Saeco D.A. COMBISNACK Use And Maintenance

Specifications

Brand: Saeco
Category: Coffee Maker
Model: D.A. COMBISNACK (Use And Maintenance), pryz/JVMFk2X.
File Type: PDF
File Size: —
Pages: 28 pages

Download Document

Get a high-quality, printable PDF version of this manual for offline use.

Download PDF Manual (28 pages)

⚠️ Download Safety: This PDF is completely safe to download (last scan date: 08/07/2026).

Read Online

Read the Saeco D.A. COMBISNACK Use And Maintenance online using the built-in PDF viewer.

D.A. COMBISNACK Use And Maintenance: Key Pages of Document

ACCESSORIES AND PAYMENT SYSTEMS

D.A. COMBISNACK Vending machine USE AND MAINTENANCE Type: D.A. COMBISNACK Espresso Italia USE AND MAINTENANCE USE AND MAINTENANCE LTD USE AND MAINTENANCE www.espressoitalia.com.au Freecall 1300 660 976 ...

DIAGRAM OF CONNECTIONS TO THE KEYPAD BOARD/CPU:. ................................................. 3

2 - PAYMENT SYSTEM INSTALLATION. ............................................................................................. 4 3 - PAYMENT SYSTEM FEEDER KIT. ................................................................................................... 5 4 - INDEPENDENT TANK KIT. ............................................................................................................ 7 5 - FLOAT KIT. ......................................................................................................................... ...

DIAGRAM OF CONNECTIONS TO THE KEYPAD BOARD/CPU:

1. MDB systems; 2. BDV, MDB and executive system power supply; 3. 24 V DC / 12 V DC banknote reader; 4. Executive and BDV systems; 5. 24 V DC parallel coiner (non-change giving); 5. 12 V DC parallel coiner (non-change giving) with its suitable kit, 6. Programming key; 7. Clock module; 8. Saeco card; 9. Connector for PC serial interface 10. Feeder kit for payment systems; Italia PTY LTD www.espressoitalia.com.au 3 Freecall 1300 660 976 ...

This vending machine is supplied with panels assembled as shown

in fig. 2. It is possible to change and replace them with those provided by Saeco according to the customer’s requirements. - Panel for OTR. and M.IVO banknote readers - Panel for JCM banknote reader - Panel for SMILE banknote reader - Panel for m125 COINCO banknote reader - Panel for NRI G13 coiner - Lower Neutra panels (to combine with NRI G 13 panel) Saeco also supplies the relevant wiring harnesses to connect the different payment systems. A specific kit must be used to connect the 12V non-change-giving parallel coiner. Open the front doors to replace the panels a ...

Unplug the four-pin connector from the CPU card (fig. 6).

- Connect the two-pin connector (ref. c, fig. 3) to the payment system power supply board. Connect the 2 contacts of the other end to the 2 free slots of the 4-pin connector that was previously unplugged from the CPU card (fig. 7). fig. 6 fig. 7 3 - PAYMENT SYSTEM FEEDER KIT This kit provides all the necessary power supply for the proper operation of the payment systems connected to the CPU card of Combisnack vending machine, which have a mains voltage of + 12 Vdc (parallel banknote readers) or + 6 Vdc (1432.0xx and 1471.0xx models saeco card). Assembly kit (fig. 3) a. 1 feeder outle ...

Connect the four-pin connector to the CPU card (fig. 8).

fig. 8 - Close the vending machine upper door. The mains voltage values provided by this feeder can also be found on CN6 (ref. 3, fig. 1) and CN9 (ref. 8, fig. 1) connectors of CPU card. Connector Description Voltage Pin CN6 connector for parallel banknote readers +12Vdc 7 CN9 connector for saeco card universal module +5Vdc or +6Vdc 12,13,14 (see table below) Pin 12, 13, 14 voltage of CN6 is set according to JP8 jumper position. JP8 jumper position Voltage on CN6 12, 13, 14 pins 1-2 +6Vdc 2-3 +5Vdc JP8 jumper position Espresso Italia PTY LTD www.espressoitalia.com.au Freecall 1300 66 ...

Remove the machine rear panel (fig. 10) by untightening the

screws and disconnecting the ground wiring placed on the machine. a b c d e n p r g h 4 - INDEPENDENT TANK KIT This kit allows the vending machine to be supplied by means of an internal tank instead of by the water network. To do this, it is necessary to use the tank inside the machine as drinking water hopper. If the machine has not been started for the first time, and the tank has already been used as discharge fluid tank, it shall be replaced with a new one. Assembly kit (fig. 9) a. 1 discharge fluid tank with cap b. 1 spring for tank c. 1 pump with supports and pip ...

Carry out all the electric connections as indicated by the

diagram below. - Disconnect the two power supply wirings from the water inlet solenoid valve (fig. 14). - Remove the water inlet solenoid valve (fig. 15). - Tighten the relay and support plate (ref. r, fig. 9) by using the screws previously taken from the inlet solenoid valve (fig. 16) - Tighten the pump by means of the two screws and two washers 4,3x16 (ref. h, fig. 9) to the bottom (fig. 17). - Connect the pipe (ref. s, fig. 12), previously extracted from the water inlet solenoid valve, to the fitting located on the pump (fig. 18). - Withdraw the cap (ref. u, fig. 15). Connect the ...

24 V D.C.

INLET SOLENOID VALVE RED DARK BLUE Power supply wirings inlet solenoid valve Power supply wirings fan motor BLUE RED BLUE RED 230V 50Hz DARK BLUE DARK BLUE DARK BLUE DARK BLUE DARK BLUE RELAY PINK PINK PINK PINK PINK PUMP 1 FAN - Reassemble the machine rear panel taking care to reconnect the earth cable. - Open the V.M. lower door. - Tighten the spring (ref. b, fig. 9) in the position shown in fig. 29 by using the two screws and two washers 4,3x12 (ref. h, fig. 9). fig. 19 - Replace the pipe fastened to the drain channel (fig. 21) with the drain tube (ref. p, fig.9). Remove the cap (ref. m, fig. 9) from the tank. Insert the other en ...

It allows the display to read the discharge fluid maximum level. In

this condition, no hot beverage is available and the display will read “ERROR 09”. The float can be installed in different positions according to whether the machine is connected to a water network (22 L tank) or uses an independent tank (7L tank). Assembly kit (fig. 25) a. 1 basket set for discharge fluid level b. 2 screws c. 1 reed wiring a b c Installation - Open the front lower door. - If it is applied on the independent tank version, it is necessary to remove the 7 L tank (ref. g, fig. 28) and to assemble the reed wiring (ref. c, fig. 25) by means of t ...

Access the machine programming menu and set “YES” in the

“TANK” menu (fig. 34) to enable the display reading of the discharge fluid maximum level. In order to properly carry out this operation, disable the safety device and press key 1 (fig. 33) to access the programming menu. If no password has been assigned you enter the programming menu directly. Important If vending machine was assigned a password to enable the programming menu, “PASSWORD 0000” will appear on display with a flashing cursor on the first digit. Now digit the password using UP and DOWN keys. Confirm the entered digit by means of ENTER key. To e ...

PULSE COUNTER KIT

The vending machine can be fitted with an electromechanical pulse counter (24V DC) which will count the number of coffees or the total beverages brewed by the machine. Assembly kit (fig. 35) a. 1 pulse counter with support b. 2 screws a b fig. 35 fig. 37 Installation - Open the upper door and fasten the pulse counter (ref. a, fig. 35) to it (fig. 36) by means of the two screws (ref. b, fig. 35). - Couple the pulse counter wiring with the “CN14” connector of the board (fig. 37). fig. 36 To enable the counting of coffees or beverages brewed, access the machine programming menu and set “COFFEE” or ...

It is possible to brew hot water alone by installing the required kit

Assembly kit (fig. 39) a. 1 water pipe set b. 1 OR, pipe clamp and 1/8" H4,5 nut c. 1 two-way solenoid valve fig. 39 Installation - Remove the machine rear panel (fig. 40) by untightening the screws and disconnecting the ground wiring placed on the machine. a b c - Unscrew the cap inserted on the solenoid valve block (fig. 41) and hold the latter to avoid any excessive stress to the block support plate. - Open the upper door and loosen the screw (fig. 42) fixing the block support plate. - Remove the hopper (Fig. 43). - Loosen the two screws fi ...

Screw the nut and fix the OR (ref. b, fig. 39) on the 2-way

solenoid valve (ref. c, fig. 39). Remove the block support from its seat and screw the solenoid valve in the hole (fig. 45) previously cleared from its cap (fig. 41). The solenoid valve must be placed with fastons upwards Reinstall the block support in their seat and tighten the screws. - Remove the clamp (fig. 46) that fastens the two unused cables. - Connect the 2 free cables to the solenoid valve taking care to insert the red cable on the left and the white cable on the right. - Insert the pipe clamp (ref. b, fig. 39) on pipe (ref. a, fig. 39). Then, fasten the pipe (fig. 48) a ...

8 - SUGAR COIL KIT

This kit allows the sugar door opening only when required, since an electromagnet controls it. This prevents any sugar grain from accidentally falling when the “without sugar” option has been selected. Assembly kit (fig. 50) a. 1 two-pin connector b. 1 connecting rod c. 2 M3x6 screws, 1 M3x8 screw and 1 M3 nut d. 1 relay electromagnet e. 1 spring f. 1 sticker a b e f c d g - Disassemble the sugar-dispensing channel (Fig. 52). - Install the connecting rod (ref. b, fig. 50) on the electromagnet piston (ref. d, fig. 50) by means of the spring (ref. e, fig. 50) to obtain the unit shown in fig. 53. - Apply the sticker (ref ...

Assemble the whole unit on the sugar stirrer dispenser (fig.

57) - Couple the connector (ref. a, fig. 50) with the electromagnet by means of the fastons. Insert the other end in the connection located on the mounting plate (fig. 58). - Reinstall the sugar channel and fix it with the spring (fig. 59). - Close the vending machine upper door. - Fasten the connecting rod on the sugar door (fig. 56) by means of an M3x8 screw and an M3 nut (ref. c, fig. 50). fig. 56 fig. 57 fig. 58 Espresso Italia PTY LTD www.espressoitalia.com.au Freecall 1300 660 976 ...

SAECO CARD ASSEMBLY

KIT Assembly kit (fig. 60) a. 1 adhesive sheet for drilling b. 1 guard for universal module c. 1 flat cable d. 4 screws and 4 spacers for card e. 1 Saeco card external antenna fig. 60 f a b c d e fig. 61 fig. 62 fig. 63 - Open the upper front door. - Loosen the guard fastening screws and remove it (fig. 62). - Remove the two screws (fig. 63) of the external antenna; they will be subsequently used to fasten the antenna to the tile. - Fasten the antenna on the tile (fig. 64) by sliding the cable through the 3 dia. hole. Important To use the Saeco card, the machine must be equipped with a Time keeper. Important If the un ...

Fasten the universal module by means of the 4 screws and

spacers (ref. d, fig. 60) on the door (fig. 66). - Connect the universal module to the I/O card (fig. 67) by means of the flat cable (ref. c, fig. 60). - Connect the antenna cable to the universal module (fig. 68). fig. 65 - Tighten the two screws (fig. 65). - Assemble the guard (ref. b, fig. 60) on the universal module (fig. 69). Espresso Italia PTY LTD www.espressoitalia.com.au Freecall 1300 660 976 ...

Saeco card programming

The Saeco card module presence (automatically detected by the V.M.) adds the following entries to the PAYMENT SYSTEM programming menu Entry description: Recharge - It allows disabling or enabling any saeco card recharge operations. By setting RECHARGE = NO the V.M. will only deduct the cost from saeco cards Card prices - This function allows applying differentiated prices in case of card use for the beverage payment. By setting PRICE DIFFERENTIAL = YES a new menu entry will appear in PRICE MANAGEMENT, which will allow setting the price level to be applied to the product (beverage or snack) in case of saeco card u ...

Insert the lever under the vending machine. Rotate the lever to

lift the machine (fig. 71 and 72). The lever position shall allow the carriage set to be subsequently inserted. - Insert the carriage set under the V.M. (fig. 73), move the lever back to its initial position, then remove it from under the machine (fig. 74). fig. 70 fig. 71 fig. 72 fig. 73 fig. 74 fig. 75 fig. 76 fig. 77 fig. 78 a b 10 - HANDLING KIT This kit allows easy handling of the vending machine in order to carry out any maintenance operations and to place it in narrow spaces. Warning During handling operations be extremely careful in order to avoid any limb ...

Coffee Maker PDF Instructions

ECM Compact HX-2 Operation & user’s manual
ECM Compact HX-2
23.08.2026 24 pages

Liebe Kundin, lieber Kunde mit der Compact HX-2 haben Sie eine Espresso-Kaffeemaschine der absoluten Spitzenklasse erworben. Wir danken Ihnen für Ihre Wahl und wünschen Ihnen viel Freude an Ihrer Maschine und vor allem natürlich an der Zubereitung von Espre

Sunbeam 32863281 Instruction manual
Sunbeam 32863281
24.06.2026 44 pages

Instruction Manual 12-CUP CUSTOMBLEND™COFFEE MAKER Manuel d’Instructions CAFETIÈRE 12 TASSES CUSTOMBLEND™ Manual de Instrucciones CAFETERA PARA 12 TAZAS CUSTOMBLEND™ Manual de Instruções CAFETEIRA CUSTOM BLEND™ COM CAPACIDADE PARA 12 XÍCARAS I I

Philips HD8825 Operation & user’s manual
Philips HD8825
15.05.2026 68 pages

USER MANUAL Read carefully before using the machine. Register your product and get support at www.philips.com/welcome English EN 02 02 HD8824 HD8825 Super automatic espresso machine 3000 series

WMF Terra Operating manual
WMF Terra
11.07.2026 29 pages