Grant WPVKIT5 Installation & User's Instructions

Brand: Grant
Category: Pellet stove
Model: WPVKIT5 (Installation & User's Instructions)
File Type: PDF
File Size: —
Pages: 36
Text of Grant WPVKIT5 Installation & User's Instructions

Grant SpiraVac Pellet Feed System

For Grant Spira Boiler Pellet Hoppers Installation & User Instructions Part No. DOC.43 Rev.07 – 17/05/17

Grant WPVKIT5 EC Declaration of Conformity

In accordance with BS EN ISO/IEC 17050-1:2004 We Grant Engineering (IRL) Of Crinkle Birr Co. Offaly Ireland Telephone: 057 912 0089 Fax: 057 912 1060 Email: [email protected] Website: www.grantengineering.ie Declare that Equipment: Wood Pellet Vacuum System for Domestic Wood Pellet Boilers Model Name/Number: Grant BioVac System In accordance with the following EC Directives: 2006/42/EC Conforms with the requirements of

Grant WPVKIT5 2. Technical Specification

2.1 Kit contents 5 2.2 Technical data 6 2.3 System arrangement 6 3. Description & Operation 3.1 Vacuum unit 7 3.2 Auger unit 8 3.3 Flexible tubes 9 3.4 Operating sequences 9 4. Installation 4.1 Auger unit 13 4.2 Vacuum unit 15 4.3 Flexible pellet tubes 17 5. Electrical 5.1 General 19 5.2 Connection of pellet hopper 19 5.3 Connection of vacuum unit to pellet hopper 19 5.4 Connection of vacu

These Installation instructions should be read carefully before installing the SpiraVac system and must be

used in conjunction with the Grant Spira Installation & User instructions supplied with the boiler. Installation of the Grant Spira boiler and Grant SpiraVac system must only be carried out by a Grant Approved Installer who has successfully completed the Grant Spira training course. The Grant SpiraVac is a vacuum system for conveying
2. Technical Specification 2.1 Kit Contents The Grant SpiraVac system is available in 4 different kits, containing the following: • 1 x Auger unit • 1 x Vacuum unit • 1 x Pellet dam plate • 4 x ‘Jubilee’ type pipe clips • Flexible pellet tube (length dependant on kit – see table below) • Metal pipe clips (quantity to suit tube length used – see table below) • Installation & User Instructions Note. The electrical cable required to co

Grant WPVKIT5 2.2 Technical Data

Auger unit Vacuum unit Weight 16.4kg 24kg Supply Voltage 230V 50HZ 1ph 13A fused* Running Current 8.6A Power 1870W *Refer to Section 5.2 for further details on fuse ratings required 2.3 SpiraVac System Arrangement Spira pellet boiler Bulk pellet store Auger unit Flexible pellet tubes Vacuum unit Boiler pellet hopper

3. Description & Operation

The Grant SpiraVac pellet feed system consists of the following items 3.1 Vacuum Unit The vacuum unit is designed to be mounted on the top of either the single or double Spira pellet hopper. The pellet hopper, supplied with the boiler, has a removable cover on the top rear panel to allow fitting of the vacuum unit. Refer to Section 4 for vacuum unit installation details. The vacuum unit can be fixed to the top rear panel of the

The vacuum unit has two factory-fitted flying leads with pre-wired plugs.

• The 6-way plug connects the vacuum unit to the pellet hopper, via the corresponding factory fitted flying lead and pre-wired 6-way connector (to be found within the electrical wiring enclosure at the rear of the pellet hopper). • The 3-way plug provides the electrical connection for the remote auger unit. A suitably sized cable of the required length must be connected between

3.3 Flexible Pellet Tubes

Two lengths of flexible tube (supplied with the SpiraVac system kit) are used to connect the vacuum unit (on the top of the pellet hopper) to the auger unit (mounted on the bulk pellet store). The tube supplied is a 50mm diameter reinforced Polyurethane flexible tube with a copper anti-static wire moulded into the tube wall. When fitting the tube, this wire must be exposed and placed in contact with the steel connections (on the

‘24 hour’ mode – to automatically fill the hopper with pellets, up to the trap door of the vacuum

unit trap door, every 24 hours starting when the ON/OFF switch on the SpiraVac control panel is first set to ON. In both cases the operation of the vacuum unit is as follows – Refer to the flow diagram in Figure 3-6. The vacuum motor will start and create a vacuum in the cyclone. This pulls closed the trap door at the base of the cyclone. The v

‘24 hour’ mode

In this operating mode, the SpiraVac system will only operate after exactly 24 hours has elapsed since the ‘VACUUM SYSTEM’ ON/OFF switch on the SpiraVac control panel was last set to ON. The vacuum system will operate repeatedly until the hopper is filled with pellets up to the trap door of the cyclone, as on the initial operation of the vacuum system. It is possible to re-set the time that this ’24 hour’ operation occurs to a

Grant Pellet stove Owners Instructions:

Device Model Type of Document Pages Size Views Downloads Updated
WPVKIT5

WPVKIT5 (Pellet stove ePDF User Manual, #45FD26)

36 246 55 12-05-2026

Pellet stove: Similar Manuals