Digital Projection RIGGING FRAME Installation Manual

Text of the manual

Rev B March 2015

115-918B HIGHlite 660 / 740 / 8000 Series HIGHlite Laser 3D Series M-Vision 930 Series Titan LED / 800 / 930 / Quad Series RIGGING FRAME INSTALLATION GUIDE 4

Rigging Frame Installation Guide

Rev B March 2015 About This Document Follow the instructions in this manual carefully to ensure safe and long-lasting use of the rigging frame. Symbols used in this manual Many pages in this document have a dedicated area for notes. The information in that area is accompanied by the following symbols: WARNING: this symbol indicates that there is a danger of physical injury to yourself and/or damage to the equipment unless the instructions are closely followed. ELECTRICAL WARNING: this symbol indicates that there is a danger of electrical shock unless the instructions are closely followed. NOTE: this symbol indicates that there is some important information that you should read. Product revision Because we at Digital Projection continually strive to improve our products, we may change specifications and designs, and add new features without prior notice. Legal notice Trademarks and trade names mentioned in this document remain the property of their respective owners. Digital Projection disclaims any proprietary interest in trademarks and trade names other than its own. Copyright © 2015 Digital Projection Ltd. All rights reserved. Notes

Rigging Frame Installation Guide

Rev B March 2015 Safety Information Please follow the instructions in this document carefully to ensure a safe installation. Please consider keeping the original box and packing materials in case you ever need to ship the frame. Safety warnings INTENDED USE This rigging frame is intended for use by fully qualified, trained and competent persons as an aid to provide safe and secure transportation, installation and adjustment of projectors. Only use the frame indoors, where there is no wind. This frame is intended for use only with the projectors listed in Which Products Are Compatible With This Frame? further in this manual. Any attempt to use the frame with other projectors may result in severe injury or damage. MAINTENANCE AND INSPECTION The Rigging Frame is a maintenance free product. However, before carrying out an installation it is essential to ensure that: • No screws are missing and all screws are in the right position. • No screws, adjustment wheels or other components are damaged. • No plates, square pipes or other components are bent or broken. Use a suitable tool to test each screw and make sure that none are loose. After an installation, ensure that all screws, washers and insulations are present and positioned correctly. Notes

Rigging Frame Installation Guide

Rev B March 2015 INSTALLATION AND MOUNTING Installation errors may lead to serious accidents. Installation should only be carried out by qualified personnel. Installation should be carried out by a minimum of two persons. Do not place the projector on sloped or unstable surfaces as it may fall or tip over, resulting in injury or damage. Make sure the surface can support a weight of 210 kg (462.97 lb). Do not exceed the maximum weight loads for ceiling mounts. For suspended installations, use only designated hanging accessories such as the truss mount and the 750 kg Doughty clamp for a maximum weight load of 138 kg (304.23 lb). When stacking projectors, make sure all four threaded rods are tightened with a torque of 5 N m. Do not position the frame in a manner which may impede projector ventilation. Poor ventilation may result in a fire. Ensure that there is at least 30 cm (12 in) of space between the ventilation outlets and any wall, and 10 cm (4 in) on all other sides. Prevent property damage and personal injury caused by incorrect installation. Ensure the frame is in good condition, the installation has been carried out properly and the load capacity of the supporting structure is sufficient to carry the weight of the entire installation, up to 150 kg (330.69 lb) incl. lenses, cabling, etc. Do not operate the projector in humid or dusty places or in places where the projector may come into contact with oily smoke or steam. Using the projector in such conditions may result in fire, electric shocks or plastic deterioration. Notes

Rigging Frame Installation Guide

Rev B March 2015 SAFE HANDLING Avoid injury from falling objects during assembly and disassembly of the frame. Wear protective shoes, gloves and helmet. The frame is heavy. Use safe handling techniques when lifting the frame. Wear safety gloves to prevent fingers being caught between the outer rings and the plates. When adjusting the image, keep your hands on the adjustment wheels at all times as shown below. Do not lean on the frame. Notes

Rigging Frame Installation Guide

Rev B March 2015 Which Products Are Compatible With The Rigging Frame? The rigging frame can be used with the following projectors: Products Badges • HIGHlite Laser 3D HIGHlite 3D LASER • HIGHlite 660 and 740 2D • HIGHlite 660 3D • HIGHlite 8000 HIGHlite 2D 660 740 HIGHlite 3D 660 HIGHlite 2D 8000 • M-Vision 930 3D M-Vision 3D 930 • Titan LED LED 3D • Titan 800 and Titan 930 2D 800 3D 800 2D 930 3D 930 • Titan Quad Series: • Titan Quad • Titan Super Quad / Quad 2000 2D Quad 3D Quad 2D Quad Super 3D Quad Super 2D Quad2000 3D Quad2000 Notes Any attempt to use the frame with other projectors may result in severe injury or damage.

Rigging Frame Installation Guide

Rev B March 2015 IN THIS GUIDE What’s In The Box?.............................................................................................. 1 Fitting HIGHlite Laser In The Frame............................................................. 2 Required parts..............................................................................................................2 Setup.............................................................................................................................2 Order of components in assembly with HIGHlite Laser...........................................6 Fitting M-Vision 930 In The Frame................................................................. 7 Required parts..............................................................................................................7 Setup.............................................................................................................................7 Order of components in assembly with M-Vision 930............................................11 Fitting Titan In The Frame.............................................................................. 12 Required parts............................................................................................................12 Setup...........................................................................................................................13 Order of components in assembly with Titan.........................................................16 Fitting HIGHlite In The Frame....................................................................... 17 Required parts............................................................................................................17 Setup...........................................................................................................................17 Order of components in assembly with HIGHlite....................................................21 Adjustment Options........................................................................................... 22 Roll..............................................................................................................................22 Pitch............................................................................................................................22 Yaw..............................................................................................................................22 Stacking Projectors.......................................................................................... 23 Ceiling Installation............................................................................................ 24 Ceiling installation using 750 kg / 1650 lb Doughty clamps..................................24 Safe fitting areas - bottom................................................................................................25 Safe fitting areas - top......................................................................................................26 Ceiling installation using the truss mount (optional accessory)..........................27 Adjusting ceiling installations with the truss mount..............................................28 Maximum Weight Loads................................................................................... 29 Truss mount installations..........................................................................................29 Ceiling installation using 750 kg / 1650 lb Doughty clamps..................................30 Table mounts..............................................................................................................31 Dimensions........................................................................................................... 32 Rigging frame.............................................................................................................32 Truss mount................................................................................................................33

Rigging Frame Installation Guide

WHAT’S IN THE BOX? Rev B March 2015 What’s In The Box? Notes Make sure your box contains everything listed. If any pieces are missing, contact your dealer. You should save the original box and packing materials, in case you ever need to ship the rigging frame. The frame is shipped with all components listed here. However, some projectors do not use all screws, sleeves and washers supplied. To find out which parts you need for your installation, refer to the relevant projector section: • Fitting HIGHlite Laser In The Frame • Fitting M-Vision 930 In The Frame • Fitting Titan In The Frame • Fitting HIGHlite In The Frame 1 x rigging frame 115-919 4 x M10x25 low profile socket head screws 115-921 4 x ø10 insulation washers 115-922 4 x ø10 insulation sleeves 115-923 6 x M6x20 button head screws 115-924 12 x ø6.2 insulation sleeves 115-925 4 x square to round adaptors 115-920 Rigging Frame Installation Guide 115-918 4 x ø10.5 insulation spacers 115-994 6 x ø6 spring lock washers 116-226

Rigging Frame Installation Guide

FITTING HIGHLITE LASER IN THE FRAME Rev B March 2015 Fitting HIGHlite Laser In The Frame HIGHlite 3D LASER Required parts Part Quantity Rigging frame 1 M10x25 low profile socket head screws 4 ø10 insulation washers 4 ø10 insulation sleeves 4 M6x20 button head screws 6 ø6 spring lock washers 6 ø6.2 insulation sleeves 12 Setup 1. Remove the lens hood. 2. Place the projector upside down on a suitable flat surface and remove the four adjustable feet 1 . 3. Place the ø10 insulation washers over each M10 screw hole 2 . Notes This procedure requires two persons. It is important to use the washers as they provide galvanic isolation. 1 1 1 1 2 2 2 2

Rigging Frame Installation Guide

FITTING HIGHLITE LASER IN THE FRAME Rev B March 2015 Setup (continued) 4. Insert six of the ø6.2 insulation sleeves in the M6 screw holes 3 on the inside of the frame. Notes This procedure requires two persons. . It is important to use the sleeves as they provide galvanic isolation. 3 3 3 3 3 3

Rigging Frame Installation Guide

FITTING HIGHLITE LASER IN THE FRAME Rev B March 2015 Setup (continued) 5. Position the rigging frame over the projector so that the adjustment screws 4 are at the back, aligning the M10 5 and M6 screw holes 6 . Ensure that the projector plate 7 is flat against the body of the projector. This can be achieved by placing the projector on a surface which is smaller than the frame, allowing full contact between the plate and the projector. Notes This procedure requires two persons. . 4 4 6 5 5 6 6 5 5 6 6 6 7

Rigging Frame Installation Guide

FITTING HIGHLITE LASER IN THE FRAME Rev B March 2015 Setup (continued) 6. Place the ø10 insulation sleeves over each M10 hole. Secure the four M10x25 low profile socket head screws 8 into each hole. Ensure each screw runs through the corresponding sleeve and washer and catches into the corresponding M10 hole in the projector surface. 7. Place the other six ø6.2 insulation sleeves over each M6 screw hole. Place a ø6 spring lock washer over each ø6.2 insulation sleeve. Secure the six M6x20 button head screws 9 into each hole. Ensure each screw runs through the sleeve and washer and catches into the corresponding M6 hole in the projector surface. Notes This procedure requires two persons. It is important to use the sleeves and washers as they provide galvanic isolation. Torque: 4±0.5 N m. 8 9 8 9 9 8 8 9 9 9

Rigging Frame Installation Guide

FITTING HIGHLITE LASER IN THE FRAME Rev B March 2015 Order of components in assembly with HIGHlite Laser 1 M10x25 low profile socket head screw 2 ø10 insulation sleeve 3 Projector plate 4 ø10 insulation washer 5 M6x20 button head screw 6 ø6 spring lock washer 7 ø6.2 insulation sleeve Notes 1 2 3 4 5 6 3 7 7 Notes This procedure requires two persons. It is important to use the sleeves and washers as they provide galvanic isolation. Torque: 4±0.5 N m.

Rigging Frame Installation Guide

FITTING M-VISION 930 IN THE FRAME Rev B March 2015 Fitting M-Vision 930 In The Frame M-Vision 3D 930 Required parts Part Quantity Rigging frame 1 M6x20 button head screws 6 ø6 spring lock washers 6 ø6.2 insulation sleeves 12 Setup 1. Place the projector upside down on a suitable flat surface and remove the four adjustable feet 1 . Notes This procedure requires two persons. It is important to use the washers as they provide galvanic isolation. 1 1 1 1

Rigging Frame Installation Guide

FITTING M-VISION 930 IN THE FRAME Rev B March 2015 Setup (continued) 2. Insert six of the ø6.2 insulation sleeves in the M6 screw holes 2 on the inside of the frame. Notes This procedure requires two persons. . It is important to use the sleeves as they provide galvanic isolation. 2 2 2 2 2 2

Rigging Frame Installation Guide

FITTING M-VISION 930 IN THE FRAME Rev B March 2015 Setup (continued) 3. Position the rigging frame over the projector so that the adjustment screws 3 are at the back, aligning the M6 screw holes 4 . Ensure that the projector plate 5 is flat against the body of the projector. This can be achieved by placing the projector on a surface which is smaller than the frame, allowing full contact between the plate and the projector. Notes This procedure requires two persons. 3 3 4 4 4 4 4 4 5

Rigging Frame Installation Guide

FITTING M-VISION 930 IN THE FRAME Rev B March 2015 Setup (continued) 4. Place the other six ø6.2 insulation sleeves over each M6 screw hole. Place a ø6 spring lock washer over each ø6.2 insulation sleeve. Secure the six M6x20 button head screws 6 into each hole. Ensure each screw runs through the sleeves and catches into the corresponding M6 hole in the projector surface. Notes This procedure requires two persons. It is important to use the washers as they provide galvanic isolation. Torque: 4±0.5 N m. 6 6 6 6 6 6

Rigging Frame Installation Guide

FITTING M-VISION 930 IN THE FRAME Rev B March 2015 Order of components in assembly with M-Vision 930 1 M6x20 button head screw 2 ø6 spring lock washer 3 ø6.2 insulation sleeve 4 Projector plate 1 2 4 3 3 Notes This procedure requires two persons. It is important to use the washers as they provide galvanic isolation. Torque: 4±0.5 N m.

Rigging Frame Installation Guide

FITTING TITAN IN THE FRAME Rev B March 2015 Fitting Titan In The Frame LED 3D 2D 800 3D 800 2D 930 3D 930 2D Quad 3D Quad 2D Quad Super 3D Quad Super 2D Quad2000 3D Quad2000 Required parts Part Quantity Rigging frame 1 M10x25 low profile socket head screws 4 ø10 insulation sleeves 4 ø10.5 insulation spacers 4 Notes This procedure requires two persons.

Rigging Frame Installation Guide

FITTING TITAN IN THE FRAME Rev B March 2015 Setup 1. Place the projector upside down on a suitable flat surface and remove the four adjustable feet 1 . 2. Place the ø10.5 insulation spacers over each M10 screw hole 2 . Notes This procedure requires two persons. It is important to use the washers as they provide galvanic isolation. 1 1 1 2 2 2 1 2

Rigging Frame Installation Guide

FITTING TITAN IN THE FRAME Rev B March 2015 Setup (continued) 3. Position the rigging frame over the projector so that the adjustment screws 3 are at the back, aligning the M10 screw holes 4 . Ensure that the projector plate 5 is flat against the body of the projector. This can be achieved by placing the projector on a surface which is smaller than the frame, allowing full contact between the plate and the projector. Notes This procedure requires two persons. 3 3 4 4 4 4 5

Rigging Frame Installation Guide

FITTING TITAN IN THE FRAME Rev B March 2015 Setup (continued) 4. Place the ø10 insulation sleeves over each M10 hole. Secure the four M10x25 low profile socket head screws 6 into each hole. Ensure each screw runs through the corresponding sleeve and washer and catches into the corresponding M10 hole in the projector surface. Notes This procedure requires two persons. It is important to use the washers as they provide galvanic isolation. Torque: 4±0.5 N m. 6 6 6 6

Rigging Frame Installation Guide

FITTING TITAN IN THE FRAME Rev B March 2015 Order of components in assembly with Titan 1 M10x25 low profile socket head screw 2 ø10 insulation sleeve 3 Projector plate 4 ø10.5 insulation spacer Notes This procedure requires two persons. It is important to use the washers as they provide galvanic isolation. Torque: 4±0.5 N m. 1 2 3 4

Rigging Frame Installation Guide

FITTING HIGHLITE IN THE FRAME Rev B March 2015 Fitting HIGHlite In The Frame HIGHlite 2D 660 740 HIGHlite 3D 660 HIGHlite 2D 8000 Required parts Part Quantity Rigging frame 1 M6x20 button head screws 6 ø6 spring lock washers 6 ø6.2 insulation sleeves 12 Setup 1. Place the projector upside down on a suitable flat surface and remove the four adjustable feet 1 . Notes This procedure requires two persons. 1 1 1 1

Rigging Frame Installation Guide

FITTING HIGHLITE IN THE FRAME Rev B March 2015 Setup (continued) 2. Insert six of the ø6.2 insulation sleeves in the M6 screw holes 2 on the inside of the frame. Notes This procedure requires two persons. It is important to use the sleeves as they provide galvanic isolation. 2 2 2 2 2 2

Rigging Frame Installation Guide

FITTING HIGHLITE IN THE FRAME Rev B March 2015 Setup (continued) 3. Position the rigging frame over the projector so that the adjustment screws 3 are at the back, aligning the M6 screw holes 4 . Ensure that the projector plate 5 is flat against the body of the projector. This can be achieved by placing the projector on a surface which is smaller than the frame, allowing full contact between the plate and the projector. Notes This procedure requires two persons. 3 3 4 4 4 4 4 4 5

Rigging Frame Installation Guide

FITTING HIGHLITE IN THE FRAME Rev B March 2015 Setup (continued) 4. Place the other six ø6.2 insulation sleeves over each M6 screw hole. Place a ø6 spring lock washer over each ø6.2 insulation sleeve. Secure the six M6x20 button head screws 6 into each hole. Ensure each screw runs through the sleeves and catches into the corresponding M6 hole in the projector surface. Notes This procedure requires two persons. It is important to use the sleeves as they provide galvanic isolation. Torque: 4±0.5 N m. 6 6 6 6 6 6

Rigging Frame Installation Guide

FITTING HIGHLITE IN THE FRAME Rev B March 2015 Order of components in assembly with HIGHlite 1 M6x20 button head screw 2 ø6 spring lock washer 3 ø6.2 insulation sleeve 4 Projector plate Notes This procedure requires two persons. It is important to use the washers as they provide galvanic isolation. Torque: 4±0.5 N m. 1 2 4 3 3

Rigging Frame Installation Guide

ADJUSTMENT OPTIONS Rev B March 2015 Adjustment Options Roll Use the adjusting screws on the left and right to roll the projector by approximately ±5º. Use the adjusting screw on the left to roll to the left and the screw on the right to roll to the right. Pitch Use the two adjusting screws to adjust the pitch by approximately ±5º. Apply equal adjustment to both screws. Yaw Use the adjustment screw positioned underneath the projector to adjust the yaw by approximately ±5º. Notes ±5º ±5º ±5º ±5º

Rigging Frame Installation Guide

STACKING PROJECTORS Rev B March 2015 Stacking Projectors 1. Position the top projector so that the four stacking holes 1 are exactly above the M8 threaded rods 2 . 2. To secure the installation, tighten by hand using the wing nut 3 until it is very difficult to turn one more time. 3. Tighten the M8 nut 4 with a torque value of 5 N m using a dynamometric wrench. Notes This procedure requires two persons. Make sure the screw is in a straight position, perpendicular to the frame. Correct Incorrect 1 2 3 4

Rigging Frame Installation Guide

CEILING INSTALLATION Rev B March 2015 Ceiling Installation Ceiling installation using 750 kg / 1650 lb Doughty clamps Fit the square to round adaptors 1 and secure the clamp to the frame. Notes For information on weight restrictions for installations using the Doughty clamps, see Maximum Weight Loads further in this guide. Parts of the frame are unsuitable for fitting square to round adaptors. See Safe fitting areas - bottom and Safe fitting areas - top for more information. 1

Rigging Frame Installation Guide

CEILING INSTALLATION Rev B March 2015 Safe fitting areas - bottom Square to round adaptors should only be fitted in the areas shown below. 510 mm (20.07 in) 510 mm (20.07 in) 113 mm (4.44 in) 113 mm (4.44 in) 65 mm (2.55 in) 113 mm (4.44 in) 113 mm (4.44 in) 65 mm (2.55 in) Notes For information on weight restrictions for installations using the Doughty clamps, see Maximum Weight Loads further in this guide.

Rigging Frame Installation Guide

CEILING INSTALLATION Rev B March 2015 Safe fitting areas - top Square to round adaptors should only be fitted in the areas shown below. Notes For information on weight restrictions for installations using the Doughty clamps, see Maximum Weight Loads further in this guide. 510 mm (20.07 in) 510 mm (20.07 in) 300 mm (11.81 in) 300 mm (11.81 in)

Rigging Frame Installation Guide

CEILING INSTALLATION Rev B March 2015 Ceiling installation using the truss mount (optional accessory) Attach the truss mount to the top frame in the stack by driving the screws  1 into the mounting holes on the frame 2 . 1 1 1 1 1 2 Notes For information on weight restrictions for installations using the truss mount, see Maximum Weight Loads further in this guide. Torque: 4±0.5 N m.

Rigging Frame Installation Guide

CEILING INSTALLATION Rev B March 2015 Adjusting ceiling installations with the truss mount Lift the handle 1 to allow 360° rotation adjustment. The inclination angle can be adjusted by 10% at the upper part (rough adjustment) and by 2% at the lower part (fine adjustment). Use the four adjustment screws 2 for fine adjustment. Notes 2 Fine adjustment (up to 2º) Rough adjustment (up to 10º) 1 360º

Rigging Frame Installation Guide

MAXIMUM WEIGHT LOADS Rev B March 2015 Maximum Weight Loads Truss mount installations The maximum weight load for a truss mount installation is 137.84 kg (302.03 lb). Use the truss mount with up to two projectors per installation, as shown in the illustration. Notes Ensure the load capacity of the supporting structure is sufficient to carry the weight of the entire installation, up to 150 kg (330.69 lb) incl. lenses, cabling, etc. M-Vision 930 HIGHlite HIGHlite Laser Titan

Rigging Frame Installation Guide

MAXIMUM WEIGHT LOADS Rev B March 2015 Ceiling installation using 750 kg / 1650 lb Doughty clamps The maximum weight load for a ceiling installation using Doughty clamps is 137.84 kg (302.03 lb). Use Doughty clamps to mount up to two projectors as shown in the illustration. Notes Ensure the load capacity of the supporting structure is sufficient to carry the weight of the entire installation, up to 150 kg (330.69 lb) incl. lenses, cabling, etc. HIGHlite Laser HIGHlite M-Vision 930 Titan

Rigging Frame Installation Guide

MAXIMUM WEIGHT LOADS Rev B March 2015 Table mounts The maximum weight load for a table mount installation is 210 kg (462.97 lb). Mount up to three projectors as shown in the illustration. Make sure the surface can support the weight of the installation. Notes HIGHlite Laser HIGHlite M-Vision 930 Titan

Rigging Frame Installation Guide

DIMENSIONS Rev B March 2015 Dimensions Rigging frame Notes Frame only weight: 20 kg / 44.09 lb 695 mm / 27.36 in 360 mm / 14.17 in 670 mm / 26.37 in 815 mm / 32.08 in 360 mm / 14.17 in 490 mm / 19.29 in

Rigging Frame Installation Guide

DIMENSIONS Rev B March 2015 Truss mount Notes Truss mount weight: 4.5 kg / 8.81 lb 284 mm / 11.18 in 250.2 mm / 9.85 in 164.7 mm / 6.48 in 159 mm / 6.26 in

Rigging Frame Installation Guide

DIMENSIONS Rev B March 2015 This page is intentionally left blank.

115-918B Rigging Frame Installation Guide

Contact Information: Digital Projection Limited Greenside Way, Middleton Manchester M24 1XX, UK Registered in England No. 2207264 Registered Office: as above Tel (+44) 161 947 3300 Fax (+44) 161 684 7674 [email protected] [email protected] www.digitalprojection.co.uk Digital Projection Inc. 55 Chastain Road, Suite 115 Kennesaw, GA 30144, USA Tel (+1) 770 420 1350 Fax (+1) 770 420 1360 [email protected] www.digitalprojection.com Digital Projection China 中国 北京市 朝阳区 芍药居北里101号 世奥国际中心A座2006室(100029) Rm A2006 ShaoYaoJu 101 North Lane Shi Ao International Center Chaoyang District Beijing 100029, PR CHINA Tel (+86) 10 84888566 Fax (+86) 10 84888566-805 [email protected] www.dp-china.com.cn Digital Projection Asia 16 New Industrial Road #02-10 Hudson Technocentre Singapore 536204 Tel (+65) 6284-1138 Fax (+65) 6284-1238 www.digitalprojectionasia.com