UIN 212128 A01
INSTALLATION
AND SERVICING
24, 30
For users guide see reverse of book
When replacing any part on this appliance, use only spare parts that you can be
assured conform to the safety and performance specification that we require.
Do not use reconditioned or copy parts that have not been clearly authorised by Ideal.
For the very latest copy of literature for specification and maintenance practices visit our
website www.idealboilers.com where you can download the relevant information in PDF format.
i-mini - Installation and Servicing
Model
Symbol
Units
24
30
Condensing Boiler
n/a
n/a
yes
yes
Low Temperature Boiler
n/a
n/a
no
no
B1 Boiler
n/a
n/a
no
no
Cogeneration Space Heater
n/a
n/a
no
no
Equipped with a Supplementary Heater
n/a
n/a
no
no
Combination Heater
n/a
n/a
yes
yes
Nominal Heat Output for Space Heating
Full Load
P4
kW
24.2
24.2
Part Load
P1
kW
7.9
7.9
Auxiliary Electricity Consumption
Full Load
elmax
kW
0.029
0.031
Part Load
elmin
kW
0.012
0.013
Standby
PSB
kW
0.005
0.005
Seasonal Space Heating Energy Efficiency
Full Load
ƞ4
%
89.6
89.6
Part Load
ƞ1
%
98
98
Standby Loss
Pstby
kW
0.05
0.05
Ignition
Pign
kW
0
0
Emissions
NOx
mg/kWh
26.1
26.3
Annual Energy Consumption
QHE
GJ
74.9
74.9
Sound Power Level, Indoors
LWA
dB
45.2
45.5
Domestic Hot Water
Qelec
kWh
0.177
0.177
ƞWH
%
75.3
75.6
Qfuel
kWh
7.667
7.615
AEC
kWh
37.8
37.7
AFC
GJ
5.8
5.8
ERP DATA
i-mini - Installation and Servicing
i-mini combination boiler
Ideal Boilers
ErP Data
Symbol
Units
MODEL
24
30
Condensing boiler
Yes
Seasonal Space heating efficiency class
A
Rated heat output
kW
24
Seasonal space heating energy efficiency
ƞson
%
93*
Annual energy consumption
QHE
GJ
74.9
Sound power level, indoors
LWA
dB
45
45
Water heating energy efficiency class
A
Seasonal Space Heating Energy Efficiency of the Boiler
*%
Temperature control (from fiche of temperature control)
%
Class I
Class II
Class III
Class IV
Class V
Class VI
Class VII
Class VIII
1%
2%
1.5%
2%
3%
4%
3.5%
5%
product fiche
The energy efficiency of the package of products provided for in this document may not correspond to its actual energy efficiency once installed in a
building, as the efficiency is influenced by further factors such as heat loss in the products in relation to the building size and its characteristics
Collector Size
(in m2)
Tank Volume
(in m3)
Collector
Efficiency
(in %)
Tank rating
A* = 0.95
A = 0.91
B = 0.86
C = 0.83
D-G = 0.81
Solar Contribution (from fiche of solar device)
Seasonal Space Heating Energy Efficiency of Package TOTAL: A+B+C=
Seasonal Space Heating Energy Efficiency Class of Package
= (‘III ’x
+ ‘IV ’ x
) x 0.9 x (
/ 100 x
=
%
%
G
F
E
D
C
B
A
A+
A++
A+++
< 30%
≥ 30%
≥ 34%
≥ 36%
≥ 75%
≥ 82%
≥ 90%
≥ 98%
≥ 125%
≥ 150%
A
B
C
i-mini - Installation and Servicing
DOCUMENT amendments
Relevant Installation changes implemented in this book from Mod Level.................................. A01 (May 15)
Ideal Boilers reserve the right to vary specification without notice
For any technical queries pleAse ring the IDEAL
installer helpline : 08708 498057
NOTE. BOILER Restart PROCEDURE -
To restart boiler, turn mode knob to restart position and immediately turn knob back to required
setting. The boiler will repeat the ignition sequence if a heat demand is present.
Notes for the installer
i-mini - Installation and Servicing
general
i-mini
24
30
Gas supply
2H - G20 - 20mbar
Gas Supply Connection
15mm copper compression
Injector Size
(mm)
4.15
4.65
Inlet Connection
Domestic Hot Water
15mm copper tail
Outlet Connection
Domestic Hot Water
15mm copper compression
Flow Connection
Central Heating
22mm copper compression
Return Connection
Central Heating
22mm copper compression
Flue Terminal Diameter
mm (in)
100 (4)
Average Flue Temp-Mass Flow Rate
(DHW)
63oC - 11g/s 68oC - 13g/s
Maximum Working Pressure (Sealed Systems)
bar (lb/in2)
2.5 (36.3)
Maximum Domestic Hot Water Inlet Pressure
bar (lb/in2) (kPa)
10.0 (145) (1000)
Minimum Domestic Hot Water Inlet Pressure* bar (lb/in2) (kPa)
0.8 (11.6) (80) 1.3 (18.9) (130)
Electrical Supply
230 V ~ 50 Hz.
Power Consumption
W
146 152
Fuse Rating
External : 3A Internal : T4H HRC L250 V
Water content
Central Heating
litre (gal)
1.2 (0.26)
Domestic Hot Water litre (gal)
0.5 (0.11)
Packaged Weight
kg (lb)
35.8 (79.1)
36 (79.6)
Maximum Installation Weight
kg (lb)
31.8 (70.3)
32 (70.8)
Boiler Casing Size
Height
mm (in)
700 (27.5)
Width
mm (in)
395 (15.5)
Depth
mm (in)
278 (11)
Table 1 - General Data
Note. Gas consumption is calculated using a
calorific value of 38.7 MJ/m3 (1038 Btu/ft3) gross
or 34.9 MJ/m3 (935 Btu/ft3) nett
To obtain the gas consumption at a different
calorific value:
a. For l/s
- divide the gross heat input
(kW) by the gross C.V. of the gas (MJ/m3)
b. For ft3/h - divide the gross heat input (Btu/h)
by the gross C.V. of the gas (Btu/ft3)
c. For m3/h - multiply l/s by 3.6.
Key to symbols
GB =
United Kingdom
IE = Ireland
(Countries of destination)
PMS = Maximum operating pressure of water
C13 C33 C53 = A room sealed appliance designed for connection via ducts to a
horizontal or vertical terminal, which admits fresh air to the burner
and discharges the products of combustion to the outside through
orifices which, in this case, are concentric. The fan is up stream of
the combustion chamber.
I2H
= An appliance designed for use on 2nd Family gas, Group H only.
* The value is used in the UK Government’s Standard Assessment Procedure (SAP) for energy rating of dwellings. The test data from
which it has been calculated have been certified by a notified body.
*Required for maximum flow rate. Boiler operates down to 2 l/min DHW delivery
** In areas of low water pressure the DHW restrictor can be removed
Maximum DHW Input :
24
30
Nett CV
kW
24.3
30.4
(Btu/h)
(82,900)
(103,600)
Gross CV
kW
27.0
33.7
(Btu/h)
(92,000)
(115,000)
Gas Consumption
m3/h
2.512
3.135
(ft3/h)
(89)
(111)
Maximum
kW
24.2
30.3
DHW Output
(Btu/h)
(82,600)
(103,300)
DHW Flow Rate
l/min
9.9
12.4
at 35°C temp. rise.
(gpm)
(2.2)
(2.8)
DHW Specific Rate
l/min
11.5
14.5
(gpm)
(2.5)
(3.2)
Boiler Input :
Max.
Min.
24
30
Boiler Input ‘Q’
Nett CV
kW
24.3
4.9
6.1
(Btu/h) (82,900) (16,600 (20,700
Gross CV
kW
27.0
5.4
6.7
(Btu/h) (92,000) (18,400) (23,000)
Gas Consumption
m3/h 2.512
0.500
0.627
(ft3/h)
(89)
(17.8)
(22)
Boiler Output :
Non Condensing
kW
24.2
4.8
6.1
70oC Mean Water temp.
(Btu/h) (82,600) (16,500) (20,700)
Condensing
kW
25.6
5.1
6.4
40oC Mean Water temp.
(Btu/h) (87,400) (17,500) (21,800)
Seasonal efficiency* SEDBUK 2005
91%
91.1%
Seasonal efficiency* SEDBUK 2009
89%
89%
NOx Classification
CLASS 5
Table 2 - Performance Data - Central Heating
Table 3 - Performance Data - Domestic Hot Water
i-mini - Installation and Servicing
general
Boiler size
G.C. Appliance No.
PI No.
(Benchmark No.)
24
47-348-77
86 CL 08
30
47-348-78
86 CL 08
Contents
Air Supply .....................................................................11
Benchmark Commissioning Checklist ...................... 62
Boiler Clearances ........................................................ 12
Boiler Exploded Diagram ............................................ 15
Condensate Drain ..........................................11,26,27,37
Electrical Connections ................................................ 29
Electrical Supply ..........................................................11
Fault Finding ........................................................... 53-58
Flue Fitting .............................................................. 19-25
Flue Installation ........................................................... 10
Gas Safety Regulations ................................................ 9
Gas Supply ................................................................... 10
Installation .............................................................. 15-34
Pump ............................................................................ 49
Safe Handling ................................................................ 8
Servicing ................................................................. 35-51
Spare Parts Info ........................................................... 59
Thermostatic Radiator Valves .....................................11
Water and Systems ...........................................11,13,14
Water Connections ...................................................... 28
Water Treatment ......................................................... 14
Wiring Diagram ............................................................ 30
Natural Gas only
Destination Country: GB, IE
Boiler
Page
Make and model..........................................................7
Appliance serial no. on data badge ...........Front Cover
SEDBUK No. %...........................................................6
Controls
Time and temperature control to heating..................29
Time and temperature control to hot water ..............29
Heating zone valves.................................................n/a
TRV’s........................................................................ 11
Auto bypass.............................................................. 11
Boiler interlock........................................................... 11
For all boilers
Flushing to BS.7593..................................................14
Inhibitor.....................................................................14
Central heating mode
Heat input....................................................to be calculated
For assistance see Technical Helpline on the back page
Page
Burner operating pressure.......................................n/a
Central heating flow temp.............measure and record
Central heating return temp..........measure and record
For combination boilers only
Scale reducer............................................................14
Hot water mode
Heat input.............................................to be calculated
Max. operating burner pressure...............................n/a
Max. operating water pressure......... measure & record
Cold water inlet temp....................... measure & record
Hot water outlet temp....................... measure & record
Water flow rate at max. setting......... measure & record
For condensing boilers only
Condensate drain......................................................26
For all boilers:
complete, sign & hand over to customer
For GB, to comply with Building Regulations Part L1 (Part 6 in Scotland) the boiler should be fitted in accordance with the
manufacturer’s instructions. Self-certification that the boiler has been installed to comply with Building Regulations can be
demonstrated by completing and signing the Benchmark Commissioning Checklist.
Before installing this boiler, read the Code of Practice sheet at the rear of this book.
Benchmark Commissioning Checklist Details
NOTE TO THE INSTALLER: COMPLETE
THE BENCHMARK COMMISSIONING
CHECKLIST AND LEAVE THESE
INSTRUCTIONS WITH APPLIANCE
i-mini
i-mini - Installation and Servicing
general
INTRODUCTION
The i-mini range of boilers are wall mounted, full sequence,
automatic spark ignition, low water content, fanned flue, high
efficiency, condensing, combination gas boilers.
Note. Due to the high efficiency of the boiler a plume of water
vapour will form at the terminal during operation.
Central heating (CH) output is fully modulating with a range of:
24
4.8 to 24.2kW (16,500 to 82,600 Btu/h)
30
6.1 to 24.2kW (20,700 to 82,600 Btu/h)
Instantaneous domestic hot water (DHW) output is also fully
modulating with a maximum of :
24
24.2kW (82,600 Btu/h)
30
30.3kW (103,300 Btu/h)
The boiler is supplied fully assembled with DHW plate heat
exchanger, diverter valve, circulating pump, pressure gauge,
safety valve and CH expansion vessel.
Variable CH and DHW temperature controls are fitted on the user
control and the boiler features a DHW preheat facility.
The boiler includes as standard:
-
Automatic bypass
-
Boiler frost protection
-
Daily pump and diverter valve exercise
The boiler casing is of white painted mild steel.
The boiler temperature controls are visible located in the control
panel on the front of the boiler.
The heat exchanger is manufactured from cast aluminium.
The boiler is suitable for connection to fully pumped, sealed
heating systems ONLY. Adequate arrangements for completely
draining the system by provision of drain cocks MUST be provided
in the installation pipework.
Pipework from the boiler is routed downwards.
Data Plate
The boiler model and serial number can be located on the bottom of the
boiler casing, shown in Frame 1 - Water & Gas Connection Diagram.
operation
With no demand for CH, the boiler fires only when DHW is drawn
off, or periodically for a few seconds without any DHW draw-off, in
order to maintain the DHW calorifier in a heated condition. This
only occurs if pre-heat knob is in the ‘ON’ period.
When there is a demand for CH, the heating system is supplied at
the selected temperature of between 45oC and 80oC, until DHW
is drawn off. The full output from the boiler is then directed via
the diverter valve to the plate heat exchanger to supply a nominal
DHW draw-off of
24
9.9 l/min at 35 oC temperature rise.
30
12.4 l/min at 35 oC temperature rise.
The DHW draw off rate specified above is the nominal that the
boiler flow regulator will give. Due to system variations and
seasonal temperature fluctuations DHW flow rates/temperature
rise will vary, requiring adjustment at the draw off tap.
At low DHW draw-off rate the maximum temperature is limited to
64 oC by the modulating gas control.
The boiler features a comprehensive diagnostic system which
gives detailed information on the boiler status when operating,
and performance of key components to aid commissioning and
fault finding.
Safe Handling
This boiler may require 2 or more operatives to move it to its
installation site, remove it from its packaging base and during
movement into its installation location. Manoeuvring the boiler
may include the use of a sack truck and involve lifting, pushing and
pulling.
Caution should be exercised during these operations.
Operatives should be knowledgeable in handling techniques when
performing these tasks and the following precautions should be
considered:
•
Grip the boiler at the base.
•
Be physically capable.
•
Use personal protective equipment as appropriate, e.g. gloves,
safety footwear.
During all manoeuvres and handling actions, every attempt should
be made to ensure the following unless unavoidable and/or the
weight is light.
•
Keep back straight.
•
Avoid twisting at the waist.
•
Avoid upper body/top heavy bending.
•
Always grip with the palm of the hand.
•
Use designated hand holds.
•
Keep load as close to the body as possible.
•
Always use assistance if required.
Optional extra kits
•
Horizontal Flue Terminal (1000mm long)
•
Horizontal Flue Terminal (600mm long)
•
Flue Extension Ducts (1000mm long)
•
Flue Extension Ducts (2000mm long)
•
Flue Extension Ducts (500mm long)
24-up to 9m
30-up to 8m
•
90o Elbow Kit (maximum per installation).
24-upto 6 elbows
30-upto 6 elbows
•
45o Elbow Kit (maximum per installation).
24-upto 6 elbows
30-upto 6 elbows
•
Telescopic B Pack
•
Roof Flue Kit (to a maximum of 7.5m)
•
Flue Finishing Kit
•
High Level Flue Outlet Kit
•
Balcony Flue Kit
•
Soffit Flue Kit
•
Adjustable Flue Support Bracket
•
Flue Deflector Kit
•
Raised Horizontal Flue Outlet Kit
•
Concentric Flue Screw Retaining Kit
•
Weather Collar
•
Stand-Off Kit
•
Condensate Pump Kit
•
DHW Expansion Vessel Kit
•
Weather Compensation Kit
•
PRV Wall Outlet Kit
•
Security Bracket Kit
•
Pressure Gauge Extension Kit
•
Mechanical Timer (24hr) Kit
•
RF Mechanical Programmable Room Thermostat (24hr) Kit
i-mini - Installation and Servicing
general
Safety
Current Gas Safety (installation and use) regulations or rules
in force:
The appliance is suitable only for installation in GB and IE and
should be installed in accordance with the rules in force.
In GB, the installation must be carried out by a Gas Safe
Registered Engineer. It must be carried out in accordance with
the relevant requirements of the:
•
Gas Safety (Installation and Use) Regulations
•
The appropriate Building Regulations either The Building
Regulations, The Building Regulations (Scotland), Building
Regulations (Northern Ireland).
•
The Water Fittings Regulations or Water byelaws in Scotland.
•
The Current I.E.E. Wiring Regulations.
Where no specific instructions are given, reference should be
made to the relevant British Standard Code of Practice.
In IE, the installation must be carried out by a Registered Gas
Installer (RGII) and installed in accordance with the current edition
of I.S.813 “Domestic Gas Installations”, the current Building
Regulations and reference should be made to the current ETCI
rules for electrical installation.
Detailed recommendations are contained in the following British
Standard Codes of Practice:
BS. 5440:1
Flues (for gas appliances of rated input not
exceeding 70 kW).
BS. 5440:2
Ventilation (for gas appliances of rated input not
exceeding 70 kW).
BSEN. 12828:2003 Heating Systems in buildings: Design for
water based heating systems.
BSEN 12831:2003 Heating Systems in buildings: Method for
calculation of the design heat load.
BSEN 14336:2004 Heating Systems in buildings: Installation
and commissioning of water based heating
systems.
BS. 5546
Installation of gas hot water supplies for domestic
purposes (2nd Family Gases)
BS. 6798
Installation of gas fired hot water boilers of rated
input not exceeding 70 kW.
BS. 6891
Low pressure installation pipes.
Health & Safety Document No. 635.
The Electricity at Work Regulations, 1989.
The manufacturer’s notes must NOT be taken, in any way, as
overriding statutory obligations.
IMPORTANT. These appliances are CE certificated for safety
and performance. It is, therefore, important that no external
control devices, e.g. flue dampers, economisers etc., are
directly connected to these appliances unless covered by
these Installation and Servicing Instructions or as otherwise
recommended by Ideal Boilers in writing. If in doubt please
enquire.
Any direct connection of a control device not approved by Ideal
Boilers could invalidate the certification and the normal appliance
warranty. It could also infringe the Gas Safety Regulations and
the above regulations.
SAFE HANDLING OF SUBSTANCES
No asbestos, mercury or CFCs are included in any part of the
boiler or its manufacture.
Location of boiler
The boiler must be installed on a flat and vertical internal wall,
capable of adequately supporting the weight of the boiler and any
ancillary equipment.
The boiler may be fitted on a combustible wall and insulation
between the wall and the boiler is not necessary, unless required
by the local authority.
For electrical safety reasons there must be no access available
from the back of the boiler.
The boiler must not be fitted outside.
Timber Framed Buildings
If the boiler is to be fitted in a timber framed building it should be
fitted in accordance with the Institute of Gas Engineering document
IGE/UP/7:2006 - Edition 2.
Bathroom Installations
This appliance is rated IP20.
The boiler may be installed in any room or internal space, although
particular attention is drawn to the requirements of the current
IEE (BS.7671) Wiring Regulations and the electrical provisions
of the building regulations applicable in Scotland, with respect to
the installation of the boiler in a room or internal space containing
a bath or shower. For IE reference should be made to the current
ETCI rules for electrical installations and I.S. 813:2002.
If the appliance is to be installed in a room containing a bath or
shower then, providing water jets are not going to be used for
cleaning purposes (as in communal baths/showers), the appliance
must be installed beyond Zone 2, as detailed in BS.7671.
Compartment Installations
0.6m
Zone 0
Recessed
window
Zone 2
Ceiling
3G8913a
2.25m
Zone 1
A compartment used to enclose the boiler should be designed and
constructed specially for this purpose.
An existing cupboard or compartment may be used, provided that
it is modified for the purpose.
In both cases, details of essential features of cupboard /
compartment design, including airing cupboard installation, are to
conform to the following:
•
BS 6798 (No cupboard ventilation is required - see ‘Air Supply’
for details).
•
The position selected for installation MUST allow adequate
space for servicing in front of the boiler.
•
For the minimum clearances required for safety and
subsequent service, see the wall mounting template and
Frame 1. In addition, sufficient space may be required to
allow lifting access to the wall mounting plate.
i-mini - Installation and Servicing
general
GAS SUPPLY
The local gas supplier should be consulted, at the installation
planning stage, in order to establish the availability of an adequate
supply of gas. An existing service pipe must NOT be used without
prior consultation with the local gas supplier.
The boiler MUST be installed on a gas supply with a governed
meter only.
A gas meter can only be connected by the local gas supplier or
by a Gas Safe Registered Engineer. In IE by a Registered Gas
Installer (RGII).
An existing meter should be checked, preferably by the gas
supplier, to ensure that the meter is adequate to deal with the rate
of gas supply required.
It is the responsibility of the Gas Installer to size the gas
Installer to size the gas installation pipework in accordance with
BS6891:2005. Whilst the principle of the 1:1 gas valve ensures
the i-mini range is able to deliver it’s full output at inlet pressures
as low as 14mb, other gas appliances in the property may not be
as tolerant. When operating pressures are found to be below the
minimum meter outlet of 19mb these should be checked to ensure
this is adequate for correct and safe operation.
Allowing for the acceptable pressure loss of 1mb across the
installation pipework, it can be assumed that a minimum permitted
operating pressure of 18mb will be delivered to the inlet of
the appliance. (Reference BS 6400-1 Clause 6.2 Pressure
Absorption).
The external gas cock could further reduce the operating pressure
when measured at its test point. The pressure drop is relative to
the heat input to the boiler (kW), refer to graph below.
0
0.5
1
1.5
2
2.5
3
0
10
20
30
40
50
Pressure drop (mbar )
Heat Input to Boiler (kW)
Gas Cock Pressure Drop
Important.
Installation pipes must be fitted in accordance with BS.6891. In IE
refer to IS.813:2002.
The complete installation MUST be tested for gas tightness and
purged as described in the above code.
Flue installation
Pluming will occur at the terminal so terminal positions where this
could cause a nuisance should be avoided.
The flue must be installed in accordance with the
recommendations of BS. 5440-1: 2008.
In IE refer to I.S. 813:2002.
The following notes are intended for general guidance:
1. The boiler MUST be installed so that the terminal is exposed
to external air.
2. It is important that the position of the terminal allows the free
passage of air across it at all times.
* Only one reduction down to 25mm is allowable per installation
otherwise BS5440-1 2008 dimensions must be followed.
Flue Terminal Positions
Min. Spacing*
1. Directly below, above or alongside an opening
window, air vent or other ventilation opening.
300mm (12”)
2. Below guttering, drain pipes or soil pipes.
25mm ( 1”)*
BS5440-1 2008
75mm (3”)
3. Below eaves.
25mm (1”)*
BS5440-1 2008
200mm (8”)
4. Below balconies or a car port roof.
25mm (1”)*
BS5440-1 2008
200mm (8”)
5. From vertical drain pipes or soil pipes.
25mm (1”)*
BS5440-1 2008
150mm (6”)
6. From an internal or external corner or to a
25mm (1”)*
boundary along side the terminal. BS5440-1 2008
300mm (12”)
7. Above adjacent ground, roof or balcony level.
300mm (12”)
8. From a surface or a boundary facing the terminal.
600mm (24”)
9. From a terminal facing a terminal.
1,200mm (48”)
10. From an opening in a car port
(e.g. door or window) into dwelling.
1,200mm (48”)
11. Vertically from a terminal on the same wall.
1,500mm (60”)
12. Horizontally from a terminal on the wall.
300mm (12”)
Vertical Terminals
13. Above the roof pitch with roof slope of all angles.
300mm (12”)
Above flat roof.
300mm (12”)
14. From a single wall face.
300mm (12”)
From corner walls.
300mm (12”)
15. Below velux window
2000mm (79”)
16. Above or side of velux window
600mm (24”)
Table 4 - Balanced Flue Terminal Position
3. Minimum acceptable spacing from the terminal to obstructions
and ventilation openings are specified in Table 4.
4. Where the lowest part of the terminal is fitted less than 2m
(6’6”) above a balcony, above ground or above a flat roof
to which people have access then the terminal MUST be
protected by a purpose designed guard.
Terminal guards are available from boiler suppliers. (Ask for
TFC flue guard model no. K6 - round, plastic coated). In case
of difficulty contact:
TFC Group
Tel. + 44 (0) 01732 351 680
Tower House, Vale Rise
Fax. + 44 (0) 01732 354 445
Tonbridge. Kent TN9 1TB
www.tfc-group.co.uk
Ensure that the guard is fitted centrally.
5. The flue assembly shall be so placed or shielded as to prevent
ignition or damage to any part of any building.
6. The air inlet/products outlet duct and the terminal of the boiler
MUST NOT be closer than 25mm (1”) to combustible material.
Detailed recommendations on the protection of combustible
material are given in BS. 5440-1:2008.
IMPORTANT. It is essential to ensure, in practice, that products
of combustion discharging from the terminal cannot re-enter the
building or buildings through any openings into the building such
as ventilators, windows, doors, or other sources of natural air
infiltration, such as forced ventilation openings etc.
If products of combustion re-entry is identified or suspected this
should be immediately investigated and corrected following the
guidance provided in the current Gas Industry Unsafe Situation
Procedure.
The terminal assembly can be adapted to accommodate various
wall thicknesses. Refer to Frame 1.
i-mini - Installation and Servicing
general
Air supply
It is NOT necessary to have a purpose-provided air vent in the
room or internal space in which the boiler is installed. Neither
is it necessary to ventilate a cupboard or compartment in which
the boiler is installed, due to the low surface temperatures of the
boiler casing during operation; therefore the requirements of BS
6798, Clause 12, and BS 5440:2 may be disregarded.
Water circulation system
Important.
A minimum length of 1 metre of copper pipe MUST be fitted
to both flow and return connections from the boiler before
connection to any plastic piping.
The central heating system should be in accordance with BS.6798
and, in addition, for smallbore and microbore systems, BS.5449.
Water treatment - see Frame 4
Boiler Control Interlocks
Central heating systems controls should be installed to ensure
the boiler is switched off when there is no demand for heating, in
compliance with Building Regulations.
Heating systems utilising full thermostatic radiator valve control
of temperature in individual rooms should also be fitted with a
room thermostat controlling the temperature in a space served by
radiators not fitted with such a valve.
When thermostatic radiator valves are used, the space heating
temperature control over a living / dining area or hallway having
a heating requirement of at least 10% of the minimum boiler heat
output should be achieved using a room thermostat, whilst other
rooms are individually controlled by thermostatic radiator valves.
However, if the system employs thermostatic radiator valves on all
radiators, or two port valves, then a bypass circuit must be fitted
with an automatic bypass valve to ensure a flow of water should
all valves be in the closed position.
Electrical supply
Warning.
This appliance must be earthed.
Wiring external to the appliance MUST be in accordance with
the current I.E.E. (BS.7671) Wiring Regulations and any local
regulations which apply. For IE reference should be made to the
current ETCI rules for electrical installations.
The mains supply to the boiler and system wiring centre shall
be through one common fused double pole isolator and for
new heating systems, and where practical replacement boiler
installations, the isolator shall be situated adjacent to the
appliance.
Condensate drain
Refer to Frames 21, 22 & 37
A condensate drain is provided on the boiler. This drain must be
connected to a drainage point on site. All pipework and fittings in
the condensate drainage system MUST be made of plastic - no
other materials may be used.
Important.
Installation must be in accordance with BS 6798.
The drain outlet on the boiler is sized for standard 21.5mm (3/4”)
overflow pipe. It is a universal fitting to allow use of different
brands of pipework.
i-mini - Installation and Servicing
general
395
2.5
2.5
from case
700
Side flue
dim. A
CH FLOW
DHW OUTLET
COND. DRAIN
GAS INLET
Centre line
of boiler
DHW INLET
CH RETURN
PRV
43.5
65
28.5 28.5
60.6
75
37.5
56.4
DATA PLATE
Underside View - Dimensions to Wall
W A L L
W A L L
103
91
91
95
95
1
boiler dimensions, services & clearances
all dimensions in mm
The boiler connections are made on the boiler bulkhead fittings.
Refer to Frame 23.
The following minimum clearances must be maintained for
operation and servicing.
Additional space will be required for installation, depending upon
site conditions.
Side and Rear Flue
a. Provided that the flue hole is cut accurately, e.g. with a core
drill, the flue can be installed from inside the building where
wall thicknesses do not exceed 600mm (24”). Where the
space into which the boiler is going to be installed is less
than the length of flue required the flue must be fitted from
the outside.
Installation from inside ONLY
b. If a core boring tool is to be used inside the building the
space in which the boiler is to be installed must be at least
wide enough to accommodate the tool.
Front clearance
The minimum front clearance when
built in to a cupboard is 5mm from
the cupboard door but 450mm overall
clearance is still required, with the
cupboard door open, to allow for
servicing.
* Bottom clearance
Bottom clearance after installation
can be reduced to 5mm.
This must be obtained with an
easily removable panel, to enable
the consumer to view the system
pressure gauge, and to provide
the 100mm clearance required for
servicing.
i-mini - Installation and Servicing
general
General
1. The installation must comply with all relevant national and local
regulations.
2. The installation should be designed to work with flow
temperatures of up to 86 oC.
3. All components of the system must be suitable for a working
pressure of 3 bar and temperature of 110 oC. Extra care should
be taken in making all connections so that the risk of leakage
is minimised.
The following components are incorporated within the
appliance:
a. Circulating pump.
b. Safety valve, with a non-adjustable preset lift pressure of
3 bar.
c. Pressure gauge, covering a range of 0 to 4 bar.
d. An 8-litre expansion vessel, with an initial charge pressure
of 0.75 bar.
4. ‘Make-up’ Water. Provision must be made for replacing water
loss from the system, either :
a. From a manually filled ‘make-up’ vessel with a readily
visible water level. The vessel should be mounted at
least 150mm above the highest point of the system and
be connected through a non-return valve to the system,
fitted at least 150mm below the ‘make-up’ vessel on the
return side of the radiators. or
b. Where access to a ‘make-up’ vessel would be difficult, by
pre-pressurisation of the system.
The maximum cold water capacity of the system should
not exceed 143 litres, if not pressurized. However, if
the system is to be pressurized, the efficiency of the
expansion vessel will be reduced and a larger vessel
(or smaller system volume) may be necessary. If the
capacity of the vessel is not considered sufficient for
this, or for any other reason, an additional vessel must
be installed on the return to the boiler.
Guidance on vessel sizing is given in Frame 2.
5. Filling
The system may be filled by the following method:
Where the mains pressure is excessive a pressure reducing
valve must be used to facilitate filling.
a. Thoroughly flush out the whole system with cold water.
b. Fill and vent the system until the pressure gauge
registers 1bar and examine for leaks.
c. Check the operation of the safety valve by raising the
water pressure until the valve lifts. This should occur
within 0.3bar of the preset lift pressure.
d. Release water from the system until the
minimum system design pressure is reached;
1.0 bar if the system is to be pre-pressurised.
Notes
a. The method of filling, refilling, topping up or flushing sealed
primary hot water circuits from the mains via a temporary hose
connection is only allowed if acceptable to the local water
authority.
b. Antifreeze fluid, corrosion and scale inhibitor fluids suitable for
use with boilers having aluminium heat exchangers may be used
in the central heating system.
2
system requirements - Central Heating
Water Flow Rate and Pressure Loss
Max CH Output
kW
24.2
(Btu/h)
(82,600)
Water flow rate
l/min
17.3
(gal/min)
(3.8)
Temperature Differential
oC
20
(oF)
(36)
Head available for
m.w.g.
3.4
system
(ft.w.g.)
(11.1)
Safety valve setting
bar
3.0
Vessel charge pressure
bar
0.5 to 0.75
System pre-charge pressure bar
None
1.0
System volume
Expansion vessel
(litres)
volume (litres)
25
1.6
1.8
50
3.1
3.7
75
4.7
5.5
100
6.3
7.4
125
7.8
9.2
150
9.4
11.0
175
10.9
12.9
190
11.9
14.0
200
12.5
14.7
250
15.6
18.4
300
18.8
22.1
For other system volumes
multiply by the factor across
0.063
0.074
CH Return
Hose unions
Mains
water supply
Temporary hose
(disconnect after filling)
Additional
stop valve
Double check valve
assembly
(note direction of flow)
i-mini - Installation and Servicing
general
The boiler does not normally need a bypass but at least some radiators on the heating circuit, of load of at least 10% of the minimum boiler
output, must be provided with twin lockshield valves so that this minimum heating load is always available. See note regarding thermostatic
radiator valves on page 11.
Note. Systems incorporating zone valves which could completely cut off the flow through the system must also include a bypass.
3
system balancing
Balancing
1. Set the programmer to ON.
Close the manual or thermostatic valves on all radiators, leaving the twin
lockshield valves (on the radiators referred to above) in the open position.
Turn up the room thermostat and adjust the lockshield valve to give an
uninterrupted flow through the radiator. These valves should now be left as set.
4
water treatment
Central Heating
The i-mini range of boilers have an aluminium alloy heat
exchanger.
Important.
The application of any other treatment to this product
may render the guarantee of Ideal Boilers, invalid.
Ideal Boilers, recommend Water Treatment in accordance
with the Benchmark Guidance Notes on Water Treatment in
Central Heating Systems.
If water treatment is used Ideal Boilers recommend only
the use of SCALEMASTER GOLD 100, Fernox, MBI, Adey
MC1, Sentinel X100 or CALMAG GM100 inhibitors and
associated water treatment products, which must be used in
accordance with the manufacturers’ instructions.
Notes.
1. It is most important that the correct concentration of the
water treatment products is maintained in accordance
with the manufacturers’ instructions.
2. If the boiler is installed in an existing system any
unsuitable additives MUST be removed by thorough
cleansing. BS 7593:2006 details the steps necessary to
clean a domestic heating system.
3. In hard water areas, treatment to prevent lime scale may
be necessary - however the use of artificially softened
water is NOT permitted.
4. Under no circumstances should the boiler be fired before
the system has been thoroughly flushed.
Domestic Hot water
In hard water areas where mains water can exceed 200ppm Total
Hardness (as defined by BS 7593:2006 Table 2) a scale reducing device
together with Scalemaster in-line scale inhibitor should be fitted into the
boiler cold supply within the requirements of the local water company.
The use of artificially softened water, however, is not permitted.
Ideal Boilers, recommend the use of Fernox Quantomat, Sentinel
Combiguard and Calmag CalPhos I scale reducing devices, which
must be used in accordance with the manufacturers’ instructions.
2. Open all manual or thermostatic radiator valves and
adjust the lockshield valves on the remaining radiators,
to give around 20oC temperature drop at each radiator.
3. Adjust the room thermostat and programmer to
normal settings.
Domestic Hot Water
1. The domestic hot water service must be in accordance with BS
5546 and BS 6700.
2. Refer to Table 1 for minimum and maximum working pressures.
In areas of low mains water pressures the domestic hot water
regulator may be removed from the DHW flow turbine cartridge.
Refer to Frame 69. The boiler will require the flow rate to be set to
obtain a temperature rise of 35oC at the tap furthest from the boiler.
3. The boilers are suitable for connection to most types of washing
machine and dishwasher appliances.
4. When connecting to suitable showers, ensure that:
a.
The cold inlet to the boiler is fitted with an approved anti-
vacuum or syphon non-return valve.
b.
Hot and cold water supplies to the shower are of equal pressure.
5. Hard Water Areas
Where the water hardness exceeds 200mg/litre, it is
recommended that a proprietary scale reducing device is fitted
into the boiler cold supply within the requirements of the local
water company.
Cold water, rising main and pipework in exposed areas need to be
suitably lagged to prevent freezing.
important. Provision must be made to accomodate the expansion
of DHW contained within the appliance. If the DHW inlet contains a
back flow prevention device or non-return valve, e.g. a water meter,
then a mini expansion vessel should be fitted between the device
and the boiler in the cold inlet pipe.
Note. DHW Expansion Vessel Kit available from Ideal Boilers.
2
system requirements - Cont’d
For further information contact:
Fernox Cookson Electronics
Forsyth Road, Sheerwater, Woking, Surrey GU21 5RZ
+44 (0) 8706 015000
Sentinel Performance Solutions
The Heath Business & Technical Park
Runcorn, Cheshire WA7 4QX
Tel: 0800 389 4670
Scalemaster Water Treatment Products
Emerald Way, Stone, Staffordshire ST15 0SR
Tel: +44 (0) 1785 811636
Calmag Ltd.
Unit 3-6, Crown Works, Bradford Road,
Sandbeds, Keighley, West Yorkshire BD20 5LN
Tel: +44 (0) 1535 210320
Adey Professional Heating Solutions
Gloucester Road, Cheltenham GL51 8NR
Tel: +44 (0) 1242 546700
i-mini - Installation and Servicing
5
boiler assembly - exploded view
104
CH Return Valve
105
CH Flow Valve
106
DHW Inlet & Outlet
108
Pump Head
110
Auto Air Vent
111
Divertor Valve Motor
112
Divertor Valve Body & Paddle
113
Pressure Relief Valve
114
Pipe - PRV Outlet
115
Pipe - Flow
116
Pipe - Return
117
Pipe - Expansion Vessel
118
Expansion Vessel
119
Return Group Manifold
120
Flow Group Manifold
121
Plate Heat Exchanger
124
Flow Regulator
127
Flow Sensor/Turbine
131
Water Pressure Switch
135
Pressure Gauge
203
Gas Cock
204
Pipe - Gas Inlet
205
Gas Valve
206
Pipe - Gas Injector
211
Injector Assy
214
Venturi
215
Fan
217
Burner
218
Gasket - Burner
219
Sump Clean Out Cover
223
Flue Manifold
224
Flue Manifold Top
227
Clamp Retaining Flue Turret
228
Hose Condensate Internal
229
Siphon Trap
231
Condensate Outlet Connection
301
Ctrl Box Fixings Hings & Spring
302* Primary PCB
303
CUI Board
304
Control Thermistor (Return)
306
Electrode Ignition
307
Electrode Detection
308
Ignitor Unit
309
Thermistor Flow
313
Ignition Lead
314
Control Box Lens
320
Detection Lead
324
Control Box Lid
325
Control Box Front
326
Programmer Insert
401
Heat Engine
503
Wall Mounting Bracket
504
Front Panel
505
Fascia
506
Bracket - Gas Valve
507
Bracket - Expansion Vessel
* Note that production boiler PCBs are
factory pre-set to operate for boiler range
and output. When ordering Primary PCB
as a spare, an additional Boiler Chip Card
(BCC) MUST also be purchased for your
specific boiler range and output.
Check boiler serial letter code on data
plate to obtain correct BCC.
504
227
224
503
505
313
215
309
306
308
211
214
206
205
204
223
326
325
302*
110
114
113
121
118
507
131
127
124
120
119
117
104
106
203
106
135
105
231
112
228
229
303
304
116
115
219
301
401
320
218
307
324
314
506
BCC*
217
111
108
INSTALLATION
i-mini - Installation and Servicing
HARDWARE PACK CONTENTS
Gas Valve Pack
1. Gas Cock
2. Valve - DHW
3. Valve - Return
4. Valve - Flow
5. Pipe - DHW Inlet
6. Nut - G 1/2"
7. Washer - Gas
8. Washer - DHW
9. Washer - CH
10. Screw
11. Wall Plug
12. Turret Clamp Screw (spare)
Fixings Pack
3
4
7
10
11
8
9
2
6
5
1
12
6
unpacking
The boiler is supplied fully assembled in Pack A. A telescopic or non-telescopic flue assembly for rear or side flue outlet in Pack
B is suppled as a separate order.
Unpack and check the contents.
Pack A Contents
A
Boiler
B
Hardware Bag
C
Wall Mounting Plate
D
These Installation/Users Instructions
E
Wall Mounting Template
(located on internal protective packaging)
F
Turret Clamp (fitted to boiler)
G
Warranty
C
A
D
F
B
E
G
Boiler Guarantee
INSTALLATION
i-mini - Installation and Servicing
A
D
B
C
D
C
B
A
E
8
front panel removal
1. Loosen the 2 screws retaining the front panel.
2. Pull the two spring clips downwards to disengage.
3. Pull the front panel forward and upwards to remove.
1
2
Pack B Contents Telescopic
A
Telescopic Flue Terminal
B
Flue Turret
C
Rubber Terminal Wall Seal
D
Screw
E
Sealing Tape
Pack B Contents Non-Telescopic
A
Flue Terminal
B
Flue Turret
C
Rubber Terminal Wall Seal
D
Cutting Aid
Note. This flue system incorporates a removable flue outlet nose that utilises a push fit location system. This enables the
installation of deflector, high level or balcony outlet flue kits without the removal of the whole ‘B’ pack terminal. The appliance
must not be operated without the desired outlet nose correctly fitted in place.
Note. Location dimples must be aligned with terminal mounting frame.
7
unpacking Cont’d
INSTALLATION
i-mini - Installation and Servicing
FLUE OUTLET
3G9988
“A” - See Diagram in
Frame 1
Extended centre line
155
(200)
3G9495
X
Section
through wall
Note. Check all of the hole
positions before drilling.
Side flue only
5" diameter hole
Rear flue only
5" diameter hole
The wall mounting template is located on the internal protective
packaging. The template shows the position of the fixing and rear
flue centre holes for a standard installation
Care MUST be taken to ensure the correct holes are drilled.
1. Tape template into the required position, ensuring its squareness
by hanging a plumbline as shown.
2. If fitting a side flue, extend the flue centreline onto the side by
155mm on a standard wall fix or 200mm if using a stand-off
bracket.
3. Mark the following on to the wall:
a The selected group of wall mounting screw holes.
b. The centre position of the flue duct. Marking both the centre
and the circumference of the flue duct.
4. Remove the template plate from the wall.
9
wall mounting template
10 preparing the wall
Important.
Ensure that, during the cutting operation, masonry falling
outside of the building does not cause damage or personal
injury.
1. Cut the flue hole (preferably with a 5” core boring tool),
ensuring that the hole is square to the wall.
Both wall faces immediately around the cut hole should be
flat.
2. Drill 2 mounting holes (marked from template) with a 7.5mm
/ 8mm masonry drill and insert the plastic plugs, provided,
for the wall mounting plate.
3. Locate 2 No.14 x 50mm screws in the wall mounting plate
(one at each side, in any of the 3 holes provided at each
side) and screw home. Ensure mounting bracket is level.
12 Mounting the Boiler
1. Ensure the plastic plugs are removed from both the CH
and DHW connections before mounting the boiler.
Note. boiler may contain residual water.
2. Lift the boiler onto the wall mounting plate (refer to the
Introduction section for safe handling advice), locating it
over the two tabs.
11 Fitting the Wall Mounting Plate
Screw the wall mounting plate to the wall using 2 wall plugs
(previously fitted) with the 2 screws provided.
Choose one of the 2 sets of slots in left and right bank.
Ensuring that at least one of the screws is fitted into a top slot
and the mounting bracket is level.
3G9948
Example of fixing
i-mini - Installation and Servicing
FLUE OUTLET
13 DETERMINING THE FLUE LENGTH and flue packs required
IMPORTANT. The boiler must be installed in a vertical position
in accordance to the installation instructions.
Flue Kits
Telescopic Flue‘B’ Pack - contains: Flue turret, telescopic flue
incorporating a terminal and rubber wall seal.
Horizontal Flue Terminal (600mm long) ‘B’ Pack - contains:
Flue turret, non telescopic single piece flue incorporating a
terminal and rubber wall seal.
Horizontal Flue Terminal (1000mm long) ‘B’ Pack - Flue turret,
telescopic flue incorporating a terminal, rubber wall seal and
instructions.
Note. If ‘B’ packs are used on their own (either 1 piece or
telescopic), then they can be fitted horizontally as the flue
inside is designed to slope 1.5 degrees.
Flue Kit 203129 - D Pack Flue Extension 100mm DIA 1000mm long
Flue Kit 211037 - D Pack Flue Extension 100mm DIA 500mm long
Flue Kit 211038 - D Pack Flue Extension 100mm Dia 2000mm long
Flue Kit 211039 - Roof Flue Kit with Vertical Connector
When extension ‘D’ Packs are used the flue duct must incline
1.5 degrees away from the appliance, to allow the condensate
to drain back to the boiler and out of the condensate drain. It is
recommended that a support bracket is fitted on every 1 metre of
pipe work used and the bracket is located as close to the collar
as possible. The bracketing must ensure a 1.5 degree fall back
to the appliance.
Optional Flue Finishing Kit - UIN 155988 & Concentric Flue
Screw Retaining Kit (Optional Kit of mechanical fixing of flue
joints)
Only use water as a lubricant during assembly.
The ‘B’ pack terminal is classed as part of the maximum flue
length.
These flue systems incorporates a removable flue outlet
nose that utilises a push fit location system. This enables the
installation of deflector, high level or balcony flue kits without
the removal of the whole ‘B’ pack terminal. The appliance must
not be operated without the desired outlet nose correctly fitted
in place, ensuring the side location dimples are in line with the
mounting face allowing the correct sealing of the components.
It is IMPORTANT that all attachments are fitted in accordance
to the installation instructions provided with them.
The TURRET supplied in the ‘B’ Pack has an upper combustion
sample point with a screw cap seal and a lower air sample point
with an air stopper seal. Ensure all caps & seals are in place.
Additional Termination Kits available for use with these ‘B’ packs.
Flue Deflector Kit
The resistance is the equivalent of 1 metre of flue pipe and therefore must be deducted from
any maximum flue length
High Level Flue Outlet Kit
The maximum permissible concentric flue length when using a standard (500mm) kit is 4.5 metres
Balcony Flue Outlet Kit
The maximum permissible concentric flue length when using this kit is dependant on the length
of the balcony flue outlet run which combined with the concentric run must not exceed the
maximum flue length requirement of the appliance it is to be fitted to
Soffit Kit
This kit enables fitment of an external flue below soffits.
Total Maximum Permissible Horizontal Concentric Flue Length combining both ‘B’ Packs and ‘D’ Packs
(Measured from centreline of the turret to the outside of the wall terminal)
24 kW appliances
Total Maximum: 9 metres - minus any flue kit options or bends
30 kW Appliances
Total Maximum: 8 metres - minus any flue kit options or bends
Total Maximum Permissible Vertical Flue Length combining both Roof Terminal and ‘D’ Packs
24 & 30kW Appliances
Total Maximum: 7.5 Metres - minus any bends
90º Elbow Kit 60/100 - (Equivalent flue length resistance = 1M)
45º Elbow Kit 60/100 - (Equivalent flue length resistance = 0.6M)
Minimum Horizontal Flue Lengths (Centre line of turret to outside of wall terminal)
Telescopic Flue ‘B’ Pack = 400mm
Horizontal Flue terminal (600mm long) ‘B’ Pack = 285mm
Wall Thickness
Std Metric Brick 102.5mm wide
‘B’ Pack Flue Type
Minimum permissible Wall Thickness
Maximum permissible Wall Thickness
Rear Flue
Rear Flue + Std-Off
Side Flue
Rear Flue
Rear Flue + Std-Off
Side Flue
Horizontal Flue Terminal
(600mm long) B Pack
116
102.5
102.5
501
456
456
Telescopic Flue B Pack
231
186
186
429
384
384
Horizontal Flue Terminal
(1000mm long) B Pack
546
501
501
761
716
716
Horizontal Flue Terminal
(1000mm long) B Pack cut 75mm
471
426
426
686
641
641
For Flue lengths between 658 & 708 use a Horizontal Flue Terminal (1000mm long) B Pack, cut 75mm off the end of the
terminal section of the telescopic flue only.
i-mini - Installation and Servicing
FLUE OUTLET
100mm
Edge of turret
to outside face of wall plus
44mm = fue length
Centre of turret to edge of turret = 100mm
Turret has a fue insertion of 30mm
The compressed outer wall seal has protruding wall to seal mounting lip - 14mm
From centreline of turret to wall. Rear mount 155mm, side (including clearance) 200mm
NOTES
REAR
Fit
to wall
A
WALL
Edge of turret
to outside face of wall plus
44mm = fue length
Flue length measured from outer terminal lip
to end of outer fue
A + 44mm
REAR
Fit
to wall
inc. Stand
of Frame
A
WALL
Edge of turret
to outside face of wall plus
44mm = fue length
SIDE
Fit
to wall
A
WALL
Minimum clearance 5mm
14 DETERMINING THE FLUE LENGTH and flue packs required, cont’d
Shows the flue required when measured from outside edge of turret to the outside face of the wall (to obtain cut length add 44mm)
Minimum & Maximum finished flue lengths obtainable (dimension ‘A’ +44mm)
Horizontal Flue Terminal
(600mm long) B Pack
Telescopic Flue B Pack
Horizontal Flue
Terminal (1000mm long)
B Pack (Telescopic)
Horizontal Flue Terminal
(1000mm long) B Pack
(Telescopic) Cut 75mm
Minimum
Maximum
Minimum
Maximum
Minimum
Maximum
Minimum
Maximum
B Pack (Standard)
171
556
286
484
601
816
526
741
Plus 1 (1m D pack)
1121
1506
1236
1434
1551
1766
1476
1691
Plus 2 (1m D pack)
2071
2456
2186
2384
2501
2716
2426
2641
Plus 3 (1m D pack)
3021
3406
3136
3334
3451
3666
3376
3591
Plus 4 (1m D pack)
3971
4356
4086
4284
4401
4616
4326
4541
Plus 5 (1m D pack)
4921
5306
5036
5234
5351
5566
5276
5491
Plus 6 (1m D pack)
5871
6256
5986
6184
6301
6516
6226
6441
Plus 7 (1m D pack)
6821
7206
6936
7134
7251
7466
7176
7391
Plus 8 (1m D pack)
7771
8186
7886
8084
8201
8416
8126
8341
Plus 9 (1m D pack)
8721
9000
8836
9000
9000
9000
9000
9000
Max output 30 kW
Max output 24 kW
figure 1
figure 2
Note. Maximum permissible
flue length is measured from
centre line of appliance flue
outlet to outside wall face.
Note; Telescopic flue B Pack or attached “D” pack extensions do not need to be cut between minimum and maximum values
shown above (except where specified). Horizontal Flue Terminal (600mm long) B Pack flue will require cutting on values
below maximum values shown in the table above.
If using the 2000mm D Pack , the maximum usable length per extension is 1950mm
If using the 500mm D Pack, the maximum usable length per extension is 450mm.
i-mini - Installation and Servicing
FLUE OUTLET
15 Cutting & Setting the Flue Length
Cut 75mm off horizontal flue terminal 1000mm long b pack (telescopic)
1. Measure cut flue length (A+44mm). (If required telescopic length is not between
658 and 708 then proceed to “Setting Telescopic Flue B Pack”).
2. Remove telescopic end piece from the flue body and set aside.
3. Mark the circumference 75mm from the open end of the outer flue.
4. Cut along the 75mm mark cutting only the outer flue ensuring the cut is square.
5. Dress the cut end to make sure all burr is removed and the cut edge is in its
original shape.
6. Measure 20mm from the newly cut edge of the outer flue, place a mark at the top of the flue approximately 20mm wide &
write stop the terminal side of the line.
7. Mark the inner tube 10mm longer than the outer tube around its circumference and cut following the mark to ensure its cut
square
8. Remove all burrs and place a chamfer on the outer edge to aid assembly.
9. Re-assemble telescopic section.
Setting Telescopic Flue B Pack
1. Measure the required flue length (A+44mm).
2. Measure from the outer terminal lip to end of outer flue. Pull apart flue until
desired length is achieved. ENSURE THE STOP MARK IS NOT VISIBLE,
IF IT IS, THE FLUE IS TOO SHORT AND SHOULD NOT BE USED.
3. Check that both flue seams are at the top and the outlet terminal is upper
most.
4. Drill a 3.5mm hole through one of the 2 outer side holes in the outer flue
section into the inserted outer flue (as shown). Take care not to pierce the
inner plastic flue. Fit screw provided.
5. Seal the joint on the outer air duct with the tape provided.
6. Fit external wall seal (see installing flue).
Cutting HORIZONTAL FLUE TERMINAL (600MM LONG) B PACK
1. Measure the required cut flue length (A+44mm). If inside the dimensions
shown in Figure 2 “1 Piece 600mm” proceed.
2. Measure from the outer terminal lip to end of outer flue. Mark the
required cut length (A+44) around the circumference of the outer flue and
cut following the mark to ensure its cut square.
3. Dress the cut end to make sure all burr’s are removed and the cut edge
is in its original shape.
4. Mark the inner tube 10mm longer than the outer tube around its
circumference and cut following the mark to ensure its cut square.
5. Remove all burrs and place a light chamfer on the outer edge to aid
assembly.
Telescopic Flues
Telescopic Flue B Pack should only be adjusted for use within its specified range and must NOT
BE CUT
Horizontal Flue Terminal (1000mm long) B Pack (telescopic) must ONLY BE CUT IF REQUIRED FLUE
LENGTHS ARE BETWEEN 602 & 652MM. THIS WILL REQUIRE 75MM TO BE CUT OFF THE TERMINAL END OF THE
1000MM TELESCOPIC FLUE.
ALL OTHER LENGTHS OBTAINED USING “D” PACK EXTENSIONS IN FLUE LENGTH TABLE 1, COLUMN “HORIZONTAL
FLUE TERMINAL (1000MM LONG) B PACK CUT 75MM” (telescopic) SHOULD HAVE THE 75MM CUT OFF THE “D”
PACK EXTENSION AND NOT TELESCOPIC FLUE
i-mini - Installation and Servicing
FLUE OUTLET
16 Installing the Flue
Fitting Flue Through the Wall
1. Measure wall thickness and add 14mm.
2. Measure from the outer terminal lip towards the end of outer flue, place a
small location mark at the dimension acquired at point 1.
3. Fit external black wall seal ensuring the inside of the outer lip is in contact
with the terminal lip you have been measuring from (see fig 1)
4. For an internal fit, place flue terminal in the centre of the 5” drilled hole
in the wall. Apply pressure and lightly move the flue left to right or up
and down. This will cause the outer flange to fold in and allow the flue to
pass through the wall.
5. Push through a further 65mm. This will allow the outer flange to return
to its original shape.
6. Pull back the flue until the location mark point 1 is level with the internal
face of the wall.
Note. If the location mark is not visible then the flue is not pulled back
far enough to obtain the correct seal. If the location mark has passed
the face of the wall the flue has been pulled to far back and the outer
wall seal will have been dislodged from its mounting and will need to be
refitted.
7. Ensure the seam and the outlet terminal are at the top and fitted as shown.
Note. If less than 50% of the length of the flue is internal the flue should be
fitted from outside.
Fitting the Turret - Ensure the condense trap/siphon is filled with water
1. Ensure the rubber seal is fitted correctly on the appliance manifold and that all flue seals are undamaged.
2. Hold the flue firmly and push the turret on until it has travelled 30mm on to the flue pipe and is fully engaged. Make sure the
flue has not rotated or moved forward during fitting and the flue seam is upper most.
3. Push the turret into the manifold ensuring the upper plastic lip is flush with the top of the manifold.
4. Fully engage the clamp location section into the manifold location holes. Rotate down on to turret flange.
5. Secure clamp to appliance using securing screw.
6. Ensure all sample points are accessible and all sample plugs and caps are fitted.
Ensure lip of wall seal is positioned
over step on plastic nose of flue terminal
(note, seal is cut away for clarity)
Terminal Lip
Wall Seal Lip
Rubber
Terminal
Wall Seal
Terminal
MUST be
fitted as
shown
Retaining
screw
Clamp Lugs
Sample points
Flue Outlet
C
A
A - Duct Assembly
B - Flue Turret
C - Turret Clamp
D - Seal
Flue Outlet
D
B
Fig 1
i-mini - Installation and Servicing
FLUE OUTLET
Note.
A flat or pitched roof flashing plate (not supplied) is required before proceeding
with the installation of this kit.
This kit is suitable for both flat and pitched roof terminations, using a concentric
flue to run vertically from the top of the boiler and terminating above roof level.
Connection to the top of the boiler is made
using the supplied vertical connector.
Weather Proofing
Where the flue passes through the roof line
an adequate seal must be made. This is
achieved by using either:
-
Flat roof weather collar
or
-
Universal weather collar.
Accessories
Flue Duct Extension Kits are available for
flue lengths extending beyond 1m. These
packs contain 1m extension ducts and may
be cut to the desired length.
If the offset vertical option is used an elbow
Kit is required. For a full accessories list
refer to page 8, Optional Extras.
Flue
duct
support
Vertical
Connector
Flue
duct
support
90
o elbow
UIN 203130
45
o elbow
UIN 203131
Roof Flue Extension Duct
UIN 211037 (500mm)
UIN 203129 (1000mm)
UIN 211038 (2000mm)
Flue Terminal
UIN 211039
Flue Seal Collar - Flat Roof
UIN 152259
Flue Seal Collar - Tile Roof
UIN 152258
Soffit Flue Kit
UIN 211067
Vertical connector
UIN 208175
18 Roof Flue Kit Contents / Options
17 Fitting the Optional Roof Flue Kit (Flat or Pitched)
i-mini - Installation and Servicing
FLUE OUTLET
2
Extension
Duct
Vertical
connector
5
4
19 Assembling the Roof Flue Kit
Determine the correct height that the flue should terminate above
the roof. If after calculating or measuring the overall flue height
from the top of the boiler, it is necessary to cut both pipes of
assembly A, then ensure they are cut equally leaving the inner
flue tube longer than the outer air tube as supplied.
Ensure the cut pipe ends are free from any burrs.
1. Position the roof flashing plate (supplied separately) over the
hole cut in the roof and insert flue terminal from the roof end.
nm8739
min 16
o
max 41
o
MAX LENGTH:
7.5m
BOILER
nm8740
Flue Terminal
Pitched roof tile
weather collar
Flat roof tile
weather collar
1
3G9557b
'X'
6
2. Fit the vertical connector supplied in accordance with the
instructions provided with the vertical connector kit.
3. Secure the vertical connector by applying downward pressure
on the connector.
4. Position the clamp on the top face of the flue manifold and push
it horizontally backwards. Locate both clamp lugs into the flue
manifold and secure to the flue manifold with the M5 retaining
screw.
5. “Push” fit extension duct (if required (supplied separately)) into
vertical connector.
Note. Ensure turret sample points are servicable and all caps and
plugs are fitted. Fill the condense trap/siphon with water.
6. If the last extension duct requires cutting, measure ‘X’, the distance
(outer ducts), between the duct and the terminal and add 100 mm to this
dimension. This gives the length of the last extension duct.
Note. Check the position of the inner flue duct relative to the outer duct on
the assembled extension duct(s) and ensure the terminal flue duct is cut
longer than the air duct to ensure engagement in the final flue duct seal.
7. Finally ensure the roof flashing plate is correctly sealed to the roof.
aSSEMBLY a
i-mini - Installation and Servicing
FLUE OUTLET
rf8394-1
690mm
Fixed
300mm
min
20 Flue Terminal Position
rf8393-1
300mm
min
300mm
min
625mm
Fixed
Flat roof - with structure
The terminal should be positioned so that products of
combustion can safely disperse at all times.
Pluming may occur at the termination so, where possible,
terminal positions where this could cause a nuisance
should be avoided.
Minimum dimensions are shown below
RF9807
A
A
B
A
A = 600mm
B = 2000mm
The flue terminal shall not penetrate the shaded area of the roof
Note.
The equivalent flue length
resistance of the elbow kits are:
90o elbow kit = 1m
45o elbow kit = 0.6m
If chimney penetrates dotted area such that A is less
than 300mm, B shall not be less than 300mm.
Where two or more vertical fanned draught chimney configurations terminate in close
proximity at the same height, they shall be separated by at least 300mm. Where
any one vertical outlet is more than 300mm above the other, then they shall be
separated by at least 1500mm.
Where any vertical fanned draught chimney configuration outlet is within 2000mm
measured horizontally of an opening window, then it shall be at least 300mm
above the opening.
Pitched roof - with velux window
or opening
i-mini - Installation and Servicing
21 condensate drain
This appliance is fitted with a siphonic 75mm condensate trap
system that requires filling before operating the appliance for the
1st time or after maintenance.
All condensate pipework should conform to the following:
a. Where a new or replacement boiler is being installed, access to
an internal ‘gravity discharge’ termination should be one of the
main factors considered in determining boiler location.
b. Plastic with push fit or solvent connections.
c. Internal plastic pipe work a minimum of 19mm ID (typically
22mm OD)
d. External plastic pipe must be a minimum of 30mm ID (typically
32 OD) before it passes through the sleeved wall.
e. All horizontal pipe runs, must fall a minimum of 45mm per metre
away from the Boiler.
f.
External & unheated pipe work should be kept to a minimum
and insulated with Class “O” waterproof pipe insulation.
g. All installations must be carried out in accordance to the
relevant connection methods as shown in the “Condensate
installation diagrams” & BS6798:2009
h. Pipe work must be installed so that it does not allow spillage
into the dwelling in the event of a blockage (through freezing)
i.
All internal burrs should be removed from the pipe work and any
fittings.
In order to minimise the risk of freezing during prolonged very cold
spells, one of the following methods of terminating condensate
drainage pipe should be adopted.
Internal Drain Connections
Wherever possible, the condensate drainage pipe should be routed
to drain by gravity to a suitable internal foul water discharge point
such as an internal soil and vent stack or kitchen or bathroom
waste pipe etc. See Figs 1 and 2.
Condensate Pump
Where gravity discharge to an internal termination is not physically
possible or where very long internal pipe runs would be required
to reach a suitable discharge point, a condensate pump of a
specification recommended by the boiler or pump manufacturer
should be used terminating into a suitable internal foul water
discharge point such as an internal soil and vent stack or internal
kitchen or bathroom waste pipe etc. (fig 3).
External Drain Connections
The use of an externally run condensate drainage pipe should
only be considered after exhausting all internal termination options
as described previously. An external system must terminate at a
suitable foul water discharge point or purpose designed soak away.
If an external system is chosen then the following measures must
be adopted:
The external pipe run should be kept to a minimum using the most
direct and “most vertical” route possible to the discharge point, with
no horizontal sections in which condensate might collect.
-
For connections to an external soil/vent stack see Fig 4.
Insulation measures as described should be used.
-
When a rainwater downpipe is used, an air break must be
installed between the condensate drainage pipe and the
downpipe to avoid reverse flow of rainwater into the boiler
should the downpipe become flooded or frozen, see Fig 5.
-
Where the condensate drain pipe terminates over an open
foul drain or gully, the pipe should terminate below the grating
level, but above water level, to minimise “wind chill” at the open
end. The use of a drain cover (as used to prevent blockage by
leaves) may offer further prevention from wind chill. See Fig 6.
-
Where the condensate drain pipe terminates in a purpose
designed soak away (see BS 6798) any above ground
condensate drain pipe sections should be run and insulated as
described above. See Fig 7
Unheated Internal Areas
Internal condensate drain pipes run in unheated areas, e.g. lofts
basements and garages, should be treated as external pipe.
Ensure the customer is aware of the effects created by a frozen
condensate and is shown where this information can be found in
the user manual.
Boiler
with 75mm
sealed
condensate
trap
Min Ø 19mm
Internal pipe
Minimum
connection
height up to 3
storeys
Soil & vent stack
≥ 450
75
Boilers without 75mm sealed
condensate trap must be fitted with
a 75mm trap and visible air break
Sink/basin/
bath or
shower
Boiler
with 75mm
sealed
condensate
trap
Min Ø 19mm
Internal pipe
Internal soil & vent stack
Boilers without 75mm sealed
condensate trap must be fitted with
a 75mm trap and visible air break
75
≥ 100
≥ 100
Figure 1 - Connection of Condensate Drainage Pipe to
Internal Soil & Vent Stack
Figure 2 - Connection of a Condensate Drainage Pipe
Downstream of a Sink, Basin, Bath or Shower Water Trap to
Internal Soil Vent Stack
continued . . . . .
137
47
149
Condensate
Drain
INSTALLATION
i-mini - Installation and Servicing
22 Condensate drain - Cont’d.......
Visible air break
Condensate pump
(Install in accordance with manufacturers instructions)
Min Ø 19mm
Internal pipe
Boiler
with 75mm
sealed
condensate
trap
75
Min Ø 19mm
Internal pipe
Min Ø 30mm
Internal pipe
Air gap
External air
break
combined foul/
rain water drain
Terminated
and cut at 45º
43mm 90º male/
female bend
Water/
weather proof
insulation
68mm Ø PVCU
Strap on fitting
Boiler
with 75mm
sealed
condensate
trap
Boiler
with 75mm
sealed
condensate
trap
Min Ø 19mm
Internal pipe
Min Ø 30mm
Internal pipe
Water/Weather
proof insulation
Max 3m external
pipework
Limestone
chippings
≥ 500
≥ 300
≥ 25
75
Boilers without 75mm sealed
condensate trap must be fitted with
a 75mm trap and visible air break
2 rows of three Ø12mm holes
25mm centres, 50mm from
the bottom of the tube, facing
away from the house
Minimum
connection
height up to 3
storeys
Soil & vent stack
≥ 450
Boiler
with 75mm
sealed
condensate
trap
Min Ø 19mm
Internal pipe
Min Ø 30mm
Internal pipe
Water/weather
proof insulation
75
Boilers without 75mm sealed
condensate trap must be fitted with
a 75mm trap and visible air break
Visible air break
at plug hole
Min Ø 19mm
Internal pipe
Sink, basin, bath or
shower with integral
overflow and 75mm trap
Minimum 30mm
internal pipe
Water/
weather proof
insulation
≥ 25 Below grate
45º pipe
termination
Boiler
with 75mm
sealed
condensate
trap
75
≥ 100
Figure 3 - Connection of a Condensate Pump Typical
Method (see manufacturers detailed instructions)
Figure 4 - Connection of condensate Drainage Pipe to
External Soil & Vent Stack
Figure 5 - Connection of a Condensate Drainage Pipe to an
External Rainwater Downpipe (only combined foul/rainwater
drain)
Figure 7 - Connection of a Condensate Drainage Pipe to an
External Purpose Made Soak Away.
Figure 6 - Connection of Condensate Drainage Pipe
Upstream of a Sink, Basin, Bath or Shower Waste Trap to
External Drain, Gulley or Ranwater Hopper
INSTALLATION
i-mini - Installation and Servicing
Safety
Drain
Valve
Black
Handle
Yellow
Handle
Black
Handle
Blue
Handle
205367-9927b
CH Flow
DHW Outlet
Gas Supply
CH Return
DHW Inlet
Gas Pressure
Test Point
23 connections & Filling
NOTES.
Ensure all boss blanking plugs are removed before connecting hardware. Each valve must be fitted to the correct boss as shown
in the picture.
Ensure each union is fitted with fibre seals provided.
Do not subject any of the isolating valves to heat as the seals may be damaged.
WATER CONNECTIONS CH
1. Connect the CH flow service valve provided in the
hardware pack to the threaded boss connection
provided at the lower rear of the boiler.
2. Connect the CH return valve (black handle).
GAS CONNECTION
IMPORTANT.
The gas service cock is sealed with a non-
metallic blue fibre washer, which must not be overheated when
making capillary connections. Refer to Frame 1 for details of the
position of the gas connection.
For additional gas supply information refer to “Gas Supply” on
page 10.
safety valve Drain
The safety valve connection, located at the bottom right-hand
side of the boiler, comprises a 15mm diameter stub pipe.
The discharge pipe should be positioned so that the discharge
of water or steam cannot create a hazard to the occupants of
the premises or damage the electrical components and wiring.
FILLING
Important - when filling:
A. Ensure the dust cap on air vent
located at the rear of the pump
chamber is slightly unscrewed.
B. When filling, there may be a slight
water leak from the air vent therefore
electrical connections should be
protected.
CH -
1. Ensure that the CH isolating
handles are open.
2. Fill and vent the system. Refer to
Frame 2 for setting pressure.
DHW -
1. Fully open all DHW taps and ensure
that water flows freely from the.
2. Close all taps.
Dust Cap
WATER CONNECTIONS DHW
1. Fit the DHW inlet service valve (blue handle) to the
threaded boss connection ensuring the seal provided is
correctly located.
2. Fit the DHW outlet pipe tail to DHW outlet connection,
ensuring the seal provided is correctly located.
3. If connecting the boiler to heating loads in excess of
60,000 Btu/h, connecting flow and return heating systems
pipework must be sized in 28mm diameter at the point of
pipe connection to the boiler tails. Use 22mm x 28mm
pipe adaptors as appropriate.
Note.
The DHW flow rate is automatically regulated to a max:
24 = 9.9 l/m (2.2 gpm)
30 = 12.4 l/m (2.8 gpm)
Note that all isolation
handles are shown in the
open postion.
Pressure Relief Valve
Drain Connection
15mm elbow
or fittings
(not supplied)
Pressure Relief Valve
Drain Pipe
INSTALLATION
i-mini - Installation and Servicing
25 internal wiring
26 external electrical controls
Wiring External to the Boiler
The fuse rating should be 3A.
Wiring external to the boiler MUST be in accordance with the current I.E.E.
(BS.7671) Wiring Regulations and any local regulations.
Frost Protection
If parts of the pipework run outside the house or if the boiler will be left off for
more than a day or so then a frost thermostat should be wired into the system.
The frost thermostat should be sited in a cold place but where it can sense heat
from the system.
Note. If the boiler is installed in a garage it may be necessary to fit a pipe
thermostat, preferably on the return pipework.
A mains cable must be connected to a permanent live supply and NOT switched by
thermostats/programmers. To do so follow the instructions below:
1. Remove the front panel. Refer to Frame 39.
2. Swing the control box down into the service position. Refer to frame 45.
3. Route cable through the cable clamp and grommet and tighten to provide cord anchorage.
4. Connect the live, neutral and earth wires to the terminal strip. When making the mains
electrical connections to the boiler it is important that the wires are prepared in such a
way that the earth conductor is longer than the current carrying conductors, such that if
the cord anchorage should slip, the current carrying conductors become taut before the
earthing conductor.
5. Swing the control box back up into the operating position and re-fit the front panel
ensuring a good seal is made.
3G9989
N
L
N
FROST
STAT
(OPTIONAL)
ROOM
STAT/
TIMER
Room
Stat or
Prog.
Room
Stat
Optional
Frost Stat
Earths are not shown for clarity but must
never be omitted.
24 electrical connections
Wiring should be 3 core PVC insulated cable, not less than
0.75mm2 (24 x 0.2mm), and to BS 6500 Table 16. For IE
reference should be made to the current ETCI rules for electrical
installations.
Connection must be made in a way that allows complete isolation
of the electrical supply such as a double pole switch having
a 3mm (1/8”) contact separation in both poles. The means of
isolation must be accessible to the user after installation.
Warning. This appliance must be earthed.
A mains supply of 230Vac ~ 50 Hz is required.
The fuse rating should be 3A. All external controls and wiring
must be suitable for mains voltage.
Wiring external to the boiler MUST be in accordance with the
current I.E.E. (BS.7671) Wiring Regulations and any local
regulations.
The i-mini boiler comes pre-fitted with a link wire between the room thermostat/
Timer connections on the terminal strip. This creates a permanent call for heat
and must be removed when adding a room thermostat.
Room Thermostat - Wiring
1. Remove link wire between Room stat/timer terminals.
2. Connect room stat as shown in wiring diagram opposite.
3. If room stat has a neutral connection, connect this to terminal N (load) in
the fused spur.
frost thermostat - Wiring
If parts of the system are vulnerable to freezing or the programmer is likely to
be left off during cold weather, a frost stat should be fitted in conjunction with a
pipe thermostat.
1. Position the frost thermostat in a suitable position, i.e. area vulnerable to
freezing.
2. Connect frost stat across terminals marked frost stat as shown in wiring
diagram opposite.
3G9990
L
N
Room Stat
Frost Stat
Mains In
Use of General Live for Room Stat
Room
Stat
Optional
Frost Stat
INSTALLATION
i-mini - Installation and Servicing
27 wiring diagram
r
b
bk
or
bk
1
X1A
X1B
X1C
X2
X3
X5
X6
X8
2
3
4
5
6
1
2
3
4
5
1
2
3
4
5
6
8
7
9
1
2
3
4
1
2
3
4
5
6
X7
1
2
3
4
5
X13
1
2
3
1
2
3
4
5
6
7
8
9
10
11
p
bk
r
bk
PCB
Earth
y/g
br
b
bk
bk
b
b
br
y/g
- blue
- black
- brown
- red
- pink
- yellow
- white
- yellow/green
- grey
- orange
- violet
b
bk
br
r
p
y
w
y/g
g
or
v
KEY
p
y
bk
bk
bk
b
y/g
br
y/g
y/g
bk
b
bk
b
br
bk
v
y/g
y/g
1 2 3 4 5
bk
bk
b
b
b br
bk
r
r
r
r r
bk
y
p
bk
y
p
Timer
Link
1 2 3 4 5
r
Water
Flow
Turbine
Water
pressure
Switch
Flow
Thermistor
Return
Thermistor
Service
Connector
Flame
Sensor
Electrode
Fan
Spark
Electrode
Spark
Generator
Gas
Valve
Divertor
Valve
Room
Stat
Main
Supply
Frost
Stat
INSTALLATION
i-mini - Installation and Servicing
WARNING. Whilst effecting the required gas tightness test and purging air from the gas installation,
open all windows and doors, extinguish naked lights and do not smoke.
A. Electrical Installation
1. Checks to ensure electrical safety should be carried out by a
competent person.
2. Always carry out the preliminary electrical system checks, i.e.
earth continuity, polarity, resistance to earth and short circuit,
using a suitable test meter.
3. After wiring the boiler, all grommets in the bottom panel MUST
be in place to ensure that the boiler case sealing is maintained.
B. Gas Installation
1. The whole of the gas installation, including the meter,
should be inspected and tested for tightness and
purged in accordance with the recommendations of
BS. 6891.
In IE refer to IS.813:2002.
2. Purge air from the gas installation by the approved
methods only.
28 Commissioning and Testing
General
Please Note: The combustion for this appliance
has been checked, adjusted and p at the factory for
operation on the gas type defined on the appliance
data plate. Do not adjust the air/gas ratio valve.
Having checked:
-
That the boiler has been installed in accordance
with these instructions.
-
The integrity of the flue system and the flue seals,
as described in the Flue Installation section.
Proceed to put the boiler into operation as follows:
Check the operational (working) gas
inlet pressure
Set up the boiler to operate at maximum rate by
opening hot tap to maximum flow.
With the boiler operating in
the maximum rate condition
check that the operational
(working) gas pressure at
the inlet gas pressure test
point complies with the
requirements - refer to “Gas
Supply” on page 10.
Ensure that this inlet pressure
can be obtained with all other
gas appliances in the property
working.
Safety
Drain
Valve
Black
Handle
Yellow
Handle
Black
Handle
Blue
Handle
3G9927
CH Flow
DHW Outlet
Gas Supply
CH Return
DHW Inlet
Gas Pressure
Test Point
As part of the commissioning process, the combustion of this appliance must be checked
and the Benchmark Checklist completed. A flow chart to assist is provided on page 65.
ATTENTION !
IT IS A CONDITION OF THE MANUFACTURERS WARRANTY THAT THE
BENCHMARK COMMISSIONING CHECKLIST IS FULLY COMPLETED
AND LEFT WITH THE APPLIANCE
INSTALLATION
i-mini - Installation and Servicing
3G9928
Safety
Drain
Valve
Black
Handle
Yellow
Handle
Black
Handle
Blue
Handle
G
H
J
L
N
M
K
29 initial lighting
THE DISPLAY
The user control has one neon and one display to inform
the user about the status. The display will show the status
of the boiler. The neon will show the status of the flame.
If no flame is detected the neon is off. When the flame is
detected the neon will be lit permanently.
Below is a list with display function in normal operation.
Standby, no demand for heat present.
Boiler is active for central heating.
Boiler is active for domestic hot water.
Boiler is heating up the plate heat exchanger.
Boiler is active for boiler frost protection.
Boiler is in lockout for a specific error. Display will be
blinking, alternating with a number or letter to show
which error is detected.
Boiler has a fault for a specific error. Display will be
blinking, alternating with a number or letter to show
which error is detected.
Note: Boiler frost protection - boiler fires if temperature is
below 5 degrees C.
Legend
A. Domestic Hot Water Preheat On/Off Knob
B. Domestic Hot Water Temperature Knob
C. Central Heating Temperature Knob
D. Mode Knob
E. Boiler Status
F.
Burner ‘on’ Indicator
G. CH Flow Isolating Valve
H. System Pressure Gauge
J.
Gas Inlet Pressure Test Point
K. Gas Service Cock
L.
DHW Inlet Valve
M. CH Return Isolating Valve
N. DHW Outlet
P. Central Heating Economy Setting
1. Check that the system has been filled to the required pressure and that
the boiler is not airlocked. Ensure the automatic air vent cap is open.
Note.
It is important the burner is not operated before the system is fully vented of
air. If it is necessary to operate the appliance pump to assist venting of the air
this must be done with the gas service cock turned off.
2. Refit the boiler front panel. Refer to Frame 34.
3. Check that the drain cock is closed and that the CH and DHW isolating valves
(M, L and G) are OPEN.
4. Check that the electrical supply is OFF.
5. Check that the boiler mode knob (D) is off.
6. Check that the gas service cock (K) is OPEN.
7. Slacken the screw in the inlet pressure test point (J) and connect a gas
pressure gauge via a flexible tube.
8. Switch the electricity supply ON and check all external controls are calling for
heat.
Central Heating
Note. The boiler incorporates a fan overrun cycle which
MUST NOT be prematurely interrupted by isolation of the
mains electricity supply.
A
B
E
F
C
P
D
9. Set the CH temp control (C) to max and turn the mode knob (D) to ‘
’. The boiler control should now go through its ignition sequence
until the burner is established.
10. If the boiler does not light code
will be displayed. After 5 attempts
the boiler will lock out and display fault code
constantly. Restart
the boiler (Refer to Frame 31). The boiler will repeat its ignition
sequence. If restart occurs 5 times within 15 minutes then
will
be shown. If power is removed this will be restarted.
When the burner is established the BLUE ‘Burner On’ neon (F) will
be illuminated, the LED display (E) will show status .
DOMESTIC HOT WATER
11. With the boiler firing, set the DHW Temp knob (B) to maximum
and fully open a DHW tap.
The boiler should continue to run and the LED display (E) should
show status
12. Ensure that with the boiler operating the dynamic gas pressure is
able to obtain maximum output. Refer to Table 2.
Important
The gas input to the burner is regulated by the gas valve
according to the air flow produced by the fan. It is not user-
adjustable. Any interference to sealed settings on the gas valve
will adversely affect operation and render our warranty void.
For additional gas supply info refer to “Gas Supply” on page 10.
13. Turn off the DHW tap.
INSTALLATION
i-mini - Installation and Servicing
Water circulation system
1. With the system COLD, check that the initial pressure is
correct to the system design requirements.
For pre-pressurised systems, this should be 1.0 bar.
2. With the system HOT, examine all water connections
for soundness. The system pressure will increase with
temperature rise but should not exceed 2.5 bar.
3. With the system still hot, turn off the gas, water and
electricity supplies to the boiler and drain down to
complete the flushing process.
Note: A flushing solution should be used during the flushing
procedure. Flushing solutions: Fernox Superfloc,
Sentinel X300 (new systems) or X400 (existing
systems). Refer to Frame 4.
4. Refill and vent the system, add inhibitor (see Frame 5),
clear all air locks and again check for water soundness.
5. Reset the system initial pressure to the design
requirement.
6. Balance the system. Refer to Frame 3.
7. Check the condensate drain for leaks and check that it
is discharging correctly.
8. Finally, set the controls to the User’s requirements.
Note: The pump will operate briefly as a self-check
once every 24 hours in the absence of any system
demand.
Water temperatures
Temperatures can be selected using the CH and DHW thermostats.
Knob Setting
CH Flow Temp
DHW Outlet Temp
oC (
oF)
oC (
oF)
Max
80 (176)
64 (147)
Min
45 (113)
40 (104)
30 general checks
Domestic hot water (dhw) mode
1. Fully open all DHW taps in turn and ensure that water flows
freely from them.
The display should read:
neon flashing
then:
neon steady when the burner lights.
2. Close all taps except the furthest one from the boiler and check
that the boiler is firing at maximum rate.
This is factory set to give a DHW temperature rise of
approximately 35oC at the flow rate stated on page 8 under
“operation”.
3. Reduce the DHW draw-off rate to about 3 l/min (0.7gpm) and
check that the boiler modulates to deliver DHW at approximately
64oC.
4. Close the DHW tap and check that the main burner extinguishes.
The pump should overrun for 60 seconds and the display
sequence should read:
When the pump stops the display sequence should read:
Note. On systems in excess of 2 bar inlet pressure a water
pressure governor may be required to prevent water noise.
Central Heating (CH)
& Domestic Hot Water (DHW) mode.
1. Ensure that the CH external controls are calling for heat.
The display should read:
2. Fully open a DHW tap and check that hot water is delivered.
The display should read:
3. Gas Rate
Check the boiler gas rate when the boiler is at full DHW
output.
Check at the gas meter, with no other appliance in use.
Refer to Tables 2 & 3 for gas rates.
4. Close the DHW tap.
5. Set the central heating external controls to OFF. The burner
should go off and the pump continue to run for two minutes
The display should read:
6. Check the correct operation of the timer and all other system
controls. Operate each control separately and check that the
main burner responds.
Make the following checks for correct operation in:
Due to system variations and seasonal temperature
fluctuations DHW flow rates/temperature rise will vary, requiring
adjustment at the draw off tap : the lower the rate the higher the
temperature, and vice versa.
INSTALLATION
i-mini - Installation and Servicing
32 HANDING OVER
7. Draw attention to the timer Users Instructions and hand them
to the householder.
8. Loss of system water pressure
Explain that the dial underneath the boiler indicates the
central heating system pressure and that if the normal
COLD pressure of the system is seen to decrease over a
period of time then a water leak is indicated. Explain the re-
pressurising procedure and if unable to re-pressurise or if the
pressure continues to drop a registered local heating installer
should be consulted.
9. Explain Boiler restart procedure.
10. After installation and commissioning please complete
the
Commissioning Checklist before
handover to the customer. For IE, its is necessary to
complete a “Declaration of Conformity” to indicate compliance
to I.S. 813:2002.
Important
11. A comprehensive service should be carried out ANNUALLY.
Stress the importance of regular servicing by a Gas Safe
Registered Engineer. In IE servicing work must be carried out
by a Registered Gas Installer (RGII).
12. Inform the householder of the guarantee/registration found
within the envelope pack and the requirement to register it to
receive the full benefit of the warranty.
1. Hand the User Instructions to the householder and
explain his/her responsibilities under the relevant national
regulations.
2. Explain and demonstrate the lighting and shutting down
procedures.
3. The operation of the boiler and the use and adjustment of all
system controls should be fully explained to the householder,
to ensure the greatest possible fuel economy consistent with
the household requirements of both heating and hot water
consumption.
Advise the User of the precautions necessary to prevent
damage to the system and to the building, in the event of the
system remaining inoperative during frosty conditions.
4. Explain the function and the use of the boiler heating and
domestic hot water controls.
Explain that due to system variations and seasonal
temperature fluctuations DHW flow rates/temperature
rise will vary, requiring adjustment at the draw off tap. It
is therefore necessary to draw the users attention to the
section in the Users Instructions titled “Control of Water
Temperature” and the following statement:
“Additionally, the temperature can be controlled by the
user via the draw-off tap: the lower the rate the higher
the temperature, and vice versa”.
5. Explain the function of the boiler fault mode.
Emphasise that if a fault is indicated refer to “Fault Codes” in
the User Guide.
6. Explain and demonstrate the function of time and
temperature controls, radiator valves etc., for the economic
use of the system.
After completing the installation and commissioning of the system the installer should hand over to the householder by
the following actions:
31 Restart PROCEDURE
To restart boiler, turn the mode control knob (D) to restart position and immediately turn knob back to required setting. The boiler
will repeat the ignition sequence if a heat demand is present.
Legend
A. Domestic Hot Water Preheat On/Off
Knob
B. Domestic Hot Water Temperature Knob
C. Central Heating Temperature Knob
D. Mode Knob
E. Boiler Status
F. Burner ‘on’ Indicator
P. Central Heating Economy Setting
A
B
E
F
C
P
D
INSTALLATION
i-mini - Installation and Servicing
35
i-mini - Installation and Servicing
33 servicing schedule
For the very latest copy of literature for specification & maintenance practices, visit our website www.idealboilers.com, where you
will be able to download the relevant information. N.B. Technical Bulletins are also available on our website.
Warning. Always turn off the gas supply at the gas service cock, and switch OFF and disconnect the electricity
supply to the appliance before servicing.
Combustion testing must be carried out by a competent person using a combustion analyser conforming to BS7927.
To ensure the continued safe and efficient operation of the appliance it is recommended that it is checked at regular intervals and
serviced as necessary. The frequency of servicing will depend upon the installation condition and usage but should be carried out
at least annually.
It is the law that any service work must be carried out by a Gas Safe Registered Engineer. In IE service work must be carried out
by a Registered Gas Installer (RGII).
INSPECTION
1. Light the boiler and carry out a pre-service check, noting any
operational faults.
2. Check the flue terminal (and terminal guard if fitted) is undamaged
and clear of any obstruction.
3. Check all water and gas joints for signs of leakage. Remake any
suspect joints ensuring a gas tightness check is carried out if
applicable and the water system is correctly refilled, vented and
re-pressurised.
CLEANING PROCEDURE
Note. In order to carry out either servicing or replacement of
components the boiler front panel must be removed. Refer to
Frame 39.
1. Clean the main burner. Refer to frame 41.
2. Clean the heat exchanger & condensate trap/siphon. Refer to
Frames 42 & 43.
3. Check the main injector for blockage or damage. Refer to Frame
40.
4. Check that the flue terminal is unobstructed and that the flue system
is sealed correctly.
ALSO IF THE DHW FLOW RATE IS IN QUESTION :-
5. Check the DHW filter for blockage. Refer to Frame 69.
The cleaning procedures are covered more fully in Frames 39-44 and
must be carried out in sequence.
Important.
6. After completing the servicing or exchange of components always
test for gas tightness.
7. When work is complete the front panel MUST be correctly refitted,
ensuring that a good seal is made.
Do not operate the boiler if the front panel is not
fitted.
8. If, for any reason, the condensate trap/siphon has been removed
ensure the trap is refilled with water before
reassembling.
9. Check the gas consumption.
10. Check combustion by connecting the flue gas analyser to the flue
gas sampling point as shown in the diagram and measure CO &
CO2.
If the CO/CO2 ratio is greater than 0.004 AND the integrity of the
complete flue system and combustion circuit seals have been
verified and the inlet gas pressure (and gas rate) have been
verified, then contact Ideal Boilers.
11. Complete the service section in the Benchmark Commissioning
Checklist.
Flue Sampling Point
Air Sample
Point
Ensure all caps and seals
are re-fitted after use
General
Please Note: During routine servicing, and after any
maintenance or change of part of the combustion
circuit, the following must be checked:
-
The integrity of the flue system and the flue seals,
-
The integrity of the boiler combustion circuit and
the relevant seals
-
The operational (working) gas inlet pressure at
maximum rate.
-
The gas rate
-
The combustion performance.
Competence to carry out the check
of combustion performance
Please Note:
BS 6798:2009 Specification for
installation and maintenance of gas-fired boilers of
rated input not exceeding 70kW net advises that:
-
The person carrying out a combustion
measurement should have been assessed as
competent in the use of a flue gas analyser and the
interpretation of the results.
-
The flue gas analyser used should be one meeting
the requirements of BS7927 or BS-EN50379-3
and be calibrated in accordance with the analyser
manufacturers requirements, and
-
Competence can be demonstrated by satisfactory
completion of the CPA1 ACS assessment, which
covers the use of electronic portable combustion
gas analysers in accordance with BS7967, Parts 1
to 4.
servicing
i-mini - Installation and Servicing
34 boiler front panel removal / Replacement
35 fan and venturi assembly removal and cleaning
REMOVAL
1. Loosen the two screws retaining the front panel.
2. Pull the two spring clips down to disengage and pull panel
forward and upward and remove.
view from top of boiler
view from bottom of boiler
1
2
3
1. Disconnect the electrical leads from the
fan.
2. Remove the clip from the gas control
valve outlet and ease the pipe upwards
rotate and then ease down to remove.
3. Remove the extended nut on the fan
mounting bracket.
4. Lift off fan and venturi assembly.
5. Undo the two M4 screws and release the
nozzle assembly.
6. Inspect the injector for blockage or
damage.
7. Inspect fan outlet sealing gasket and
replace if necessary.
1
2
3
5
Injector
REPLACEMENT
3. Hook the panel onto the top retaining clips.
4. Push the panel until the 2 bottom spring clips engage ensuring
the 4 control knobs line up with the holes in the front panel.
5. Re-tighten the two retaining screws.
Servicing
i-mini - Installation and Servicing
36 burner removal and cleaning
1. Ensure the sump is fully drained
2. Undo the two screws and remove the sump cover retaining the lower
flue manifold.
3. Lift the manifold to clear the bottom sealing gasket and remove
manifold.
4. Remove the 2 burner front fixing screws and loosen the 2 rear
extended nuts by at least ten turns.
5. Lift off the burner from the combustion chamber. To facilitate the
removal angle the burner as shown.
Important
The burner head is a ceramic plaque construction. Care must be
taken to ensure that the burner is not placed down upon
its face as this may cause damage to the ceramic.
6. Brush off any deposits that may be on the ceramic with a
SOFT brush.
7. Inspect the sealing gasket around the burner for any
signs of damage. Replace as necessary.
1. Pull off the rubber pipe noting the position and flush out any deposits with
clean water.
2. Replace the cleaning plug and refill the siphon with water.
3. Replace the rubber pipe connector with the twin wall seal fitted to the
condensate siphon.
37 cleaning the condensate Trap/Siphon
3
2
2
4
4
5
1
servicing
i-mini - Installation and Servicing
3
38 cleaning the heat exchanger
Note: Ensure the condensate trap/siphon
is fully drained before cleaning. Refer to
Frame 50.
1. Remove ignition and flame detection
electrodes. Refer to Frames 45 & 46.
2. It is advisable to replace the sump cover
prior to the water flush process.
3. Thoroughly flush the heat exchanger
by pouring water into the top of the
combustion chamber ensuring the full top
area is covered.
4. Remove the sump cover and clean loose
deposits from the sump.
5. Inspect the ignition and detection
electrodes. Ensure that they are clean
and in good condition - replace if
necessary.
6. Re-fit the ignition and flame detection
electrodes, ensuring that both earth tabs
are fitted to ignition electrode.
7. Check that the ignition and detection gaps
are correct. Refer to Frames 45 & 46.
1
Ignition Electrode
Flame Detection
Reassemble the boiler in the following order:
1. Ensure that the condensate trap/siphon is full of water.
2. Refit the burner ensuring the sealing gasket is correctly
positioned and free from damage (tighten the 4 fixing screws
in the sequence shown below).
3. Refit the fan / venturi assembly ensuring the retaining tabs
are correctly positioned and the sealing gasket is correctly
positioned and free from damage.
4. Reconnect the fan electrical leads.
5. Remove the sump cover and refit the lower flue manifold as
shown.
39 reassembly
5
1
6. Refit the sump cover.
7. Refit the boiler front panel.
Important. Ensure that the boiler front panel is
correctly fitted and that a good seal is made.
8. Swing the control box back into its working position and
secure.
9. Turn on the gas supply at the gas service cock.
10. Reconnect the electrical supply.
3
2
4
Servicing
i-mini - Installation and Servicing
40 replacement of components
General
When replacing ANY component
1. Isolate the electricity supply.
2. Turn off the gas supply.
3. Remove the boiler front panel. Refer to Frame 39.
4. Release the retaining clip and swing the control box down
into its servicing position.
After replacing ANY component check operation of the
boiler, including gas soundness, gas rate and combustion
test.
Important.
When work is complete, the front panel must be correctly
refitted - ensuring that a good seal is made.
Notes.
1. In order to assist fault finding, the control panel has an
LED diagnostic display.
2. In order to replace components in Frames 55-66 it is
necessary to drain the boiler. Refer to Frame 54.
THE BOILER MUST NOT BE OPERATED without THE FRONT PANEL FITTED
41 fan replacement
1. Refer to Frame 40.
2. Disconnect the electrical leads from the fan.
3. Remove the clip from the gas control valve.
4. Remove the extended nut retaining the fan
mounting bracket.
5. Lift and remove the fan and venturi assembly.
6. Remove the screw and twist venturi anti-
clockwise to remove venturi assembly, noting
the orientation of the venturi in relation to the
fan body.
7. Transfer the venturi assembly to the new fan,
replacing the ‘o’ ring if evidence of damage or
deterioration is visible.
8. Fit the new fan / venturi assembly ensuring the
retaining tabs are correctly positioned and the
fan outlet sealing gasket is correctly positioned
and free from damage. Refit the extended nut.
9. Reassemble the boiler in reverse order, taking
care not to overtighten the screw on the fan
mounting bracket.
10. Check the operation of the boiler. Refer to
Frames 29 & 30.
4
2
4
6
8
Retaining Tabs
3
servicing
i-mini - Installation and Servicing
4
3
3
42 Burner injector replacement
1. Refer to Frame 40.
2. Disconnect the electrical leads from the fan.
3. Remove the clip from the gas valve to venturi pipe
and ease the pipe upwards, rotate and ease down
to remove.
4. Loosen the screw retaining the fan mounting
bracket.
5. Lift and remove the fan and venturi assembly.
6. Remove the 2 injector housing screws.
7. Withdraw the injector housing.
8. Fit the new injector housing complete with injector.
9. Reassemble in reverse order, ensuring that the
new gas seal supplied is located correctly in the
injector housing.
10. Check operation of the boiler. Refer to Frames 29
& 30.
43 burner REPLACEMENT
5
5
6
1. See Frame 42.
2. Refer to Frame 40.
3. Undo the two screws and remove the sump cover.
4. Lift the manifold to clear the bottom sealing gasket and remove
manifold.
5. Remove the 2 front fixing screws and loosen the 2 rear
extended nuts.
6. Lift off the burner from the combustion chamber. To facilitate
the removal angle the burner as shown.
7. Fit the new burner, replacing any damaged or deteriorating
sealing gasket.
8. Reassemble in reverse order. Refer to Frame 42.
9. Check the operation of the boiler. Refer to Frames 29 & 30.
2
4
3
6
Injector
Servicing
i-mini - Installation and Servicing
45 ignition electrode replacement
1. Refer to Frame 40.
2. Remove the burner. Refer to Frame
43.
3. Unplug the ignition lead from the
electrode.
4. Remove the earth lead from the
ignition electrode.
5. Remove the 2 screws holding the
ignition electrode to the combustion
chamber.
6. Remove the electrode.
7. Fit the new ignition electrode, using
the new gasket supplied. Check
dimensions as shown.
8. Reassemble in reverse order.
9. Check the operation of the boiler.
Refer to Frames 29 & 30.
44 return thermistor reNEWAL
1. Refer to Frame 40.
2. Unclip the return thermistor from the return pipe and withdraw it from the
boiler.
3. Disconnect the electrical lead from the thermistor.
4. Reconnect the electrical lead to the new thermistor and reassemble in
reverse order, ensuring that the thermistor is securely fitted to the pipe on the
thermistor locator tab as shown.
5. Check the operation of the boiler. Refer to Frames 29 & 30.
2
Ignition Electrode
3mm
Straight edge
Spark Gap
3.5mm
Thermistor Locator Tab
(with thermistor fitted)
4
servicing
i-mini - Installation and Servicing
46 flame detection electrode replacement
47 Spark generator replacement
1. Refer to Frame 40.
2. Disconnect the leads from the spark
generator.
3. Remove the single M5 Screw
securing the spark generator to the
gas valve mounting bracket.
4. Lift the spark generator up and out of
the bottom retaining moulding.
5. Fit the new spark generator and re-
assemble in reverse order ensuring
that the the earth lead is replaced
6. Check operation of the boiler .Refer
to Frames 29 & 30.
Flame Detection Electrode
12.5mm
Straight edge
1. Refer to Frame 40.
2. Remove the burner. Refer to Frame 43.
3. Unplug the flame detection lead from the
electrode.
4. Remove the 2 screws retaining the detection
electrode.
5. Remove the electrode.
6. Fit the new flame detection electrode, using the
new gasket supplied.
7. Reassemble in reverse order.
8. Check the operation of the boiler. Refer to
Frames 29 & 30.
3
2
2
Servicing
i-mini - Installation and Servicing
48 gas control valve replacement
1. Refer to Frame 40.
2. Unplug the electrical lead connection from the gas
control valve.
3. Disconnect the earth wire.
4. Remove the outlet gas valve clip and slide the
pipe upwards
5. Undo the gas inlet pipe union at the inlet to the
gas valve.
6. Undo the single screw fixing the gas valve to
the mounting bracket and withdraw the valve
forwards.
7. Fit the new gas control valve ensuring that the
O ring and sealing washer are in place and
reconnect gas and electrical connections.
8. Check operation of the boiler. Refer to Frames
29 & 30.
49 diverter valve actuator replacement
To remove the motor:
2. Remove the condensate trap/siphon. Refer to
Frame 37.
3. Disconnect the inline connector block.
4. Place a flat bladed screwdriver in the actuator
slot provided and ease out the actuator.
5. Before replacing the diverter valve actuator
proceed as follows:
a. Re-connect the inline connector
block.
b. Ensure that the switched live to the boiler is
off and that all DHW taps are shut and that
pre-heat is switched off.
c.
Hold the mode knob in the restart position
for more than 10 secs.
d. The display will alternate between “d” and
“U” and the actuator will move into the mid-
position.
e. The divertor valve will initially drive all the
way out, this may cause the spindle to
become detached from the body. If this
occurs simply screw back into the body so
the cycle can continue driving fully in before
going to mid-position.
f.
Replace the actuator into the boiler.
6. Fit the new motor ensuring the arm is correctly
engaged in the metal fork and re-assemble in
reverse order ensuring the condensate trap/
siphon is refilled with water.
7. Check the operation of the boiler. Refer to
Frames 29 & 30.
Note. All spares will be delivered in mid-position
therefore ignore point 5 and proceed to point 6 after
re-connecting the inline connector.
3
5
6
4
2
3
6
servicing
i-mini - Installation and Servicing
5
Ribbon Cable
Connection
5
4
1. Refer to Frame 40.
Note: Ensure condensate trap is fully
drained before removal.
2. Pull off the rubber pipe at the sump
drain.
3. Disconnect the condensate drain pipe.
4. Turn the siphon clockwise to disengage
and lift to remove.
5. Reassemble in reverse order.
6. When reassembling ensure the trap is
full of water.
7. Check operation of the boiler. Refer to
Frames 29 & 30.
50 condensate trap/Siphon replacement
51 mAIN pcb rEPLACEMENT
* Note. that production boiler PCB’s are factory pre-
set to operate for boiler range and output, but when
ordering Primary PCB as a spare, an additional Boiler
Chip Card (BCC) MUST also be purchased for your
specific boiler range and output.
Note. Fit the earth strap provided with the PCB to
your wrist and secure to a suitable earth on the boiler
chassis.
1. Refer to Frame 40.
2. Note the control knob positions.
3. Remove the 2 screws retaining the control box
cover.
4. Carefully lift the 4 retaining clips and remove
control box cover.
5. Unplug all lead connections to the PCB including
the ribbon cable (to facilitate ribbon cable removal,
ease side clips apart and pull upwards), also where
applicable, push the small plastic clip with an
electrical screwdriver to facilitate plug removal.
6. Spring out the two side retaining clips and pull the
PCB upwards to clear the 4 corner retaining posts.
7. Take the new Primary PCB and attach the
appropriate Boiler Chip Card (BCC) to it (this
should correspond to the output of the boiler: 24kW,
30kW. Note. Ensure the correct orientation of
BCC by placing “TOP” side up as shown.
8. Re-connect all plug connections.
9. Reassemble in reverse order.
10. a. Turn power on
b. Displays “8” blue light on/off, “first digit input”,
“second digit input”, “1st letter appliance type”,
i.e. “2”, “4”, “c”
c.
Move knob to required setting (standby,
summer, winter)
Note. If no BCC fitted on non programmed board
“C2” will be displayed. The correct BCC for this
appliance will need to be fitted.
11. Check operation of the boiler. Refer to Frames 29 & 30.
3
3
7
2
6
Servicing
i-mini - Installation and Servicing
Note. Fit the earth strap provided with the PCB to your
wrist and a suitable earth on the boiler chassis.
1. Refer to Frame 40.
2. Remove the main PCB, refer to Frame 51.
3. Unclip the PCB and lift to clear the mounting posts.
4. Fit the new PCB ensuring the 4 potentiometer
spindles line up with the control knobs which must
be in a vertical position.
5. Reassemble in reverse order.
6. Check operation of the boiler. Refer to Frames 29 &
30.
52 User control PCB replacement
3
Potentiometer spindle
Control Knobs (to be in vertical position)
PCB
4
56 DHW FLOW TURBINE Sensor REPLACEMENT
1. Refer to Frame 40.
2. Drain the DHW system. Refer to Frame 54.
3. Pull off the electrical connection.
4. Using a suitable tool, lift and remove the
retaining clip.
5. Use the clip to ease the turbine sensor from its
housing.
6. Re-assemble in reverse order.
7. Check operation of the boiler. Refer to Frame
29 & 30.
4
3
5
servicing
i-mini - Installation and Servicing
1. Refer to Frame 40.
2. Drain the heating system. Refer to Frame 54.
3. Unscrew the pressure gauge and discard.
4. Fit new pressure gauge, using suitable jointing
compound.
5. Refill the boiler.
6. Check operation of the boiler. Refer to Frames
29 & 30.
55 Pressure Gauge Renewal
54 draining the boiler
DOMESTIC HOT WATER CIRCUIT
1. Refer to Frame 40.
2. Close the DHW water isolating valve on the boiler inlet.
3. To drain the domestic hot water circuit: As there is no direct drain for the domestic hot water circuit, depending on the
location of the boiler, opening the lowest hot water tap may drain this circuit. However it must be noted that some residual
water will be experienced during replacement of components.
4. After replacing any component on the boiler, close tap, close the drain valve and open all system isolating valves (re-
pressurise as appropriate)
5. Check operation of the boiler. Refer to Frames 29 & 30.
CENTRAL HEATING CIRCUIT
1. Refer to Frame 40.
2. Close all the CH water isolating valves on the boiler inlet.
3. To drain the primary heat exchanger circuit: Open the drain valve and attach a length of hose to the CH drain point.
4. After replacing any component on the boiler, remove the hose, close the drain valve and open all system isolating valves
(re-pressurise as appropriate).
5. Check operation of the boiler. Refer to Frames 29 & 30.
CH
Flow
DHW
Outlet
Gas
DHW
Inlet
CH
Return
CH Circuit
Drain
Servicing
i-mini - Installation and Servicing
56 safety relief VALVE reNEWAL
57 Pump automatic air vent replacement
1. Refer to Frame 40.
2. Drain the boiler. Refer to Frame 54.
3. Remove the expansion vessel. Refer to Frame 66.
4. Firstly, increase access area by disconnecting the 22mm pipe connection
at top of pump chamber and bottom of heat exchanger and remove pipe.
5. The automatic air vent head is retained in the pump body with a bayonet
connection. The air vent head and float assembly is removed by turning
the head anti-clockwise (viewed from above) and pulling upwards.
6. Reassembly is the reverse of the above. Ensure the air vent head ‘o’ ring
seal is in place when refitting and the new ‘o’ ring is fitted to the return pipe
top connection.
7. Ensure the air vent cap is loose.
8. Refill the boiler. Check for leaks around the new air vent joint.
9. Check the operation of the boiler. Refer to Frames 29 & 30.
5
Dust Cap
1. Refer to Frame 40.
2. Drain the boiler. Refer to Frame 54.
3. Remove the clip on return thermistor. Refer to frame 44.
4. Pull out and remove the clip (positioned behind the safety
valve) retaining the safety valve.
5. Undo the safety valve pipe compression fitting positioned
outside the boiler casing.
6. Lift out the safety valve/pipe assembly.
7. Remove the safety valve pipe and transfer to the new safety
valve.
8. Reassemble in reverse order ensuring the retaining clip is
correctly fitted, the pipe compression fitting retightened and
return thermistor is re-clipped.
9. Refill the boiler. Check operation of the boiler. Refer to
Frames 29 & 30.
3
4
61 DHW FILTER & DHW FLOW REGULATOR CLEANING/REPLACEMENT
1. Refer to Frame 40.
2. Drain the DHW system. Refer to Frame 54.
3. Turn the housing anti clockwise and pull
forward to remove the cartridge.
4. Using a pair of pliers, pull out the plastic
filter/flow regulator.
5. Clean or replace filter as necessary.
6. Reassemble in reverse order.
7. Refill the boiler.
8. Check operation of the boiler. Refer to
Frames 29 & 30.
3
4
servicing
i-mini - Installation and Servicing
1. Refer to Frame 40.
2. Drain the boiler. Refer to Frame 54.
3. Remove condensate trap/siphon. Refer to Frame 50.
4. Remove the diverter valve actuator. Refer to Frame 49.
5. Remove the 2 allen screws securing the plate heat exchanger to the
composite housings.
6. Manoeuvre the plate heat exchanger out of the top LH or centre of the
controls area. Be aware of any water spillage.
7. Fit the new plate heat exchanger, using the new o-rings supplied.
Note. Ensure that the depressions are on the bottom prior to fitting.
8. Reassemble in reverse order.
9. Refill the boiler.
10. Check operation of the boiler. Refer to Frames 29 & 30.
60 dhw plate heat exchanger replacement
61 Pump Head Replacement
1. Refer to Frame 40.
2. Drain the boiler. Refer to Frame 54.
3. Disconnect the electrical lead from the pump.
4. Remove the 4 Allen screws retaining the pump head.
5. Remove the pump head.
6. Fit the new pump head.
7. Reassemble in reverse order.
8. Refill the boiler.
9. Check operation of the boiler. Refer to Frames 29 & 30.
62 Diverter Valve body assembly replacement
To remove the valve body assembly:
1. Refer to Frame 40.
2. Drain the boiler. Refer to frame 54.
3. Remove the condensate trap/siphon. Refer to Frame 50.
4. Remove the electrical plug. Refer to Frame 49.
5. Place a flat bladed screwdriver in the diverter valve motor
body slot provided and ease out the motor Refer to Frame 49.
6. Remove the return thermistor electrical connection. Refer to
Frame 44.
7. Remove the pump electrical connection. Refer to Frame 61 no. 3.
8. Remove DHW Turbine electrical connection. Refer to Frame 56 no. 3.
9. Remove the DHW plate heat exchanger (note orientation).
Refer to Frame 56.
10. Undo the safety valve pipe compression fitting. See No.5 Frame 56.
11. Loosen the nut above pump and rotate the pipe.
12. If required remove expansion vessel connection hose.
Refer to Frame 66.
13. Remove the DHW inlet and CH return connection situated
beneath the boiler.
14. Remove the three torx head screws fixing the return
manifold to the boiler sheet steel base.
15. Lift the manifold assembly and remove from boiler.
16. Twist and remove the DHW manifold.
17. Remove the two diverter valve body fixing screws and
withdraw the diverter valve body assembly.
18. Fit the new diverter valve body assemble and replace the
two fixing screws.
19. Refit the DHW manifold, fit the assembly back to the boiler
and reassemble in reverse order.
19. Refill the boiler. Check operation of the boiler. Refer to
Frames 29 & 30.
14
11
12
13
16
18
17
5
3
4
Servicing
i-mini - Installation and Servicing
62 CH Water Pressure sensor Replacement
63 DHW Filter & DHW Flow Regulator Cleaning / Replacement
1. Refer to Frame 40.
2. Drain the boiler. Refer to frame 54.
3. Pull off the two electrical connections.
4. Using a suitable tool, pull out the metal retaining clip.
5. Carefully withdraw the pressure switch.
6. Fit the new pressure switch and re-assemble in reverse
order.
7. Refill the boiler.
8. Check operation of the boiler. Refer to Frames 29 & 30.
3
4
5
3
1. Refer to Frame 40.
2. Isolate the DHW supply.
3. Turn the housing anti clockwise and
pull forward to remove the cartridge. Be
aware of water spillage.
4. Using a pair of pliers, pull out the plastic
filter/flow regulator.
5. Clean or replace filter as necessary.
6. Reassemble in reverse order.
7. Re-instate the DHW supply and check for
leaks.
8. Check operation of the boiler. Refer to
Frames 29 & 30.
4
1. Refer to Frame 40.
2. Drain down the boiler. Refer to Frame 54.
3. Unplug the electrical lead.
4. Unscrew the thermistor (to facilitate removal a 13mm
socket spanner should be used).
5. Fit the new thermistor using the sealing washer
provided.
6. Reassemble in the reverse order.
7. Refill the boiler.
8. Check the operation of the boiler. Refer to Frames 29 & 30.
64 FLOW Thermistor Replacement
4
3
servicing
i-mini - Installation and Servicing
65 heat engine reNEWAL
Refer also to Frame 5 - ‘Boiler Exploded View’
IMPORTANT
Before starting the removal procedure, protect the gas and electrical controls with a waterproof sheet or plastic bag.
13. Remove the condensate rubber pipe. Refer to Frame 50, no. 2.
14. Remove the two heat exchanger fixing screws.
15. Remove the Heat exchanger, slide out of location bracket.
16. If replacement sump required: Rotate heat exchanger assembly
180º. Place new sump onto heat exchanger, ensuring correct
orientation and seal is in place. Then gently apply pressure to
the base of the sump at each tab fixing point and engage tabs
onto the heat exchanger.
17. Reassemble in reverse order, ensuring the heat exchanger LH
retaining bracket is correctly positioned. Replace any new ‘o’
rings supplied with new heat exchanger and replacing gaskets
or seals if any sign of damage is evident. When replacing the
spring clips located on the return pipe connection, ensure clip is
oriented to correctly match connecting pipe diameters.
18. Ensure the trap/siphon is filled with water. Refer to Frame 54.
19. Refill the boiler. Refer to Frame 23.
20. Check operation of the boiler. Refer to Frames 29 & 30.
1. Refer to Frame 40.
2. Drain the boiler. Refer to Frame 54.
3. Remove the fan / venturi assembly and place on one side.
Refer to Frame 41.
4. Remove the burner and place on one side. Refer to Frame 53.
5. Remove the ignition and detection electrodes. Refer to
Frames 45, 46 & 49.
6. Remove the spark generator. Refer to Frame 47.
7. Remove the gas valve. Refer to Frame 48.
8. Remove the expansion vessel. Refer to Frame 66.
9. Remove the flow and return thermistor. Refer to Frame 44
and 67.
10. Remove the 2 M5 screws retaining the gas valve mounting
bracket and transfer bracket to the new heat exchanger.
11. Undo the pump union nut and remove pipe.
12. Remove the two retaining spring clips and remove pipes.
16
Shown as 180º position
14
11
12
10
9
9
12
Servicing
i-mini - Installation and Servicing
67 Boiler sealing panel seal replacement
66 expansion vessel Recharging & replacement
1. Refer to Frame 40.
2. Remove the old seal from the casing and
thoroughly clean the casing surfaces.
3. Fit the new seal, ensuring the bottom joint
provides an air tight seal.
5. Reassemble in reverse order.
6. Check operation of the boiler. Refer to
Frames 29 & 30.
Note. Ensure that the boiler front panel is
correctly sealed, compressing the seal
to make an airtight joint.
RECHARGING
1. Refer to Frame 40.
2. Remove the charge point cover.
3. Recharge the tank pressure to 0.75 bar.
4. Re-assemble in reverse order
5. Check operation of the boiler. Refer to
Frames 29 & 30.
REPLACEMENT
6. Refer to Frame 40.
7. Drain the boiler CH circuit. Refer to Frame 54.
8. Remove the retaining clip on the vessel water
connection pipe.
9. Support the expansion vessel and unscrew
the 2 screws from the securing clamp,
located on the top of the boiler, and remove.
(Note the position of the bracket on the
vessel)
10. Remove the expansion vessel.
11. Fit the new expansion vessel.
12. Reassemble in reverse order ensuring the
seal is in place.
13. Refill the boiler. Refer to Frame 23
14. Check operation of the boiler. Refer to
Frames 29 & 30.
8
9
Recharge
Point
servicing
FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING
i-mini - Installation and Servicing
68 aLTERNATING ‘L’ AND ‘1’ - FLOW TEMPERATURE OVERHEAT LOCKOUT
Is the Boiler and CH System filled with water and all
isolation and radiator valves open?
yes
Fill and vent the system and open all
isolation valves, then restart boiler
Is the Flow/Return Differential across the Boiler in
excess of 30°C?
no
Check that the Pump is rotating freely. Is
the Differential now below 20°C?
yes
NO
Replace the Pump,
then restart boiler
no
OK, now
restart boiler
yes
69 aLTERNATING ‘L’ AND ‘2’ - Ignition lockout
If the boiler is restart does the
boiler ignite for a short time and
then extinguish?
yes
Is the Gas Pressure available at
the Boiler Inlet (>18 mbar)?
Check the detection electrode
and associated harness for:
continuity, visual condition and
position (Refer to Frame 46).
Check if the condensate pipe is
blocked.
Check flue is installed correctly.
Replace as necessary
no
Check gas supply and
rectify fault
no
yes
Is 215Vdc supply available at the
Gas Valve? (* See note)
yes
Check spark generator and
associated harness for: continuity
and visual condition. (Refer to
Frame 52) Are these functioning
correctly?
yes
Check ignition electrode and
associated harness for: continuity,
visual condition and position.
(Refer to Frame 45) Are these
functioning correctly?
NO
Check siphon and condensate
drain pipe work for blockage and
rectify if necessary. Boiler now
working OK?
Check wiring connection
from gas valve to PCB for
continuity. If the wiring is
OK then replace the PCB
no
Replace Spark
Generator and harness
as necessary
no
Replace Ignition
Electrode and
associated harness as
necessary
no
Replace Gas Valve
YES
* Note: due to the wave form of the rectified voltage, the reading will vary depending on the type of meter used to measure the
value. In general terms a reading greater than 150V indicates that the correct voltage is supplied to the gas valve.
Unplug gas valve. Is resistance
between outside pins 4KΩ (±2)?
yes
Replace Gas Valve
no
Restart PROCEDURE - To restart boiler, turn mode knob to restart position and immediately turn knob back to required setting.
Restart PROCEDURE - To restart boiler, turn mode knob to restart position and immediately turn knob back to required setting.
Check the Return Thermistor
(Refer to Frame 44)
Check resistance using a suitable multimeter
connected across the thermistor’s terminal pins
At 25 oC expect
9,700 - 10,300
Ohms
At 60 oC expect
2,400 - 2,600
Ohms
At 85 oC expect
1,000 - 1,100
Ohms
FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING
i-mini - Installation and Servicing
71 aLTERNATING ‘L’ AND ‘6’ - False Flame Lockout
Restart the boiler, does Boiler Work OK?
NO
Check routing and integrity of internal boiler
wiring is OK. Check condition of Flame Sense
Electrode and replace if deteriorated.
Separate the flame detection electrode in-line
connector. Is there continuity between the terminals
pins connected to the electrode?
YES
Replace Flame Detection Electrode
yes
NO
Check routing and integrity of internal boiler wiring.
Restart PROCEDURE - To restart boiler, turn mode knob to restart position and immediately turn knob back to required setting.
70 aLTERNATING ‘L’ AND ‘5’ - 5 restarts within 15 mins
Turn power off and on
72 aLTERNATING ‘F’ AND ‘1’ - Low Water Pressure
Are the Boiler and CH System filled with water and
all isolation and radiator valves open (check pressure
gauge is between 1 to 1.5 bar)?
NO
Fill and vent the system and open all
isolation valves
YES
Are connections on water pressure sensor secure?
NO
Re-fit connections
Replace water pressure sensor
YES
FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING
i-mini - Installation and Servicing
73 aLTERNATING ‘F’ AND ‘2’ - Flame Loss
Does the boiler ignite for a short
time and then extinguish?
yes
Is the Gas Pressure available at
the Boiler Inlet (18 mbar)?
Check the detection electrode and
associated harness for: continuity,
visual condition and position (Refer
to Frame 46). Check if condensate
pipe is blocked. Check if flue is
blocked.
Replace as necessary
no
Check gas supply and
rectify fault
no
yes
Is 215Vdc supply available at the
Gas Valve while the flame is on?
(* See note)
yes
Check spark generator and
associated harness for: continuity
and visual condition. (Refer to
Frame 47) Are these functioning
correctly?
Check ignition electrode and
associated harness for: continuity,
visual condition and position.
(Refer to Frame 45) Are these
functioning correctly?
yes
Check siphon and condensate drain pipe
work for blockage and rectify if necessary.
Boiler now working OK?
Check wiring from gas
valve to PCB for continuity.
If the wiring is OK then
replace the PCB
no
Replace Spark Generator
and Harness as necessary.
no
Replace Ignition Electrode and
associated harness as necessary
no
Replace Gas Valve
no
* Note: due to the wave form of the rectified voltage, the reading will vary depending on the type of meter used to measure the
value. In general terms a reading greater than 150V indicates that the correct voltage is supplied to the gas valve.
74 aLTERNATING ‘F’ AND ‘3’ - Fan Fault
Does the wiring from the Fan to the PCB have
secure connections at both ends and has not
deteriorated? Does the wiring have continuity?
yes
Rectify Wiring &
connections
Is there 230Vac at the Blue and Brown connections
to the 3 way connection on the Fan?
NO
Replace PCB
NO
yes
Replace Fan
YES
FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING
i-mini - Installation and Servicing
75 aLTERNATING ‘F’ AND ‘5’ - Return Thermistor Fault
Remove the Return Thermistor from the CH Return
Pipe and disconnect the wires.
Check the resistance using a suitable multimeter
connected across the thermistor’s terminal pins.
At 25 oC expect
9,700 - 10,300
Ohms
At 60 oC expect
2,400 - 2,600
Ohms
At 85 oC expect
1,000 - 1,100
Ohms
Is the Thermistor value correct?
Is there continuity between the PCB and
the Thermistor?
Fit a new Thermistor
no
Check and replace
wiring as necessary
YES
NO
YES
Replace PCB
76 aLTERNATING ‘F’ AND ‘6’ - Outside sensor fault
Disconnect the wires to the outside sensor.
Check the resistance using a suitable multimeter
connected across the Outside Sensor’s terminal pins.
At 0 oC
expect
31,000 - 35,000
Ohms
At 15 oC expect
15,000 - 16,500
Ohms
At 30 oC expect
7,700 - 8,500
Ohms
Is the Outside Sensor value correct?
yes
Is the wiring securely connected between the
incoming terminal block boiler connection of the
Outside Sensor and the PCB?
Replace PCB
Fit a new Outside Sensor
no
Securely connect the wiring at the
Terminal Block and the PCB
Is the wiring securely connected at both the boiler and
Outside Sensor?
yes
no
Securely connect the wiring at both the
boiler and Outside Sensor
no
yes
77 aLTERNATING ‘F’ AND ‘7’ - low mains voltage
Contact electricity provider
FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING
i-mini - Installation and Servicing
79 aLTERNATING ‘F’ AND ‘4’ - Flow Thermistor Fault
Disconnect the wiring from the Flow Thermistor
Check the resistance using a suitable multimeter connected
across the Thermistor’s terminal pins.
At 25 oC expect
9,700 - 10,300
Ohms
At 60 oC expect
2,400 - 2,600
Ohms
At 85 oC expect
1,000 - 1,100
Ohms
Is the Thermistor value correct?
yes
Is the wiring securely connected to the low voltage 6 way
connector at the front left hand side of the PCB?
yes
Replace PCB
Fit a new Thermistor
no
Securely connect the wiring to the PCB
Is the wiring securely connected to the Flow Thermistor
(located in the top of the Heat Exchanger?)
yes
no
Securely connect the wiring to the Flow
Thermistor
no
78 aLTERNATING ‘F’ AND ‘9’ - PCB Fault
Replace PCB -
Ensure that the BCC (boiler chip card - small plastic part) is
fitted to the PCB otherwise replace PCB.
80 aLTERNATING ‘c’ AND ‘2’ - BCC fault (Boiler CHIP card)
Is the correct BCC for the boiler securely inserted into the
slot at the front left of the PCB?
(identified by the label on the BCC)
yes
no
Securely insert the correct BCC for the boiler
into the PCB and after switching power on and
‘c0’ being shown, restart boiler.
Note. Ensure the correct orientation of BCC by
placing “TOP” side up.
Replace the BCC with a new BCC (that is correct for the
boiler). After switching power on and ‘c0’ being shown,
press restart. Is ‘c2’ still shown?
Replace PCB
YES
Restart PROCEDURE - To restart boiler, turn mode knob to restart position and immediately turn knob back to required setting.
FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING
i-mini - Installation and Servicing
81 aLTERNATING ‘c’ AND ‘0’ - low mains voltage
Restart Boiler
Restart PROCEDURE - To restart boiler, turn mode knob to restart position and immediately turn knob back to required setting.
82 nO ch oPERATION BUT hw WORKS ok
Is the mode knob in the Winter position?
yes
no
Move the mode knob to the Winter position
Are the Timer and the Room Thermostat switched
on?
yes
no
Switch the Timer and Room Thermostat On
Are the Radiator Valves Open?
yes
no
Open the Radiator Valves
Is there 230Vac at (A)?
yes
no
There is no Voltage from the Timer/Room Stat. This
is not boiler fault. Ensure Voltage is supplied to
boiler by rectifying external wiring.
Replace the Divertor Valve
A
FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING
i-mini - Installation and Servicing
84 No Display
Is there 230Vac to the boiler at L and N?
yes
no
Supply power to the boiler
Is the wiring from the terminal block to the Main PCB
connected securely?
yes
no
Connect the wiring from the terminal block to the
Main PCB securely.
Is the ribbon cable from the main PCB to the User
Interface PCB connected securely?
no
Connect the ribbon from the main PCB to the User
Interface PCB securely
yes
Replace the
User Interface
PCB
Is ribbon cable damaged?
yes
Replace ribbon cable
no
N
L
83 nO HW BUT CH ON
Does the display show “d” when a tap is on?
no
no
yes
Are the flow rates correct as per Frame 2.
Is the wiring between the PCB and the diverter
valve motor connected?
yes
yes
Check diverter head fully engaged and clip
secured onto waterset.
yes
Is diverter stuck in the CH position
yes
Check and replace diverter valve actuator head.
Is Boiler DHW OK?
NO
Change diverter valve motor
no
Adjust flow rates to achieve 35º
temp rise and check filter fitted in
turbine is not blocked with debris.
no
Reconnect wiring or
replace wiring harness if
no continuity.
no
Re-engage diverter
head and secure clip to
wateset
no
Replace PCB
Is hot and cold pipework crossed?
Is the wiring connected
between PCB and DHW
sensor?
Remove the turbine, and
check for debris in the
turbine & filter. Replace
turbine if necessary. Is
DHW OK?
YES
NO
Re-connect wiring
NO
Replace turbine sensor
i-mini - Installation and Servicing
When replacing any part on this appliance use only spare parts that you can be assured conform to the safety and performance
specification that we require. Do not use reconditioned or copy parts that have not been clearly authorised by Ideal. Failure to do so
could affect safety or performance of this appliance.
Comprehensive spares parts information and details of approved Ideal Parts Distributors are available on www.idealparts.com
Our Parts team are also available to help with your Ideal Spare Parts enquiries on 01482 498665.
When calling, and to ensure we can provide you with the most accurate parts information, please ensure you have the following to
hand;
-
Boiler Model
-
Appliance GC Number
-
Boiler Serial Number
i-mini - Installation and Servicing
© Heating and Hotwater Industry Council (HHIC)
www.centralheating.co.uk
Benchmark Commissioning and
Servicing Section
It is a requirement that the boiler is installed and commissioned to the
manufacturers instructions and the data fields on the commissioning checklist
completed in full.
To instigate the boiler guarantee the boiler needs to be registered with the
manufacturer within one month of the installation.
To maintain the boiler guarantee it is essential that the boiler is serviced annually
by a Gas Safe registered engineer who has been trained on the boiler installed.
The service details should be recorded on the Benchmark Service Interval
Record and left with the householder.
* All installations in England and Wales must be
to Local Authority Building Control (LABC) either directly or through a
Competent Persons Scheme. A Building Regulations Compliance
will then be issued to the customer.
www.centralheating.co.uk
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
GAS BOILER SYSTEM COMMISSIONING CHECKLIST
CONTROLS
Programmable room thermostat
Optimum start control
Combination Boiler
Fitted
Fitted
Fitted
Automatic bypass to system
Fitted
Boiler interlock
ALL SYSTEMS
Yes
Yes
CENTRAL HEATING MODE
OR
mbar
OR
mbar
Central heating return temperature
COMBINATION BOILERS ONLY
Yes
Yes
DOMESTIC HOT WATER MODE
OR
mbar
OR
mbar
Cold water inlet temperature
Yes
Temperature
CONDENSING BOILERS ONLY
Yes
ALL INSTALLATIONS
AND
² Ratio
AND
² Ratio
Yes
Yes
Yes
Yes
www.centralheating.co.uk
* All installations in England and Wales must be
to Local Authority Building Control (LABC) either directly or through a
Competent Persons Scheme. A Building Regulations Compliance
will then be issued to the customer.
© Heating and Hotwater Industry Council (HHIC)
www.centralheating.co.uk
It is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed.
Service Provider
SERVICE RECORD
SERVICE 01
AND
² %
(Where Possible)
AND
² %
Signature
SERVICE 02
AND
² %
(Where Possible)
AND
² %
Signature
SERVICE 03
AND
² %
(Where Possible)
AND
² %
Signature
SERVICE 04
AND
² %
(Where Possible)
AND
² %
Signature
SERVICE 05
AND
² %
(Where Possible)
AND
² %
Signature
SERVICE 06
AND
² %
(Where Possible)
AND
² %
Signature
SERVICE 07
AND
² %
(Where Possible)
AND
² %
Signature
SERVICE 08
AND
² %
(Where Possible)
AND
² %
Signature
SERVICE 09
AND
² %
(Where Possible)
AND
² %
Signature
SERVICE 10
AND
² %
(Where Possible)
AND
² %
Signature
i-mini - Installation and Servicing
FLOWCHART FOR CO LEVEL AND COMBUSTION RATIO
CHECK ON COMMISSIONING A CONDENSING BOILER
Important Preliminary Information on Checks
The air gas ratio valve is factory-set and must not be adjusted DURING COMMISSIONING.
If the boiler requires conversion to operate with a different gas family (e.g. conversion from natural gas to LPG) sepa-
rate guidance is provided with the conversion kit supplied and this must be followed.
PRIOR TO CO LEVEL AND COMBUSTION RATIO CHECK
The installation instructions must have been followed, gas type verified and gas supply pressure / gas rate checked as
required prior to commissioning.
As part of the installation process, ESPECIALLY WHERE A FLUE HAS BEEN FITTED BY PERSONS OTHER THAN
THE BOILER INSTALLER, visually check the integrity of the whole flue system to confirm that all components are
correctly assembled, fixed and supported. Check that maximum flue lengths have not been exceeded and all guidance
has been followed (e.g. Gas Safe Register Technical Bulletin (TB) 008 where chimney/flues are in voids).
The ECGA should be of the correct type, as specified by BS 7967.
Prior to its use, the ECGA should have been maintained and calibrated as specified by the manufacturer. The installer
must have the relevant competence for use of the analyser.
Check and zero the analyser IN FRESH AIR in accordance with the analyser manufacturer’s instructions.
KEY:
CO = carbon monoxide
CO2 = carbon dioxide
O2 = oxygen
Combustion Ratio = The CO reading measured in ppm divided by the CO2 reading first converted to ppm
ppm = parts per million
GS(I&U)R = Gas Safety (Installation and Use) Regulations
*Setting to Minimum Rate:
1. Turn the CH temperature control knob into the 10 O’clock position.
2. Create a CH demand by ensuring that the system controls are requesting heat and the boiler Mode
Knob is in the Winter Position.
3. Within an overall time of 3 seconds, turn the CH temperature control knob fully clockwise, back to
10 O’clock and then fully clockwise again.
4. “S” will be shown on the display and the boiler output will be reduced to minimum
5. The boiler will remain at minimum rate for 5 minutes before reverting to normal operation
i-mini - Installation and Servicing
No
No
Yes
No
No
Yes
Yes
Yes
Yes
No
Is
CO level less
than 350ppm AND CO/CO2
ratio less than
0.0040?
Turn off Appliance and Call Ideal Technical Helpline
The appliance must not be commissioned until problems
are identified and resolved. If commissioning cannot be
fully completed, the appliance must be disconnected from
the gas supply in accordance with GS(I&U)R. NOTE:
Check and record CO level and combustion ratio at both
maximum AND minimum rate before contacting Ideal.
Is
CO level less
than 350ppm AND CO/CO2
ratio less than
0.0040?
Set Boiler to Maximum Gas Rate
In accordance with boiler instructions,
set boiler to operate at maximum rate
(full load condition). Allow sufficient
time for combustion to stabilise.
Note. Do not insert analyser probe
during this period to avoid possible
flooding of sensor.
Check CO level and Combustion Ratio
at Maximum Gas Rate
With boiler still set at maximum gas rate,
insert analyser probe into flue gas
sampling point. Allow readings to stabilise
before recording.
Set Boiler to Minimum Gas Rate
(*see opposite page)
In accordance with boiler instructions, set boiler to
operate at minimum rate (to minimum load condition).
Allow sufficient time for combustion to stabilise.
Verify Flue Integrity
Analyser readings indicate that combustion products and inlet air
must be mixing. Further investigation of the flue is therefore required.
Check that flue components are assembled, fixed and supported as
per instructions. Check that flue and flue terminal are not obstructed.
Check that no seals, e.g. Those on flue extensions, have
been displaced during installation. Rectify if necessary.
Turn off appliance and call Ideal Technical Helpline for advice
The appliance must not be commissioned until problems are identified
and resolved. If commissioning cannot be fully completed, the appliance
must be disconnected from the gas supply in accordance with GSIUR.
Carry Out Flue Integrity Check Using Analyser
Insert analyser probe into air inlet test point (where available) and allow
readings to stabilise.
Note. Where no air inlet test point is provided then a flue integrity check with
the analyser is not possible. The installer should verify that flue integrity has
been visually checked in accordance with the “Prior to CO level and
combustion ratio check” (see opposite page) before proceeding to the
“check CO level and combustion ratio at maximum rate” stage below.
Is
O2 more than or
equal to 20.6% OR CO2
less than or equal to
0.2%?
Is
CO level less
than 350ppm AND CO/CO2
ratio less than
0.0040?
Is
O2 more than or
equal to 20.6% OR CO2
less than or equal to
0.2%?
Boiler is Operating Satisfactorily
No further actions required.
Ensure test points are capped, boiler case is correctly replaced and all
other commissioning procedures are completed. Complete Benchmark
Checklist, recording CO and combustion ratio readings as required.
Check CO and Combustion Ratio at Minimum Gas Rate
With boiler set at minimum rate, insert analyser probe into flue
gas sampling point. Allow readings to stabilise before recording.
Start
The code of practice for the installation,
commissioning & servicing of central heating systems
Ideal Installer/Technical Helpline: