Ambirad Vision VS Assembly, Installation & Servicing
Read Online
Read the Ambirad Vision VS Assembly, Installation & Servicing online using the built-in PDF viewer.
Text of the manual
ASSEMBLY, INSTALLATION & SERVICING
MANUAL FOR AMBIRAD VISION® VS
RANGE OF RADIANT TUBE HEATERS
INDEX
Section
Introduction and Document Index
Installation Requirements -------------------------------------------------1
Assembly Instructions------------------------------------------------------2
Commissioning Instructions----------------------------------------------3
Servicing Instructions ------------------------------------------------------4
Spare Parts-------------------------------------------------------------------5
Fault Finding Guide --------------------------------------------------------6
Replacing Parts -------------------------------------------------------------7
User and Operating Instructions ----------------------------------------8
WARNINGS
AmbiRad equipment must be installed and maintained in accordance with the relevant
provisions of the Gas Safety (Installations and Use) Regulations 1998 for gas fired products.
Due account should also be taken of any obligations arising from the Health and Safety at
Works Act 1974 or relevant codes of practice. In addition the installation must be carried out
in accordance with the current IEE wiring regulations (BS 7671), BS 6896:2005 (Industrial &
Commercial) and any other relevant British Standards and Codes of Practice by a qualified
installer. All external wiring MUST comply with the current IEE wiring regulations.
1 Installation Requirements
1.1 Health & Safety
1.2 Model Definitions
1.3 Heater Suspension
1.4 Wall Mounting
1.5 Herringbone Systems
1.6 Clearance to Combustibles
1.7 Gas Connection & Supply Details
1.8 Electrical Connections
1.9 Ventilation Requirements
1.9.1 Unflued Radiant Heater
Mechanical Ventilation
Natural Ventilation
1.9.2 Flued Radiant Heater
Mechanical Ventilation
Natural Ventilation
1.10 Flue & Combustion Air Inlet Options
1.11 Technical Details
2 Assembly Instructions
2.1 Tools Required
2.2 Assembly Notes
2.2.1 Tubes
2.2.2 Turbulators
2.2.3 Brackets
2.2.4 U Bends
2.2.5 Couplers
2.2.6 Reflectors
2.2.7 End Caps
2.2.8 Burner Assembly
2.2.9 Fan Assembly
2.2.10 DL Condensate Box Assembly
2.2.11 HB Damper Assembly
2.2.12 HB Manifold Assembly
2.2.13 Detailed Assembly Drawings
3 Commissioning Instructions
3.1 Tools Required
3.2 Balancing the Herringbone System
3.3 Balancing a DL System
3.4 Commissioning Chart for VS Unitary Heaters
4 Servicing Instructions
4.1 Tools Required
4.2 Burner Description
4.3 Burner Removal
4.4 Burner Gas Injector Servicing
4.5 Burner Head and Electrode Servicing
4.6 Combustion Fan Assembly Induced Burner
4.7 Combustion Fan Assembly Forced Burner
4.8 Radiant Tube Servicing
4.9 Reflector Servicing
4.10 Inspection of Flue
4.11 Re-commissioning after Service
5 Spare Parts
6 Fault Finding Guide
7 Replacing Parts
7.1 Burner Controller Replacement
7.2 Air Pressure Switch Replacement
7.3 Gas Valve Replacement
8 User and Operating Instructions
8.1 To Start Heater
8.2 To Switch Off Heater
8.3 Routine Maintenance Between Service Intervals
8.4 Frequency of Servicing
at height regulations are adhered to at the
mounting heights specified.
PLEASE READ this document prior to
installation to familiarise yourself with the
components and tools you require at the various
stages of assembly.
All Dimensions shown are in mm unless
otherwise stated.
The manufacturer reserves the right to alter
specifications without prior notice.
Welcome to the new range of high efficiency
AmbiRad Vision radiant tube heaters. Local
regulations may vary in the country of use and
it is the installers responsibility to ensure that
such regulations are satisfied
All installation, assembly, commissioning and
service procedures must be carried out by
suitable qualified competent persons to the
statutory regulations in the country of use.
When assembling, installing, commissioning
and servicing is undertaken on radiant tube
heaters specified in these instructions, due care
and attention is required to ensure that working
1. Installation Requirements.
Isolate any electrical supply to the
heater and controller before proceeding.
obligations arising from the Health and Safety at
Works Act 1974 or relevant codes of practice. In
addition the installation must be carried out in
accordance
with
the
current
IEE
wiring
regulations (BS 7671), BS 6896:2005 (Industrial
& Commercial) and any other relevant British
Standards and Codes of Practice by a qualified
installer. Isolate all electrical supplies to the
heater & controller before proceeding.
1.1
Health and Safety
AmbiRad
heaters
must
be
installed
in
accordance with the relevant provisions of the
Gas Safety (Installations and Use) Regulations
1998. Due account should also be taken of any
For your own safety we recommend the use of
safety boots and leather faced gloves when
handling sharp or heavy items. The use of
protective eye wear is also recommended.
1.2
Model Definitions
VSUT = AmbiRad Vision U Tube heater with
painted induced burner, stainless steel reflector
& end caps.
VSUH = AmbiRad Vision U Tube heater in
Herringbone
manifold
configurations
with
painted induced burner, stainless steel reflector
& end caps.
VSLI = AmbiRad Vision Single Linear heater
with painted induced burner, stainless steel
reflector & end caps.
VSLF = AmbiRad Vision Single Linear heater
with painted Forced burner, stainless steel
reflector & end caps. (Nat Gas ONLY)
VSLH = AmbiRad Vision Linear heater in
Herringbone
manifold
configurations
with
painted induced burner, stainless steel reflector
& end caps.
VSDL = AmbiRad Vision Double Linear heater
with painted induced burner, stainless steel
reflector & end caps.
VSAUT, VSAUH, VSALI, VSALF, VSALH &
VSADL = As above except: aluminised reflector
with no end caps.
1.3
Heater Suspension
See fig 3b. Attachment to the heater
support lugs should be made by a ‘speed
link’, D shackle or in the case of drop rods, a
closed formed hook. The hanging attachments
to overhead steelwork etc. must be purpose
made to good sound engineering practice or of
a proprietary type fixing. They must be
adequately fixed and designed to carry the
whole weight of the heater. In the event of
suitable roof steelwork being unavailable,
additional steelwork should be fitted to enable
vertical hangers to be used for suspending the
heaters.
These methods are illustrated in Figure 3.b. If
there are any doubts as to the strength or
suitability of roof steelwork to which heaters are
to be suspended, please refer to a Consultant,
Architect or owner of the building. The
recommended mounting heights for AmbiRad
heaters are given in the table above.
1.4
Wall Mounting
These radiant tube heaters can be wall mounted
using the appropriate bracket (AmbiRad part no
WMB-13-22-38).
When using the wall mounting brackets the
heater must be inclined at an angle between 30°
and 45°.
Table 1 Angle Mounting
Figure 3.a. Angle Mounting using the Wall
mounting bracket
U Tube
Linear
Heater
Size
Required
angle
Chain
length
Eyebolt
position
Chain
length
Eyebolt
position
15 - 30
30-35°
10 links
2
7 links
1
45°
13 links
2
9 links
1
35 - 50
30-35°
12 links
3
8 links
1
45°
16 links
3
10 links
1
Model
Horizontal
Inclined / wall
mounted
15
4.0 - 5.0m
3.5 - 4.5m
20
4.5 - 7.0m
3.5 - 5.0m
25
5.0 - 8.0m
4.0 - 5.0m
30
5.5 - 9.0m
4.0 - 6.0m
35
6.0 - 10.0m
4.5 - 6.5m
40
6.5 - 11.0m
5.0 - 7.0m
45
7.0 - 12.0m
5.5 - 8.0m
50
7.5 - 13.0m
6.0 - 9.0m
Recommended Mounting Height (m)
1.
2. 3.
E
Figure 3.b. Recommended Methods of Heater Suspension.
Where chain supports have an
angle of inclination greater
than 15° an equal and opposite
support is recommended.
Vertical suspension chain ideal.
Where supports are inclined,
maximum recommended angle
of inclination is 15°.
Shackle method of
attachment. Pin must
be tightened by pliers.
Drop rod with formed hook.
note. hook or eyebolt must
be closed tight.
15° max.
ON U TUBE VARIANTS THE HEATER SHOULD SLOPE DOWNWARDS TOWARDS THE RETURN BEND AND ON
LINEAR VARIANTS SHOULD SLOPE DOWNWARDS TOWARDS BURNER BY APPROX. 10mm FOR BOTH
HORIZONTAL AND WALL MOUNTED INSTALLATIONS.
Typical Speedlink attachment.
* These angles to
be equal and not
more than 45°.
Vertical or inclined
suspension on this
plane is acceptable.
*
*
U TUBE SUSPENSION
*
*
** Alternative suspension
for Linear via single chain.
SINGLE LINEAR SUSPENSION
**
Herringbone systems (UH & LH).
The manifold system should be arranged to fall
slightly in the direction of the vacuum fan. This
ensures that any condensation formed in the
manifold on cold start and cool down is not
trapped or allowed to drain back into the heater
unit. This allows condensate to flow towards
the condensate trap located at the vacuum fan
end of the manifold system. (See figure 4a
below for condensate trap arrangement).
The manifold should be supported by chain,
stainless steel flexible wire, or other flexible
means from the roof structure to allow
movement caused by thermal expansion. For
100mm
diameter
manifold
the
maximum
distance between supports is 2.4m and 3.0m
for 150mm diameter.
Flexible couplers (supplied by AmbiRad) must
be inserted within the manifold system to allow
linear expansion to take place and prevent
stress and strain on the system.
The exhaust flue should be adequately
supported from the building structure and
installed
in
accordance
with
the
British
Standard Code of Practice BS 5440: Part
1:2000 – Installation and maintenance of flues
and ventilation for gas appliances of rated input
not exceeding 70kW net (1st, 2nd and 3rd
family gases)
A condensate trap assembly must be provided
at the end of the manifold system before the
hot gas vacuum fan.
The
minimum
depth
of
the
condensate
collecting chamber shall be 305mm and the
minimum depth of the condensate drain pipe
‘U’ trap shall be 457mm deep. The end cap of
the collecting chamber to be fitted with a flush
flanged tank connector. Any protrusion to be
removed leaving the inside flush with end cap.
The end cap should be sealed with silicon
jointing compound and pop riveted in position.
All condensate drains from the flue collecting
chamber to the disposal point shall be
corrosion-resistant material of not less than
22mm internal diameter. Copper or copper
based alloy shall not be used for condensation
drains.
See
reference
BS
6896:2005.
Condensate drain pipes must be protected
against the effects of freezing.
The Type ‘0’ and Type ‘2’ vacuum fans have
bottom horizontal discharge with rectangular
connections (flanged on the type 0) and must be
mounted in that position by means of the fan
support stool onto a suitable platform or
brackets fixed to the building structure.
For details of the fan outlet fixing holes see
below.
305.0
457.0
Figure 4a.
Condensate
Trap Arrangement
Figure 4c. Type ‘O’ Fan Outlet Dimensions
Figure 4d.
Type 2 Fan
Outlet Dimensions
190
213
Figure 4b. Collecting Chamber Arrangement
The manifold must be supported either
side of the flexible coupler.
For details of fan mounting bracket and fixing
down holes see figure 5.
Figure 4e. Conventional Flue Arrangement
Roof Exit.
Figure 4f. Conventional Flue Arrangement
Wall Exit.
Figure 4g. Stainless Steel Telescopic
Through The Wall Arrangement (available for
Type ‘O’ and Type ‘2’ fans)
Where a conventional flue is to be installed,
AmbiRad supply an aluminium transformation
piece to which a 150mm (6ins) diameter flue
must be attached.
The length of flue which may be connected to
the fan outlet must be adequately supported
from the building structure.
Figure 4h. Typical Low Fan Arrangement
305.0
Running Current (amps)
2.6
0.8
Voltage
230V 1ph
230V 1ph
Figure 5. Vacuum fan mounting details (Type ‘O’ fan illustrated)
Hole Centers
Hole Centers
Figure 6. Typical Herringbone system
Dos and don'ts of herringbone system
Dos
Don’ts
Check for corrosive industrial process in
proposed building - e.g. cleaning, electroplating,
printers using sugar powder etc.
Install system with extra 90° bends without asking
AmbiRad if the system will operate correctly.
Drain all flue ducts and seal all joints.
Install flue with vertical rise without firstly fitting a
drain point at it’s lowest level.
Secure joints with pop rivets as well as sealing
compound (refer to assembly instructions).
Fit fan with outlet vertical or with top horizontal
discharge.
Fit drain traps before and after fans (see figs 4).
Fit damper upside down or on it’s side.
Fit
expansion
joints
before
fan
and
at
intermediate points on the herringbone system.
Fit damper wrong way round. (see fig14 page 31.)
Run drains in galvanised steel or plastic pipes.
Follow guide to combined flue heating system.
Check design pressure drop.
Run drains in copper or mild steel pipework.
Clearance to Combustibles.
The minimum clearances to combustible materials are given in the tables below. These
minimum distances MUST be adhered to at all times.
Figure 7.a Diagram illustrating the clearance to combustibles (U tube shown)
VSUT / VSAUT
15/20
25/30
35/40
45/50
Above Reflector (VSUT NG ONLY)
A
180
180
180
180
Above Reflector
(VSAUT and ALL LPG ONLY)
A1
280
280
280
280
Above Burner / Heater Outlet
B
500
500
500
500
To the Sides
C
900
1000
1100
1100
Below Tubes
D
1500
1700
2100
2100
Horizontally from Heater Outlet
(UNFLUED)
E
1200
1200
1200
1200
End Wall (VSUT ONLY)
F
500
500
500
500
A/A1
C
E
F
D
B
VS(A)LI; VS(A)LF; VS(A)LH; VS(A)DL
15/20
25/30
35/40
45/50
Above Reflector (VSLI/LF/LH/DL NG
ONLY)
A
150
150
150
150
Above Reflector (VSALI/LF/LH/DL NG
and ALL LPG ONLY)
A1
280
280
280
280
Above Burner
B
500
500
500
500
To the Sides
C
750
750
750
750
Below Tubes
D
1500
1700
2100
2100
Horizontally from Heater Outlet
(UNFLUED)
E
1200
1200
1200
1200
End Wall
F
500
500
500
500
Above Heater Outlet (FLUED)
G
150
150
150
150
Above Heater Outlet (UNFLUED)
G1
500
500
550
550
Figure 7.b Diagram illustrating the clearance to combustibles (VSLF shown)
A/A1
B
E
F
G/G1
C
C
D
to the heater not to apply excessive turning
force to the internal controls.
A flexible hose is installed to allow safe linear
expansion of the heater without creating undue
stress on the gas supply pipe work. It is
therefore important that a tested and certified
hose assembly made to ISO 10380 2003,
supplied with ½” BSP female cone seat
adapters, is installed as per these instructions.
It is also important to ensure that expansion is
taken up in the body of the flexible hose, and
not on its attachment to the pipe work. The cone
seat adapter supplied on one end of the flexible
gas hose provides a `swivel` action, and must
be fitted on the burner using a ½” BSP barrel
nipple to provide ease of disconnection for
future servicing. This assumes that the heater
and fixed gas supply to the isolating valve have
been installed.
The installation layout described below is
the only method recommended by the
institute of gas engineers, the hose
manufacturer, and AmbiRad and must only be
carried out by a qualified/competent gas
engineer.
fig.a
fig.c
Arrow denotes
direction of
expansion.
Depending on the specific installation, the
flexible gas hose may be routed to the gas
cock at any of the following angles in relation to
the burner:
Vertical
(fig.a)
45° angle
(fig.b)
90° angle
(fig.c)
Any other position in between these angles is
acceptable.
A clearance distance ‘x’ of min 200mm
must be observed to allow side door
access .
Care must be taken to observe the minimum
pipe
bend
diameter
(minimum
250mm,
maximum 350mm) & pipe expansion distance
(minimum 30mm, maximum 70mm) as shown in
fig.e.
Maximum bend diameter for the 1000mm
hose is 450mm.
The correct installation as shown will allow
for approx 100mm of movement due to
expansion.
x
x
fig.b
fig.d
1.7
Gas Connection and Supply
Before installation, check that the local
distribution conditions, nature of gas
and pressure, and adjustment of the
appliance are compatible.
A competent or qualified engineer is required to
either install a new gas meter to the service
pipe or to check that the existing meter is
adequate to deal with the rate of gas supply
required. Installation pipes should be fitted in
accordance with BS 6896:2005, so that the
supply pressure, as stated in Table 4 will be
achieved. It is the responsibility of the
competent engineer to ensure that other
relevant Standards and Codes of Practice are
complied with in the country of installation.
Pipes of smaller size than the heater inlet gas
connection must not be used. The complete
installation must be tested for soundness as
described in the country of installation.
The gas union service cock MUST be
fitted in the gas supply close to the
heater, but not onto the burner itself.
Take care when making a gas connection
fig.e
300 +/- 50mm
Burne
50 +/- 20mm
Figure 8. Correct Installation of Flexible Gas Connection
This appliance must be earthed.
Supply 230V 50Hz single phase.
Standard heater 116W. Herringbone 16W.
Current rating 0.55 amp max (inductive).
Fuse: external 3 amp.
All electrical work should be carried out to
IEE standards by a competent electrician.
The electrical connection to the heater is made
by means of a three pin plug-in power
connector. Live, neutral and earth connections
should be made via a flexible supply cable to
the power connector and routed clear of the
heater or tubes.
The flexible supply cables should be of 0.5mm²
and comply with BS 6500:2000. The
wires in the mains lead are coloured
in accordance with the following
code: Green & Yellow Earth; Blue
Neutral; Brown Live
It is recommended the heater or
group of heaters are controlled by
thermostats, a time switch and if
required manual control switches
and a frost thermostat.
We recommend use of AmbiRad approved
controls. Please refer to control manual for
siting and installation details.
Where alternative manufactures controls are
used, please refer to their instructions for their
siting and installation details.
Table 4 Gas Supply Pressures
Gas Category
I2H
I3P
Gas Type
Natural Gas (G20)
Propane (G31)
Max Supply Pressure (mbar)
25
45
Min Supply Pressure (mbar)
17
25
Nominal Pressure (mbar)
20
37
Gas Supply
Connection R½ ½in BSP Internal Thread
Figure 9.a Typical VSUT/VSAUT Wiring Connections
Fan plugs into burner
Fused Spur
fig.f
fig.g
The methods shown in fig.f and fig.g are unacceptable, due to undue stress on the hose & fittings.
Fused Spur
Figure 9.b Typical VSLF/VSALF Wiring Connections
Fan plugs into burner
Figure 10. Internal Burner Wiring Diagram.
Fused Spur
Figure 9.d Typical VSDL Wiring Connections
Fused Spur
Fused Spur
Figure 9.c Typical VSLI/VSALI Wiring Connections
Fan plugs into burner via
plug/socket supplied.
Extension wiring by others
Fused Spur
MAIN
GREY
YELLOW
WHITE
FLAME SENSOR
IGNITOR
8
7
9
11
10
12
1
3
2
4
BLACK
PURPLE
WHITE
LAMPS
ON
MAINS
YELLOW
GREY
BLACK
GRN/YEL
BROWN
SOLENOID
GREEN/YELLOW
SWITCH
N.C.
N.O.
C.
GREY
EMC FILTER
MAINS
L
N
FAN
N
L
ON
BURNER
BLUE
BLUE
BLUE
VACUUM
BROWN
VALVE
J.S.T.
INPUT
BLACK
1
3
2
VALVE
J.S.T.
BLUE
GREEN/YELLOW
1.9 Ventilation Requirements
AmbiRad tube heaters can be operated as
flued or unflued appliances in accordance with
the relevant national requirements in the
country of installation.
1.9.1 Unflued Radiant Heater
Radiant tube heaters can be operated as
unflued appliances so that the concentration of
Carbon Dioxide (CO2) at positions where the air
will be inhaled does not exceed 0.28%.
BS EN 13410:2001 is a guide to achieving this
requirement.
If the building air change rate exceeds 1.5 per
hour or if the heat input is less than 5W/m³, no
additional ventilation is required.
In addition to the ventilation requirements, con-
sideration needs to be given to the possibility of
condensation forming on cold surfaces.
It should be noted that the clearance distance
around the burner increases when the unit is
operated unflued (see section 1.6). It should be
ensured that the combustion gases do not
impinge on any combustible materials.
Mechanical Ventilation
Mechanical ventilation must be installed to
meet a minimum of 1.5 air changes per hour
using appropriately sized fans and interlocked
with the heaters.
Natural Ventilation
BS EN 13410:2001 should be used to size air
vents to provide adequate ventilation, an
example of this calculation is given below:
Site Details:
20°c Internal Operating Temperature
0°c Outside Air Temperature
5m between high and low level vents
Following the sizing procedure in BS EN
13410:2001 gives an air exit velocity of 1.6m/s.
This equates to a free area vent at both high
level and low level of 17.36cm²/kW free area.
1.9.2 Flued Radiant Heater
In buildings having an air change rate of less
than 0.5 per hour, additional mechanical or
natural ventilation is required. For detailed
information, please see BS6896:2005 section
5.2.2.2.1
Mechanical Ventilation
Mechanical ventilation must be installed to meet
a minimum of 0.5 air changes per hour using
appropriately sized fans and interlocked with the
heaters.
Natural Ventilation
Low level ventilation openings with a free area
of at least 2cm²/kW shall be provided. See
section 5.2.2.2.2.1.
1.10 Flue and Combustion Air Inlet -
Options
Induced Burners without Heat Exchangers
Please refer to Figure 12 for options.
Burner 2
Burner 1
Burner 3
1 phase
Isolator
Tail Pipe
1 phase 230V
Exhaust Fan
230V 50Hz 13A
Mains Supply
Controller
0.75mm²
Screened
Cable
Isolator
Sensor
Zone A
Isolator
Isolator
Isolator
Figure 11. Typical VSLH/VSALH
Wiring Connections
Figure 12. Flue Attachment Induced Burners (VSUT or VSAUT)
A 127mm (5ins) Twin Wall Flue System
B Fan Adaptor 7177-SUB (2501/2507 fan)
or 7176-SUB (2506 fan)
C Fan 2501/2507 or 2560
D Optional Ducted Air Intake. VSI-DA
E Standard Air Intake (supplied as standard)
Ventilation requirements are as detailed
in section 1.9
Ducted air must be used in locations
where there is airborne dust or where
there
is
a
polluted
atmosphere
e.g.
Chlorinated Vapours.
Maximum length = 9m
Minimum diameter = 100mm
Maximum no of bends = 2
Maximum flue length = 9.5m @ Ø125mm
Maximum no of bends = 2
All flues must terminate vertically.
For further information on flue runs, please refer
to BS 5440 pt.1 2000
For non-flued installations, delete items A and
B and rotate fan outlet to the HORIZONTAL
position away from the burner.
Products of Combustion
Products of combustion
Firing tube
Ducted Air Intake
D
E
A
B
C
Figure 13. End Attachments Forced Burners (VSLF or VSALF)
A
127mm (5ins) Twin Wall Flue System
B
Tube to Flue Adaptor 75mm 201881
100mm 201882
C
Flue Bend 7166
D
Forced Burner
E
Standard end terminal (unflued)
Ventilation requirements are as detailed in
section 1.9
Ducted air must be used in locations
where there is airborne dust or where
there is a polluted atmosphere e.g. Chlorinated
Vapours.
Maximum length = 9m
Minimum diameter = 100mm
Maximum no of bends = 2
Products of
Combustion
Firing tube
D
B
C
A
E
Flued Installation
For unflued installation, fit
standard terminal supplied
using grub screw provided
Maximum flue length = 9.5m @ Ø125mm
Maximum no of bends = 2
All flues must terminate vertically.
For further information on flue runs, please refer
to BS 5440 pt.1 2000
1.11 Technical Details.
Tables 5a/b/c/d & e - Natural Gas (G20)
Heater
Model
Heat Input kW
Gas
Flowrate
(m³/hr)
Injector
Pressure
(mbar)
Injector
Size
(mm)
Size
(h x l x w)
Weight
(Kg)
Fan
Rating
(A)
Fan
Type
Gross
Nett
VS(A)15UT4
15.8
14.2
1.5
11.1
1.3
260x2219x670
41
0.5
2501
VS(A)15UT
15.0
13.5
1.4
10.7
1.3
240x3417x500
43
0.5
2501
VS(A)20UT
19.5
17.6
1.9
10.8
1.5
240x4142x500
50
0.5
2501
VS(A)25UT
23.5
21.2
2.3
8.0
1.8
240x5066x500
60
1.0
2507
VS(A)30UT
29.5
26.5
2.8
9.5
2.0
240x6029x500
70
1.0
2507
VS(A)35UT
36.0
32.4
3.4
9.7
2.3
260x5709x670
92
1.0
2507
VS(A)40UT
40.0
36.0
3.8
12.2
2.3
260x5709x670
92
1.0
2507
VS(A)45UT
44.0
39.6
4.2
8.9
2.9
260x7471x670
121
0.5
2560
VS(A)50UT
48.0
43.2
4.6
9.1
2.5
260x7471x670
121
0.5
2560
No of Injectors
1
Gas Connection
½ in BSP Internal thread
Flue Nominal Bore mm (in)
125 (5)
Unitary Fan Motor Details
230 volt 1 phase 50Hz
Heater
Model
Gas
Flowrate
(m³/hr)
Injector
Pressure
(mbar)
Injector
Size
(mm)
Size
(h x l x w)
Weight
(Kg)
Fan
Rating
(A)
Fan
Type
Gross
Nett
VS(A)15LF6
13.8
12.4
1.3
9.8
1.3
390x5984x315
43
0.5
2501
VS(A)15LF8
13.8
12.4
1.3
9.8
1.3
390x8022x315
53
0.5
2501
VS(A)20LF7
19.5
17.6
1.9
12.0
1.5
390x6992x315
49
1.0
2507
VS(A)20LF10-5
19.5
17.6
1.9
12.0
1.5 390x10662x315
72
1.0
2507
VS(A)25LF8
23.5
21.2
2.3
9.5
1.8
390x8022x315
53
0.5
2501
VS(A)25LF10-5
23.5
21.2
2.3
9.5
1.8 390x10662x315
72
0.5
2501
VS(A)30LF10-5
29.5
26.6
2.8
11.5
2.0 390x10662x315
72
1.0
2507
VS(A)30LF12-5
29.5
26.6
2.8
11.5
2.0 390x12652x315
84
1.0
2507
VS(A)35LF10-5
36.5
32.9
3.5
11.5
2.3 390x10892x470
103
0.5
2501
VS(A)35LF13-5
36.5
32.9
3.5
11.5
2.3 390x13492x470
126
0.5
2501
VS(A)40LF13-5
40.0
36.0
3.8
12.5
2.4 390x13492x470
126
1.0
2507
VS(A)40LF16
40.0
36.0
3.8
12.5
2.4 390x16092x470
147
1.0
2507
VS(A)45LF13-5
45.0
40.5
4.3
11.0
2.9 390x13492x470
126
1.0
2507
VS(A)45LF16
45.0
40.5
4.3
11.0
2.9 390x16092x470
147
1.0
2507
VS(A)50LF13-5
50.0
45.0
4.8
13.6
3.0 390x13492x470
126
1.0
2507
VS(A)50LF16
50.0
45.0
4.8
13.6
3.0 390x16092x470
147
1.0
2507
Heat Input kW
Heat Input kW
Gas
Flowrate
(m³/hr)
Injector
Pressure
(mbar)
Injector
Size
(mm)
Size
(h x l x w)
Weight
(Kg)
Fan
Rating
(A)
Gross
Nett
VS(A)15LI8
15.0
13.5
1.4
10.7
1.3
390x7917x315
53
0.5
2501
VS(A)20LI7
19.5
17.6
1.9
10.8
1.5
390x6907x315
49
0.5
2501
VS(A)20LI10-5
19.5
17.6
1.9
10.8
1.5 390x10537x315
72
0.5
2501
VS(A)25LI8
23.5
21.2
2.3
8.0
1.8
390x7917x315
53
0.5
2501
VS(A)25LI10-5
23.5
21.2
2.3
8.0
1.8 390x10537x315
72
0.5
2501
VS(A)30LI10-5
29.5
26.6
2.8
9.5
2.0 390x10537x315
72
1.0
2507
VS(A)30LI12-5
29.5
26.6
2.8
9.5
2.0 390x12567x315
84
1.0
2507
VS(A)35LI10-5
36.0
32.4
3.4
9.6
2.3 390x10787x470
103
1.0
2507
VS(A)35LI13-5
36.0
32.4
3.4
9.6
2.3 390x13387x470
126
1.0
2507
VS(A)40LI13-5
40.0
36.0
3.8
12.2
2.3 390x13387x470
126
1.0
2507
VS(A)40LI16
40.0
36.0
3.8
12.2
2.3 390x16006x470
147
1.0
2507
VS(A)45LI13-5
44.0
39.6
4.2
8.9
2.9 390x13387x470
126
1.0
2507
VS(A)45LI16
44.0
39.6
4.2
8.9
2.9 390x16006x470
147
1.0
2507
VS(A)50LI13-5
50.0
45.0
4.8
10.0
2.5 390x13387x470
126
0.5
2560
VS(A)50LI16
50.0
45.0
4.8
10.0
2.5 390x16006x470
147
1.0
2507
Fan
Type
Heater
Model
Heat Input kW
Gas
Flowrate
(m³/hr)
Injector
Pressure
(mbar)
Injector
Size
(mm)
Size
(h x l x w)
Gross
Nett
VS(A)15LH6
15.0
13.5
1.4
10.7
1.3
390x5725x315
42
VS(A)15LH8
15.0
13.5
1.4
10.7
1.3
390x7763x315
52
VS(A)20LH7
19.5
17.6
1.9
10.8
1.5
390x6733x315
48
VS(A)20LH10-5
19.5
17.6
1.9
10.8
1.5
390x10363x315
71
VS(A)25LH8
23.5
21.2
2.3
8.0
1.8
390x7763x315
52
VS(A)25LH10-5
23.5
21.2
2.3
8.0
1.8
390x10363x315
71
VS(A)30LH10-5
29.5
26.6
2.8
9.5
2.0
390x10363x315
71
VS(A)30LH12-5
29.5
26.6
2.8
9.5
2.0
390x12393x315
83
VS(A)35LH10-5
36.0
32.4
3.4
9.6
2.3
390x10633x470
101
VS(A)35LH13-5
36.0
32.4
3.4
9.6
2.3
390x13233x470
124
VS(A)40LH13-5
40.0
36.0
3.8
12.2
2.3
390x13233x470
124
VS(A)40LH16
40.0
36.0
3.8
12.2
2.3
390x15832x470
145
VS(A)45LH13-5
44.0
39.6
4.2
8.9
2.9
390x13233x470
124
VS(A)45LH16
44.0
39.6
4.2
8.9
2.9
390x15832x470
145
VS(A)50LH13-5
50.0
45.0
4.8
10.0
2.5
390x13233x470
124
VS(A)50LH16
50.0
45.0
4.8
10.0
2.5
390x15832x470
145
Weight
(Kg)
Heat Input kW
Flowrate
(l/hr)
Injector
Pressure
(mbar)
Injector
Size
(mm)
Size
(h x l x w)
Weight
(Kg)
Gross
Nett
VS(A)15UH
15.2
13.7
2.16
23.7
1.2
240x3417x500
42
VS(A)20UH
19.2
17.3
2.73
26.1
1.0
240x4142x500
49
VS(A)25UH
23.5
21.3
3.34
10.8
1.3
240x5066x500
59
VS(A)30UH
28.0
25.2
3.98
16.2
1.3
240x6029x500
69
VS(A)35UH
36.0
32.4
5.12
22.4
1.4
260x5709x670
91
VS(A)40UH
40.0
36.0
5.68
18.4
1.5
260x5709x670
91
VS(A)45UH
44.0
39.6
6.25
14.9
1.7
260x7471x670
120
VS(A)50UH
48.0
43.2
6.82
14.3
1.8
260x7471x670
120
Heater
Model
Heat Input kW
Gas
Flowrate
(m³/hr)
Injector
Pressure
(mbar)
Injector
Size
(mm)
Size
(h x l x w)
Weight
(Kg)
Gross
Nett
VS(A)15UH4
15.8
14.2
1.5
11.1
1.3
260x2219x670
40
VS(A)15UH
15.0
13.5
1.4
10.7
1.3
240x3417x500
42
VS(A)20UH
19.5
17.6
1.9
10.8
1.5
240x4142x500
49
VS(A)25UH
23.5
21.2
2.3
8.0
1.8
240x5066x500
59
VS(A)30UH
29.5
26.5
2.8
9.5
2.0
240x6029x500
69
VS(A)35UH
36.0
32.4
3.4
9.7
2.3
260x5709x670
91
VS(A)40UH
40.0
36.0
3.8
12.2
2.3
260x5709x670
91
VS(A)45UH
44.0
39.6
4.2
8.9
2.9
260x7471x670
120
VS(A)50UH
48.0
43.2
4.6
9.1
2.5
260x7471x670
120
Tables 6a/b/c & d. Technical Details - Propane Gas (G31)
Heater
Model
Heat Input kW Flowrate
(l/hr)
Injector
Pressure
(mbar)
Injector
Size
(mm)
Size
(h x l x w)
Weight
(Kg)
Fan
Rating
(A)
Fan
Type
Gross
Nett
VS(A)15UT
15.2
13.7
2.16
23.7
1.2
240x3417x500
43
0.5
2501
VS(A)20UT
19.2
17.3
2.73
26.1
1.0
240x4142x500
50
1.0
2507
VS(A)25UT
23.5
21.3
3.34
10.8
1.3
240x5066x500
60
1.0
2507
VS(A)30UT
28.0
25.2
3.98
16.2
1.3
240x6029x500
70
1.0
2507
VS(A)35UT
36.0
32.4
5.12
22.4
1.4
260x5709x670
92
0.5
2560
VS(A)40UT
40.0
36.0
5.68
18.4
1.5
260x5709x670
92
0.5
2560
VS(A)45UT
44.0
39.6
6.25
14.9
1.7
260x7471x670
121
0.5
2560
VS(A)50UT
48.0
43.2
6.82
14.3
1.8
260x7471x670
121
0.5
2560
Heat Input kW
Gas
Flowrate
(l/hr)
Injector
Pressure
(mbar)
Injector
Size
(mm)
Size
(h x l x w)
Weight
(Kg)
Fan
Rating
(A)
Gross
Nett
VS(A)15LI6
15.2
13.7
2.16
23.7
1.2
390x5879x315
43
0.5
2501
VS(A)15LI8
15.2
13.7
2.16
23.7
1.2
390x7917x315
53
0.5
2501
VS(A)20LI7
19.2
17.3
2.73
26.1
1.0
390x6907x315
49
0.5
2501
VS(A)20LI10-5
19.2
17.3
2.73
26.1
1.0 390x10537x315
72
0.5
2501
VS(A)25LI8
23.5
21.2
3.34
10.8
1.3
390x7917x315
53
1.0
2507
VS(A)25LI10-5
23.5
21.2
3.34
10.8
1.3 390x10537x315
72
1.0
2507
VS(A)30LI10-5
28.0
25.2
3.98
16.2
1.3 390x10537x315
72
1.0
2507
VS(A)30LI12-5
28.0
25.2
3.98
16.2
1.3 390x12567x315
84
1.0
2507
VS(A)35LI10-5
36.0
32.4
5.12
22.4
1.4 390x10787x470
103
1.0
2507
VS(A)35LI13-5
36.0
32.4
5.12
22.4
1.4 390x13387x470
126
1.0
2507
VS(A)40LI13-5
40.0
36.0
5.68
18.4
1.5 390x13387x470
126
1.0
2507
VS(A)40LI16
40.0
36.0
5.68
18.4
1.5 390x16006x470
147
1.0
2507
VS(A)45LI13-5
44.0
39.6
6.25
14.9
1.7 390x13387x470
126
0.5
2560
VS(A)45LI16
44.0
39.6
6.25
14.9
1.7 390x16006x470
147
0.5
2560
VS(A)50LI13-5
48.0
43.2
6.82
14.3
1.8 390x13387x470
126
0.5
2560
VS(A)50LI16
48.0
43.2
6.82
14.3
1.8 390x16006x470
147
0.5
2560
Fan
Type
Heater
Model
Heat Input kW
Gas
Flowrate
(l/hr)
Injector
Pressure
(mbar)
Injector
Size
(mm)
Size
(h x l x w)
Gross
Nett
VS(A)15LH6
15.2
13.7
2.16
23.7
1.2
390x5879x315
42
VS(A)15LH8
15.2
13.7
2.16
23.7
1.2
390x7917x315
52
VS(A)20LH7
19.2
17.3
2.73
26.1
1.0
390x6907x315
48
VS(A)20LH10-5
19.2
17.3
2.73
26.1
1.0
390x10537x315
71
VS(A)25LH8
23.5
21.2
3.34
10.8
1.3
390x7917x315
52
VS(A)25LH10-5
23.5
21.2
3.34
10.8
1.3
390x10537x315
71
VS(A)30LH10-5
28.0
25.2
3.98
16.2
1.3
390x10537x315
71
VS(A)30LH12-5
28.0
25.2
3.98
16.2
1.3
390x12567x315
83
VS(A)35LH10-5
36.0
32.4
5.12
22.4
1.4
390x10787x470
101
VS(A)35LH13-5
36.0
32.4
5.12
22.4
1.4
390x13387x470
124
VS(A)40LH13-5
40.0
36.0
5.68
18.4
1.5
390x13387x470
124
VS(A)40LH16
40.0
36.0
5.68
18.4
1.5
390x16006x470
145
VS(A)45LH13-5
44.0
39.6
6.25
14.9
1.7
390x13387x470
124
VS(A)45LH16
44.0
39.6
6.25
14.9
1.7
390x16006x470
145
VS(A)50LH13-5
48.0
43.2
6.82
14.3
1.8
390x13387x470
124
VS(A)50LH16
48.0
43.2
6.82
14.3
1.8
390x16006x470
145
Weight
(Kg)
Mass Flow Rate of Flue
Gasses (kg/s)
Flue Pressure (Pa)
Maximum Flue
Resistance
Flue Gas Temp (°C)
VS(A)15UT4
0.0110
200 - 250
VS(A)15UT
0.0115
VS(A)20UT
0.0117
VS(A)25UT
0.0139
VS(A)30UT
0.0171
VS(A)35UT
0.0193
VS(A)40UT
0.0210
VS(A)45UT
0.0212
VS(A)50UT
0.0261
VS(A)15LI6
0.0098
19 - 30
210 - 270
VS(A)20LI7
0.0119
VS(A)25LI8
0.0131
VS(A)30LI10-5
0.0171
VS(A)35LI10-5
0.0207
VS(A)40LI13-5
0.0216
VS(A)45LI13-5
0.0249
VS(A)50LI13-5
0.0256
VS(A)15LI8
0.0100
25 -35
160 - 210
VS(A)20LI10-5
0.0120
VS(A)25LI10-5
0.0145
VS(A)30LI12-5
0.0174
VS(A)35LI13-5
0.0194
VS(A)40LI16
0.0214
VS(A)45LI16
0.0237
VS(A)50LI16
0.0237
VS(A)15LF6
0.0075
18 - 25
250 - 290
VS(A)20LF7
0.0106
VS(A)25LF8
0.0127
VS(A)30LF10-5
0.0130
VS(A)35LF10-5
0.0157
VS(A)40LF13-5
0.0168
VS(A)45LF13-5
0.0189
VS(A)50LF13-5
0.0206
VS(A)15LF8
0.0077
20 - 30
180 - 240
VS(A)20LF10-5
0.0105
VS(A)25LF10-5
0.0126
VS(A)30LF12-5
0.0136
VS(A)35LF13-5
0.0161
VS(A)40LF16
0.0167
VS(A)45LF16
0.0190
VS(A)50LF16
0.0207
15 - 31
Table 7. Flue details - Natural Gas
Mass Flow Rate of Flue
Gasses (kg/s)
Flue Pressure (Pa)
Maximum Flue
Resistance
Flue Gas Temp (°C)
VS(A)15UT
0.0119
15 - 31
190 - 240
VS(A)20UT
0.0132
VS(A)25UT
0.0147
VS(A)30UT
0.0154
VS(A)35UT
0.0264
VS(A)40UT
0.0281
VS(A)45UT
0.0300
VS(A)50UT
0.0300
VS(A)15LI6
0.0105
19 - 30
190 - 240
VS(A)20LI7
0.0135
VS(A)25LI8
0.0126
VS(A)30LI10-5
0.0180
VS(A)35LI10-5
0.0210
VS(A)40LI13-5
0.0220
VS(A)45LI13-5
0.0280
VS(A)50LI13-5
0.0263
VS(A)15LI8
0.0109
25 - 35
160 - 200
VS(A)20LI10-5
0.0149
VS(A)25LI10-5
0.0137
VS(A)30LI12-5
0.0185
VS(A)35LI13-5
0.0210
VS(A)40LI16
0.0224
VS(A)45LI16
0.0268
VS(A)50LI16
0.0262
Table 8. Flue details - Propane
Table 10. Herringbone & DL Settings- Natural Gas (G20)
Model
Cold HB Pressure
Hot HB Pressure
mm H2O
mbar
mm H2O
mbar
VS(A)15UH4
21.4
2.1
12.7
1.2
VS(A)15UH
21.4
2.1
16.3
1.6
VS(A)20UH
19.4
1.9
15.3
1.5
VS(A)25UH
24.5
2.4
20.4
2.0
VS(A)30UH
23.5
2.3
19.4
1.9
VS(A)35UH
25.5
2.5
15.3
1.5
VS(A)40UH
29.6
2.9
17.3
1.7
VS(A)45UH
33.0
3.2
23.5
2.3
VS(A)50UH
33.0
3.2
23.5
2.3
VS(A)15LH6/DL12
18.4
1.8
13.3
1.3
VS(A)15LH8/DL16
18.4
1.8
14.3
1.4
VS(A)20LH7/DL14
19.4
1.9
14.3
1.4
VS(A)20LH10-5/DL21
18.4
1.8
14.3
1.4
VS(A)25LH8/DL16
20.4
2.0
16.3
1.6
VS(A)25LH10-5/DL21
22.4
2.2
18.4
1.8
VS(A)30LH10-5/DL21
24.5
2.4
19.4
1.9
VS(A)30LH12-5/DL25
33.6
3.3
25.5
2.5
VS(A)35LH10-5/DL21
27.5
2.7
13.3
1.3
VS(A)35LH13-5/DL27
20.9
2.0
12.7
1.2
VS(A)40LH13-5/DL27
22.4
2.2
12.2
1.2
VS(A)40LH16/DL32
21.4
2.1
14.3
1.4
VS(A)45LH13-5/DL27
27.5
2.7
16.8
1.6
VS(A)45LH16/DL32
26.5
2.6
17.3
1.7
VS(A)50LH13-5/DL27
30.0
2.9
18.3
1.8
VS(A)50LH16/DL32
27.5
2.7
17.8
1.7
Type ‘O’
Type ‘2’
Power (W)
550
120
Running current (overload setting)
(A)
2.6
0.8
Phase
Single
Single
Voltage
(V)
230
230
Fan type
Table 9. Herringbone Vacuum Fan characteristics
Table 11. Herringbone & DL Settings- Propane Gas (G31)
Model
Cold HB Pressure
Hot HB Pressure
mm H2O
mbar
mm H2O
mbar
VS(A)15UH
21.4
2.1
16.3
1.6
VS(A)20UH
21.4
2.1
16.3
1.6
VS(A)25UH
24.5
2.4
21.4
2.1
VS(A)30UH
26.5
2.6
17.3
1.7
VS(A)35UH
35.7
3.5
21.4
2.1
VS(A)40UH
38.7
3.8
23.5
2.3
VS(A)45UH
37.7
3.7
23.5
2.3
VS(A)50UH
38.7
3.8
24.5
2.4
VS(A)15LH6/DL12
21.4
2.1
14.3
1.4
VS(A)15LH8/DL16
19.4
1.9
15.3
1.5
VS(A)20LH7/DL14
22.4
2.2
15.3
1.5
VS(A)20LH10-5/DL21
21.4
2.1
16.3
1.6
VS(A)25LH8/DL16
22.4
2.2
17.3
1.7
VS(A)25LH10-5/DL21
20.4
2.0
16.3
1.6
VS(A)30LH10-5/DL21
28.6
2.8
19.4
1.9
VS(A)30LH12-5/DL25
28.6
2.8
20.9
2.0
VS(A)35LH10-5/DL21
24.5
2.4
18.4
1.8
VS(A)35LH13-5/DL27
21.4
2.1
17.3
1.7
VS(A)40LH13-5/DL27
22.4
2.2
18.4
1.8
VS(A)40LH16/DL32
30.6
3.0
20.9
2.0
VS(A)45LH13-5/DL27
34.7
3.4
24.5
2.4
VS(A)45LH16/DL32
34.7
3.4
23.5
2.3
VS(A)50LH13-5/DL27
33.6
3.3
21.4
2.1
VS(A)50LH16/DL32
30.6
3.0
20.4
2.0
2. Assembly Instructions.
2.2.2 Turbulators (where fitted)
Insert turbulator(s) into tube(s) ensuring the
correct length and quantity are inserted into their
respective correctly identified tube(s) as detailed
in the assembly drawings.
2.2.3 Brackets
There can be three types of brackets supplied
with these heaters:
•
Type ‘A’ are suspending brackets with
reflector fixing points.
•
Type ‘B’ are suspending brackets with no
fixing points.
•
Type ‘C’ is a centre bracket to retain the
reflector. (certain models only)
Slide the bracket assemblies along to the tubes
to the marked positions in their correct order as
detailed in the assembly drawings. Tighten
clamping ‘U’ bolt arrangement to tubes ONLY
WHERE STATED on the assembly drawings.
2.2
Assembly Notes.
2.2.1 Tubes
Identify and position tubes on trestles. For
aesthetics it is advisable to position the tube
seam and coupling fastener so that these
cannot be seen from beneath the heater. Mark
out the position of the bracket centres from the
dimensions shown on the assembly drawings.
PLEASE READ this section prior to
assembly to familiarise yourself with the
components and tools you require at the
various stages of assembly. Carefully open the
packaging and check the contents against the
parts and check list.
The manufacturer reserves the right to alter
specifications without prior notice.
Please ensure that all packaging is
disposed of in a safe environmentally
friendly way.
For your own safety we recommend the
use of safety boots and leather faced
gloves when handling sharp or heavy items. The
use
of
protective
eye
wear
is
also
recommended.
Pozidrive
Screwdriver
Saw
Trestles
Leather
Faced
Gloves
Silicone
Sealant
& Gun
4 & 5mm
Allen
Keys
Pop
Riveter
& 3/16”
Rivets
Tape
Measure
13mm
Socket
Wrench With
Extension
10mm,
12mm &
13mm
Spanners
Herringbone
Systems Only
2.1
Tools Required.
The following tools and equipment are advisable
to complete the tasks laid out in this manual.
Suitable alternative tools may be used.
Please read these assembly notes in
conjunction with the correct assembly
drawings (figs 14 to 28).
After removing the protective plastic coating, slip
the reflector through the brackets until the
locating slots are aligned with the type A bracket
fixing points.
Slide the next reflector through the brackets and
overlap the existing reflector until the locating
slots line up with the same bracket fixing points
Secure overlapped reflectors to bracket using
M6 nuts, bolts and flat mud washers.
2.2.7 End Caps.
On VSUT models only, position the end cap
with no tube holes beneath the reflector profile
at the U bend end with the end cap flanges
facing inwards. Fasten to reflector using M5 pozi
set pin and ‘Z’ clips. Position the end cap with
tube holes beneath the reflector profile at the
burner end with the end cap flanges facing
inwards. Fasten to reflector using M5 pozi set
pin and ‘Z’ clips.
On VS(A)LF, VS(A)DL & VS(A)LH models
only, position ONE end cap beneath the
reflector profile at the open/fan/damper end with
the end cap flanges facing inwards. Fasten to
reflector using ‘Z’ clips. Position the other end
cap beneath the reflector profile at the burner
end with the end cap flanges facing inwards.
Fasten to reflector using ‘Z’ clips.
2.2.3.1 Tube alignment sections
For VS(A)50UT Angle Mounted Installations
ONLY. To allow for differential expansion of the
tubes, a tube alignment assembly is fitted to the
first bracket on the fan side radiant tube.
Position U bolt tube alignment sections over the
tube and through bracket prior to clamping.
2.2.4 U Bend.
For VS(A) ‘U’ tube heaters only. Slide the ‘U’
bend onto the tube ends with the clamping
bolts facing upwards until the predefined stop
position. Tighten clamping bolt arrangement
using 13mm socket and wrench.
2.2.5 Couplers.
For VS(A)LF, VS(A)LH, VS(A)LI and VS(A)
45/50UT tube heaters only. For joining radiant
tubes, locate and position tube couplers at the
end of the tubes so that the socket heads are
facing
outwards.
Tighten
clamping
bolt
arrangement to secure ensuring the bolts are
not over tightened.
To avoid damaging the heater whilst
installing we recommend the heater
chassis be suspended prior to fitting reflectors.
All
reflectors
must
be
positioned/
attached to the brackets exactly as
detailed in the assembly drawings.
Remove the protective plastic coating.
end of the tube ensuring it is fully engaged.
Secure with grub screws. Note: The damper
assembly must be located with its damper blade
vertical and left in the closed position. The
manifold tube is to be sealed and secured (as
described below) to the damper assembly.
2.2.12 Herringbone Manifold Assembly.
HB Models ONLY. After fixing the heaters in
the desired position, the manifold system
requires fitting.
After allowing for a minimum of 75mm (3in) of
penetration of the fitting into the tube, cut the
tubes to the lengths required and remove all
burrs and wipe off any grease or oil with a clean
rag.
Method of jointing aluminium tube
Using the applicator gun exude 4mm diameter
bead of high temperature silicon jointing
compound externally round the end of the fitting
and internally round the end of the tube.
2.2.8 Burner Assembly.
On VS(A)UT only, slide the burner assembly
onto the RIGHT HAND TUBE when viewed
from above, ensuring it is fully engaged. Secure
with grub screws.
On VS(A)LF, VS(A)DL & VS(A)LH models
only, slide the burner assembly onto the inlet
end of the tube ensuring it is fully engaged.
Secure with grub screws.
2.2.9 Fan Assembly.
On U Tube heaters only, slide fan onto the left
hand tube ensuring it is fully engaged. The fan
discharge should face vertically for individually
flued or horizontally away from the burner if
unflued.
2.2.10 Condensate Box Assembly.
On
VS(A)DL
models
only,
slide
the
condensate box flange onto the outlet end of
the tube ensuring it is fully engaged. Secure
with grub screws.
2.2.11 Herringbone Damper Assembly.
On VS(A)UH and VS(A)LH models only, slide
the damper assembly flange onto the outlet
2 x ‘Z’ clips
End Cap
M5 set pin
These holes -
Burner end only
Fitting
Manifold
External bead of
jointing compound
Internal bead of
jointing compound
Manifold Tube
Vacuum Test Point
Damper Blade
Emitter Tube
FLOW
FLOW
Enter the fitting into the tube using a slight
rotating movement to spread the jointing
compound uniformly until a penetration of
75mm (3in) is achieved.
Note The silicon jointing compound remains
workable after application for only 5 minutes.
Secure the joint by drilling through the tube and
fitting and fix with three pop rivets at 12 o’clock,
4 o’clock and 8 o’clock positions. 4.8mm
(3/16in) diameter pop rivets are recommended.
2.2.13 Detailed Assembly Drawings
The following pages show the technical
dimensional details of the VSUT/VSAUT,
VSUH/VSAUH and VSLF/VSLH/VSALH, VSDL/
VSADL range of heaters.
Please note the heater type, length and
reference number from the delivery/advice note
before identifying the correct model drawing.
Figure 14. Vision Heater Assembly: Models VS/VSA U tube Nat Gas 15kW. 100mm (4ins) Nominal Dia
161
FIGURE 1
SEE FIGURE 1
FIGURE 2
FIGURE 3
NOTE:
SWAGE THIS END
Figure 15. Vision Heater Assembly: Models VS/VSA U tube 15kW.
SEE FIGURE 1
FIGURE 2
FIGURE 3
FIGURE 1
FIGURE 1
M6
Figure 16. Vision Heater Assembly: Models VS/VSA U tube 20kW.
FIGURE 1
FIGURE 1
M6
FIGURE 2
FIGURE 3
SEE FIGURE 2
SEE FIGURE 1
Figure 17. Vision Heater Assembly: Models VS/VSA U tube 25kW.
FIGURE 1
FIGURE 1
M6
FIGURE 2
FIGURE 3
SEE FIGURE 1
SEE FIGURE 2
Figure 18. Vision Heater Assembly: Models VS/VSA U tube 30kW.
FIGURE 1
FIGURE 1
M6
FIGURE 2
FIGURE 3
SEE FIGURE 1
SEE FIGURE 2
Figure 19. Vision Heater Assembly: Models VS/VSA U tube 35/40kW.
SEE FIGURE 1
FIGURE 1
SEE FIGURE 1
FIGURE 2
FIGURE 3
Figure 20. Vision Heater Assembly: Models VS/VSA U tube 45/50kW.
SEE FIGURE 1
SEE FIGURE 1
SEE FIGURE 1
FIGURE 1
FIGURE 2
LOCATE PINS IN HOLES
PROVIDED IN TUBES
NOTE:
ALSO REFER TO
ASSEMBLY IN-
STRUCTIONS
SECT 2.2.3.1 FOR
ANGLE MOUNED
HEATERS.
7471
1760
1200
1760
1760
NB. ONLY USED ON NAT GAS VARIANTS
Figure 21. Vision Heater Assembly: Models VSLF/VSDL/VSLHB 15kW 6m - 75mm (3ins) Nom Dia.
NB. VLSF
ONLY USED
ON NAT GAS
VARIANTS
FIGURE 2
FIGURE 1
VSLF - 5984 (5829 UNFLUED)
VSLI - 5879
NB. VLSF
ONLY USED
ON NAT GAS
VARIANTS
IMPORTANT:
ENSURE FIRST REFLECTOR OVERLAPS
SECOND REFLECTOR.
Figure 22. Vision Heater Assembly: Models VSLF/VSDL/VSLHB 20kW 7m - 75mm (3ins) Nom Dia.
FIGURE 1
FIGURE 2
NB. VLSF
ONLY USED
ON NAT GAS
VARIANTS
VSLF - 6992 (6837 UNFLUED)
VSLI - 6907
NB. VLSF
ONLY USED
ON NAT GAS
VARIANTS
IMPORTANT:
ENSURE FIRST REFLECTOR OVERLAPS SECOND
REFLECTOR. SECOND REFLECTOR OVERLAPS THIRD.
Figure 23. Vision Heater Assembly: Models VSLF/VSDL/VSLHB 15/25kW 8m - 75mm (3ins) Nom Dia.
FIGURE 1
FIGURE 2
VSLF - 8022 (7867 UNFLUED)
VSLI - 7917
NB. VLSF
ONLY USED
ON NAT GAS
VARIANTS
NB. VLSF
ONLY USED
ON NAT GAS
VARIANTS
IMPORTANT:
ENSURE FIRST REFLECTOR OVERLAPS SECOND
REFLECTOR. SECOND REFLECTOR OVERLAPS THIRD.
Figure 24. Vision Heater Assembly: Models VSLF/VSDL/VSLHB 20/25/30kW 10.5m - 75mm (3ins) Nom Dia.
FIGURE 1
FIGURE 2
VSLI - 10537
NB. VLSF
ONLY USED
ON NAT GAS
VARIANTS
NB. VLSF
ONLY USED
ON NAT GAS
VARIANTS
2285 TURBULATOR (x1) - 30Kw NAT GAS
730 TURBULATOR (x1) - 30Kw PROPANE
IMPORTANT:
ENSURE FIRST REFLECTOR OVERLAPS SECOND
REFLECTOR. SECOND REFLECTOR OVERLAPS
THIRD AND SO ON DOWN THE LENGTH OF THE TUBE.
VSLF - 10622 (10467 UNFLUED)
Figure 25. Vision Heater Assembly: Models VSLF/VSDL/VSLHB 30kW 12.5m - 75mm (3ins) Nom Dia.
FIGURE 1
FIGURE 2
VSLF - 12652 (12497 UNFLUED)
VSLI - 12567
NB. VLSF
ONLY USED
ON NAT GAS
VARIANTS
NB. VLSF
ONLY USED
ON NAT GAS
VARIANTS
4850 TURBULATOR (x1) - 30Kw VSLF NAT GAS
3560 TURBULATOR (x1) - 30Kw VSLI NAT GAS
1300 TURBULATOR (x1) - 30Kw PROPANE
IMPORTANT:
ENSURE FIRST REFLECTOR OVERLAPS SECOND
REFLECTOR. SECOND REFLECTOR OVERLAPS
THIRD AND SO ON DOWN THE LENGTH OF THE TUBE.
Figure 26. Vision Heater Assembly: Models VSLF/VSDL/VSLHB 35kW - 10.5m - 100mm (4ins) Nom Dia.
FIGURE 1
FIG. 2
VSLF - 10892 (10737 UNFLUED)
VSLI - 10787
NB. VLSF
ONLY USED
ON NAT GAS
VARIANTS
NB. VLSF
ONLY USED
ON NAT GAS
VARIANTS
IMPORTANT:
ENSURE FIRST REFLECTOR OVERLAPS SECOND
REFLECTOR. SECOND REFLECTOR OVERLAPS
THIRD AND SO ON DOWN THE LENGTH OF THE TUBE.
Figure 27. Vision Heater Assembly: Models VSLF/VSDL/VSLHB 35/40/45/50kW - 13.5m - 100mm (4ins) Nom Dia.
VSLF - 13492 (13337 UNFLUED)
VSLI - 13387
NB. VLSF
ONLY USED
ON NAT GAS
VARIANTS
IMPORTANT:
ENSURE FIRST REFLECTOR OVERLAPS SECOND
REFLECTOR. SECOND REFLECTOR OVERLAPS
THIRD AND SO ON DOWN THE LENGTH OF THE TUBE.
NB. VLSF
ONLY USED
ON NAT GAS
VARIANTS
370
FIG. 2
FIGURE 1
2380
2500
5000 TURBULATOR (x1) - 35/45/50Kw VSLI
5000 TURBULATOR (x1) - 45/50Kw VSLF
3400 TURBULATOR (x1) - 35Kw VSLF
2600 TURBULATOR (x1) - 40Kw
Figure 28. Vision Heater Assembly: Models VSLF/VSDL/VSLHB 35/40/45/50kW - 16m - 100mm (4ins) Nom Dia
FIG. 2
VSLF - 16091 (15936 UNFLUED)
VSLI - 16006
NB. VLSF
ONLY USED
ON NAT GAS
VARIANTS
NB. VLSF
ONLY USED
ON NAT GAS
VARIANTS
FIGURE 1
IMPORTANT:
ENSURE FIRST REFLECTOR OVERLAPS SECOND
REFLECTOR. SECOND REFLECTOR OVERLAPS
THIRD AND SO ON DOWN THE LENGTH OF THE TUBE.
Balancing The Herringbone System
Important When all the heaters have been
installed the vacuum settings must be
finally balanced in the hot condition.
Before attempting to start up the heating
system it is essential to perform the preliminary
balancing of the vacuum level at each burner
unit. Isolate each heater unit by unplugging the
electrical connector and closing the gas
isolating valve.
Start all burners up and allow them to
run for at least 20 minutes. Adjust the
damper at exit of each heater using a
4mm Allen key in the damper blade
securing screw. Observing the vacuum
reading using a ‘U’ tube manometer
connected to the vacuum test point (see
fig29) each damper should be readjusted
and set at a hot condition reading as shown
in table 9 (NG) and table 10 (LPG) for the
appropriate size of heater and model.
Figure 29. HB Damper Assembly
3. Commissioning Instructions.
These appliances should be commissioned by a qualified engineer.
3.1
Tools Required.
The
following
tools
and
equipment
are
advisable to complete the tasks laid out in this
manual.
Suitable alternative tools may be used.
3.3
Balancing a DL System
Important When all the heaters have been
installed the vacuum settings must be
finally balanced in the hot condition.
As with a Herringbone system above, start both
burners up and allow them to run for at least 20
minutes. Adjust the damper on the condensate
box using a 4mm Allen key in the damper blade
securing screw. Observing the vacuum reading
using a manometer connected to the vacuum
test point (see figure 30) each damper should
be readjusted and set at a hot condition reading
as shown in table 9 (NG) and table 10 (LPG) for
the appropriate size of heater and model.
Damper blade
Vacuum
test point
Figure 30. DL Condensate Box Assembly
Small Flat
Head
Screwdriver
Manometer
Pozidrive
Screwdriver
Leather
Faced
Gloves
4mm
Allen
Key
12mm
Spanner
Large Adjustable
Spanners or 22, 26 &
27mm Spanners for
fitting Of Gas Flex.
13mm
Socket
Wrench with
Extension
Ref
Description
A
Radiant Emitter Tube
B
Manifold Tube
C
Vacuum Test Point
D
Damper Blade
D
A
C
B
Check installation has
been carried out to these
instructions.
NO
YES
Ensure gas and electricity
supplies are isolated.
Disconnect gas hose from
burner
Remove burner from tube and inspect burner head.
(See servicing instructions)
Replace burner on tube
and secure.
Open control housing and
check that all components
are securely fastened.
Reconnect gas hose.
Open isolating valve.
Check soundness.
Check thermostat is set to
maximum and is calling
for heat.
Switch on electrical supply.
The red neon should now
be illuminated. If restarting
heater a delay of 15s
should be allowed.
A successful ignition is indicated
by the amber light illuminating
and remaining illuminated.
The heater should now
run through its start up
sequence and ignite.
Turn off power and check
that all components are
securely fastened.
Has the
burner lit?
Check operation on flame failure.
Check gas pressure.
Check gas pressure.
Close control housing
Leave the instructions
with a responsible
person.
3.4
Commissioning chart for VS series unitary heaters
Gas Valve adjustment
Injector pressure
test point.
Adjustment screw under
cap to set injector pressure
Gas inlet
test point
Check operation of
air pressure switch.
4. Servicing Instructions.
These appliances should be serviced annually by a competent person to ensure safe
and efficient operation. In exceptional dusty or polluted conditions more frequent
servicing may be required. The manufacturer offers a maintenance service. Details
available on request
Soft
Brush
Manometer
Pozidrive
Screwdriver
Leather
Faced
Gloves
4mm
Allen
Key
Wrench with
13mm
Socket
12mm
Spanner
4.1
Tools Required.
The following tools and equipment are advisable
to complete the tasks laid out in this manual.
Suitable alternative tools may be used.
Large Adjustable
Spanners or 22, 26 &
27mm Spanners for
Fitting of Gas Flex.
A
Ducted Air Inlet
B
Induced Air Inlet
Please refer to spares for burner components
C
Ignitor Assembly
D
Extruded Burner Head
E
Multi Hole Injector
F
Ignition Controller
G
Gas Valve
H
Pressure Switch
I
Neon's (Red/Amber)
J
Pepperpot Head
4.2
Burner Description.
Figure 31. Induced Burner: Models VS(A)LI, VS(A)LH, VS(A)UH and VS(A)DL
2501 or 2507 Fan
B
Fan Inlet Spigot
C
Fan Orifice plate
D
Fan Mount Plate and Support
E
Gasket Set
4.3 Burner Removal (All Options)
Step 1 Isolate mains electric and gas
supplies. Unplug the fan and mains
electricity connectors.
Step 2 Detach the gas supply as shown below,
taking care to support the burner connection.
Figure 32. Forced Gas Burner: Model VSLF
G
Gas Valve
H
Multi Hole Injector
I
Neon's (Red/Amber)
J
Ignition Controller
K
Extruded Burner Head
L
Pepperpot Head
M
Pressure Switch
F
Ignitor Assembly
Please refer to spares for burner components
N
Jet Carrier
Step 3 On forced burners with ducted air
attachment slacken jubilee clip and remove the
flexible hose from the fan.
Step 4 Slacken the grub screw on the burner
support casting using a 4mm Allen key to
enable the burner to be removed from the
radiant tube.
Step 5 Carefully remove the burner to prevent it
or any components from falling to the ground
and position the assembly in a safe area.
4.4 Burner Gas Injector Servicing
Step 1 Remove the burner support casting and
gasket.
Step 2 The burner head assembly can be
disconnected by separating the connectors of
the ignition lead assembly and removing the
pressure switch silicon tube.
Step 3 The gas injector can be inspected and
replaced if contaminated or blocked.
When replacing the gas injector use a
12mm spanner and ensure approved
thread sealant is used.
Step 4 Refit the burner support casting and
replace the gaskets to ensure effective sealing.
4.5 Burner Head and Electrode Servicing
Step 1 Check the pepper pot burner head for
contamination. If necessary the head can be
removed for cleaning of the inside of the burner
head, see below.
Step 2 The pepper pot burner head can be
replaced ensuring the 5 holes on the outer ring
are aligned alongside the probes.
Step 3 The condition of the ignitor assembly
can be checked for deterioration. However, we
advise replacement at each service to ensure
continued reliability.
Step 4 Detach the electrode assembly from the
burner head by removing the two screws and
separating the ignitor lead connectors.
Step 5 Refit the electrode assembly and ensure
the silicon sleeving is fitted as shown above to
prevent arcing of the spark electrode.
Step 6 Check the positions and spark gap as
shown below.
Step 7 The burner assembly is ready to refit
after servicing the combustion fan and the
radiant tube assembly.
4.6 Combustion Fan Assembly Induced
Burner (Model VSLI/VSALI)
Step 1 Loosen the clamp fitting on the flue
Step 2 Loosen the 4mm grub screw.
Step 3 The combustion fan can now be
detached.
Figure 33. Burner head detail
Step 4 Remove the fan orifice plate spinning.
Step 5 Inspect the impeller and remove any
dust with a soft brush.
Step 6 Remove any dust from fan scroll and
from around the motor.
Step 7 Ensure the impeller rotates freely.
Step 8 Refit components.
4.7 Combustion Fan Assembly Forced
Burner (Model VSLF only)
Step 1 On Forced burners with ducted air
attachment slacken jubilee clip and remove the
flexible hose from the fan.
Step 2 Remove fan spigot fixings.
Step 3 The combustion fan can now be
detached.
Step 4 Remove the fan orifice plate spinning.
Step 5 Inspect the impeller and remove any dust
with a soft brush.
Step 6 Remove any dust from fan scroll and
from around the motor.
Step 7 Ensure the impeller rotates freely.
Step 8 Refit components.
4.8 Radiant Tube Servicing
Step 1 Brush any dust from the exterior of the
tubes.
Step 2 Inspect the fan and burner tubes
visually. If the tubes appear clean, skip to
servicing the reflector.
Step 3 Remove the U bend (or damper - HB
products or condensate box - DL products)
Step 4 Withdraw the turbulators from the
appliance. Carefully noting their condition and
position. Replace turbulators if necessary.
Step 5 The turbulators should be cleaned with
a soft brush.
Step 6 If required the interior of the tubes can
then be cleaned using an industrial vacuum
cleaner or by using long poles and a scraper.
Step 7 Refit components.
4.9 Reflector Servicing
The condition of the reflectors should be noted.
If necessary the reflectors can be cleaned with a
mild detergent.
This can significantly improve the efficiency
of the appliance.
4.10 Inspection of Flue
The flue needs to be inspected and cleaned if
necessary or in accordance to the regulations of
the country that the appliance is installed.
4.11 Re-commissioning After Service
After
servicing
of
the
heater
has
been
undertaken,
it
will
be
necessary
to
re-commission the heater as detailed in Section
3 of these instructions.
In order to aid troubleshooting and servicing we
recommend that the components shown in this
section should be stocked.
Note Any spare part components that are
not approved by AmbiRad could invalidate
the approval of the appliance and validity of the
warranty.
5. Spare Parts.
2015S
Ignition
Controller
201857
Nat Gas Valve
Twin sol reg
220/240
Part No.
Description
See
section 1.11
Injector
200358
Extruded Burner
Head
Item
201284
Ignitor Assembly
Part No.
Description
200988
Pepperpot Head
Item
2175
Amber Neon
(Burner On)
2180
Red Neon
(Mains On)
200420
Jet Carrier
(all except *)
See
Section 1.11
Combustion Fan
201571
Flame Plate
(VS35/40/45
Propane ONLY)
201488
Gasket Set
201630
Jet Carrier *
VS50
UT/UH/LI/LH/DL
900225-2
900225-3
900225-1
Cables:
Spark Electrode
(black)
Rectification lead
(purple)
Earth lead
(green/yellow)
201914
Propane Valve
Twin sol reg
220/240
201905
Flame Plate
(VS50
Propane ONLY)
201358
Flame Plate
(VS15 ONLY Nat
Gas & Propane)
201854
Flame Plate
(VS20/25/30
Propane ONLY)
201676
201508
Pressure Switch:
VSLF (Red)
All others (Green)
6. Fault Finding Guide.
Check:
1. Integrity of spark leads
2. Integrity of electrode
assembly & spark gap
3. Burner controller
Ensure gas & electricity
supplies are enabled.
Does the RED
neon
illuminate?
Check:
1. Operation of any thermostat
2. Any external fuses
3. Correct voltage is selected
YES
Does the
combustion fan
run?
Does the
amber light
illuminate after
10s purge?
If the heater still fails to
operate normally,
please contact
the AmbiRad
service department.
NO
NO
Does the
vacuum switch
`pull in`?
Check:
1. Wiring harness & plugs
2. Vacuum switch operation
3. Replace fan
Is the burner
sparking?
Does the gas
valve open?
Check:
1. Burner controller
2. Replace gas valve
Check:
1. Vacuum switch tubes
2. Emitter tubes, air inlet & flue
for obstructions
3. Operation of vacuum switch
4. Replace combustion fan
NO
YES
Check:
1. Burner controller
2. Wiring harness
3. Amber neon faulty
Check:
1. Burner inlet pressure
2. Burner nozzle pressure
3. Check live & neutral polarity
4. Check presence of good earth
YES
YES
NO
NO
YES
NO
YES
Does the
amber light
illuminate for 10s
then go out?
NO
YES
YES
Is there power
on the burner?
Check:
1. Burner controller
2. Red neon faulty
YES
NO
7. Replacing Parts.
7.1 Burner Controller Replacement
Step 1 Slacken screw in burner lid and open the
right hand burner access door.
Step 2 Disconnect burner controller from the
wiring harness.
Step 3 Disconnect the HT Lead from burner
controller.
Step 4 Remove the two screws attaching the
controller to the burner and remove.
Step 5 Fit new burner controller.
Step 6 Refit HT leads and refit burner controller
to wiring harness.
Step 7 Test product and close access door.
7.2 Air Pressure Switch Replacement
Step 1 Disconnect the two silicone impulse
tubes.
Step 2 Remove the two screws as shown below.
Step 3 The air pressure switch can now be
removed.
Step 4 Fit the new air pressure switch ensuring
the impulse tubes are connected as shown
below.
Step 5 Test product and close access doors.
7.3 Gas Valve Replacement
Step 1 Remove the burner assembly as
described in section 4.3 Servicing.
Step 2 Open the right hand access door and
detach the burner controller from the wiring
harness.
Step 3 Open the left hand access door and
detach the impulse hoses from the air pressure
switch.
Step 4 Remove the 4 screws holding the burner
head onto the burner assembly.
Step 5 The burner head can now be detached
by disconnecting the impulse tube and the
burner head wiring.
Step 6 Detach the two screws holding the front
of the gas valve.
Step 7 Remove the four screws holding the rear
burner plate in position.
Step 8 Remove the rear plate.
Step 9 The jet carrier, gas inlet, and wiring
harness can now be detached from the gas
valve.
Step Screw
Adjustment
8. User & Operating Instructions.
Document reference number GB/VS/118/0711
8.1
To Start the Heater
1. Ensure gas supply is turned on.
2. Electrical supply to the controls is on.
3. Ensure that the controls are correctly set
i.e.;
•
Clock is correctly set.
•
Heater program is correctly set.
•
Required room temp is correctly set
4. Once the heating controller ‘calls for heat’
power will be supplied to the heater(s). The
red neon will then illuminate.
5. After a pre-purge period of 10 seconds the
burner will ignite and the amber neon will
then illuminate.
6. If lockout occurs press the lockout reset
button (if available), or switch off electrical
supply and restart after 15 seconds.
7. If lockout occurs three times consecutively
switch off and isolate the gas and
electricity supplies.
Contact the AmbiRad Service department.
8.2.
To Switch Off Heater
1. Switch off electrical supply to the heater.
The burner will stop and the fan will shut
off.
2. If the heater is to be switched off for
periods in excess of one week it is highly
recommended that both the gas and the
electrical supplies are turned off.
8.3.
Routine Maintenance between Service
Intervals
After ensuring that the heater is cold and
mains electric isolated, cleaning of the
reflectors with a soft cloth and a mild
detergent (non solvent based cleaners only)
in water can be undertaken.
Additional removal of dust from the radiant
tubes, burner and heat exchanger can be
undertaken.
8.4
Frequency of Servicing
The manufacturer recommends that to
ensure
continued
efficient
and
safe
operation of the appliance, the heater is
serviced annually by a competent person
e.g. every year in normal working conditions
but
in
exceptional
dusty
or
polluted
conditions more frequent servicing may be
required.
The manufacturer offers a maintenance
service. Details are available on request.
For Service requirements, please contact
AmbiRad.
For further technical and service support
visit our Support Information Database at
www.s-i-d.co.uk
AmbiRad is a registered trademark of AmbiRad Limited. Because of continuous product
innovation, AmbiRad reserve the right to change product specification without due notice
AmbiRad Limited Fens Pool Avenue
Brierley Hill West Midlands DY5 1QA
United Kingdom.
Telephone 01384 489700
Facsimile 01384 489707
Email [email protected]
Website www.ambirad.co.uk
Technical Support www.s-i-d.co.uk
Step 10 The two screws retaining the gas valve
can then be removed.
Step 11 The gas valve can now be replaced.
Step 12 Refit all components in reverse order.
Step 13 Ensure step screw is in the correct
position as indicated in the previous diagram.
(For Natural Gas burners ONLY).
Step 14 Set gas pressures to data badge or as
per section 1.11 and ensure reliable burner
performance.
Step 15 Test product and close access doors.