Venmar 41502 Installation Manual

Text of the manual

These products earned the ENERGY STAR® by

meeting strict energy efficiency guidelines set by Natural Resources Canada and the US EPA. They meet ENERGY STAR requirements only when used in Canada. 06010A rev. 17 INSTALLATION GUIDE FOR VENMAR AVS UNITS CONSTRUCTO 1.0 HRV AND CONSTRUCTO 1.0 ERV Model no.: 41502 (HRV with top ports) Model no.: 4150

Because of the large amount of models covered by this publication, the illustrations are typical ones. Some details of your unit may be

slightly different than the ones shown. Please take note that this manual uses the following symbols to emphasize particular information: NOTE: Indicates supplementary information needed to fully complete an instruction. W

TABLE OF CONTENTS

1. TYPICAL INSTALLATIONS ......................................................................................................................... 4-5 1.1 FULLY DUCTED SYSTEM ..........................................................................................................................................4 1.2 CENTRAL DRAW POINT

Installations may vary according to the type of unit and the ports configuration (top or sides). Use the following illustrations as guidelines

to help you decide on how the unit will be installed. All the units should be hung from the joists. In every case, bathroom fans and a range hood should be used to exhaust stale air. Also, f

TYPICAL INSTALLATIONS (CONT’D)

1.4 ATTIC INSTALLATION FOR ERV UNITS ONLY All 3 types of installations can be used in the attic (Fully ducted system, Central Draw Point or Simplified). The example shown below is a Simplified installation (connection to a forced air system). NOTE: To get the most of your ERV unit, the ambient temperature around the unit

UNIT PREPARATION (CONT’D)

The door latches location can be changed from sides to front of the unit, according to the installation needs. To do so, turn the unit upside down. Open the latches an unscrew them from the unit. Install the latches on their new locations. VD0176 Latches on sides of the unit Latches in front of the

PLANNING OF THE DUCTWORK

• Keep it simple. Plan for a minimum of bends and joints. • Keep the length of insulated ducts to a minimum. • Do not ventilate crawl spaces or cold rooms. Do not attempt to recover the exhaust air from a dryer or a range hood. This would cause clogging of the filters and recovery module. • If

INSTALLING THE DUCTWORK AND REGISTERS (CONT’D)

2.6.3 SIMPLIFIED INSTALLATION (AS ILLUSTRATED IN SECTION 1.3) There are 2 methods for connecting the unit to the furnace/air handler: Method 1: Supply-return connection Method 2: Return-return Stale air intake: • Cut an opening into the furnace/air handler return duct not les

Other Air Conditioner Manuals