Kirsch Cellular Shade Collection Getting Started
Text of Kirsch Cellular Shade Collection Getting Started
Cellular Shade Collection
Vertical Cellular Automation Installation Instructions
GETTING STARTED
Product View.................................................................................................................................................................. 1
Tools and Fasteners Needed......................................................................................................................................... 2
INSTALLATION
Install
*Located inside headrail
Inside
Mount
Adaptor
Moving
Rail
Fabric Carriers
Extension
Bracket
Optional Outside Mount Hardware:
1∕8" Shim
1∕2" Spacer
Block
Stationary
Rail
Extension
Cable
18V DC Power Supply
(Optional)
Headrail
Cord
Tensioners*
Battery
Wands
Moving
Rail
Bracket*
Installation
Brackets
Manual
Control Button
Gear Box
Motor
Ribbon Cable C
Thank you for purchasing the Kirsch® Cellular Shade Collection. With proper installation,
operation, and care, your new shades will provide years of beauty and performance.
To get started, unpack the shade and remove all foam/packaging materials. Check that all
parts shown on the packing list are included with the order. Please thoroughly review this
instruction booklet before beginning the installation.
IMPORTANT: Cords are wrapped aro
Installation Brackets Required
■
■The number of installation brackets required varies with headrail width, as shown
in the table.
Installation Overview
Installation of Vertical Celullar shades varies based on the shade mounting type, stacking design, and the valance type selected.
Mounting Types and Window Terminology
■
■Review the mounting types and basic window terminology illustrated below. Determine if your shade is
■Determine where to place the top of the installation brackets.
➤
➤Add the desired floor clearance to the ordered height of the shade. The ordered height can
be found on the packaging label. A minimum of 1⁄2" floor clearance is recommended.
➤
➤Measure the total distance up from the floor. This is where to place the top of the installation brackets.
➤
➤A minimum flat vertical surface of 11⁄4" is required to
■Attach the spacer blocks and installation brackets with #6 hex head mounting screws long
enough for a secure installation. (See chart below.) Longer screws are not provided.
➤
➤The top of the spacer blocks should be at the desired shade height.
➤
➤The front edges of the installation brackets must be level and aligned to each other.
CAUTION: Use drywall anchors when mounting into drywall.
CAUTION: The rear of the