Site Preparation Guide TRAK VMC7 F16467-54 Rev 050520 Page 1 of 7 Before an Authorized Field Service Technician can perform the machine’s final checkout, the following requirements must be met: • The machine must be in position and placed on its rest pads. • To move the machine while on the pall ...
Site Preparation Guide TRAK VMC7 F16467-54 Rev 050520 Page 2 of 7 Figure 1 – Front View of Machine Figure 2 – Side View of Machine ...
Site Preparation Guide TRAK VMC7 F16467-54 Rev 050520 Page 3 of 7 Figure 3 – Lifting the VMC Figure 4 – Lifting the VMC ...
Site Preparation Guide TRAK VMC7 F16467-54 Rev 050520 Page 4 of 7 Figure 5 – Lifting the VMC Figure 6 – Leveling Pad Locations ...
Site Preparation Guide TRAK VMC7 F16467-54 Rev 050520 Page 5 of 7 Figure 7 – Lifting Machine with Straps Figure 8 – Lifting Machine Eye Bolts on Top of Column ...
Site Preparation Guide TRAK VMC7 F16467-54 Rev 050520 Page 6 of 7 Electrical Connections Main Power to the Machine Connections The 3 phase 208 voltage (200 – 240 V is acceptable) is connected to L1, L2 and L3 at the main power switch inside the electrical box. Connect the ground wire as shown in the ...
Site Preparation Guide TRAK VMC7 F16467-54 Rev 050520 Page 7 of 7 Figure 10 – Exit Location for Ground Wire to Copper Rod ...