ZKaccess ML10R Installation Instruction

Text of the manual

Mounting Hardware Package Mounting Hardware Package

for door thickness of 39-46mm for door thickness

Note: The standard lock includes 2 mounting hardware packages only, which are used for the door

thickness of 39-46mm and 47-54 mm separately. Note: Please refer to the above picture to adjust the direction of strike plate F and latch D. 1. Check the door thickness and prepare the corresponding mounting hardware package. 2. Check door openi

3. Check the required backset (60mm or 70mm).

Note2: The latch has two backset options: 60mm and 70mm, please choose either one as required. Note1: Installation template has the backset options of both 60mm and 70mm. 4

1. New lock is configured to grant ANY Mifare card access to unlock.

2. The lock is equipped with mechanical keys for manual unlocking. Remove mechanical keys from the package and keep them in a safe place. 3. To power up the lock, four alkaline AA batteries (not included) are required. Non-alkaline and rechargeable batteries ARE NOT R

1. Align the template along the vertical center line of

the latch(D) at the desired handle height, and tape it to the door. 2. Mark the holes first, and then start drilling. E E D center line of the handle desired handle height 1.Drill holes on the door. 2.Install the latch (D). Installation 6

Correct Position: T he small triangle

must be vertically upward. This position is wrong . B H C 3.Install outdoor unit(B) with gasket(C) and spindle(H) on the door. 7

More ZKaccess Door locks Owners Instructions: