle is used to catch any oil
residue.
� Remove changeover screw (B).
� Remove horseshoe washer (C).
� Refit changeover screw (B).
� Refit front cover (A).
� Remove oil pump return plug (2).
b) SUNTEC AS47C:
� Remove return port plug (2) and insert
grub screw (B).
c) RIELLO RDB:
� Unscrew return plug (2).
� Screw in by-pass screw (3).
2� Connect the flexible oil return hose
(not supplied) between the oil pump and
the return line connection, and tighten to
secure.
OIL BURNER & PUMP
5mm
Electrode gap
2.5 - 3.0mm
7.5mm
B
A
1
C
1
2
B
1
2
B
C
A
5mm
a) DANFOSS BFP 11 L3 OIL PUMP
b) SUNTEC AS47C OIL PUMP
2.5mm
Electrode gap 4mm
B
A
1
C
5mm
c) RIELLO RDB OIL PUMP
1
2
3
BENTONE
12/18 & 18/25kW
RIELLO
12/18, 18/25 &
25/32kW
8 716 113 389d 30/3/10 14:01 Page 26
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
27
INSTALLATION
REFITTING COMPONENTS
1� Align burner combustion head (A) into boiler
housing tube with gasket (B) correctly fitted.
� Push firmly down to compress the gasket (B).
� Tighten burner retainers (C) sufficiently to
ensure a good seal.
IMPORTANT: Ensure the gasket is a good
seal between the burner combustion head
and the boiler housing to prevent flue gases
escaping from the combustion chamber
into the cabinet.
� Attach the flexible air duct and tighten
clamp(D) to secure to the burner air intake.
2� Plug burner lead (E) into control box (F).
F
A
B
C
D
E
8 716 113 389d 30/3/10 14:01 Page 27
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
28
INSTALLATION
FR
LR
Ns
Fs
FR
Ls
N
L
DHW
CH
ELECTRICS
1
DANGER - 230V:
ISOLATE THE MAINS ELECTRICITY
SUPPLY BEFORE STARTING ANY
WORK AND OBSERVE ALL RELEVANT
SAFETY PRECAUTIONS.
IMPORTANT: THIS APPLIANCE
PROVIDES A PERMENANT EXTERNAL
ELECTRICAL SUPPLY FOR SERVICING
AND MUST THEREFORE BE FED VIA A
CIRCUIT BREAKER INCORPORATING
EARTH LEAKAGE PROTECTION.
IMPORTANT: OBSERVE ELECTRONIC
STATIC DISCHARGE PRECAUTIONS.
DO NOT TOUCH THE PCB CIRCUITS.
WARNING: EXTERNAL EQUIPMENT
OPERATED AT 230 VOLTS SHOULD NOT
BE SERVICED OR REPAIRED UNDER
ADVERSE WEATHER CONDITIONS.
Access to 230V connections:
1�Release screws (B) and remove cover
panel (C) from control box (A).
2�Release screws (D) from cable clamp (E).
�Pull inner clamp part (F) outwards.
�Feed sufficient power cable (G) through the
cable clamp (E) and secure grip with screw (D).
�Separate wires from cable end and strip to 6mm.
230V connections (terminal block X1):
3�Connect LIVE wire (Brown) to terminal L.
�Connect NEUTRAL wire (Blue) to
terminal N.
�Connect EARTH wire (Green/Yellow) to
the connector .
Route the power cable down the side panel and
through the service duct to the internal property
connection point avoiding any potentially hot
surfaces.
Any external device connected to the
boiler must take its power supply from
the boiler supply only and must NOT
have a separate supply.
Terminal block (M) is provided with links (P) to
test fire the boiler with DHW and CH
permenant demand. Links (P) must be removed
and a suitable programmer connected before
commissioning.
External 230V programmer
(terminal block X4):
4 �Remove 4 pin plug (M) from X4.
�Remove test links (P) from plug block (M).
�Connect wires to plug block (M) as shown.
�Fit plug into terminal block X4.
�Connect earth to terminal block X1connector
230V room thermostat (terminal block X2):
6 �Remove link (K).
�Connect LIVE supply to terminal LS.
�Connect SWITCHED LIVE supply to
terminal LR.
NOTE: This is sometimes referred to as
‘call for heat’ or ‘heating load’.
�Connect NEUTRAL to terminal Ns.
NOTE: Some devices do not require this.
Refit electric control panel cover:
�Refit panel (C) and secure with screws (B).
NOTE: Both frost thermostats are fitted as
standard to the external appliance to
provide frost protection.
C
B
A
4
P
M
G
D
E
2/3
230V
MAINS
SUPPLY
X2
6
Neutral (if required)
Switched Live
Live
FROST
STAT(1)
FROST
STAT(2)
7 k 7
ROOMSTAT
Accelerator
resistor
(if fitted)
PROGRAMMER (EXTERNAL)
5
clock
CH channel
HW channel
N Supply
L Supply
HW Demand
CH Demand
X4
Fuse
CONTROL
BOARD
.
M
B
G
F
8 716 113 389d 30/3/10 14:01 Page 28
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
29
INSTALLATION
RESET
White
ELECTRICS
Electrical components:
1
Printed circuit board
2
Thermostat - boiler high limit
3
Thermostat - DHW control
4
Thermostat - CH control
5
Indicator lamp - boiler mode
6
Indicator lamp - lock-out
7
Manual reset - overheat thermostat
8
Manual reset - flue overheat thermostat
9
Manual reset - burner lock-out
10 Manual reset - tank overheat thermostat
11 External programmer (not supplied)
12 Burner socket
13 Burner plug
14 Burner control box
15 Flow switch
16 Circulating pump
17 Diverter valve
18 Frost stat
19 Frost stat
Wire colour code:
br - Brown
bl - Blue
gy - Green/Yellow
r
- Red
w - White
y
- Yellow
g
- Grey
bk - Black
or - Orange
pk - Pink
8 716 113 389d 30/3/10 14:01 Page 29
CHECKS - APPLIANCE
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
30
1
2
3
5
200
0
0
Bar
Litres per hour
0.6
0.5
0.4
0.3
0.2
0.1
400
600
800 1000 1200 1400 1600
200
0
0
Bar
Litres per hour
0.6
0.5
0.4
0.3
0.2
0.1
400
600
800 1000 1200 1400 1600 1800 2000 2200 2400
0.7
12/18 & 18/25
25/32
4
PRE-COMMISSIONING CHECKS -
APPLIANCE
CAUTION: ISOLATE THE MAINS SUPPLIES
BEFORE STARTING ANY WORK AND
OBSERVE ALL RELEVANT SAFETY
PRECAUTIONS.
1� Check that the service and water pipes are
connected correctly.
� Check that all unused sockets are capped.
2� Check that the oil supply is kerosene and
that the pipework is connected correctly
to the oil pump via the supplied flexible oil
hose.
� Turn on the main oil supply valve at the
tank, check the oil supply pipework and
connections. Rectify any leaks.
3� Check the flue is correctly fitted and the
connections are secure.
4� Check the condensate pipework is
correctly fitted and connected.
� Check the condensate trap is filled with
water.
5� Check the CH circulating pump is set to 3.
NOTE: The CH circulating pump is preset to
number 3 and should not be altered.
The diagrams opposite show the
pump outputs.
NOTE: The cabinet is not load bearing, it only
provides weather protection for the
boiler inside.
IMPORTANT: If the boiler is not to be
commissioned immediately then:
After successfully completing all of the
checks and any rectification work, close the
water valves, shut off the oil supply and
electrically isolate the boiler.
Complete the installation part of the
Guarantee Registration Card, and complete
a CD10 or its equivalent, to inform the LABC
of the installation.
COMMISSIONING
8 716 113 389d 30/3/10 14:01 Page 30
FILLING THE SYSTEM
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
31
COMMISSIONING
1�Pull lever (C) up and push to the left to
move the diverter valve to the mid-position
between ports A and B.
�Push and hold lever (C) down to lock.
2�Loosen the automatic tank air vent.
� The pump automatic air vent has a
protective cover that must remain in place,
this auto air vent needs no adjustment
before filling the boiler.
� Refit the protective cover.
3�Sealed systems only; check and if required,
adjust the expansion vessel pressure using
the Schraeder type valve (D).
The charge pressure of the built-in 12 Litre
expansion vessel is 0.5 bar as dispatched,
which is equivalent to a static head of 5m.
If an extra expansion vessel is fitted to the
central heating return, adjust this to the same
pressure as the appliance internal expansion
vessel, refer to separate instructions supplied
with the extra expansion vessel.
4�Open all system and radiator valves (E).
�Turn on the water main stop cock.
�Open vented systems only; turn on the
water to the system feed and expansion
cistern and allow the system to fill.
�Sealed systems only; fill the system to
between 1 and 2 bar pressure via a WRAS
approved filling link. Monitor the pressure
gauge during venting and repressurise if
required.
�Check air is being discharged from the
automatic air vents.
�Vent all radiators, retighten when completed,
check the system and correct any leaks.
�Bleed air from both of the secondary heat
exchanger air vents (F).
�Bleed air from the pump using the
pump bleed screw.
5�Sealed systems only; connect a suitable
hose to the Heatslave tank drain. Open the
drain valve to reduce the system to the
correct pressure, then close the drain valve.
Ensure safe disposal of the discharge.
Rotate the adjustable pointer on the
pressure gauge to record the set system
pressure.
6 �Check system and rectify any leaks.
�Push lever (C) to the left and pull
upwards to allow the lever to return to
position A.
�Leave the lever (C) unlocked at
position A.
FILLING THE SYSTEM
Total system
volume (litres)
180
107
138
Initial system
pressure (bar)
0.5
1.0
1.0
Initial charge
pressure (bar)
0.5
0.5
1.0
8 716 113 389d 30/3/10 14:01 Page 31
STARTING THE APPLIANCE
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
32
COMMISSIONING
F
H
G
Return
Flow
TANK
A
B
C
A
B
C
A - Bleed & pressure gauge port
B - Pressure adjustment
C - Vacuum gauge port
D - Retaining screws - cover
D
D
DANFOSS
BFP 11 L3 OIL PUMP
SUNTEC
AS47C OIL PUMP
BURNER LOCKOUT
C
B
A
D
RIELLO
RDB OIL PUMP
ALTERNATIVE
BURNER LOCKOUT
RESET BUTTON (D)
GREENSTAR HEATSLAVE EXTERNAL
max
flue
reset
boiler
reset
max
lockout
on
service
1
BURNER LOCKOUT
RESET BUTTON (D)
(Under control box)
(On top of burner control box)
E - Lockout indicator
STARTING THE APPLIANCE
IMPORTANT: Never run the appliance when
the appliance/system is unpressurised
(sealed systems) or empty.
1�Check the oil supply is correctly fitted and
in good working order before turning on
the oil supply valves to the boiler.
�Turn on the main oil supply valve at the tank
and draw off at least 21/2 litres of oil until a
steady flow of clear uncontaminated oil can
be seen as follows:
• The oil supply to the boiler should be
primed before the burner is operated to
avoid unnecessary pump wear.
• The use of an oil suction pump will prime
and flush through any oil supply set up
simply and easily, alternatively the
following procedures can be used.
�Single pipe gravity feed systems:
�Disconnect the flexible oil hose and open
the isolating valve to discharge the oil into a
suitable container.
�If a top entry tank has been used the
pipework will need to be primed before the
oil will discharge under gravity.
�When completed, close the isolating valve,
reconnect the flexible oil hose.
�Double pipe sub-gravity feed systems
and single pipe suction lift with de-aerator:
�To prime a de-aerator, disconnect the
flexible oil inlet hose (F) from the isolation valve
and place in a container of kerosene (G).
Connect a spare flexible oil hose (H), to
discharge into container (G). Open the
isolating valve, turn on the power to the boiler
and set the programmer to ON. Prime the
de-aerator until there is a steady flow of oil into
container (G). Turn off the boiler then
reconnect the flexible oil inlet hose (F).
�Turn on the boiler, the oil level in the
de-aerator will drop as the oil is used until
the oil is drawn from the tank. If the
de-aerator empties and the burner locks out
before the oil is drawn from the tank, prime
the de-aerator again.
When the oil reaches the pump, bleed
the air from the pump as follows:
�Open the isolating valve and the oil pump
bleed valve (A) to discharge into a suitable
container once the boiler is started up.
�Switch on the electricity supply to the boiler.
�Set the programmer to ON for CH and DHW.
�Turn on the boiler CH control thermostat.
�Allow the burner to run through to lockout
indicated by the illumination of the lockout
indicator (E).
If no oil comes out of the port valve A,
then re-prime the oil line as detailed
above.
�Wait 2 minutes then press the lockout reset
button (D).
�Repeat the procedure until a steady stream of
oil, without air, runs from the bleed port, then
relock the bleed port (A).
�Switch off the boiler.
�Remove the oil pump filter, clean with
kerosene and refit.
The internal filter is accessed by removing
the oil pump cover on the Danfoss BFP 11
L3, Suntec AS47C and Riello RDB.
�Safely dispose of the container/discharge.
DANFOSS
PUMP
SHOWN
8 716 113 389d 30/3/10 14:01 Page 32
STARTING THE APPLIANCE
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
33
COMMISSIONING
STARTING THE APPLIANCE
2� Remove plastic cover from the burner casing
(there is no plastic cover on the Riello burner).
� Fit a suitable pressure gauge to port (A) on
the oil pump.
IMPORTANT: RIELLO BURNERS.
If changing the burner output, ensure the
position of the air damper disk is correct for
the desired output. Refer to the table on the
following page.
� 12/18 - RIELLO RDB 1
Adjust position of the air damper disc to suit
the burner output (see chart on the following
page), located as shown in the diagram
opposite. Access is by removing the two star
screws (SC) to release the air inlet manifold.
• 18/25 - RIELLO RDB 2.2
The damper disk should not be moved, as it
is required for all three outputs, 18, 21.5 and
25kW.
� Adjust the air shutter (L) and pump pressure
(B) as shown in the table opposite. The
burner should ignite following a pre-ignition
period of approximately 15 seconds.
NOTE: The RIELLO control box has an
11 second delay before the start of
the pre-ignition.
Boiler lockout indicator on:
If the burner fails to establish a normal firing
pattern or flame failure occurs the flame
monitoring photocell mounted in the burner
body will alert the burner control box to shut the
burner down and provide a safe lockout state
indicated by the illumination of the
lockout indicator (E).
�Wait 2 minutes then press the lockout
reset button (D) to initiate another start
sequence.
�Repeat procedure until a flame is established.
3�Start and run for 3 minutes then switch off.
�Check for after-spurting from the nozzle,
indicated by oil saturation on the combustion
head (F).
If after-spurting occurs:
�Release the burner retainers.
�Remove the burner, combustion head (F).
and electrodes, hold the burner vertical
to unscrew the nozzle and fill the nozzle
holder with oil.
�Refit nozzle, electrodes, combustion
head (F) and the burner.
�Restart and run for 3 minute intervals until
after-spurting stops.
4�Start and run for 20 minutes.
�Remove sampling point plug (K) to check
the smoke reading is between 0-1. If the
smoke level is above 1, check the combustion
settings are correct and the oil nozzle is in
good condition.
NOTE: Smoke readings may be inaccurate until
the smoke from burning organic binder in
the access door insulation has ceased.
2
4
3
A
B
C
A - Bleed & pressure gauge port
B - Pressure adjustment
C - Vacuum gauge port
DANFOSS
BFP 11 L3 OIL PUMP
A
B
C
SUNTEC
AS47C OIL PUMP
RIELLO
RDB OIL PUMP
C
B
A
D
SC
SC
G
F
K
D
(under control box)
D
Alternative lockout reset
button
(on top of burner control box)
E
15/18kW
12kW
8 716 113 389d 30/3/10 14:01 Page 33
STARTING THE APPLIANCE
�Check the CO2 levels and adjust the air
shutter (L) setting according to the table
opposite.
�Check the flue gas temperature is close to
the values shown in the table.
If the flue gas temperature is too high and
the baffles are correctly fitted, then reduce
the oil pump pressure (B) 5-10 p.s.i. to
compensate for nozzle variations.
�Turn off the electrical supply.
�Isolate the oil supply to the burner.
�Remove the oil pressure gauge.
�Refit the blanking plug (A).
�Check and rectify any oil leaks.
5�Switch on the oil supply.
�Switch on the electrical supply.
�Restart the boiler and run for 5 minutes.
�Recheck the CO2 levels and if required,
adjust the air shutter setting (L) to obtain
the correct CO2 level.
A
B
C
A - Bleed & pressure gauge port
B - Pressure adjustment
C - Vacuum gauge port
DANFOSS
BFP 11 L3 OIL PUMP
A
B
C
SUNTEC
AS47C OIL PUMP
%CO2
NOMINAL BOILER RATING AT NORMAL OPERATING TEMPERATURE
USING 28sec KEROSENE:
NOZZLE
12/18 - Bentone Sterling 40 Burner:
OIL
PUMP
PRESSURE
(p.s.i.)
FUEL
FLOW RATE
Kg/h
l/h
APPROX
FLUE
GAS
TEMP.
( °C )
AIR
DAMPER
DISC
APPROX.
AIR
SETTING
APPLIANCE
INPUT
OUTPUT
kW
Btu/hr
kW
Btu/hr
0.35 80°SR
0.45 80°S
0.50 80°ES
115
115
140
1.04
1.29
1.55
1.32
1.63
1.96
66
70
73
11.5
12.0
12.5
2.5
4.5
5.25
42300
52900
63500
12
15
18
40900
51200
61400
12.4
15.5
18.6
RIELLO
RDB OIL PUMP
C
B
A
12/18 - Riello RDB 1 Burner
:
0.35 80°SR
0.45 60°ES
0.50 60°ES
105
120
125
1. 0 4
1.29
1.55
1.32
1.63
1.96
64
67
72
12 .0
12.0
12.5
4.5
3.0
4.5
42300
52900
6 3500
12
15
18
40900
51200
61400
12.4
15.5
18.6
18/25 - Riello RDB 2.2 Burner
:
0.50 60°ES
0.65 60°ES
0.75 60°ES
125
120
115
1.56
1.86
2.17
1.98
2.36
2.75
75
78
84
11.5
12.0
12.5
2.0
3.0
4.5
63300
75100
8 9700
18
21.5
25
61400
73400
85300
18.6
22.2
25.8
25/32 - Riello RDB 2.2 Burner
:
0.75 60°ES
0.75 60°ES
0.85 60°ES
105
140
150
2.15
2.45
2.75
2.72
3.10
3.48
78
80
83
11.5
12.0
12.5
3.0
4.0
5.0
87040
99200
111400
25
28.5
32
85300
97200
109200
25.5
29.1
32.7
18/25 - Bentone Sterling 50 Burner:
0.50 80°EH
0.55 80°EH
0.65 80°EH
130
145
150
1.56
1.86
2.17
1.98
2.36
2.75
72
79
82
11.5
12.0
12.5
4.25
6.0
8.0
63300
75100
87900
18
21.5
25
61400
73400
85300
18.6
22.2
25.8
N/A
N/A
N/A
N/A
N/A
N/A
15-18kW
15-18kW
12kW
18-25kW
18-25kW
18-25kW
N/A
N/A
N/A
5
L
L
STARTING THE APPLIANCE
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
34
COMMISSIONING
8 716 113 389d 30/3/10 14:01 Page 34
GREENSTAR HEATSLAVE EXTERNAL
max
flue
reset
boiler
reset
max
lockout
on
service
GREENSTAR HEATSLAVE EXTERNAL
max
flue
reset
boiler
reset
max
lockout
on
service
1
2
3
4
C
GREENSTAR HEATSLAVE EXTERNAL
max
flue
reset
boiler
reset
max
lockout
on
service
STARTING THE APPLIANCE
Domestic hot water:
1�Set the CH/DHW programmer to OFF.
�Fully open a hot water tap.
The burner should be OFF and the circulating
pump ON.
2�Close the hot water tap.
�Set the DHW thermostat control (C) to
minimum as shown.
�Set the programmer to DHW ON.
The burner should be ON with the circulating
pump to heat the water in the Heatslave
external tank.
When minimum set temperature is reached
the burner and circulating pump will switch
off.
3� Fully open a hot water tap. The burner
should be OFF and the circulating pump
ON.The burner will turn ON when the
DHW thermostat calls for heat.
� Check the water flow rate using a suitable
measuring container;
12/18KW 15 litres/min
18/25kW 18 litres/min*
25/32kW 22 litres/min*
* Manually regulate using the water main
inlet isolating valve on the boiler.
4� Fully close the hot water tap.
� Check the burner and circulating pump**
switch off.
**The high limit thermostat may activate
pump overrun until the correct
temperature is restored.
STARTING THE APPLIANCE
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
35
COMMISSIONING
8 716 113 389d 30/3/10 14:01 Page 35
GREENSTAR HEATSLAVE EXTERNAL
max
flue
reset
boiler
reset
max
lockout
on
service
GREENSTAR HEATSLAVE EXTERNAL
max
flue
reset
boiler
reset
max
lockout
on
service
GREENSTAR HEATSLAVE EXTERNAL
max
flue
reset
boiler
reset
max
lockout
on
service
GREENSTAR HEATSLAVE EXTERNAL
max
flue
reset
boiler
reset
max
lockout
on
service
2
1
3
4
E
D
C
D
C
D
C
E
E
E
STARTING THE APPLIANCE
Central heating:
1� Open all radiator valves.
�Set room thermostat to maximum.
� Set programmer to ON for CH.
� Turn the DHW thermostat control (C) fully
anti-clockwise.
�Turn the CH thermostat control (D) to max.
The burner should be ON with the circulating
pump. The diverter valve (E) should open to
port B for CH.
�Ensure all radiators are heating up evenly
and balance the system to the temperature
difference required across the heating flow
and return relevant to the heating load.
2�Set the room thermostat to minimum.
The burner and circulating pump should be
off. The diverter valve (E) should return to
port A for DHW (default).
Domestic hot water & central heating:
3�Set the room thermostat to maximum.
�Set the programmer to ON for DHW & CH.
�Turn the DHW thermostat control (C) fully
anti-clockwise.
�Set the CH thermostat control (D) to max.
The burner should be ON with the circulating
pump. The diverter valve (E) should open to
port B for CH.
4�Set the DHW thermostat control (C) to max.
The diverter valve (E) should move to port A
and divert the flow to the Heatslave tank.
STARTING THE APPLIANCE
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
36
COMMISSIONING
8 716 113 389d 30/3/10 14:01 Page 36
IMPORTANT: Debris from the system can
damage the boiler and reduce efficiency.
Failure to comply with the guidelines for the
use of water treatment with the appliance
will invalidate the appliance warranty.
FLUSHING (Central Heating):
1�Switch off the boiler.
�Open vented systems only: turn off the
water to the system header tank.
�Open all radiator valves/drain cocks (C) and
drain the system while the appliance is hot.
�Close drain cocks (C).
2�Add a suitable flushing agent and refill the
system at the correct strength for the system
condition in accordance with the
manufacturer's instructions.
�Vent the boiler (there are two vent points (A)
at the top of the secondary heat exchanger.
Only one may be in use, the other may be
obscured by side fluing.
Always vent (A) and the vent screw (B) on
the pump and all radiators.
�Run the boiler/system at normal operating
temperature for the time stated by the
flushing agent manufacturer.
3�Drain and thoroughly flush the system and
boiler (C) to remove the flushing agent and
debris.
INHIBITOR (Central Heating):
4�Check drain cocks and manual air vents
are closed and all radiator valves are open.
5�Add a suitable inhibitor, (or combined
inhibitor/anti-freeze if the system is exposed
to freezing conditions) to the heating system
in accordance with the manufacturers
instructions.
The inhibitor or combined inhibitor/anti-freeze
must not cause damage to the materials within
the boiler (mild steel, stainless steel, copper
and brass) and any other materials/components
within the system.
�Open vented systems only: turn on the
water to the system header tank and allow
the system to fill.
�Sealed systems only: fill the system to
between 1 and 2 bar via a WRAS approved
filling loop. Check the system pressure
during venting and repressurise if necessary.
6�Vent the boiler (there are two vent points
(A) at the top of the secondary heat
exchanger. Only one may be in use, the
other maybe obscured by side fluing.
Always vent (A) and the vent screw (B) on
the pump and all radiators; retighten vents
when complete.
7�Record the date on the guarantee card when
the inhibitor was added to the system .
NOTE: The concentration level of inhibitor
in the system should be checked
every 12 months or sooner if system
content is lost.
The addition of sealing agents to the system
water is not advised as this can cause
problems with deposits left in the heat
exchanger and invalidate the appliance and
heat exchanger warranty .
A
A
B
C
C
C
C
1
2 & 6
3
WATER TREATMENT
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
37
COMMISSIONING
8 716 113 389d 30/3/10 14:01 Page 37
FINISHING COMMISSIONING -
APPLIANCE
1� Refit the top panel and press down to
compress the seal when fitting the
securing screws (A).
2� Push the front panel up behind the top
panel and push in at the base to secure
the screws (B) with the tool provided.
Always apply pressure at the edges of the
panels when securing to avoid accidental
damage.
Handover:
�Complete the guarantee registration card,
commissioning checklist (at the rear of this
manual) and a CD11 or an equivalent
commissioning form.
�Set up the controls and show the user how
to operate all the controls shown in the User
Guide, and all system controls.
�Where applicable, instruct the customer how
to repressurise the system.
�If the appliance is unused and exposed to
freezing conditions, shut off all the mains
supplies and drain the system and boiler to
prevent damage to the system and boiler.
NOTE: Release drain point (K) to drain the
secondary heat exchanger.
A
A
B
B
C
2
1
K
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
38
COMMISSIONING
FINISHING COMMISSIONING -
APPLIANCE
8 716 113 389d 30/3/10 14:01 Page 38
INSPECTION AND SERVICE
CAUTION: ISOLATE THE WATER,
ELECTRICITY AND OIL MAINS SUPPLIES
BEFORE STARTING ANY WORK AND
OBSERVE ALL RELEVANT SAFETY
PRECAUTIONS.
DO NOT USE PRESSURE WASHERS OR
STEAM CLEANERS ON THIS APPLIANCE
OR ITS CABINET.
WARNING: EXTERNAL EQUIPMENT
OPERATED AT 230 VOLTS SHOULD NOT
BE SERVICED OR REPAIRED UNDER
ADVERSE WEATHER CONDITIONS
Routine servicing:
To maintain efficient boiler operation, the
following should be carried out at least once a
year:
�Carry out a pre-service check and note any
operational faults:
�Pre-Service Check:
1�Undo the screws at the base of the
front panel using the tool provided and pull
the panel down and out to remove.
Store safely away from the working area.
Operate the appliance and system and note any
faults which may need to be corrected during
the service.
�Switch into service mode at switch (A).
2�Depress locking ears and unplug burner
lead (B) from control box (C).
• An adaptor lead is available to allow mains
voltage service aids to be operated from
the service connection (G). (Service lead
Part No. 8 716 113 483 0).
3�Loosen clip (D) to detach air duct.
4�Unscrew burner retainers (E) to release
the burner combustion head (F).
�Lift burner away, taking care not to over
strain the flexible oil hose/s or
connections.
See the following instructions for detail of some
of the service requirements listed
below:
�Check and clean the burner.
�Replace burner nozzle and flexible oil
hose/s.
�Check and clean the baffle retainers.
�Check and clean the baffles.
�Check and clean the heat exchangers
surfaces.
�Check the combustion chamber access
door insulation board.
�Check that the flue system is unobstructed
and clean as necessary.
�Clean or replace all oil filters.
�Check that the condensate system is not
obstructed, clean and refill the condensate
trap as necessary.
� Sealed systems only: The PRV is a safety
device and must be checked for correct
operation.
The expansion vessel pressure must be
checked and adjusted as required.
on
service
F
D
3
E
4
1
A
C
B
2
G
INSPECTION AND SERVICE
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
39
SERVICING
& SPARES
8 716 113 389d 30/3/10 14:01 Page 39
1 Clean the Burner:
�Remove the air intake cover (H) and clear
any debris from the air intake and air damper.
�Disassemble the burner to allow access to
the fan impeller.
�Check the condition of the gaskets between
these parts and replace if necessary.
�Note the position of the air damper
adjustment and check the air damper moves
freely.
�Clean both sides of the fan impeller and
remove any debris from the burner housing.
�Check that the impeller rotates freely.
� Reassemble the components.
�Remove the combustion head (K) and
thoroughly clean any deposits.
�Remove the nozzle (E).
2 Bentone Sterling 40 & 50
12/18 & 18/25 Inspection of Mechanical
Shut-off Valve:
� Fasten an M5 screw, with a minimum length
of 30mm, into the threaded hole (L) and pull
the screw to withdraw the check valve (M).
�Check that the nozzle holder (N) is clear of
any debris and clean if necessary.
�Check that the three holes in the check valve
(M) are clear of any debris. Check the
condition of the 'O' ring (O). Discard the
check valve if the holes cannot be cleared, if
the unit is defective or if the 'O' ring is
damaged and replace with a new one.
�Refit the check valve.
Riello RDB 1 & 2.2
12/18, 18/25 & 25/32
�Check the nozzle holder is clear of any debris
and clean if necessary.
ALL MODELS
�Fit a new oil atomising nozzle (E).
DO NOT dismantle the nozzle and DO NOT
clean the nozzle tip.
�Check the electrodes (F) and reset if
necessary as shown opposite.
�Refit the combustion head. Check that the
nozzle (E) lies centrally in the combustion
head and the head settings are as shown.
Ensure that the photo cell is lined up with the
sight hole.
� Withdraw the photocell (P) from its housing
and wipe clean.
� Remove the oil pump internal filter, clean in
kerosene and reassemble.
The internal filter is accessed by removing
screws (A) and the oil pump cover (B) on the
Danfoss BFP 11 L3, Suntec AS47C and Riello
RDB.
IMPORTANT
�Replace the standard flexible oil hose/s
at every annual service to prevent the
possibility of oil leakage.
�Reassemble the burner components.
�Check the sponge O-ring seal located
around the combustion head and replace if
necessary.
This seal must be in good condition since
failure will cause flue gases to escape into
the room.
INSPECTION AND SERVICE
A
B
A - Retaining screws - cover
B - Cover - oil pump
H
P
D
5mm
Electrode gap
2.5 - 3.0mm
7.5mm
F
E
5mm
K
L
N
M
O
DANFOSS
BFP 11 L3 OIL PUMP
SUNTEC
AS47C OIL PUMP
A
RIELLO
RDB OIL PUMP
B
2.5mm
Electrode gap 4mm
F
E
K
5mm
H
P
D
A
B
RIELLO
RDB 1 & 2.2
BENTONE
STERLING 40 & 50
12/18
18/25
12/18
18/25
25/32
INSPECTION AND SERVICE
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
40
SERVICING
& SPARES
8 716 113 389d 30/3/10 14:01 Page 40
INSPECTION AND SERVICE
M
L
O
M
K
Plan sectional view
12/18kW & 18/25kW
25/32kW
Plan sectional view
or
1
2
4
3
A
B
I
C
H
K
C
I
H
E
D
F
G
E
G
O
M
FRONT
FRONT
INSPECTION AND SERVICE
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
41
SERVICING
& SPARES
External oil filter:
�Remove the paper element from the external
oil filter and replace it. If the filter contains a
washable element, thoroughly clean in
kerosene and reassemble into the filter.
Clean the boiler:
Manifold access:
�Release screws (A) to remove the flue
manifold access cover (B) and clear any debris.
�Check the flue system and clean if necessary.
�Remove the baffle retainer (H) and baffles ( I )
from the secondary heat exchanger.
�Check and clean the secondary heat
exchanger surfaces.
NOTE: Do not use wire brushes and
cleaning agents to clean the stainless
steel secondary heat exchanger
components.
�Check the condensate route (C) is clear.
�The condensate trap (D) should be removed
and checked for debris.
�Release the pipe locking tab (E) and disconnect
the flexible pipe (F) from the top of the trap and
move the flexible pipe up away from the trap.
� Release the trap locking tab (G) and move the
trap up and back to remove from it mountings.
�Clean the trap by flushing with water.
�Check the O ring seals and replace if necessary,
grease the seals with a solvent free grease.
�Refit the trap making sure that the locking
tabs are locked in place.
�Pour 500ml of water into drain ( C ) to refill
the condensate trap.
�Clean the secondary heat exchanger baffles
( I ) if necessary and refit correctly.
� Refit the baffle retainer (H).
�Check the seal on the manifold access cover
(K) and replace if necessary.
�Refit the flue manifold access cover (B)
and secure with screws (A).
Combustion chamber:
�Release the M10 retaining nuts and washers
( L ) and remove combustion chamber access
door (M).
�Check the fibreglass rope seal on the
combustion chamber access door (M) and
replace if necessary.
�Remove and check the baffle retainer (N).
�Remove the baffles (O), clean and check the
condition of the baffles and the acoustic
insulation. Replace any baffles or insulation
pads considered to be badly corroded/degraded.
�Thoroughly clean all of the heat exchanger
surfaces using a suitable brush and clear all
loose debris from the combustion chamber.
�Check the condition of the combustion
chamber access door insulation. If the
insulation is damaged the door assembly
must be replaced.
�Refit the items in reverse order ensure the
baffles (O) and baffle retainers (N) are
correctly fitted for the boiler output as shown
in the plan view opposite.
� Refit combustion chamber door (M).
IMPORTANT: Secure with nuts and
washers ( L ) and tighten, using the
sequence shown in figure, until the
chamber door is firmly secured, do not
over tighten the nuts.
8 716 113 389d 30/3/10 14:01 Page 41
INSPECTION AND SERVICE
Fire valve:
�Check that the oil supply pipe has a fire valve
fitted at least 1m away from the appliance
with the fire valve sensor located within the
appliance case. A fire valve sensor clip (A) is
provided for this purpose.
Re-commission the burner:
1�Align burner combustion head (B) into the
boiler housing tube with gasket (C)
correctly fitted.
�Push firmly down to compress the gasket (C).
�Tighten burner retainers (D) sufficiently to
ensure a good seal.
IMPORTANT:
Ensure the gasket is a good seal between
the burner combustion head and the boiler
housing to prevent flue gases escaping.
�Refit flexible air duct and secure with clip (E ).
2�Plug burner lead (F ) into control box (G).
�Connect an oil pressure gauge to the oil
pump, run the burner and check the oil
pressure is correct for the required boiler
output. Check that the smoke reading is
between 0 and 1, if the smoke reading is
above 1 check the air setting. If the air
setting is correct check that the burner has
been reassembled correctly.
Allow the boiler to warm up then check the
combustion settings are correct as
indicated in the table below, adjust the
CO2 if necessary using the air shutter.
When the combustion is correct turn off the
boiler, remove the pressure gauge and refit
the blanking plug and plastic cover.
Refit panels:
3�Refit the top panel and press down to
compress the seal when fitting the
securing screws.
� Push the front panel up behind the top
panel and push in at the base to secure
the screws with the tool provided.
After service handover:
�Make a note of the date of any water treatment.
�Set the controls back to the users
requirements.
�Complete the service interval record at the
back of this manual and a CD11 or an
equivalent form.
�If the appliance is unused and exposed to
freezing conditions; shut off all the mains
supplies, isolate the boiler and drain the
system and boiler, including the secondary
heat exchanger.
%CO2
NOMINAL BOILER RATING AT NORMAL OPERATING TEMPERATURE
USING 28sec KEROSENE:
NOZZLE
12/18 - Bentone Sterling 40 Burner:
OIL
PUMP
PRESSURE
(p.s.i.)
FUEL
FLOW RATE
Kg/h
l/h
APPROX
FLUE
GAS
TEMP.
( °C )
AIR
DAMPER
DISC
APPROX.
AIR
SETTING
APPLIANCE
INPUT
OUTPUT
kW
Btu/hr
kW
Btu/hr
0.35 80°SR
0.45 80°S
0.50 80°ES
115
115
140
1.04
1.29
1.55
1.32
1.63
1.96
66
70
73
11.5
12.0
12.5
2.5
4.5
5.25
42300
52900
63500
12
15
18
40900
51200
61400
12.4
15.5
18.6
12/18 - Riello RDB 1 Burner
:
0.35 80°SR
0.45 60°ES
0.50 60°ES
105
120
125
1. 0 4
1.29
1.55
1.32
1.63
1.96
64
67
72
12 .0
12.0
12.5
4.5
3.0
4.5
42300
52900
6 3500
12
15
18
40900
51200
61400
12.4
15.5
18.6
18/25 - Riello RDB 2.2 Burner
:
0.50 60°ES
0.65 60°ES
0.75 60°ES
125
120
115
1.56
1.86
2.17
1.98
2.36
2.75
75
78
84
11.5
12.0
12.5
2.0
3.0
4.5
63300
75100
8 9700
18
21.5
25
61400
73400
85300
18.6
22.2
25.8
25/32 - Riello RDB 2.2 Burner
:
0.75 60°ES
0.75 60°ES
0.85 60°ES
105
140
150
2.15
2.45
2.75
2.72
3.10
3.48
78
80
83
11.5
12.0
12.5
3.0
4.0
5.0
87040
99200
111400
25
28.5
32
85300
97200
109200
25.5
29.1
32.7
18/25 - Bentone Sterling 50 Burner:
0.50 80°EH
0.55 80°EH
0.65 80°EH
130
145
150
1.56
1.86
2.17
1.98
2.36
2.75
72
79
82
11.5
12.0
12.5
4.25
6.0
8.0
63300
75100
87900
18
21.5
25
61400
73400
85300
18.6
22.2
25.8
N/A
N/A
N/A
N/A
N/A
N/A
15-18kW
15-18kW
12kW
18-25kW
18-25kW
18-25kW
N/A
N/A
N/A
3
1
2
3
F
A
C
B
D
F
INSPECTION AND SERVICE
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
42
SERVICING
& SPARES
E
G
8 716 113 389d 30/3/10 14:01 Page 42
BENTONE Sterling 40 burner
SHORT PARTS LIST 12/18
1 Burner - Sterling 40
Part Number: 8 716 112 507 0
2 Combustion head - burner
Part Number: 8 716 112 604 0
3 Control box Satronic DKO 970
Part Number: 8 716 142 396 0
4 Photocell Satronic MZ770s
Part Number: 8 716 156 692 0
5 Control box base Satronic S98 12 pole
Part Number: 8 716 157 042 0
6 Ignition electrode
Part Number: 8 716 142 752 0
7 Motor
Part Number: 8 716 156 645 0
8 Oil pump - Danfoss BFP 11 L3
Part Number: 8 716 142 736 0
8a Oil pump - Suntec AS47C
Part Number: 8 716 157 014 0
9 Transformer (Excludes cable)
Part Number: 8 716 156 696 0
10 Mechanical shut-off valve
Part Number: 8 716 156 658 0
11 Flexible oil line kit
Part Number: 8 716 115 312 0
12 Burner 'O' ring gasket
Part Number: 8 716 140 902 0
13 Heating control thermostat
Part Number: 8 716 107 621 0
14 Auto reset High Limit thermostat
Part Number: 8 716 107 640 0
15 Manual reset Boiler thermostat
Part Number: 8 716 107 625 0
16 Manual reset flue thermostat
Part Number: 8 716 107 624 0
17 DHW control thermostat
Part Number: 8 718 685 283 0
18 Manual reset tank thermostat
Part Number: 8 718 685 269 0
19 Circulation pump UPS 15-60
Part Number: 8 718 685 525 0
20 Control board
Part Number: 8 718 685 261 0
21 Cleaning brush
Part Number: 8 716 109 428 0
22 Manifold access cover seal
Part Number: 8 716 107 536 0
23 Secondary Heat Exchanger gasket
Part Number: 8 716 112 954 0
24 Frost thermostat
Part Number: 8 716 142 393 0
25 Service lead
Part Number: 8 716 113 483 0
26 Spare 1/4 turn cabinet key
Part Number: 8 716 114 013 0
27 Oil nozzle
0.35 80° SR (12kW output)
Part Number: 8 716 112 628 0
0.45 80° S (15kW output)
Part Number: 8 716 106 197 0
0.50 80° ES (18kW output)
Part Number: 8 716 156 669 0
SHORT PARTS LIST
BENTONE 40 - 12/18
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
43
SERVICING
& SPARES
8 716 113 389d 30/3/10 14:01 Page 43
BENTONE Sterling 50 burner
SHORT PARTS LIST 18/25
1 Burner - Sterling 50
Part Number: 8 716 112 570 0
2 Combustion head - burner
Part Number: 8 716 108 573 0
3 Control box Satronic DKO 970
Part Number: 8 716 142 396 0
4 Photocell Satronic MZ770s
Part Number: 8 716 156 692 0
5 Control box base Satronic S98 12 pole
Part Number: 8 716 157 042 0
6 Ignition electrode
Part Number: 8 716 142 752 0
7 Motor
Part Number: 8 716 156 645 0
8 Oil pump - Danfoss BFP 11 L3
Part Number: 8 716 142 736 0
8a Oil pump - Suntec AS47C
Part Number: 8 716 157 014 0
9 Transformer (Excludes cable)
Part Number: 8 716 156 696 0
10 Mechanical shut-off valve
Part Number: 8 716 156 658 0
11 Flexible oil hose kit
Part Number: 8 716 115 312 0
12 Burner 'O' ring gasket
Part Number: 8 716 140 902 0
13 Heating control thermostat
Part Number: 8 716 107 621 0
14 Auto reset High Limit thermostat
Part Number: 8 716 107 640 0
15 Manual reset Boiler thermostat
Part Number: 8 716 107 625 0
16 Manual reset flue thermostat
Part Number: 8 716 107 624 0
17 DHW control thermostat
Part Number: 8 718 685 283 0
18 Manual reset tank thermostat
Part Number: 8 718 685 269 0
19 Circulation pump UPS 15-60
Part Number: 8 718 685 525 0
20 Control board
Part Number: 8 718 685 261 0
21 Cleaning brush
Part Number: 8 716 109 428 0
22 Manifold access cover seal
Part Number: 8 716 107 536 0
23 Secondary Heat Exchanger gasket
Part Number: 8 716 112 954 0
24 Frost thermostat
Part Number: 8 716 142 393 0
25 Service lead
Part Number: 8 716 113 483 0
26 Spare 1/4 turn cabinet key
Part Number: 8 716 114 013 0
27 Oil nozzle
0.50 80° EH (18kW output)
Part Number: 8 716 156 672 0
0.55 80° EH (21.5kW output)
Part Number: 8 716 156 671 0
0.65 80° EH (25kW output)
Part Number: 8 716 110 362 0
SHORT PARTS LIST 18/25
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
44
SERVICING
& SPARES
8 716 113 389d 30/3/10 14:01 Page 44
RIELLO RDB 1 burner
SHORT PARTS LIST 12/18
1 Burner - Riello RDB 1 12/18
Part Number: 8 718 685 873 0
2 Combustion head - LD2SX (Short)
Part Number: 8 718 685 902 0
3 Control box MO535
Part Number: 8 718 682 250 0
4 Photocell
Part Number: 8 716 109 193 0
5 Ignition electrode
Part Number: 8 716 109 183 0
6 Motor
Part Number: 8 716 109 186 0
7 Oil pump - Riello RDB
Part Number: 8 716 115 297 0
8 Flexible oil hose kit
Part Number: 8 716 115 312 0
9 Burner 'O' ring gasket
Part Number: 8 718 682 439 0
10 Heating control thermostat
Part Number: 8 716 107 621 0
11 Auto reset High Limit thermostat
Part Number: 8 716 107 640 0
12 Manual reset Boiler thermostat
Part Number: 8 716 107 625 0
13 Manual reset flue thermostat
Part Number: 8 716 107 624 0
14 DHW control thermostat
Part Number: 8 718 685 283 0
15 Cleaning brush
Part Number: 8 716 109 428 0
16 Manifold access cover seal
Part Number: 8 716 107 536 0
17 Secondary Heat Exchanger gasket
Part Number: 8 716 112 954 0
18 Frost thermostat
Part Number: 8 716 142 393 0
19 Manual reset tank thermostat
Part Number: 8 718 685 269 0
20 Circulation pump UPS 15-60
Part Number: 8 718 685 525 0
21 Control board
Part Number: 8 718 685 261 0
22 Service lead
Part Number: 8 716 113 483 0
23 Spare 1/4 turn cabinet key
Part Number: 8 716 114 013 0
24 Oil nozzle
0.35 80° SR (12kW output)
Part Number: 8 716 112 628 0
0.45 60° ES (15kW output)
Part Number: 8 716 156 679 0
0.5 60° ES (18kW output)
Part Number: 8 716 156 671 0
SHORT PARTS LIST
RIELLO RDB 1 - 12/18
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
45
SERVICING
& SPARES
8 716 113 389d 30/3/10 14:01 Page 45
RIELLO RDB 2.2 burner
SHORT PARTS LIST 18/25
1 Burner - Riello RDB 2.2 18/25
Part Number: 8 718 685 836 0
2 Combustion head - LD2SX (Short)
Part Number: 8 718 685 872 0
3 Control box MO535
Part Number: 8 718 682 250 0
4 Photocell
Part Number: 8 716 109 193 0
5 Ignition electrode
Part Number: 8 716 109 183 0
6 Motor
Part Number: 8 716 109 186 0
7 Oil pump - Riello RDB
Part Number: 8 716 115 297 0
8 Flexible oil hose kit
Part Number: 8 716 115 312 0
9 Burner 'O' ring gasket
Part Number: 8 718 682 439 0
10 Heating control thermostat
Part Number: 8 716 107 621 0
11 Auto reset High Limit thermostat
Part Number: 8 716 107 640 0
12 Manual reset Boiler thermostat
Part Number: 8 716 107 625 0
13 Manual reset flue thermostat
Part Number: 8 716 107 624 0
14 DHW control thermostat
Part Number: 8 718 685 283 0
15 Cleaning brush
Part Number: 8 716 109 428 0
16 Manifold access cover seal
Part Number: 8 716 107 536 0
17 Secondary Heat Exchanger gasket
Part Number: 8 716 112 954 0
18 Frost thermostat
Part Number: 8 716 142 393 0
19 Manual reset tank thermostat
Part Number: 8 718 685 269 0
20 Circulation pump UPS 15-60
Part Number: 8 718 685 525 0
21 Control board
Part Number: 8 718 685 261 0
22 Service lead
Part Number: 8 716 113 483 0
23 Spare 1/4 turn cabinet key
Part Number: 8 716 114 013 0
24 Oil nozzle
0.5 60° ES (18kW output)
Part Number: 8 716 156 671 0
0.65 60° ES (21,5kW output)
Part Number: 8 716 115 843 0
0.75 60° ES (25kW output)
Part Number: 8 716 106 156 0
SHORT PARTS LIST
RIELLO RDB 2.2 - 18/25
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
46
SERVICING
& SPARES
8 716 113 389d 30/3/10 14:01 Page 46
SHORT PARTS LIST
RIELLO RDB 1 - 12/18
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
47
SERVICING
& SPARES
RIELLO RDB 2.2 burner
SHORT PARTS LIST 25/32
1 Burner - Riello RDB 2.2 25/32 HE
Part Number: 8 716 112 512 0
2 Combustion head - burner
Part Number: 8 716 112 521 0
3 Control box MO535
Part Number: 8 718 682 250 0
4 Photocell
Part Number: 8 716 109 193 0
5 Ignition electrode
Part Number: 8 716 109 183 0
6 Motor
Part Number: 8 716 109 186 0
7 Oil pump - Riello RDB
Part Number: 8 716 115 297 0
8 Flexible oil hose kit
Part Number: 8 716 115 312 0
9 Burner 'O' ring gasket
Part Number: 8 718 682 439 0
10 Heating control thermostat
Part Number: 8 716 107 621 0
11 Auto reset High Limit thermostat
Part Number: 8 716 107 640 0
12 Manual reset Boiler thermostat
Part Number: 8 716 107 625 0
13 Manual reset flue thermostat
Part Number: 8 716 107 624 0
14 DHW control thermostat
Part Number: 8 718 685 283 0
15 Cleaning brush
Part Number: 8 716 109 428 0
16 Manifold access cover seal
Part Number: 8 716 107 536 0
17 Secondary Heat Exchanger gasket
Part Number: 8 716 112 954 0
18 Frost thermostat
Part Number: 8 716 142 393 0
19 Manual reset tank thermostat
Part Number: 8 718 685 269 0
20 Circulation pump UPS 15-70
Part Number: 8 718 685 526 0
21 Control board
Part Number: 8 718 685 261 0
22 Service lead
Part Number: 8 716 113 483 0
23 Spare 1/4 turn cabinet key
Part Number: 8 716 114 013 0
24 Oil nozzle
0.75 60° ES (25 & 28.5kW output)
Part Number: 8 716 106 156 0
0.85 60° ES (32kW output)
Part Number: 8 716 110 083 0
8 716 113 389d 30/3/10 14:01 Page 47
Pulsation on start
Combustion settings incorrect
Set up as in installation instructions
Faulty nozzle
Replace nozzle
Intermittent lockout
Bad electrical connection
Check control box/electrical connections
Intermittent flame detection fault
See flame detection fault
Burner motor fails to
operate
Faulty motor or electrical supply
to motor
Check for 230v at motor plug during
startup period
Control box fault
Replace control box
Flame detection
Photocell filmed over (dirty)
Wipe clean
fault
Photocell faulty
Replace
Control box faulty
Replace
Incorrect CO2
Air adjustment fault
Set up as in installation instructions
Oil pressure incorrect
Set up as in installation instructions
No oil from nozzle
No oil at pump
Check and refill oil tank/bleed oil line
Check and clean filters & valves from oil
tank to boiler
Air in pump
Bleed pump
Nozzle blocked
Replace nozzle
Faulty pump or drive
Replace
Faulty mechanical shut off valve
Clean or replace
(12/18 & 18/25 only)
Ignition failure
Electrode settings incorrect
Set up as in installation instructions
Faulty ignition transformer
Replace
Open circuit ignition
Check and replace electrodes or high
tension leads if necessary
Faulty control box or electrical
connections not properly made
Correct control box electrical
connections or replace control box
BURNER FAILS
No power to boiler
Check electrical / control circuit
TO START
Faulty boiler thermostat
Check by temporarily linking out high
limit and control thermostats
Programmer open circuit
Check by temporarily linking 8 & 9 on
the connector
Faulty control box
Replace
HIGH SMOKE
Air intake/flue blocked
Check & clear air intake/flue
NUMBER
Incorrect combustion settings
Set up as in installation instructions
Oil pressure incorrect
Adjust to correct pressure
Incorrect components used on
combustion head
Check with installation instructions
Faulty nozzle
Replace nozzle
FAULT FINDING
BOILER LOCKOUT :
Indicated by the illumination of the 'Lockout'
indicator on the fascia.
To reset, wait 2 minutes then press the lockout
reset button.
Also refer to fault finding logic on pages
51 and 52.
UNDER NO CIRCUMSTANCES MUST AN
APPLIANCE BE LEFT TO OPERATE WITH
ANY CONTROL LINKED OUT OR
OVERRIDDEN.
FAULT FINDING
& DIAGRAMS
FAULT FINDING
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
48
8 716 113 389d 30/3/10 14:01 Page 48
Pump noise from air in pump or
worn pump
Bleed air from pump or replace pump
Worn motor bearings
Replace motor
Fan out of balance
Replace fan
Boiling
Faulty boiler thermostat
Replace if necessary
Short circuit boiler thermostat
Take out of circuit to check
Thermostat bulb not fully home in
pocket
Ensure bulb is pushed fully home
No primary water circulation
Check system / circulating pump
Short Cycling
Burner rating incorrect
Correct burner rating
Boiler thermostat differential
incorrect
Replace boiler thermostat
External controls not operating
correctly
Check and correct external controls
OIL SMELLS:
Blocked flue, fumes on startup
Check seals/gaskets
Oil soaked boiler, faulty burner
operation, numerous lockouts
Rectify burner operation and lockouts
Odour in cabinet, oil leaks from
pipework, flexible hoses
connections
Rectify oil leaks, replace components if
necessary
& tank overheat thermostat
FAULT FINDING
49
FAULT FINDING
& DIAGRAMS
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 106 389c (01/2009)
8 716 113 389d 30/3/10 14:01 Page 49
CONTROL BOX OPERATION
This operation instruction is provided to assist competent and suitably qualified engineers to
locate and rectify faults. Whilst every effort has been taken to ensure the information given is
correct and complete we cannot guarantee that every eventuality has been covered.
Worcester, Bosch Group cannot be held responsible for costs incurred by persons not deemed
to be competent.
In the lock-out condition, the oil pump can be primed
for 30 seconds:
1. Press the remote reset button for more than 6 seconds
and then release. The control box lock-out reset will
blink quickly green, orange and red.
2. Press the burner reset button again and release within
3 seconds and pump priming starts.
Operational Codes
OFF
OFF
Initial check time (11 seconds) before pre-purge
OFF
Pre-purge (15 seconds)
ORANGE Flashing
Safety time (maximum 5 seconds)
GREEN Flashing
Running
GREEN
Lock-out/Error Codes
False light before ignition
GREEN, RED
Under voltage or over voltage
RED, ORANGE
lock-out for no flame during safety time
RED
Lock-out for false flame signal /
RED Flashing
Lock-out for burner control error
Lock-out for maximum number of restarts
RED Fast flashing
Pump Priming Cycle
Pump priming cycle GREEN, ORANGE, RED
STATUS
CODE ADDITIONAL INFORMATION
Only when the solenoid valve is energised with no flame
signal.
Lock-out and Reset
The control box can be reset of 5 times, after which the power supply has to be reset; then
the control box can be reset a further 5 times.
Limit of Restarts
If the flame is lost during operation; the burner will restart 3 times. On the 4th restart the
burner will go to lock-out. By resetting the power supply the control box is reset and allows
3 restarts.
Flame Detection
Flame detection minimum current:
30µA
Flame loss maximum current:
25µA
False flame maximum current (without false light):
19µA
FAULT FINDING
& DIAGRAMS
FAULT FINDING
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
50
8 716 113 389d 30/3/10 14:01 Page 50
L & N?
L & N to
control box?
Control box
locks out?
Check boiler
controls &
supply
Check
connections/
replace leads
Replace
motor/
pump
Replace
motor
Replace
control box
Lockout
within 1
second?
Replace oil
pump
Oil to
pump?
Drive
coupling
broken?
Pump
produces
pressure?
Replace
transformer
Electrodes
& leads
OK?
230V at
transformer?
Spark
produced?
Lockout
after purge
before oil
solenoid
opens?
Replace
control box
Transformer
lead OK?
Photo cell
lead OK?
Disconnect photo cell,
reset lockout, burner
lights then locks out?
Stray light
on photo
cell?
Combustion
head set
correctly?
Combustion
air setting
correct?
Flame off
and
re-lights?
Nozzle
atomising
fuel?
Replace
photo cell
Photo cell
functional?
If BF
remove
burner
snorkel tube
& retest.
Lights OK?
Replace
photo cell
Replace coil
lead
230V at
solenoid
coil?
Coil lead
OK?
Boiler or
flue blocked
Reseal BF
on
reposition
Replace
control box
Replace
control box
Solenoid
operating?
2.2kΩ
across
solenoid
coil?
Pipe to
nozzle
holder OK?
Oil check
valve OK?
(if fitted)
Replace
nozzle
Replace
solenoid coil
Replace
pump
Replace oil
check valve
(if fitted)
Yes
Yes
Yes
No
No
Yes
Yes
No
No
No
No
No
Yes
Yes
No
No
Yes
No
No
Yes
No
Yes
Yes
Yes
No
Yes
Yes
Yes
Yes
No
No
No
Yes
Yes
Yes
Yes
No
No
No
No
No
Yes
Yes
Yes
Yes
Yes
No
No
No
No
Yes
Yes
Yes
Yes
Replace
lead
No
Reset air
setting
No
Reset
combustion
head
No
FAULT FINDING LOGIC FOR
SATRONIC CONTROL BOX
Note: This chart assumes all wiring within the control box base is correct, if in doubt check the wiring against the diagram on
the base of the control box before replacing any components.
All resistance measurements are actual measured values and some variation is to be expected, therefore measured values
should be similar to but not necessarily identical to the given values.
The operation of the photo cell can be tested by measuring the resistance across the photo cell, it should be a high resistance
(greater than 10MΩ or open circuit) in the dark and low resistance (15kΩ or less) in light.
Burners on balanced flue systems can recirculate flue products resulting in the burner cycling, if this happens check the flue
system integrity and the terminal position.
These fault finding charts are provided to assist competent and suitably qualified engineers to
locate and rectify faults. Whilst every effort has been taken to ensure the information given is
correct and complete we cannot guarantee that every eventuality has been covered.
Worcester, Bosch Group cannot be held responsible for costs incurred by persons not deemed
to be competent.
Measure all 230V tests between
Neutral (N) and the pin, wire or
terminal specified.
FAULT FINDING
51
FAULT FINDING
& DIAGRAMS
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 106 389c (01/2009)
8 716 113 389d 30/3/10 14:01 Page 51
L & N to
control box?
Motor or
pump
seized?
Photo cell
functional?
Solenoid coil
functional
(100Ω)?
Replace
photo cell
Motor gives
50 Volts on
white wire?
Lockout
after 12 sec
purge?
Replace
control box
Replace
solenoid coil
Replace
motor
Ignition
spark
proved?
Oil to pump?
Drive
coupling
broken?
Purge
pressure
1-2 bar?
Pump
produces
pressure?
Replace
pump stem
valve,
pressure
OK?
Replace
solenoid coil
Pipe to
nozzle
holder OK?
Replace
nozzle
Replace oil
pump
Replace
control box
Eectrodes &
leads OK?
Yes
No
NO
Yes
No
Yes
No
Yes
Yes
No
No
Yes
Yes
No
No
Yes
Yes
No
Yes
Motor 40Ω
between blue &
black wires ?
Replace
control box
Yes
Yes
No
Yes
No
Yes
No
No
No
Yes
No
Nozzle
atomising
fuel?
Combustion
air setting
correct?
Yes
Yes
Combustion
head set
correctly?
Solenoid operating?
Increase the pump
pressure, pressure OK?
Solenoid coil
functional
(100Ω)?
No
Coil lead
OK?
Yes
Yes
Replace
control box
No
If BF, remove
burner
snorkel tube
& retest.
Burner OK?
Flame off &
re-lights?
Yes
Photo cell
functional?
No
Yes
Replace
photo cell
No
Boiler or flue
blocked
No
Reseal BF
or reposition
terminal
Yes
Replace
control box
Yes
Replace
electrodes/
leads
No
Unblock or
replace pipe
No
Reset air
setting
No
Reset
combustion
head
No
Yes
FAULT FINDING LOGIC FOR
RIELLO CONTROL BOXES
All resistance measurements are actual measured values and some variation is to be expected, therefore measured
values should be similar to but not necessarily identical to the given values.
The operation of the photo cell can be tested by measuring the resistance across the photo cell, it should be a high
resistance (greater than 10MΩ or open circuit) in the dark and low resistance (3kΩ or less) in light.
Burners on balanced flue systems can recirculate flue products resulting in the burner cycling, if this happens check the
flue system integrity and the terminal position.
These fault finding charts are provided to assist competent and suitably qualified engineers
to locate and rectify faults. Whilst every effort has been taken to ensure the information
given is correct and complete we cannot guarantee that every eventuality has been
covered.
Worcester, Bosch Group cannot be held responsible for costs incurred by persons not
deemed to be competent.
MO535 IMPORTANT NOTE: The box has a built in delay of 11 seconds before activating the motor.
The preheater link must be fitted at
A
for the box to operate
FAULT FINDING
& DIAGRAMS
FAULT FINDING
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
52
8 716 113 389d 30/3/10 14:01 Page 52
X9 (PIN 2)
N
X1 (PIN 1)
FROST THERMOSTATS
PROGRAMMER
FUSE F1
3.15A
FAST
CERAMIC
X2
(FS)
X2 (FR)
X2 (FR)
X4 (PIN 3)
X4 (PIN 1)
white
brown
grey
X4 (PIN 2)
X2
(LS)
X2
(NS)
N
LINK
(REMOVE)
4
1
2
3
X2
(LR)
N
RELAY 1
ROOM
THERMOSTAT
DIVERTER
END SWITCH
X8 (PIN 5)
orange
X8 (PIN 2)
grey
1
4
3
N RELAY 2
4
3
1
N
RELAY
3
X10 (PIN 3)
X10 (PIN 1)
white
white
1
2
4
N
RELAY
4
X6 (PIN 2)
X6 (PIN 4)
blue
brown
DHW CONTROL
THERMOSTAT
WATER FLOW
SWITCH
LOCKOUT
INDICATOR
X11 (PIN 2)
PUMP
X7 (PIN 1)
brown
MOTORISED
DIVERTER
VALVE
X8 (PIN 3)
brown
grey
X12 (PIN 4)
grey
BURNER
X13 (PIN 1)
yellow
pink
X13 (PIN 3)
X13 (PIN 2)
orange
2
4
(C)
2
4
(C)
grey
X13 (PIN 5)
red
red
PLUG IN
CONNECTOR
CENTRAL HEATING
CONTROL THERMOSTAT
AUTO RESET HIGH LIMIT
THERMOSTAT
MANUAL RESET BOILER
OVERHEAT THERMOSTAT
X3 (PIN 3)
X8 (PIN 1)
LIVE SUPPLY FOR ALTERNATIVE DIVERTER VALVE
CH
DHW
3
2
MANUAL RESET FLUE
OVERHEAT THERMOSTAT
red
NC
NO
3
NC
orange
NO
3
red
2
6
LOCKOUT
RESET SWITCH
X3 (PIN 3 (L))
white
white
X9 (PIN 1)
X1 (PIN 3)
N
4
X11 (PIN 3)
X12 (PIN 3)
X7 (PIN 3)
brown
N
X7 (PIN 4)
N
X8 (PIN 4)
X8 (PIN 6)
X1 (PIN 5)
X1 (PIN 6)
MODE
SWITCH
SERVICE
CONNECTION
MAINS
CONNECTION
R1
R2 C2
MANUAL
RESET TANK
OVERHEAT
THERMOSTAT
brown
ELECTRICAL SCHEMATIC
53
FAULT FINDING
& DIAGRAMS
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 106 389c (01/2009)
8 716 113 389d 30/3/10 14:01 Page 53
COMMISSIONING ENGINEER COMMISSIONING CHECKS
COMPANY NAME:
PUMP PRESSURE (PSI):
ADDRESS:
CO2%:
SMOKE READING:
ENGINEERS NAME:
F.G.T.°C:
SIGNATURE:
FLUE PRESSURE:
DATE:
BURNER MODEL:
CONTROLS To comply with the Building Regulations, each section must have a tick in one or other of the boxes
TIME & TEMPERATURE CONTROL TO HEATING
ROOM T/STAT & PROGRAMMER/TIMER PROGRAMMABLE ROOMSTAT
TIME CONTROL TO HOT WATER PROGRAMMER/TIMER
HEATING ZONE VALVES
FITTED
NOT REQUIRED
THERMOSTATIC RADIATOR VALVES
FITTED
AUTOMATIC BYPASS TO SYSTEM FITTED
NOT REQUIRED
CONFIRM THE FOLLOWING:
THE CONDENSATE DRAIN HAS BEEN INSTALLED IN ACCORDANCE WITH THE INSTRUCTIONS
YES
OIL TYPE USED IS KEROSENE
YES
THE SYSTEM HAS BEEN FLUSHED IN ACCORDANCE WITH THE INSTRUCTIONS?
YES
THE SYSTEM CLEANER USED:
THE INHIBITOR USED:
HAS A WATER SCALE REDUCER BEEN FITTED? YES NO
WHAT TYPE OF SCALE REDUCER HAS BEEN FITTED?
FOR THE DOMESTIC HOT WATER MODE, MEASURE & RECORD:
WATER FLOW RATE
lts/min
CONFIRM THE FOLLOWING:
THE HEATING AND HOT WATER SYSTEM COMPLIES WITH
CURRENT BUILDING REGULATIONS
NO
YES
THE APPLIANCE AND ASSOCIATED EQUIPMENT HAS BEEN
INSTALLED AND COMMISSIONED IN ACCORDANCE WITH THE
MANUFACTURER’S INSTRUCTIONS
NO
YES
HAVE YOU RECORDED A CO/CO2 RATIO READING? N/A YES CO/CO2 RATIO
THE OPERATION OF THE APPLIANCE AND SYSTEM CONTROLS
HAVE BEEN DEMONSTRATED TO THE CUSTOMER
NO
YES
IMPORTANT: LEAVE THIS MANUAL WITH THE HOMEOWNER
SERVICE INTERVAL RECORD
It is recommended that the heating system is serviced regularly and that you complete the appropriate
Service Interval Record Overleaf.
Service Provider.
Before completing the appropriate Service Interval Record overleaf, please ensure you have carried out
the service as described in this manual. Always use Worcester, Bosch Group specified spare parts.
HEATSLAVE BOILER COMMISSIONING CHECKLIST
8 716 113 389d 30/3/10 14:01 Page 54
SERVICE 1 DATE
ENGINEER NAME
COMPANY NAME
TEL No.
OFTEC REG No.
PUMP PRESSURE: psi CO2%:
NOZZLE CHANGED? YES
NO
F.G.T. °C FLUE PRESSURE:
COMMENTS
SIGNATURE
SERVICE 2 DATE
ENGINEER NAME
COMPANY NAME
TEL No.
OFTEC REG No.
PUMP PRESSURE: psi CO2%:
NOZZLE CHANGED? YES
NO
F.G.T. °C FLUE PRESSURE:
COMMENTS
SIGNATURE
SERVICE 3 DATE
ENGINEER NAME
COMPANY NAME
TEL No.
OFTEC REG No.
PUMP PRESSURE: psi CO2%:
NOZZLE CHANGED? YES
NO
F.G.T. °C FLUE PRESSURE:
COMMENTS
SIGNATURE
SERVICE 4 DATE
ENGINEER NAME
COMPANY NAME
TEL No.
OFTEC REG No.
PUMP PRESSURE: psi CO2%:
NOZZLE CHANGED? YES
NO
F.G.T. °C FLUE PRESSURE:
COMMENTS
SIGNATURE
SERVICE 5 DATE
ENGINEER NAME
COMPANY NAME
TEL No.
OFTEC REG No.
PUMP PRESSURE: psi CO2%:
NOZZLE CHANGED? YES
NO
F.G.T. °C FLUE PRESSURE:
COMMENTS
SIGNATURE
SERVICE 6 DATE
ENGINEER NAME
COMPANY NAME
TEL No.
OFTEC REG No.
PUMP PRESSURE: psi CO2%:
NOZZLE CHANGED? YES
NO
F.G.T. °C FLUE PRESSURE:
COMMENTS
SIGNATURE
SERVICE 7 DATE
ENGINEER NAME
COMPANY NAME
TEL No.
OFTEC REG No.
PUMP PRESSURE: psi CO2%:
NOZZLE CHANGED? YES
NO
F.G.T. °C FLUE PRESSURE:
COMMENTS
SIGNATURE
SERVICE 8 DATE
ENGINEER NAME
COMPANY NAME
TEL No.
OFTEC REG No.
PUMP PRESSURE: psi CO2%:
NOZZLE CHANGED? YES
NO
F.G.T. °C FLUE PRESSURE:
COMMENTS
SIGNATURE
SERVICE 9 DATE
ENGINEER NAME
COMPANY NAME
TEL No.
OFTEC REG No.
PUMP PRESSURE: psi CO2%:
NOZZLE CHANGED? YES
NO
F.G.T. °C FLUE PRESSURE:
COMMENTS
SIGNATURE
SERVICE 10 DATE
ENGINEER NAME
COMPANY NAME
TEL No.
OFTEC REG No.
PUMP PRESSURE: psi CO2%:
NOZZLE CHANGED? YES
NO
F.G.T. °C FLUE PRESSURE:
COMMENTS
SIGNATURE
8 716 113 389d 30/3/10 14:01 Page 55
In the unlikely event the boiler does not give
complete satisfaction, before calling for a
service engineer, the installer should check
the following:-
General checks
1. Is the mode switch in boiler mode (indicator on)?
2. Is there 230V across the boiler live and neutral terminals?
3. Is the polarity correct? (230V across live and earth, 0V across neutral and earth)
4. Is the air bled from the primary system?
5. Is the air bled from the oil supply?
6. Is the flue sized and routed correctly?
Boiler runs straight to lockout
1. Has the oil line been purged of air?
2. Where an air eliminator is used in conjunction with a top feed oil tank
the non-return valve, (if fitted), should be removed from the oil dip pipe.
Boiler locks out at the start of a demand
(Heating off overnight for example)
1. If an air eliminator is being used, check that there are no leaks that allow
air to be pulled into the oil supply.
2. If a two pipe oil supply is a being used, has a non-return valve
been fitted to the inlet pipe? Refer to the instructions for guidelines.
No domestic hot water (external programmer)
1. Is the mains water in connected to the 15mm isolation valve?
2. Is there a domestic hot water demand from the programmer and has the
tank reached temperature?
3. Is there 230V on pin 2 of terminal block X4?
4. Remove the external wiring from terminal block X4 and fit a link across 1
and 2, if the domestic hot water now operates there is a problem with
the external programmer and/or its wiring.
No central heating (external programmer)
1. Are both programmer and room thermostat on demand for central heating?
2. Is the room thermostat wired correctly?
3. Refit the link across pins LS and LR on terminal X2, if the central heating
now operates correctly the room thermostat and/or its wiring are faulty.
4. Is there 230V on pin 1 of terminal block X4? If not remove the external
wiring to terminal block X4 and fit a link across pins 1 and 3 on terminal
X4, if the central heating now operates correctly the programmer
and/or its wiring are faulty.
Dedicated to heating comfort
Worcester, Bosch Group
Cotswold Way, Warndon, Worcester WR4 9SW.
Tel. 0844 892 9900 Fax. 01905 754619
Worcester, Bosch Group is a brand name of Bosch
Thermotechnology Ltd.
www.worcester-bosch.co.uk
8 716 113 389d (03/2010)
UNDER NO CIRCUMSTANCES MUST AN APPLIANCE BE LEFT
TO OPERATE WITH ANY CONTROL LINKED OUT OR OVER RIDDEN.
CONTACT INFORMATION
WORCESTER, BOSCH GROUP:
TECHNICAL:
0844 892 3366
SERVICE:
0844 892 3000
SERVICE (EIRE):
01494 0099
SPARES:
01905 752571
LITERATURE:
0844 892 9800
TRAINING:
01905 752526
SALES:
01905 752640
WEBSITE:
worcester-bosch.co.uk