PORTABLE APPLIANCE TESTER
PAT-800 and PAT-805
SONEL SA
ul. Wokulskiego 11
58-100 Świdnica, Poland
Version 1.09 13.01.2017
OPERATING MANUAL PAT-800/805 version 1.09
2
PAT-800 and PAT-805 meters are modern, high-quality meters, easy and safe in operation. Please
acquaint yourself with the present manual in order to avoid measuring errors and prevent possible
problems related to operation of the meter.
OPERATING MANUAL PAT-800/805 version 1.09
3
CONTENTS
1
SAFETY .................................................................................................................... 5
2
GENERAL DESCRIPTION AND FEATURES OF THE INSTRUMENT ......... 6
3
SWITCHING ON AND GENERAL SETTINGS .................................................. 7
3.1
POWER SUPPLY ...................................................................................................... 7
3.2
START TEST AFTER SWITCHING THE METER ON ......................................................... 8
3.3
GENERAL SETTINGS - MENU ................................................................................. 8
3.3.1
Setting date and time ..................................................................................... 9
3.3.2
Communication with PC .............................................................................. 10
3.3.3
Firmware update ......................................................................................... 11
3.3.4
Setting the bar-code reader ......................................................................... 11
3.3.5
Printer Settings ............................................................................................ 12
3.3.6
Transferring data to a pen-drive ................................................................. 13
3.3.7
Setting nominal network voltage ................................................................. 14
3.3.8
Setting current values in the measurement of RPE on IEC lead test (only
PAT-805) ..................................................................................................... 15
3.3.9
Configuration of settings from PC ............................................................... 16
4
MEASUREMENTS ................................................................................................ 19
4.1
PRELIMINARY TEST ............................................................................................... 19
4.2
MEASUREMENT OF PROTECTIVE LEAD RESISTANCE USING 200MA CURRENT .......... 21
4.3
COMPENSATION OF THE TEST LEAD RESISTANCE DURING THE MEASUREMENT OF THE
PROTECTIVE LEAD RESISTANCE USING 200MA CURRENT (AUTO-ZERO) .................. 23
4.4
MEASUREMENT OF PROTECTIVE LEAD RESISTANCE USING 10/25A CURRENT (ONLY
PAT-805) ........................................................................................................... 24
4.4.1
Two-wire measurement of protective lead resistance using 10/25A current
(only PAT-805) ............................................................................................ 25
4.4.2
Compensation of the test lead resistance during the measurement of the
protective lead resistance using 10A or 25A current (auto-zero)................ 25
4.4.3
Three-wire measurement of protective lead resistance using 10/25A current
(only PAT-805) ............................................................................................ 26
4.4.4
Four-wire measurement of protective lead resistance using 10/25A current
(only PAT-805) ............................................................................................ 27
4.5
MEASUREMENT OF INSULATION RESISTANCE ......................................................... 27
4.5.1
RISO measurement on devices of Class I ....................................................... 28
4.5.2
RISO measurement on devices of Class II (III) .............................................. 29
4.6
MEASUREMENT OF SUBSTITUTE LEAKAGE CURRENT .............................................. 30
4.7
MEASUREMENT OF PE LEAKAGE CURRENT ........................................................... 32
4.8
MEASUREMENT OF DIFFERENTIAL LEAKAGE CURRENT .......................................... 33
4.9
MEASUREMENT OF TOUCH LEAKAGE CURRENT ..................................................... 35
4.10
MEASUREMENT OF CURRENT, POWER CONSUMPTION AND VOLTAGE ...................... 36
OPERATING MANUAL PAT-800/805 version 1.09
4
4.11
IEC LEAD TEST .................................................................................................... 37
4.12
AUTOMATIC TESTS ............................................................................................... 38
5
MEMORY OF MEASUREMENT RESULT DATA .......................................... 42
5.1
STORING THE MEASUREMENT RESULTS IN THE MEMORY ........................................ 42
5.2
VIEWING MEMORY DATA ...................................................................................... 44
5.3
DELETING MEMORY DATA .................................................................................... 44
5.3.1
Deleting bank data ...................................................................................... 44
5.3.2
Deleting the whole memory ......................................................................... 45
6
REPORT PRINTING ............................................................................................ 46
7
DATA TRANSMISSION ...................................................................................... 46
7.1
COMPUTER CONNECTION ACCESSORIES ............................................................... 46
7.2
DATA TRANSMISSION WITH USB PORT .................................................................. 46
8
CLEANING AND MAINTENANCE ................................................................... 47
9
STORAGE .............................................................................................................. 47
10
DISMANTLING AND DISPOSAL ...................................................................... 47
11
ANNEXES .............................................................................................................. 48
11.1
TECHNICAL SPECIFICATIONS ................................................................................ 48
11.2
STANDARD EQUIPMENT ........................................................................................ 54
11.3
OPTIONAL ACCESSORIES ...................................................................................... 54
12
MANUFACTURER ............................................................................................... 55
OPERATING MANUAL PAT-800/805 version 1.09
5
1 Safety
PAT-800 and PAT-805 meters are designed for performing check tests on electrical equipment,
providing measurement results which determine the safety status of tested devices. Therefore, in
order to provide conditions for correct operation and the correctness of the obtained results, the
following recommendations must be observed:
Before you proceed to operate the meter, acquaint yourself thoroughly with the present manual
and observe the safety regulations and specifications determined by the producer.
Any application that differs from those specified in the present manual may result in a damage to
the device and constitute a source of danger for the user.
PAT-800 and PAT-805 meters must be operated only by appropriately qualified personnel with
relevant certificates authorising the personnel to perform works on electric systems. Operating
the meter by unauthorised personnel may result in damage to the device and constitute a source
of danger for the user.
The instrument must not be used with installations or equipment situated in dangerous
environments, e.g. where fire or explosion hazards exist.
It is unacceptable to operate the following:
A damaged meter which is completely or partially out of order,
A meter with damaged test leads insulation,
A meter stored for an excessive period of time in disadvantageous conditions (e.g. excessive
humidity). If the meter has been transferred from a cool to a warm environment with a high
level of relative humidity, do not start measurements until the meter is warmed up to the
ambient temperature (approximately 30 minutes).
The meter may be supplied only from grounded mains sockets.
Before measurements may commence, make sure the test leads are connected to the
appropriate measurement sockets.
Do not touch the tested device during measurements.
Banana test sockets and the socket for testing IEC cables are protected against improper
connection to the voltage up to 300V AC for 60 seconds.
Repairs may be carried out only by an authorised service point.
NOTE!
Only standard and additional accessories for a given device should be used, as listed
in the "Equipment" section. Use of different accessories can lead to errors in the test
connection and can introduce additional measurement uncertainties.
NOTE!
The plug on the housing near handle must be always tightened. It can be unscrewed
only when the device is transported by an aeroplane.
Note:
Due to continuous development of the meter’s software, the actual appearance of the
display, in case of some of the functions, may slightly differ from the display presented
in this operating manual.
OPERATING MANUAL PAT-800/805 version 1.09
6
2 General description and features of the instrument
PAT-800 and PAT-805 digital meters are intended to measure the basic parameters of portable
electrical devices (power tools, household appliances, etc.) important for their safety: protective
conductor resistance, insulation resistance, continuity of connections, the leakage current.
The meter may be used to test the equipment, in accordance with the following standards:
EN 60745-1 Hand-held motor-operated electric tools. Safety. Part 1: General requirements.
EN 61029 Safety of transportable motor operated electric tools. General requirements.
EN 60335-1 Household and similar electrical appliances. Safety. Part 1: General requirements.
EN 60950 Information technology equipment – Safety- Part 1: General requirements .
VDE 0404-1 Prüf- und Messeinrichtungen zum Prüfen der elektrischen Sicherheit von
elektrischen Geräten. Teil 1: Allgemeine Anforderungen.
VDE 0404-2 Prüf- und Messeinrichtungen zum Prüfen der elektrischen Sicherheit von
elektrischen Geräten. Teil 2: Prüfeinrichtungen für Prüfungen nach Instandsetzung, Änderung
oder für Wiederholungsprüfungen.
VDE
0701-0702
Prüfung
nach
Instandsetzung,
Änderung
elektrischer
Geräte.
Wiederholungsprüfung elektrischer Geräte. Allgemeine Anforderungen für die elektrische
Sicherheit.
Basic functions of the instrument:
Measurement of network voltage and frequency
Checking the resistance of L-N circuit
Checking the fuse
Measurement of protective conductor resistance (Protection class - I):
technical measurement method
measurement with sinusoidal current of network frequency and values: 200mA, 10A (only
PAT-805) and 25A (only PAT-805)
adjustable measurement time
adjustable upper limit in the range of: 10mΩ …1.99Ω with resolution 0.01Ω
Measurement of insulation resistance:
three test voltages: 100V (only PAT-805), 250 (only PAT-805) and 500V
measurement of insulation resistance up to 600M
automatic discharge of the capacitance of tested object after the insulation resistance
measurement is completed
adjustable measurement time
adjustable lower limit within the range of 0.1 ….9.9 MΩ with resolution of 0,1MΩ
Measurement of substitute leakage current:
adjustable measurement time
adjustable upper limit in the range of: 0.01 ... 9.9 mA with resolution of 0.01mA/0.1mA
Measurement of PE leakage current
adjustable measurement time
adjustable upper limit in the range of: 0.01 ... 9.9 mA with resolution of 0.01mA/0.1mA
Measurement of differential leakage current:
adjustable measurement time
adjustable upper limit in the range of: 0.01 ... 9.9 mA with resolution of 0.01mA/0.1mA
OPERATING MANUAL PAT-800/805 version 1.09
7
Measurement of touch leakage current:
adjustable measurement time
adjustable upper limit in the range of: 0.01 ... 1.99 mA with resolution of 0.01mA
Power measurement:
adjustable measurement time
Current consumption measurement
IEC lead test
Other:
automatic selection of measuring range
990 memory cells for storing individual measurement results with the option to transfer them
to a PC via USB socket or printing
cooperation with the bar-code reader and printer
large, readable display with backlight option
ergonomic operation
Note:
The displayed E02 symbol informs that the 10/25A test set is damaged. The machine
must be sent for repair.
3 Switching on and general settings
3.1 Power supply
The device is powered from the network 187 ... 265V, 50Hz.
Two 15A fuses protect L and N lines from the supply socket to the test socket, they are tripped
when current consumption from the test socket is too high (>16A).
500mA fuse protects 200mA current controller for RPE measurement.
OPERATING MANUAL PAT-800/805 version 1.09
8
3.2 Start test after switching the meter on
After switching on, the meter performs self-test to check its correct operational condition and
when this test is successfully completed, the meter automatically performs the following
measurements:
measurement of the voltage in the power supply socket, i.e. the voltage between L and N of
power supply to the meter
measurement of mains frequency
checking the continuity PE in the power supply socket
measuring the voltage between N and PE in the power supply socket
When everything is correct the following screen is displayed:
Notes:
- When the network voltage is below 187V the meter turns off automatically.
Additional information displayed by the meter
,
and
an acoustic signal
Lack of PE continuity, the measurements are blocked
(message
blinks).
,
and
an acoustic signal
Voltage UN-PE > 25V, the measurements are blocked (the
voltage value blinks).
and
an acoustic signal
Mains voltage> 265V, measurements are blocked.
Exchanged L and N, measurements are possible.
3.3 General Settings - MENU
By pressing SET button the user enters the mode where the following actions are available:
setting date and time
communicating with PC
updating firmware
operating the meter with a bar-code reader and printer
transferring data to a pen-drive
OPERATING MANUAL PAT-800/805 version 1.09
9
setting nominal network voltage
setting current values in the measurement of RPE on IEC lead (only PAT-805).
To enter the setting mode (MENU):
press SET button
Press ENTER to enter the parameter
setting.
Use buttons
,
to go to the
next parameter.
Use
,
to set the parameter
value.
Press ENTER to approve the
setting, press ESC go to the main
MENU without changing any
settings.
Notes:
- The value or symbol to be changed is blinking.
- Exit MENU using STOP/ESC.
- Settings are stored in memory after switching off the meter.
3.3.1 Setting date and time
OPERATING MANUAL PAT-800/805 version 1.09
10
Press ENTER .
Use
,
to move
to the next group of
digits, using
,
set desired
value.
Press ENTER to confirm the
settings or ESC, to exit to main
MENU without changing any
settings.
3.3.2 Communication with PC
Press ENTER to start the
transmission.
OPERATING MANUAL PAT-800/805 version 1.09
11
3.3.3 Firmware update
Press ENTER to start the
transmission. On PC run the program
downloaded from www.sonel.pl.
Notes:
- New versions of software for the meter are available at www.sonel.pl.
- This function may be used only by the computer proficient users.
- During programming, do not turn off the power supply of the meter and the power supply should be
stable. Do not disconnect the USB cable.
3.3.4 Setting the bar-code reader
Press ENTER .
OPERATING MANUAL PAT-800/805 version 1.09
12
Use
,
to set
the operation of the
meter with the bar-
code reader (
) or
without it (
).
Press ENTER, to confirm the
settings, or ESC, to exit to main
MENU without changing any
settings.
Notes:
- The reader and printer have been programmed to read the codes in CODE128 standard (in PAT
devices we use digits only). PAT accepts only 7-character codes (e.g. "1234567"), any other are
considered invalid. Therefore, if you attempt to read a 6-character code (or shorter) the reader will
read it, but PAT will not save it - the same applies to 8-character codes and longer.
- The bar-code contains only ID number of the device, no additional information is coded.
- Reader configuration:
1. Connect the reader to your PC.
2. Wait until the reader is installed on your system.
3. Point the reader at the following code pressing the button. The reader signals successful read-out
by lighting green LED and a beep.
3.3.5 Printer Settings
OPERATING MANUAL PAT-800/805 version 1.09
13
Press ENTER .
Use
,
to set
the operation of the
meter with the printer
(
) or without it
(
).
Press ENTER, to confirm the
settings, or ESC, to exit to main
MENU without changing any
settings.
Note:
- The printer must be connected to any of the USB socket of "Host" type.
- Supported types of printers: Brother QL-720NW, Brother PT-9700PC.
3.3.6 Transferring data to a pen-drive
Press ENTER .
OPERATING MANUAL PAT-800/805 version 1.09
14
Use
,
to set
copying data (
)
or its absence (
).
Press ENTER, to confirm the
settings and start data copying for
, or to exit to main MENU for
, or ESC, to exit to main MENU
without changing any settings.
Notes:
- Pen-drive must have FAT32 file system.
- Pen-drive must be plugged into the left USB socket of "Host" type.
- The content of memory is transferred to the pen-drive as a file in an independent format interpreted
by "Sonel Reader" freeware and "Sonel PAT" commercial software.
Additional information displayed by the meter
No communication or poor communication with the pen-
drive.
Pen-drive memory is full.
3.3.7 Setting nominal network voltage
OPERATING MANUAL PAT-800/805 version 1.09
15
Press ENTER .
Use
,
to set
the desired
voltage.
Press ENTER, to confirm the
settings, or ESC, to exit to main
MENU without changing any
settings.
Notes:
- Nominal network voltage is used in ISUB function for calculating the leakage current, which is
measured at a voltage of 40V and its value is rescaled to the nominal voltage.
3.3.8 Setting current values in the measurement of RPE on IEC lead test
(only PAT-805)
Press ENTER .
OPERATING MANUAL PAT-800/805 version 1.09
16
Use
,
to set
the test current (10A
or 200mA).
Press ENTER, to confirm the
settings, or ESC, to exit to main
MENU without changing any
settings.
3.3.9 Configuration of settings from PC
"Sonel PAT" software and " Sonel Reader" freeware delivered with the meter, enable user to
configure meter settings, both in terms of general data and individual parameters of each
measurement function.
When using "Sonel PAT" software - start to configure the settings by pressing Settings 1 button
displayed in the main window (Main functions tab), then in "Software settings" window press Meter
settings 2 .
When using "Sonel Reader" press Meter configuration PAT80x 1 button:
1
2
OPERATING MANUAL PAT-800/805 version 1.09
17
In both programs, window "PAT80x Settings" will be displayed:
Window for configuring general settings.
You can use this module to enter your contact details which will be visible on the reports printed
directly from the meter (using an optional printer). Moreover, here you can set the date, time and
language of reports printed by the meter.
1
OPERATING MANUAL PAT-800/805 version 1.09
18
In Manual and Auto tabs you can configure the parameters of all measurements performed both
individually and included in auto-tests.
Window for configuring manual measurements.
Window for configuring Auto-measurements.
The software enables user to read the current configuration of the meter, save the meter settings
into a file, upload the configuration from a file, create files with different configurations, which is a
simple way to prepare a number of configurations for various requirements, e.g. for different
customers and quickly reset the meter according to current needs.
OPERATING MANUAL PAT-800/805 version 1.09
19
4 Measurements
Notes:
For the convenience of measurements on devices of Class II the socket marked
with
symbol is connected with PE pin of the test socket. Do not connect
dangerous voltage to this socket.
- Tested device must be turned on.
- Measurement activated with defined duration time =
- continuous measurement – lasts as
long as START button is pressed. Maintaining the measurement is possible by pressing ENTER with
START button kept pressed.
- Each measurement with duration =
- continuous measurement – maintaining the
measurement by pressing ENTER may be stopped by pressing STOP/ESC.
- After completing each measurement use
,
to see parameters (limits) including the date and
time of measurement.
- All data can be entered using the program on your PC.
4.1 Preliminary test
Connect the mains plug of the tested device into the test
socket of the meter.
Press the button of initial measurement
.
After that meter is prepared for
measurement.
OPERATING MANUAL PAT-800/805 version 1.09
20
Press START.
Read the result.
Symbols
and
are blinking.
Symbol
indicates the need for visual inspection on the tested device. Please check the
power cord insulation, quality of housing and mains plug (for cracks or damages) etc.
Press ENTER, if this test is
successful (
is displayed) or
STOP/ESC, when the test result is
negative (
is displayed).
Symbol
indicates the possibility to check the fuse removed from the tested device.
Contact the fuse with the test points. The efficiency of the fuse
is indicated by displaying
and an acoustic signal.
Notes:
- Tested device must be turned on.
- RL-N measurement is intended for resistance objects, in case of inductive objects, the result may be
burdened with an additional errors.
- Fuse test is possible when READY message is displayed.
- Do not touch the two metal ends of the fuse with your fingers during the test, because a blown fuse
may be diagnosed as good.
OPERATING MANUAL PAT-800/805 version 1.09
21
4.2
Measurement of protective lead resistance using 200mA
current
Press RPE 200mA. After that meter is
prepared for measurement.
When parameters must be changed press
SET.
Use
,
to set the upper limit of RPE
resistance.
Use
,
to go to setting the time
of measurement, using
,
set
the measurement time.
OPERATING MANUAL PAT-800/805 version 1.09
22
Press ENTER to confirm the settings.
Connect the mains plug of the tested device into the test
socket of the meter. Use the probe connected to socket I2
(for PAT-800 - RPE) and touch metal parts of the tested
device connected to PE.
Press START.
After measuring is completed, read the
result. The measurement may be stopped
before the set time runs out by pressing
STOP/ESC.
OPERATING MANUAL PAT-800/805 version 1.09
23
Correct result: RPE < LIMIT
Incorrect result: RPE > LIMIT
Notes:
- Tested device must be turned on.
- Test circuit is electrically isolated from the mains and from PE mains lead.
4.3
Compensation of the test lead resistance during the
measurement of the protective lead resistance using 200mA
current (auto-zero)
In RPE 200mA mode, press
. Auto-zero
screen will appear with blinking symbol
.
Use the probe connected to I2 socket (for PAT-800 - RPE)
and touch PE pin of the test socket.
OPERATING MANUAL PAT-800/805 version 1.09
24
Press START, to begin auto-zero.
After finishing auto-zero process, for 1s is
displayed message
and the meter enters
the measuring function.
Completed auto -zero process is signalled during the measurement by displaying
.
In order to remove auto-zero proceed in the same manner, but disconnect the test lead from PE.
After finishing, for 1s is displayed message
.
4.4
Measurement of protective lead resistance using 10/25A
current (only PAT-805)
Press RPE 10/25A. After that meter is
prepared for measurement.
Symbol
indicates that 10/25,
two-wire measurement is set,
symbol
indicates that three-
wire measurement is set, symbol
indicates that four-wire
measurement is set. Another
pressing of RPE 10/25A switches
the current value and
measurement type.
When parameters must be changed press
SET. Setting is performed as in section 4.2.
Notes:
Note that any kind of adapter add extra resistance and thus the measurement
result will be overestimated.
OPERATING MANUAL PAT-800/805 version 1.09
25
- For 10A and 25A current, there is no possibility of continuous measurement settings (Cont.) If such
setting was set for the 200mA current, then switching the meter to measure with 10/25A current
causes that a default value of 5 s. is set as measuring time.
- To avoid excessive heating of the measuring pin in PE socket, do not trigger the measurement with
25A current at short intervals.
The method of measurement and other observations are the same as for the measurement of
200mA.
Additional information displayed by the meter
Non-continuity in the test circuit during the measurement
4.4.1 Two-wire measurement of protective lead resistance using 10/25A
current (only PAT-805)
Connect the mains plug of the tested device into the test socket of the
meter. Use the probe connected to socket I2 and touch metal parts of the
tested device connected to PE.
The method of measurement and observations are the same as for the measurement of 200mA.
4.4.2 Compensation of the test lead resistance during the measurement of
the protective lead resistance using 10A or 25A current (auto-zero)
In RPE 10A or 25A mode, press
. Auto-zero
screen will appear with blinking symbol
.
OPERATING MANUAL PAT-800/805 version 1.09
26
Use the probe connected to I2 socket and touch PE pin of
the test socket.
Press START, to begin auto-zero.
After finishing auto-zero process, for 1s the
message is displayed and the meter
enters the measuring function.
Completed auto -zero process during the measurement is signalled by displaying
.
In order to remove auto-zero proceed in the same manner, but disconnect the test lead from PE.
After finishing for 1s the
message is displayed.
4.4.3 Three-wire measurement of protective lead resistance using 10/25A
current (only PAT-805)
Connect the mains plug of the tested device into the test socket of the
meter. Use the power probe (or Kelvin crocodile clip) connected to U2 and
I2 sockets and touch metal parts of the tested device connected to PE.
OPERATING MANUAL PAT-800/805 version 1.09
27
The method of measurement and observations are the same as for the measurement of 200mA.
4.4.4 Four-wire measurement of protective lead resistance using 10/25A
current (only PAT-805)
Connect one probe (or crocodile clip) connected to I1, U1 sockets, to PE of
power cable of the tested device. Use the power probe (or Kelvin crocodile
clip) connected to U2 and I2 sockets and touch metal parts of the tested
device connected to PE.
The method of measurement and observations are the same as for the measurement of 200mA.
4.5
Measurement of insulation resistance
Press RISO. After that meter is prepared for
measurement.
Another pressing of RISO switches
the test voltage to 100V, 250V
and 500V (only 500V is available
for PAT-800).
When parameters must be changed press
SET. Setting is performed as in section 4.2
(lower limit is set.)
OPERATING MANUAL PAT-800/805 version 1.09
28
Notes:
- Tested device must be turned on.
- Test circuit is electrically isolated from the mains and from PE mains lead.
- The measurement result should be read after displayed values are stabilized.
- After the measurement the tested object is automatically discharged.
4.5.1 RISO measurement on devices of Class I
Connect the mains plug of the tested device into the test socket
of the meter. The measurement is made between shorted L, N
and PE. In addition, it is possible to carry out the measurement
with the probe connected to RISO- socket (RISO for PAT-800).
With continuous measurement set (time =
) press and hold START. To block
the measurement press ENTER.
At the time with pre-set value it is not
necessary.
Signalling the presence of high-voltage
View of the screen during
measurement.
Time remaining to the end of
the measurement
The measurement ends after a preset time runs out or
after pressing STOP/ESC.
After measuring is completed, read the result.
OPERATING MANUAL PAT-800/805 version 1.09
29
Correct result: RISO > LIMIT
Incorrect result: RISO < LIMIT
Notes:
- Before the measurement (also in AUTO test) check the resistance of the protective conductor RPE,
which should be correct.
4.5.2 RISO measurement on devices of Class II (III)
Connect the mains plug of the tested device into the test socket of the
meter. L and N are shorted. Use the probe connected to socket RISO- (for
PAT-800 - RISO) and touch the conductive accessible parts of the tested
device.
It is also possible to perform measurement without the test socket - by using
the following sockets: RISO- and RISO+ (only PAT-805).
OPERATING MANUAL PAT-800/805 version 1.09
30
The measurement is performed similarly as in 4.5.1.
4.6
Measurement of substitute leakage current
ISUB current is measured at 25..50V voltage and its value is rescaled to the
nominal mains voltage set in menu (see 3.3.7).
Press ISUB. After that meter is prepared for
measurement.
When parameters must be changed press
SET. Setting is performed as in section 4.2.
For Class I, connect the mains plug of the tested device into
the test socket of the meter.
OPERATING MANUAL PAT-800/805 version 1.09
31
For Class II and for accessible parts not connected to PE in
Class I, additionally connect I2 socket (for PAT-800 - RISO) to
the probe which will be used for touching accessible parts of
the tested device.
Press START.
After measuring is completed, read the
result. The measurement may be stopped
before the set time runs out by pressing
STOP/ESC.
Correct result: ISUB < LIMIT
OPERATING MANUAL PAT-800/805 version 1.09
32
Incorrect result: ISUB > LIMIT
Notes:
- Tested device must be turned on.
- Test circuit is electrically isolated from the mains and from PE mains lead.
- Test voltage is 25 .. 50Vrms
4.7
Measurement of PE leakage current
Press IPE. After that meter is prepared for
measurement.
Connect the mains plug of the tested device into the test socket
of the meter. The measurement is made between shorted L, N
and PE. In addition, it is possible to carry out the measurement
with the probe connected to RISO- socket (RISO for PAT-800).
OPERATING MANUAL PAT-800/805 version 1.09
33
Settings and the measurement are as in 4.5.1.
Notes:
During the measurement in the test socket the voltage of mains is present.
During the measurement of a faulty device, RCD switch may be triggered off.
- PE leakage current is measured directly on this line enabling the user to get precise measurement
results even when the device consumes 10A or 16A current. Note that if the current leakage is not
caused by PE line but by other earthed elements (e.g. water pipe) – it cannot be measured in this
measurement function.
- Ensure that the location of the tested device is isolated.
- Tested device must be turned on.
- In the half-time of the measurement, the meter automatically changes the polarity of the test socket
and as a result it displays the value of higher leakage current.
4.8
Measurement of differential leakage current
Press I∆. After that meter is prepared for
measurement.
OPERATING MANUAL PAT-800/805 version 1.09
34
Connect the mains plug of the tested device into the test socket
of the meter. The measurement is made between shorted L, N
and PE. In addition, it is possible to carry out the measurement
with the probe connected to RISO- socket (RISO for PAT-800).
Settings and the measurement are as in 4.5.1.
Notes:
During the measurement in the test socket the voltage of mains is present.
During the measurement of a faulty device, RCD switch may be triggered off.
- Differential leakage current is measured as a difference between L current and N current. This
measurement takes into account not only PE leakage current, but also leakage currents caused by
other earthed elements - e.g. water pipe. The disadvantage of this measurement is the presence of
common current (supplied to the device through L line and returning via N line), which makes the
measurement difficult. If this current is high, the measurement will be less accurate (as described in
the technical data) than the measurement of PE leakage current.
- Tested device must be turned on.
OPERATING MANUAL PAT-800/805 version 1.09
35
- In the half-time of the measurement, the meter automatically changes the polarity of the test socket
and as a result it displays the value of higher leakage current.
- The result of measurement may be affected by the presence of external fields and by the current
used by the device.
4.9
Measurement of touch leakage current
Press IT. After that meter is prepared fot
measurement.
Supply the tested device from mains socket other than PAT (for
Class I the socket must have PE). Additionally connect the probe
which will be used for touching accessible parts of the tested
device (for parts of Class I accessible and not connected to PE).
Settings and measurements as in section 4.5.
Notes:
- The measurement should be performed at both positions of the mains plug of the tested device and
as the result the higher current value should be accepted.
OPERATING MANUAL PAT-800/805 version 1.09
36
- The bandwidth of test current results from the measuring system with adjusted touch current which
simulates human perception and reaction, in accordance with EN 60990: 2002.
4.10 Measurement of current, power consumption and voltage
Press VA. After that meter is prepared for
measurement.
Press START.
The measurement may be stopped before
the set time runs out by pressing
STOP/ESC.
After measuring is completed, read the
result.
Symbols
and
are blinking.
During the measurement
current I is displayed
alternatively with the time
of measurement.
Press ENTER, if this test is successful (
is displayed)
or STOP/ESC, when the test result is negative (
is
displayed).
Notes:
During the measurement in the test socket the voltage of mains is present.
OPERATING MANUAL PAT-800/805 version 1.09
37
4.11 IEC lead test
Press IEC TEST. After that meter is prepared
for measurement.
When parameters must be changed press
SET. Setting is performed as in section 4.2.
The following must be successively set:
LIMIT for RPE, measurement time RPE, LIMIT
for RISO, measurement time RISO.
Connect the mains plug into the test socket and the other into
the IEC socket.
Press START.
The measurement may be stopped before
the set time runs out by pressing
STOP/ESC.
After measuring is completed, read the
result:
or
.
OPERATING MANUAL PAT-800/805 version 1.09
38
Additional information displayed by the meter
Lack of continuity in conductor L.
Lack of continuity in conductor N.
L and N are shorted.
L and N are replaced.
4.12 Automatic tests
Press AUTO. The screen with test selection
will be displayed (1 ... 20), the number of test
blinks.
Notes:
- Only numbers of programmed tests are displayed
- If no test is programmed, after pressing AUTO the meter immediately enters the set-up mode
(
is displayed).
- Programmed test is a test where at least for one class, one measurement is performed (set on
).
- Default programmed tests are: 1 ... 4 for all three classes.
OPERATING MANUAL PAT-800/805 version 1.09
39
Use
,
to set the
number of chosen test and
confirm by pressing ENTER.
Use
,
to select the
device class and confirm by
pressing ENTER.
Press START to start the measurement.
To program an inactive test or change the parameters, after entering the AUTO mode ...
...press SET button.
OPERATING MANUAL PAT-800/805 version 1.09
40
Use
,
to set the
number of chosen test and
confirm by pressing ENTER.
Use
,
to select the
device class and confirm by
pressing ENTER.
Now you can choose performing of individual measurements for a given test and class.
Use
and
to choose performing the
measurement (
) or cancel it (
).
To change the parameters of the active
measurement press SET. Set the next
parameters as in section 4.2. Confirm by
pressing ENTER. Use
to activate and set
parameters of the next measurement.
In this way, you may program the test by activating measurements in the following sequence: an
initial measurement → RE → RISO → ISUB → IPE → I∆ → IT → S.
After approving the last change by
pressing ENTER press it two more times
and the meter will enter standby mode
displaying the following screen.
OPERATING MANUAL PAT-800/805 version 1.09
41
Press START to start the measurement.
Notes:
- Readiness for next measurement is obtained automatically, but the individual measurements should
be initiated by pressing START, as in single measurements.
- The duration of the measurement may be reduced by pressing STOP/ESC. The result remains as at
the time of stopping the measurement and the meter turns into standby mode until the next
measurement. Double pressing of STOP/ESC interrupts the cycle of automatic measurement and all
the previous results are lost.
- If the result of one of the tests is improper (
), you may record it (finish the autotest by pressing
ENTER and consider the tested device as faulty) or press START to repeat this test (e.g. when
improper result was caused by an error in connections).
OPERATING MANUAL PAT-800/805 version 1.09
42
5 Memory of measurement result data
PAT-800/805 meters have memory divided into 10 banks of 99 cells. Each measurement result
can be stored in a memory cell marked with a selected number and in a selected memory bank.
Thanks to this, the user of the meter can, at his/her option, assign memory cell numbers to individual
measurement points and the memory bank numbers to individual facilities. The user can also perform
measurements in any sequence and repeat them without losing other data.
Memory of measurement result data is not deleted when the meter is switched off. Thanks to
this, the data can be later read or sent to a computer. The number of a current memory cell or
memory bank is not changed either.
Notes:
- In a single cell you may store a set of results and other data (time, barcode, Pass/Fail, limit, etc) for
AUTO and IEC test or the result of a single measurement (+ time, code, Pass / Fail).
- It is recommended to delete the memory after reading the data or before performing a new series of
measurements that may be stored into the same memory cells as the previous ones.
5.1
Storing the measurement results in the memory
After completing measurement
press ENTER.
Free cell.
Cell is filled with the
result of a single
measurement.
OPERATING MANUAL PAT-800/805 version 1.09
43
Cell is filled with the
result of AUTO test.
Switch between the number of a bank or number of a cell by
pressing SET (chosen digit blinks), chose the number using
and
.
Enter into the memory by pressing ENTER.
If you try to store data in an occupied memory cell, the following
warning message will appear:
Press ENTER, to overwrite the result or STOP/ESC, to cancel
saving.
Notes:
- If the meter is set to work with the barcode reader, before exiting to the screen with the
measurement, the following screen will be displayed:
Read the bar-code of the tested device, then the meter will record the result and the code in selected
memory cell, and it will proceed to the measurement screen. In order to skip reading the barcode
press ENTER.
OPERATING MANUAL PAT-800/805 version 1.09
44
5.2
Viewing memory data
In the mode of displaying the mains
voltage press ENTER.
To select a number of the data bank and cell, proceed as
described in 5.1.
Using
and
you may scroll through
the components of the result and other
data such as date/time of measurement
and bar code.
5.3
Deleting memory data
In the mode of displaying the network
voltage press ENTER.
5.3.1 Deleting bank data
Use
and
set the number of a
cell on 0. Press SET to select the
number of a bank. Use
and
set
the bank number to be deleted.
Press ENTER . A message will be
displayed asking you to confirm your
choice and informing about the loss of
data contained in the bank.
OPERATING MANUAL PAT-800/805 version 1.09
45
Press ENTER, to start deleting or
STOP/ESC, to cancel.
5.3.2 Deleting the whole memory
Use
and
set the number of
bank at 0
Proceed similarly as when deleting data bank.
OPERATING MANUAL PAT-800/805 version 1.09
46
6 Report printing
To print a measurement report set the operation with printer in general settings (par. 3.2.6). The
printer must be connected to any of the USB socket of "Host" type. To start printing, press button
. Te following will be displayed
and
. Printing may be activated:
after completing a single measurement, when the result is presented,
After completing the measurement in AUTO mode, when the result is presented,
while browsing the memory, if the selected cell contains data.
If the meter is set to work with the barcode reader, the meter will ask you to read the code (see
par. 5.1). This does not apply printing from a memory cell which had the barcode already saved.
Supported types of printers: Brother QL-720NW, Brother PT-9700PC.
7 Data transmission
7.1
Computer connection accessories
In order to operate the meter with a PC, an USB cable is required and appropriate software. The
kit includes "Sonel Reader" software used for reading data. Increased ability to read data and create
reports are provided by "Sonel PAT" software, which can be purchased from the manufacturer or
authorized distributor.
The software may be used for many devices manufactured by SONEL S.A. which are equipped
with the USB interface.
Detailed information regarding software is available from the manufacturer or an authorised
distributor.
7.2
Data transmission with USB port
1. Connect the cable to the USB port of the computer and the USB socket of the meter.
2. In general settings, select data transmission (section 3.2.3).
3. Start the programme.
OPERATING MANUAL PAT-800/805 version 1.09
47
8 Cleaning and maintenance
NOTE!
Apply solely the maintenance methods specified by the manufacturer in this
manual.
The casing of the meter may be cleaned with a soft, damp cloth using all-purpose detergents. Do
not use any solvents or cleaning agents which might scratch the casing (powders, pastes, etc.).
The electronic system of the meter does not require maintenance.
9 Storage
In the case of storage of the device, the following recommendations must be observed:
Disconnect all the test leads from the meter.
Clean the meter and all its accessories thoroughly.
10 Dismantling and Disposal
Used electrical and electronic equipment should be collected selectively, i.e. it must not be
placed with another kinds of waste.
Used electronic equipment should be sent to a collection point in accordance with the Used
Electrical and Electronic Equipment Act.
Before the equipment is sent to a collection point, do not dismantle any elements.
Observe the local regulations concerning disposal of packages.
OPERATING MANUAL PAT-800/805 version 1.09
48
11 Annexes
11.1 Technical specifications
Abbreviation "m.v." used in the specification of measurement uncertainty means a standard
measured value.
Ranges and uncertainties are additionally provided according to DIN VDE 404-1.
Measurement of network voltage
Display range
Resolution
Measurement uncertainty
(basic)
187,0…265,0V
0.1 V
(2% m.v. + 2 digits)
measurement of the mains voltage between L and N of power supply to the meter
Measurement of network frequency
Display range
Resolution
Measurement uncertainty
(basic)
45.0…55.0Hz
0.1Hz
(2% m.v. + 2 digits)
measurement of the mains voltage frequency of power supply to the meter
Measurement of PE network (mains) voltage
Display range
Resolution
Measurement uncertainty
(basic) *
0.0 ... 59.9 V
0.1 V
(2% m.v. + 2 digits)
measurement of the mains voltage between PE and N of power supply to the meter
* for U < 5V accuracy ic not specified
Resistance measurement for L - N circuit
Display range
Resolution
Measurement uncertainty
(basic)
0…999Ω
1Ω
(5% m.v. + 5 digits)
1.00 ... 4.99 kΩ
0.01 kΩ
test voltage: 4 ... 8V AC
short-circuit current: max. 5mA
Checking the fuse
test voltage: 4 ... 8V AC
test current: max. 5mA
Measurement resistance of protective conductor I=200mA (only Protection Class I)
Display range
Resolution
Measurement uncertainty
(basic)
0.00 ... 0.99 Ω
0.01 Ω
(4% m.v. + 2 digits)
1.00 ... 19.99 Ω
(4% m.v. + 3 digits)
OPERATING MANUAL PAT-800/805 version 1.09
49
Influencing factor
Designation
Additional uncertainty
Position
E1
0%
Supply voltage
E2
0%
Temperature
E3
0.1%/° C for R ≥ 0.5 Ω
0%/ºC for R < 0.5Ω
unloaded output voltage: 4 ... 12V AC
Test current: ≥ 200mA for R = 0.2 ... 1.99 Ω
adjustable upper limit in the range of: 10mΩ …1.99Ω with resolution 0.01Ω
adjustable measuring time: 1…60s with a resolution of 1s, and "Cont" mode (continuous
measurement) at point 0
Measurement resistance of protective conductor I=10A (only Protection Class I, only PAT-805)
Display range
Resolution
Measurement uncertainty
(basic)
0...999mΩ
1mΩ
(3% m.v. + 4 digits)
(3% m.v. + 40 digits)*
1.00 ... 1.99 Ω
0.01 Ω
* for two-wire measurement
Influencing factor
Designation
Additional uncertainty
Position
E1
0%
Supply voltage
E2
0%
Temperature
E3
0.1%/ºC
unloaded output voltage: <12V AC
Test current: ≥ 10A for R ≤ 0.5 Ω
adjustable upper limit in the range of: 10mΩ …1.99Ω with resolution 0.01Ω
adjustable measuring time in the range of: 1…60s with resolution of 1s
Measurement resistance of protective conductor I=25A (only Protection Class I, only PAT-805)
Display range
Resolution
Measurement uncertainty
(basic)
0...999mΩ
1mΩ
(3% m.v. + 4 digits)
(3% m.v. + 40 digits)*
1.00 ... 1.99 Ω
0.01 Ω
* for two-wire measurement
Influencing factor
Designation
Additional uncertainty
Position
E1
0%
Supply voltage
E2
0%
Temperature
E3
0.1%/ºC
unloaded output voltage: <12V AC
test current: ≥ 25A for R ≤ 0.2 Ω
adjustable upper limit in the range of: 10mΩ …1.99Ω with resolution 0.01Ω
adjustable measuring time in the range of: 1…60s with resolution of 1s
OPERATING MANUAL PAT-800/805 version 1.09
50
Measurement of insulation resistance using test voltage of 100V (only PAT-805)
Test range according to IEC 61557-2 for UN = 100V: 100kΩ…99.9MΩ
Display range
Resolution
Measurement uncertainty
(basic)
0...1999kΩ
1kΩ
(5 % m.v. + 8 digits)
2.00 ... 19.99 MΩ
0.01MΩ
20.0 ... 99.9 MΩ
0.1MΩ
Influencing factor
Designation
Additional uncertainty
Position
E1
0%
Supply voltage
E2
0%
Temperature
E3
0.1%/ºC
Capacity
E7
0% for R ≤ 20MΩ
unspecified for R> 20MΩ
Accuracy of generated voltage (Robc [] 1000*UN [V]): -0+30% from the set value
nominal current: min 1 ... 1.4 mA
adjustable lower limit within the range of 0.1 ….9.9 MΩ with resolution of 0,1MΩ
adjustable measuring time: "Cont" mode (continuous measurement) 4s…3min with a
resolution of 1s
detection of a dangerous voltage before commencing a measurement
discharging the object tested
Note: For R <50kΩ, the uncertainty is not specified.
Measurement of insulation resistance using test voltage of 250V (only PAT-805)
Test range according to IEC 61557-2 for UN = 250V: 250kΩ…199.9MΩ
Display range
Resolution
Measurement uncertainty
(basic)
0...1999kΩ
1kΩ
(5 % m.v. + 8 digits)
2.00 ... 19.99 MΩ
0.01MΩ
20,0...199,9MΩ
0.1MΩ
Influencing factor
Designation
Additional uncertainty
Position
E1
0%
Supply voltage
E2
0%
Temperature
E3
0.1%/ºC
Capacity
E7
0% for R ≤ 20MΩ
unspecified for R> 20MΩ
Accuracy of generated voltage (Robc [] 1000*UN [V]): -0+30% from the set value
nominal current: min 1 ... 1.4 mA
adjustable lower limit within the range of 0.1 ….9.9 MΩ with resolution of 0,1MΩ
adjustable measuring time: "Cont" mode (continuous measurement) 4s…3min with a
resolution of 1s
detection of a dangerous voltage before commencing a measurement
discharging the object tested
Note: For R <50kΩ, the uncertainty is not specified.
OPERATING MANUAL PAT-800/805 version 1.09
51
Measurement of insulation resistance using test voltage of 500V
Test range according to IEC 61557-2 for UN = 500V: 500kΩ…599.9MΩ
Display range
Resolution
Measurement uncertainty
(basic)
0...1999kΩ
1kΩ
(5 % m.v. + 8 digits)
2.00 ... 19.99 MΩ
0.01MΩ
20.0...599.9MΩ
0.1MΩ
Influencing factor
Designation
Additional uncertainty
Position
E1
0%
Supply voltage
E2
0%
Temperature
E3
0.1%/ºC
Capacity
E7
0% for R ≤ 20MΩ
unspecified for R> 20MΩ
Accuracy of generated voltage (Robc [] 1000*UN [V]): -0+30% from the set value
nominal current: min 1 ... 1.4 mA
adjustable lower limit within the range of 0.1 ….9.9 MΩ with resolution of 0,1MΩ
adjustable measuring time: "Cont" mode (continuous measurement) 4s…3min with a
resolution of 1s
detection of a dangerous voltage before commencing a measurement
discharging the object tested
Note: For R <50kΩ, the uncertainty is not specified.
Measurement of substitute leakage current
Display range
Resolution
Measurement uncertainty
(basic)
0.00 ... 3.99 mA
0.01 mA
(5% m.v. + 2 digits)
4.0 ... 19.9 mA
0.1 mA
Influencing factor
Designation
Additional uncertainty
Position
E1
0%
Supply voltage
E2
0%
Temperature
E3
0.075%/ºC
opening voltage: 25 ... 50V
internal resistance of the testing device 2kΩ ± 20%
adjustable upper limit in the range of: 0.01 ... 9.9 mA 0.01 mA with resolution of
0.01mA/0.1mA
adjustable measuring time in the range of: Cont , 1…60s with resolution of 1s
Measurement of PE leakage current
Note: In the half-time of the measurement, the meter automatically changes the polarity of the test
socket and as a final result it displays the value of higher leakage current.
Display range
Resolution
Measurement uncertainty
(basic)
0.00 ... 3.99 mA
0.01 mA
(5% m.v. + 2 digits)
4.0 ... 19.9 mA
0.1 mA
OPERATING MANUAL PAT-800/805 version 1.09
52
Influencing factor
Designation
Additional uncertainty
Position
E1
0%
Supply voltage
E2
0%
Temperature
E3
0.1%/ºC
Power consumption of
the tested unit
E4
0%
Low frequency magnetic
field
E5
0.02 mA I <4mA
0 for I ≥ 4 mA
The shape of the network
voltage (CF)
E8
0%
measurements are made using mains voltage
bandwidth of current measurement 40Hz ... 100kHz
uncertainty related to the measurement within the bandwidth up to 100kHz should not exceed
± 3dB for 100kHz
adjustable upper limit in the range of: 0.01 ... 9.9 mA with resolution of 0.01mA/0.1mA
adjustable measuring time in the range of: Cont , 4…60s with resolution of 1s
Measurement of differential leakage current
Note: In the half-time of the measurement, the meter automatically changes the polarity of the test
socket and as a final result it displays the value of higher leakage current.
Display range
Resolution
Measurement uncertainty
(basic)
0.00 ... 3.99 mA
0.01 mA
(5% m.v. + 2 digits)
4.0 ... 19.9 mA
0.1 mA
bandwidth of current measurement 20Hz ... 100kHz
uncertainty related to the measurement within the bandwidth up to 100kHz should not exceed
± 3dB for 100kHz
adjustable upper limit in the range of: 0.01 ... 9.9 mA with resolution of 0.01mA/0.1mA
adjustable measuring time in the range of: Cont , 4…60s with resolution of 1s
Influencing factor
Designation
Additional uncertainty
Position
E1
0%
Supply voltage
E2
0%
Temperature
E3
0.1%/ºC
Power consumption of
the tested unit
E4
Current
common
Additional
uncertainty
0...4A
0
4...8A
±0.03mA
8...16A
±0,08mA
Low frequency
magnetic field
E5
2 digits I <4mA
0 digit for I ≥ 4 mA
The
shape
of
the
network voltage (CF)
E8
0%
OPERATING MANUAL PAT-800/805 version 1.09
53
Measurement of touch leakage current
Display range
Resolution
Measurement uncertainty
(basic)
0.000...4.999mA
0.001 mA
(5% m.v. + 3 digits)
Influencing factor
Designation
Additional uncertainty
Position
E1
0%
Supply voltage
E2
0%
Temperature
E3
0,25μA/ºC
The shape of the network
voltage (CF)
E8
0%
the bandwidth of test current results from the measuring system with adjusted touch current
which simulates human perception and reaction, in accordance with EN 60990: 2002
adjustable upper limit in the range of: 0.01 ... 1.99 mA with resolution 0,01mA
adjustable measuring time in the range of: Cont , 1…60s with resolution of 1s
Power measurement S
Display range
Resolution
Measurement uncertainty
(basic)
0...999VA
1VA
(5% m.v. + 3 digits)
1…3.99kVA
0.01 kVA
adjustable measuring time in the range of: Cont , 1…60s with resolution of 1s
Current consumption measurement
Display range
Resolution
Measurement uncertainty
(basic)
0.00 ... 15.99 A
0.01 A
(2% m.v. + 3 digits)
adjustable measuring time in the range of: Cont , 1…60s with resolution of 1s
Measurement of voltage at the test socket
Display range
Resolution
Measurement uncertainty
(basic)
187.0 ... 265.0 V
0.1 V
(2% m.v. + 2 digits)
Other technical specification
a) type of insulation ..................................................... double, EN 61010-1 and IEC 61557 compliant
NOTE!
During the measurement of S, I∆, IPE and IT PE of the power supply socket is
connected to PE of the test socket.
b) measurement category .......................................................................... II 300V acc. to EN 61010-1
c) protection class of enclosure acc. to PN-EN 60529 .................................................................. IP40
d) power supply for the meter .................................................................................. 187…265V, 50Hz
e) load current ............................................................................................................ max 16A (230V)
OPERATING MANUAL PAT-800/805 version 1.09
54
f)
dimensions ...................................................................................................... 330 x 235 x 120 mm
g) meter weight ......................................................PAT-800 approx. 4.05kg, PAT-805 approx. 4,75kg
h) storage temperature...................................................................................................... –20...+70C
i)
operating temperature ....................................................................................................... 0...+40C
j)
humidity ............................................................................................................................ 20…80%
k) nominal temperature ..................................................................................................... +20...+25C
l)
reference humidity ............................................................................................................ 40…60%
m) display ...................................................................................................................... LCD, segment
n) memory of measurement results ....................................................................................... 990 cells
o) data transmission................................................................................................................ USB 2.0
p) quality standard .......................... development, design and manufacturing are ISO 9001 compliant
q) the product meets the EMC requirements acc. to ......... EN 61326-1:2009 and EN 61326-2-2:2006
Note:
During the measurement of PE continuity with PE 10/25 current the meter
may produce interference with values exceeding allowable limits defined in
EN 61326-1 and cause interference in other devices.
11.2 Standard equipment
Standard set of equipment supplied by the manufacturer includes:
power lead 1pc – WAPRZZAS1
test lead banana/banana, black 1.2m 1pc – WAPRZ1X2BLBB2X5 (WAPRZ1X2BLBB for PAT-
800)
black crocodile clip 1kV 1pc – WAKROBL30K03 (WAKROBL20K01 for PAT-800)
1kV probe - black 1pc – WASONBLOGB3
USB cable – WAPRZUSB
fuse 0314 015.VXP 15A 250VAC 6.3x32mm Littlefuse 2 pcs – WAPOZB15PAT
cover – WAFUTL5
operating manual
11.3 Optional accessories
Additionally, the following items that are not included in the scope of standard equipment can be
purchased from the manufacturer or the distributors:
barcode stickers
PASS stickers (roll - 50 pieces of stickers)
FAIL stickers (roll - 50 pieces of stickers)
barcode stickers (roll - 100 stickers)
1.2 m double-wire lead (10/25A) U1/I1 1pc (PAT-805) – WAPRZ1X2DZBB1
1.2 m double-wire lead (10/25A) U2/I2 1pc (PAT-805) – WAPRZ1X2DZBB2
power probe Sonel 1pc (PAT-805) – WASONSPGB1
Kelvin crocodile clip 1pc (PAT-805) – WAKROKELK06
black crocodile clip 1kV 1pc – WAKROBL20K01
1kV probe -black 1pc – WASONBLOGB3
test lead banana/banana, black 1.2m 1pc– WAPRZ1X2BLBB
cable - adapter Shuko / IEC (for testing extensions) – WAADAPATIEC1
three phase socket adapter 16A* – WAADAPAT16P
three phase socket adapter 16A, switchable** – WAADAPAT16PR
three phase socket adapter 32A* – WAADAPAT32P
three phase socket adapter 32A, switchable**– WAADAPAT32PR
adapter for industrial sockets 16A*** – WAADAPAT16F1
OPERATING MANUAL PAT-800/805 version 1.09
55
adapter for industrial sockets 32A*** – WAADAPAT32F1
adapter IEC 60320 C6 Plug to IEC 60320 C13 Connector Block – WAADAPATIEC2
USB barcode reader – WAADACK1
USB printer for reports / codes, portable – WAADAD1
Sonel PAT software – WAPROSONPAT1
* - These adapters have permanently shorted lines of three-phase socket: L1, L2, L3 and they are
connected to L line of one-phase socket.
** - These adapters have a rotary switch providing the following connections:
1 - L of test socket connected to L1
2 - L of test socket connected to L2
3 - L of test socket connected to L3
4 - L of test socket connected to L1+L2+L3 (shorted)
*** - These adapters are designed for testing security of devices powered from industrial sockets 16A
and 32A, providing that the tested device does not consume current higher than 16A. The adapters
enable users to perform all measurements available in PAT-800/805 meters on the network
measurement socket.
NOTE!
Adapters for three-phase sockets and for 32A industrial sockets must not be used for
the following measurements: leakage currents IPE and IΔ, power and current
consumption (for detailed information on the use of adapters see PAT Adapters User's
Guide).
12 Manufacturer
The manufacturer of the device, which also provides guarantee and post-guarantee service is the
following company:
SONEL S.A.
ul. Wokulskiego 11
58-100 Świdnica
Poland
tel. +48 74 858 38 60
fax +48 74 858 38 09
E-mail: [email protected]
Web page: www.sonel.pl
Attention:
Service repairs must be realised solely by the manufacturer.