JAYLINE IS550 Manuals

4 pdf manual(s) JAYLINE IS550 for free download (Document Types: Installation instructions manual, Installation & operation instructions)

Available Documents for IS550:

JAYLINE IS550 Installation instructions manual Main Page Preview

Installation instructions manual [PDF] (15 pages)

  • Brand: JAYLINE
  • Model: IS550
  • Format: PDF
  • Key Aspects: Component Overview and Descriptions, Documentation and Revision History, FAQ Section for Common Queries
  • Updated: 23.03.2026
  • Source File: 1072118.pdf
  • Pages: 15
  • Description: Maintenance instructions for the JAYLINE IS550.

Document Preview & Text Transcription

JAYLINE IS550 ZERO CLEARANCE CABINET INSTALLATION INSTRUCTIONS August 2014 Jayline IS550 Zero Clearance Cabinet Congratulations on the purchase of your Jayline IS550 wood fire and ZC Cabinet. Introduction Please read the entire manual before commencing the installation. The Jayline IS550 wood fire ZC Cabinet system have been tested together and complies with AS/NZS 2918:2001, AS/NZS 4012:1999 & AS/NZS 4013:1999 when installed in accordance with this manual. Correct installation is critical to the safe operation and performance of this fire. For your safety, the building regulatory Authorities in New Zealand require any wood fire installation to comply with Installation Standard AS/NZS 2918:2001. They may also have local requirements in addition to those in the Standard. Check with your local Building Authority before commencing the installation to find if you require a Building Consent and whether there are extra requirements. As the safety and emission performance can be affected by altering the appliance, no modifications are allowed without written permission from the manufacturer. Jayline recommends the installation only be carried out by a suitably qualified installation technician. Your dealer or heating specialist will be able to help with recommendations as well as advice on permits / consents required for the installation in your area. Please ensure you have all relevant permits prior to installation. CAUTION! Inspect the house construction at the proposed installation position to verify the flue / liner system will pass through the house without requiring the removal of essential roof or ceiling support beams. A minimum overall length of 4600mm, of flue pipes and casings must be used above the floor of the appliance to ensure the correct performance of this fire and ZC Cabinet installation. This comprises of 150mm diameter flue pipes, 200mm diameter inner liners and 250mm diameter outer liners. Deviation from this may alter the heaters performance and may nullify the Jayline warranty if the flue is excessively long or short. If in doubt, contact your Jayline dealer. • The ZC Cabinet must be secured to the floor / floor protector prior to the firebox being fitted. • All flue and liner joints must be riveted. The bottom of the flue must be fully sealed into the flue spigot and secured through the hole in the spigot. • The fire must be bolted securely to the floor to comply with the seismic restraint provisions of AS/NZS 2918:2001. Step 1 - Unpack and familiarisation The function of the ZC Cabinet is to enable the firebox to be installed into a timber framed wall, replacing a masonry chimney at a fraction of the cost. Unpack the items supplied and familiarise yourself with them. Supplied with the Jayline IS550 ZC Cabinet are: • 1 x Assembly & Installation instructions • 1 x Outer Cabinet assembly • 1 x 200mm / 250mm liner assembly stub • 1 x Fascia spacer frame (3 pieces) • 1 x Firebox / Cabinet alignment tool • 1 x Fastener pack • 2 x Thermal insulation strips Items not supplied: • 2 x Seismic Restraint fixtures (masonry anchors or wood screws) • 150mm diameter flue pipe • 200mm / 250mm liners • Flue / Liner spacer brackets • Cowl • 250mm or 300mm diameter flashing • Roof flashings • Non-combustible facade capping • Non-combustible materials used elsewhere • Timber and lining products • Floor Protector / Hearth materials • Vent / Vents • Other items as required • Various fasteners & products dependant on build type Step 2 – Venting An air vent or vents are required on the rear of this installation to ensure an air flow can be maintained in the enclosed cavity as shown in fig 1 & 2. The bottom edge of the lower vent or vents must be no more than 100mm above the floor and have a minimum surface area of 10,000 square mm e.g. a meshed vent of 200 x 100mm. The vent area must be kept clear at all times and vermin proofed. Step 3 – Ceiling and roof Prepare the ceiling / penetration / roof, false chimney and venting (top or side required) to enable the 250mm outer casing to be easily fitted prior to the cavity frame being completed as per fig 3 & 4. The distance from the front edge of the enclosure (non-combustible lining directly behind the fascia) to the centre of the flue is 365mm as per fig 8. Please allow for any other material being used at the front, such as bricks etc.
JAYLINE IS550 Installation & operation instructions Main Page Preview

Installation & operation instructions [PDF] (17 pages)

  • Brand: JAYLINE
  • Model: IS550
  • Format: PDF
  • Key Aspects: Manufacturer Contact and Support Data, Technical Data and Parameters, Storage and Care Recommendations
  • Updated: 20.03.2026
  • Source File: 775893.pdf
  • Pages: 17
  • Description: Comprehensive guide for the JAYLINE IS550.
JAYLINE IS550 Installation & operation instructions Main Page Preview

Installation & operation instructions [PDF] (17 pages)

  • Brand: JAYLINE
  • Model: IS550
  • Format: PDF
  • Key Aspects: Hardware Setup Instructions, Best Practices for Everyday Use, Standard Operating Procedures
  • Updated: 18.03.2026
  • Source File: 2316053.pdf
  • Pages: 17
  • Description: Official user manual for the JAYLINE IS550.

Document Preview & Text Transcription

JAYLINE IS550 INSERT WOOD FIRE INSTALLATION & OPERATION INSTRUCTIONS Please leave this information with the appliance NOVEMBER 2016 page 2 www.jayline.co.nz NOVEMBER 2016 PRODUCT REGISTRATION TO ACTIVATE YOUR 15 YEAR GUARANTEE, PLEASE COMPLETE AND RETURN WITHIN 30 DAYS OF INSTALLATION TO: RETAIL LINKS LTD PO BOX 9056 ANNESBROOK, 7044 NELSON NAME: ________________________________________________________________________ ADDRESS: ____________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ EMAIL: ________________________________________ PHONE: ________________________ MODEL: ______________________________________________________________________ SERIAL NUMBER: ______________________________________________________________ DATE PURCHASED: ____________________________________________________________ PURCHASED FROM: ____________________________________________________________ DATE INSTALLED: ______________________________________________________________ INSTALLED BY: ________________________________________________________________ page 3 www.jayline.co.nz NOVEMBER 2016 Congratulations on the purchase of your Jayline wood f re. Please read this installation and operation manual carefully. The installation of this f re must comply with the Installation Standard AS/NZS 2918:2001 as well as any additional local requirements. Please ensure you have all relevant permits prior to installation. Keep this booklet as a reference guide. INSTALLATION OF YOUR JAYLINE WOOD FIRE Jayline recommends you use a suitably qualif ed installation technician to install your f re. Your dealer or heating specialist will be able to help with recommendations as well as advise on permits/consents required for the installation in your area. Please follow carefully all dimensions and recommendations provided on the individual specif cation sheet for your model of heater as these dimensions comply with the required New Zealand standard (AS/NZS 2918:2001). As safety and emissions performance can be af ected by altering the appliance, no modif cations are allowed without the written permission from the manufacturer. PRE-INSTALLATION Prior to installing your Jayline Insert into a f replace cavity, it is important that certain clearances and other requirements are complied with as detailed below: FIREPLACE CAVITY * The chimney must be swept. * Check for cracks and overall condition. If repairs are necessary, they must be carried out by a suitably qualif ed technician. * Check the cavity dimensions to ensure the insert will f t. It is usually necessary to remove the bricks from the lower f replace cavity. * The base of the f replace on which the Jayline Insert will rest must be level. If not, it should be leveled using mortar. * If a timber or combustible mantle shelf exists above the f replace opening, it should be a minimum distance above the top of the f oor protector. The minimum distance is 1175mm. If less than the minimum specif ed, a def ector or heat shield will be required to be under the mantle shelf.
JAYLINE IS550 Installation & operation instructions Main Page Preview

Installation & operation instructions [PDF] (17 pages)

  • Brand: JAYLINE
  • Model: IS550
  • Format: PDF
  • Key Aspects: Initial Startup Checklist, Glossary of Technical Terms, Safety Recommendations and Warnings
  • Updated: 17.08.2026
  • Source File: 935358.pdf
  • Pages: 17
  • Description: User handbook for the JAYLINE IS550.

Document Preview & Text Transcription

JAYLINE SS280PW FREESTANDING WOOD FIRE INSTALLATION & OPERATION INSTRUCTIONS Please leave this information with the appliance APRIL 2017 APRIL 2017 page 2 www.jayline.co.nz PRODUCT REGISTRATION TO ACTIVATE YOUR 15 YEAR GUARANTEE, PLEASE COMPLETE AND RETURN WITHIN 30 DAYS OF INSTALLATION TO: RETAIL LINKS LTD PO BOX 9056 ANNESBROOK, 7044 NELSON NAME: ________________________________________________________________________ ADDRESS: ____________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ EMAIL: ________________________________________ PHONE: ________________________ MODEL: ______________________________________________________________________ SERIAL NUMBER: ______________________________________________________________ DATE PURCHASED: ____________________________________________________________ PURCHASED FROM: ____________________________________________________________ DATE INSTALLED: ______________________________________________________________ INSTALLED BY: ________________________________________________________________ APRIL 2017 page 3 www.jayline.co.nz Congratulations on the purchase of your Jayline wood f re. Please read this installation and operation manual carefully. The installation of this f re must comply with the Installation Standard AS/NZS 2918:2001 as well as any additional local requirements. Please ensure you have all relevant permits prior to installation. Keep this booklet as a reference guide. INSTALLATION OF YOUR JAYLINE WOOD FIRE Jayline recommends you use a suitably qualif ed installation technician to install your f re. Your dealer or heating specialist will be able to help with recommendations as well as advise on permits/consents required for the installation in your area. Please follow carefully all dimensions and recommendations provided on the individual specif cation sheet for your model of heater as these dimensions comply with the required New Zealand standard (AS/NZS 2918:2001). As safety and emissions performance can be af ected by altering the appliance, no modif cations are allowed without the written permission from the manufacturer. INSTALLATION 1. Unpack the heater and check that there is no damage. 2. Ascertain the position of the roof penetration for the f ue system. A correctly installed f ue system will normally prevent down draught problems during windy weather and eliminate smoke spillage problems due to lack of draught. 3. Ascertain suitable position for appliance and size of f oor protector and check the ceiling to ensure that no major structural members will be af ected by the path of the f ue. 4. Check that the sub-structure is capable of carrying the heater (i.e. weight consideration on the f oor). 5. Check measurements of the heater to combustibles or shield. 6. Locate the heater in the required position (also see ‘Fitting Seismic Restraint’ after installation instruction #10). 7. Using a plumb line fastened to the ceiling, mark the centre of the f ue penetration position and cut the ceiling hole to the required size and frame out. 8. Install the f ue system (see f ue installation instructions supplied with f ue system). Remember: • The f ue system should rise vertically from the appliance with as few of sets as possible. Of sets should be limited as each change in direction creates a resistance to airf ow and makes f ue cleaning dif cult. • The f ue system must be well sealed with a minimum of 3 f xings at each joint. • The f ue pipe penetrating the chimney must continue to the minimum length of 4.6m from the top of the f oor protector to the cowl.

IS550: Related Instructions

Manuals from Other Manufacturers