Efergy elite 2.0 Manuals
Efergy elite 2.0 Operator's manual (24 pages)
- Identifier: id-1132659
- Brand: Efergy
- Device: Measuring Instruments
- Type: Operator's manual, PDF
- Key Aspects: Checklists for New Users, User Group Forum Links, Case Studies of Successful Implementations
- UPD Date: 12.05.2026
- Source File: 1025736.pdf
- Pages: 24
- Description: User guide for the Efergy elite 2.0. The manual guides users through system parameters, shutdown procedures, installation.
Key Pages and Contents:
-
Table of contents
Introduction 3 Safety 4 Package contents 5 Finding the power supply cable for your electricity meter (UK) 6 Finding the power supply cable for your electricity meter (SE) (NO) (FIN) 8 Installation 10 Synchronising the transmitter and display unit 11 Setting the time and date 12 Oth -
Finding the power supply cable for your electricity meter (SE) (NO) (FIN)
The Efergy energy meter is installed by clamping the sensor clips around the incoming mains power cables leading to your electricity meter. Finding your electricity meter/distribution box Find out where your meter is located. -
If I remove the battery, will I lose all my saved data?
No, the information is saved in the internal memory and is not lost when the battery is changed. How do I reset the display (erase all data and start over)? Depress [History] and [Mode/set] simultaneously. Clr will show on t -
Setting the time and date
The energy meter must be programmed with the correct time and date in order to give accurate information. Setting the time and date: Step 1 On the back of the display there is a settings button [Time set]. Depress this button for two seconds. The date display will