Grant WPVKIT5 Installation & User's Instructions
| Brand: | Grant |
| Category: | Pellet stove |
| Model: | WPVKIT5 (Installation & User's Instructions) |
| File Type: | |
| File Size: | — |
| Pages: | 36 |
Text of Grant WPVKIT5 Installation & User's Instructions
Grant SpiraVac Pellet Feed System
For Grant Spira Boiler Pellet Hoppers
Installation & User Instructions
Part No. DOC.43 Rev.07 – 17/05/17
Grant WPVKIT5 EC Declaration of Conformity
In accordance with BS EN ISO/IEC 17050-1:2004
We
Grant Engineering (IRL)
Of
Crinkle
Birr
Co. Offaly
Ireland
Telephone:
057 912 0089
Fax:
057 912 1060
Email:
[email protected]
Website:
www.grantengineering.ie
Declare that
Equipment:
Wood Pellet Vacuum System for Domestic Wood Pellet Boilers
Model Name/Number:
Grant BioVac System
In accordance with the following EC Directives:
2006/42/EC
Conforms with the requirements of
Grant WPVKIT5 2. Technical Specification
2.1 Kit contents
5
2.2 Technical data
6
2.3 System arrangement
6
3. Description & Operation
3.1 Vacuum unit
7
3.2 Auger unit
8
3.3 Flexible tubes
9
3.4 Operating sequences
9
4. Installation
4.1 Auger unit
13
4.2 Vacuum unit
15
4.3 Flexible pellet tubes
17
5. Electrical
5.1 General
19
5.2 Connection of pellet hopper
19
5.3 Connection of vacuum unit to pellet hopper
19
5.4 Connection of vacu
These Installation instructions should be read carefully before installing the SpiraVac system and must be
used in conjunction with the Grant Spira Installation & User instructions supplied with the boiler.
Installation of the Grant Spira boiler and Grant SpiraVac system must only be carried out by a Grant
Approved Installer who has successfully completed the Grant Spira training course.
The Grant SpiraVac is a vacuum system for conveying
2. Technical Specification 2.1 Kit Contents
The Grant SpiraVac system is available in 4 different kits, containing the following:
•
1 x Auger unit
•
1 x Vacuum unit
•
1 x Pellet dam plate
•
4 x ‘Jubilee’ type pipe clips
•
Flexible pellet tube (length dependant on kit – see table below)
•
Metal pipe clips (quantity to suit tube length used – see table below)
•
Installation & User Instructions
Note. The electrical cable required to co
Grant WPVKIT5 2.2 Technical Data
Auger unit
Vacuum unit
Weight
16.4kg
24kg
Supply Voltage
230V 50HZ 1ph 13A fused*
Running Current
8.6A
Power
1870W
*Refer to Section 5.2 for further details on fuse ratings required
2.3 SpiraVac System Arrangement
Spira pellet boiler
Bulk pellet store
Auger unit
Flexible pellet tubes
Vacuum unit
Boiler pellet hopper
3. Description & Operation
The Grant SpiraVac pellet feed system consists of the following items
3.1 Vacuum Unit
The vacuum unit is designed to be mounted on the top of either the single or double Spira pellet hopper.
The pellet hopper, supplied with the boiler, has a removable cover on the top rear panel to allow fitting of
the vacuum unit. Refer to Section 4 for vacuum unit installation details.
The vacuum unit can be fixed to the top rear panel of the
The vacuum unit has two factory-fitted flying leads with pre-wired plugs.
•
The 6-way plug connects the vacuum unit to the pellet hopper, via the corresponding factory
fitted flying lead and pre-wired 6-way connector (to be found within the electrical wiring enclosure
at the rear of the pellet hopper).
•
The 3-way plug provides the electrical connection for the remote auger unit. A suitably sized
cable of the required length must be connected between
3.3 Flexible Pellet Tubes
Two lengths of flexible tube (supplied with the SpiraVac system kit) are used to connect the vacuum unit
(on the top of the pellet hopper) to the auger unit (mounted on the bulk pellet store).
The tube supplied is a 50mm diameter reinforced Polyurethane flexible tube with a copper anti-static wire
moulded into the tube wall. When fitting the tube, this wire must be exposed and placed in contact with
the steel connections (on the
‘24 hour’ mode – to automatically fill the hopper with pellets, up to the trap door of the vacuum
unit trap door, every 24 hours starting when the ON/OFF switch on the SpiraVac control panel is
first set to ON.
In both cases the operation of the vacuum unit is as follows – Refer to the flow diagram in Figure 3-6.
The vacuum motor will start and create a vacuum in the cyclone. This pulls closed the trap door at the
base of the cyclone. The v
‘24 hour’ mode
In this operating mode, the SpiraVac system will only operate after exactly 24 hours has elapsed since the
‘VACUUM SYSTEM’ ON/OFF switch on the SpiraVac control panel was last set to ON.
The vacuum system will operate repeatedly until the hopper is filled with pellets up to the trap door of the
cyclone, as on the initial operation of the vacuum system.
It is possible to re-set the time that this ’24 hour’ operation occurs to a
Grant Pellet stove Owners Instructions:
| Device Model | Type of Document | Pages | Size | Views | Downloads | Updated |
|---|---|---|---|---|---|---|
WPVKIT5 |
WPVKIT5 (Pellet stove ePDF User Manual, #45FD26) |
36 | 246 | 55 | 12-05-2026 |