TED Pro Commercial Installation Manual
Text of the manual
I n s t a l l a t i o n
M a n u a l
f o r
T E D P r o C o m m e r c i a l
A B C
TED Pro CT Clamp Commercial Energy Monitor
TED Pro CT Clamps Commercial Energy Monitor
TED Pro WD Wireless Display for Commercial Energy Monitor
TED Pro MTU-HV Commercial Energy Monitor
TED Pro MTU-HV Commercial Energy Monitor
TED Pro ECC Commercial Energy Monitor
TED Pro MTU
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
TA B L E O F C O N T E N T S
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 3
Operating Conditions . . . . . . . . . . . . . . . . . . . . . . . Page 3
Three phase services . . . . . . . . . . . . . . . . . . . . . . . Page 3
Single
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
Page 3
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
Rev 1.0.13
Use
Condition
Temperature
Relative Humidity
Altitude
Voltage
Maximum Power
Indoor
Dry
10° - 40°C
< 80%
3,300M
95-265VAC
5W
Indoor/Outdoor
Dry /Damp
- 40°C to +50C
< 95
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
o 240/120 3PH-4W Hi-Leg Delta (North America)
o 380Y/220V 3PH-4W Wye or 380V 3PH-3W Delta (Asia)1
o 400Y/230V3PH-4W Wye or 380V 3PH-3W Delta (Europe)1
o 415Y/240V 3PH-4W Wye or 380V 3PH-3W Delta (UK, Australia/NZ, India)1
o 480Y/277V 3PH-4W Wye or 480V 3-PH-3W Delta
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
Page 5
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
Rev 1.0.13
TED Pro Commercial Energy Monitoring System includes:
• One (1) MTU3000 Measuring Transmitting Unit (MTU-HV)
• One (1) ECC (with Footprints firmware embedded)
• One (1
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
PA R T I I – S A F E T Y
THE MTU AND CTs OF THE TED PRO COMMERCIAL sYsTEM MUsT BE
INsTALLED BY A LICENsED ELECTRICIAN
This manual provides the steps necessary to safely install the MTU and Current Transformers (CTs).
For detailed installation and operation of oth
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
Page 7
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
Rev 1.0.13
B E F O R E Y O U S TA R T
• Do not begin installation until you have read the “Safety” section of this manual.
•
Read all instructions before beginning installati
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
Figure 3(a)
Installation of MTU
(communication via Power Line Carrier)
Neutral
Phase C
Phase A
Incoming Power Lines
MAX 600V
MAX 1200A
White (neutral)
Black (phase A)
Neutral
Bus
15, 20, or 30A
Circuit Breaker
CT’s
Main Circuit Breaker
MAX 1200A
A
B
C
A
B
C
A
B
A
B