BuckMaster 261 Preparations, Installation, Operation, Maintenance, Safety

File Specifications

Brand: BuckMaster
Category: Stove
Model: 261 (Preparations, Installation, Operation, Maintenance, Safety), prnJMCWNCKIho
File Info: Adobe Acrobat PDF (DjVu)
File Size:
Pages: 58 pages

Download PDF

Download BuckMaster 261 Manual (58 pages)

Read Online:

Read the BuckMaster 261 Preparations, Installation, Operation, Maintenance, Safety online using the built-in PDF viewer. This document explains how to operate the device, adjust settings and perform regular maintenance.

Key Pages of Document

F. Vertical exit using (6" DVL Close Clearance pipe with Elbow) into masonry flue.

With standard close clearance shield and pipe shield. Model 261 minimum clearance to combustibles. MASONRY CHIMNEY CLEAN OUT DOOR MASONRY FLUE LINERS CEILING MASONRY CHIMNEY Figure 14. DVL CLOSE CLEARANCE PIPE Figure 13. BACK WALL SIDE WALL A E B F C C D G C C BACK WALL SIDE WALL A E B F C C D G A E B D F BACK WALL SIDE WALL PROTECTOR G A B C D E F G H MODEL 261 14” 4" 14" 7" 8" 3" 20" 10" NEW BUCK CAST C ...

2. High fuel consumption

3. Backpuffing 4. Smoke rollout when heater door is opened 1. (a) Close inlet air control as much as possible to maintain desired heat output. (b) Check gaskets, reinstall fiberglass gasketing round doors and glass as necessary 2. Check door gasket, check adjustment of door latch 1. Chimney may need wind divider. Raise chimney for better draft. 1. Chimney may need wind diverter. Raise chimney for better draft. 2. Crack door for 15 seconds before fully opening door. 1. Improper regulation of draft or inlet air 2. Improper door fitting 1. Gusts of Wind 1. ...

HOW TO LOCATE CHIMNEY EXIT, AND INSTALL

D. Vertical Wall Exit using (6" DVL Close Clearance Pipe and Elbow, and any Listed 2100° UL HT chimney and Listed 2100° UL HT T-Box assembly). With standard close clearance shield and pipe shield NOTE: For minimum clearances (See Page 15, Figure 9). 1. Mark the plumb line on the wall directly behind the center of the heater. (See Page 15, Figure 10.) NOTE: When using DVL Close Clearance Pipe, maintain manufacturers minimum clearances between pipe and ceiling. 2. Place the vertical portion of ...

B. Rear exit into Masonry Flue using (6" DVL Close Clearance pipe).

With standard close clearance shield and pipe shield. Model 261 minimum clearance to combustibles. BACK WALL SIDE WALL A E B F C C D G A E B F BACK WALL SIDE WALL PROTECTOR D A B C D E F G MODEL 261 13” 13" 13" 20" 8" 3" 10" CEILING NEW BUCK CAST COLLAR Part# MA6CHIMCNB NOTE: All clearances are to combustibles with all low c ...

Select an installation location that will give the best airflow from the front of the

heater to the remainder of the home. PREPARING THE STOVE FOR INSTALLATION 1. Inspect the unit for any obvious physical damage. 2. Plug the power cord into a 115V AC outlet to test the motor and fan when optional motor is being used. Do not run power cord under unit or in high traffic areas. 3. Check the primary air draft control to ensure that it slides freely. 4. Remove any items from within the firebox. Spread a dropcloth on the floor behind the heater. Next, tilt the heater so that the ...

E. Vertical exit into masonry flue using (6" Single Wall pipe

minimum 24 ga blued or black pipe with elbow) With standard close clearance shield and pipe shield. Model 261 minimum clearance to combustibles. Figure 11. MASONRY CHIMNEY CLEAN OUT DOOR MASONRY FLUE LINERS CEILING MASONRY CHIMNEY Figure 12. SINGLE WALL CONNECTOR ELBOW PIPE BACK WALL SIDE WALL A E B F C C D G BACK WALL SIDE WALL A E B F C C D G C C A B C D E F G H MODEL 261 13” 8" 13" 12" 8" 3" 20" 10" A E B D F BACK WALL SIDE WALL PROTECTOR G ...

NOTE: All clearances are to combustibles with all low clearance shields and double wall pipe ,

and minimum floor protector. NOTE: Floor protector must extend length of horizontal flue pipe to wall. NOTE: Model 261 comes standard with low clearance shields. A B D E F G H I MODEL 261 14" 4" 20" 8" 3” 47" 10" 84" LISTED 2100° UL 103 HT TYPE CHIMNEY REEFER TO MANUFACTURERS INSTALLATION INSTRUCTION LISTED 2100° UL 103 HT TYPE CHIMNEY T-BOX ASSEMBLY REEFER TO MANU ...

FREESTANDING MOBILE HOME

INSTALLATION MINIMUM CLEARANCES TO FLOOR AND COMBUSTIBLES See minimum floor protector measurements, and also for minimum clearances to combustibles (See Page 42, Figure 35). Floor Protection: When installing freestanding heater, a floor protector must be use. Floor protector must be 3/8” minimum thickness non-combustible material or equivalent. How to use alternate materials and how to calculate equivalent thickness An easy means of determining if a proposed alternate floor protector meets requirements listed in the appliance manual is to follow thi ...

BuckMaster 261 user guide recommended for: 7518.0110, GRAINNE, 1G1FAPG, HT-1600, ASHFORD 30.

⚠️ Download Safety

The Stove Preparations, installation, operation, maintenance, safety (58 pages) is completely safe to download (last scan date: 30/11/2025).

Related PDF Instructions for BuckMaster 261:

Stove Equipment: Frequently Requested

Have some Questions about BuckMaster 261 Device?

Get valuable and actionable advices from other BuckMaster 261 device users. Describe your problem or question, regarding the using of 261, in as much detail as possible, and other users will be able to answer you.