TRAK VMC10 Manuals
3 pdf manual(s) TRAK VMC10 for free download (Document Types: Site preparation manual, Safety, installation, maintenance, service and parts list)
TRAK VMC10 Site preparation manual [PDF] (7 pages)
- Identifier: id-2078325
- Brand: TRAK
- Device: VMC10 Industrial Equipment
- Type: PDF
- Key Aspects: Technical Data and Parameters, Glossary of Technical Terms, Manufacturer Contact and Support Data
- UPD Date: 13.06.2026
- Source File: 2209531.pdf
- Pages: 7
- Description: User instruction booklet for the TRAK VMC10.
Pages Preview:
Document Preview & Text Transcription (Main Page)
Click to expand and read text
TRAK Machine Tools Site Preparation Guide TRAK VMC10 F16467-55 Rev 050520 Page 1 of 7 Before an Authorized Field Service Technician can perform the machine’s final checkout, the following requirements must be met: • The machine must be in position and placed on its rest pads. • To move the machine while on the pallet, a 15000 lb. forklift with a 24” load center & 6’ fork extensions is required. Depending on the load center or rating of the forklift, a larger forklift may be required. The center of gravity (CG) of the machine while on the pallet is ~56” from the edge of the pallet. • The VMC must be lifted from either the left or right hand sides. Make certain that the forks are squarely in the lifting cutouts beneath the machine. See the figures below. • The VMC may be lifted via 2 eye bolts on top of the column and 2 straps at the front of the Y axis as shown in figures 7 and 8. • Once the machine is raised from the pallet, thread the adjusting screws into the bed casting. Thread the leveling screws down approximately 1.25” as measured from the bottom of the leveling bolt to the bottom of the casting. The VMC should be placed on the 4 leveling pads labeled L1, R1, L2 and R2. The leveling screws labeled L3 and R3 should be threaded in but not touching the pad. They will be adjusted during installation. • The machine must be wired (refer to the installation and service manual for additional information). Make sure to follow our grounding recommendations. • The machine must have air hooked up. We strongly recommend that a water separator or air dryer be installed upstream of the VMC air supply. Space & Weight • Floor area (W x L) = 174.50” x 135” • Height = 90” (min) / 106.5” (max) • Footprint (W x L) (coolant tank in place) = 111” x 135” • Net (approx.) Weight = 9900 lbs. • Shipping (approx.) Weight = 10250 lbs. • Pallet Size = 91” x 119” • The floor area encompasses the space required to position the chip container and have the electrical cabinet or side doors open along the X axis. • A solid and level foundation to maintain approximately 9900 lbs. plus the weight of the workpiece (maximum total of ~ 11500 lbs.) is required. Six leveling screws are provided. • Minimum doorway width is 88” and minimum height is 90” that the VMC can fit through (assumes Z cable carrier collapsed and Z axis motor removed). The 90” height dimension can be reduced to 84” if further items are removed or adjusted. Electrical • A separate 208 VAC (200 to 240 V is acceptable), 70 amp minimum, 60 Hz, 3 phase circuit is required. • Machine tool must be earth grounded with a dedicated 8- foot long copper rod. The 6-gage ground wire should run from the copper rod to grounding location in the electrical cabinet. See figures 9 and 10. • A step down transformer is required for 480V. TMT provides this as an option. The transformer must be rated at 30 KVA. Air • ½” ID minimum air connection is required. • Air pressure must be a minimum of 90 psi. • CFM = 2.5 or SCFM = 18 at 90 psi.
TRAK VMC10 Safety, installation, maintenance, service and parts list [PDF] (101 pages)
- Identifier: id-1652411
- Brand: TRAK
- Device: VMC10 Industrial Equipment
- Type: PDF
- Key Aspects: Product Performance Metrics, Detailed Installation Instructions, Basic Configuration Guidelines
- UPD Date: 04.05.2026
- Source File: 1666318.pdf
- Pages: 101
- Description: Technical reference manual for the TRAK VMC10.
Pages Preview:
Document Preview & Text Transcription (Main Page)
Click to expand and read text
TRAK® VMC’s ProtoTRAK® RMX CNC Safety, Installation, Maintenance, Service and Parts List Covers Current Models: • TRAK VMC5 • TRAK VMC7 • TRAK VMC10 Document: P/N 31551 Version: 051820 2615 Homestead Place Rancho Dominguez, CA 90220-5610 USA T | 310.608.4422 | F | 310.764.2668 Service Department: 800.367.3165 e-mail: [email protected] | [email protected] | web: www.trakmt.com
TRAK VMC10 Site preparation manual [PDF] (7 pages)
- Identifier: id-1652412
- Brand: TRAK
- Device: VMC10 Industrial Equipment
- Type: PDF
- Key Aspects: Component Overview and Descriptions, Glossary of Technical Terms, Detailed Installation Instructions
- UPD Date: 18.03.2026
- Source File: 1666317.pdf
- Pages: 7
- Description: Operating instructions for the TRAK VMC10.
Pages Preview:
Document Preview & Text Transcription (Main Page)
Click to expand and read text
TRAK Machine Tools Site Preparation Guide TRAK VMC7 F16467-54 Rev 050520 Page 1 of 7 Before an Authorized Field Service Technician can perform the machine’s final checkout, the following requirements must be met: • The machine must be in position and placed on its rest pads. • To move the machine while on the pallet, a 15000 lb. forklift with a 24” load center & 6’ fork extensions is required. Depending on the load center or rating of the forklift, a larger forklift may be required. The center of gravity (CG) of the machine while on the pallet is ~48” from the edge of the pallet. • The VMC must be lifted from either the left or right hand sides. Make certain that the forks are squarely in the lifting cutouts beneath the machine. See the figures below. • The VMC may be lifted via 2 eye bolts on top of the column and 2 straps at the front of the Y axis as shown in figures 7 and 8. • Once the machine is raised from the pallet, thread the adjusting screws into the bed casting. Thread the leveling screws down approximately 1.25” as measured from the bottom of the leveling bolt to the bottom of the casting. The VMC should be placed on the 4 leveling pads labeled L1, R1, L2 and R2. The leveling screws labeled L3 and R3 should be threaded in but not touching the pad. They will be adjusted during installation. • The machine must be wired (refer to the installation and service manual for additional information). Make sure to follow our grounding recommendations. • The machine must have air hooked up. We strongly recommend that a water separator or air dryer be installed upstream of the VMC air supply. Space & Weight • Floor area (W x L) = 167.25” x 135” • Height = 90” (min) / 106.5” (max) • Footprint (W x L) (coolant tank in place) = 97” x 135” • Net (approx.) Weight = 8360 lbs. • Shipping (approx.) Weight = 8710 lbs. • Pallet Size = 91” x 104” • The floor area encompasses the space required to position the chip container and have the electrical cabinet or side doors open along the X axis. • A solid and level foundation to maintain approximately 8360 lbs. plus the weight of the workpiece (maximum total of ~ 10000 lbs.) is required. Six leveling screws are provided. • Minimum doorway width is 88” and minimum height is 90” that the VMC can fit through (assumes Z cable carrier collapsed and Z axis motor removed). The 90” height dimension can be reduced to 84” if further items are removed or adjusted. Electrical • A separate 208 VAC (200 to 240 V is acceptable), 70 amp minimum, 60 Hz, 3 phase circuit is required. • Machine tool must be earth grounded with a dedicated 8- foot long copper rod. The 6-gage ground wire should run from the copper rod to grounding location in the electrical cabinet. See figures 9 and 10. • A step down transformer is required for 480V. TMT provides this as an option. The transformer must be rated at 30 KVA. Air • ½” ID minimum air connection is required. • Air pressure must be a minimum of 90 psi. • CFM = 2.5 or SCFM = 18 at 90 psi.