Framery O VCR Installation Instructions Manual

File Specifications

Brand: Framery
Category: Indoor Furnishing
Model: O VCR (Installation Instructions Manual), prpizZpFimQHU
File Type: PDF
File Size: —
Pages: 84 pages

Download Document

Get a high-quality, printable PDF version of this manual for offline use.

Download PDF Manual (84 pages)

⚠️ Download Safety: This PDF is completely safe to download (last scan date: 07/06/2026).

Read Online

Read the Framery O VCR Installation Instructions Manual online using the built-in PDF viewer.

Key Pages of Document

1 Warranty checklist........................................................................................... 5

2 Safety.................................................................................................................6 3 Installation requirements................................................................................ 8 3.1 Tools and accessories............................................................................... ...

11 Install the glass wall....................................................................................53

11.1 Install the floor cover panels................................................................................... 57 12 Install the interior.........................................................................................58 12.1 Cut the carpet............................................................................................ ...

1 Warranty checklist

For the product warranty to be valid: This checklist must be filled and sent to Framery after pod installation. Take a photo/scan the filled list and send it to Framery at [email protected]. Leave the completed list on the pod's glass door. Country: _________________________________________ City: _________________________________________ Customer: _________________________________________ Pod serial number: ________________ ...

This chapter outlines important safety matters concerning the installation and maintenance of

the pod. It is important that these instructions are followed to recognize and prevent potential risks before they occur. Note: All personnel must understand and observe these instructions prior to installation or maintenance of the pod. Restrictions • Non-conventional use • Installation or maintenance of the pod without reading and understanding the ...

The pod is intended to be used in the following conditions.

• Ambient temperature: +15°C ... +30°C (59°F ... 86°F) • Humidity: max. 50% Framery O VCR Installation Instructions [email protected] 7 ...

3 Installation requirements

3.1 Tools and accessories Figure 1: Tools and accessories needed for installation and maintenance Note: Use a white rubber mallet to not leave marks on the body covers. Note: Use a plastic chisel. 8 Framery O VCR Installation Instructions [email protected] ...

Note: Use a lint-free cloth.

Note: Use a mild alcohol-based cleaning solution for cleaning the pod. 3.2 Display size Make sure that your display fits the display slot. Figure 2: Display slot dimensions 3.3 Installation space Make sure that you have enough installation space before you start the installation. Framery O VCR Installation Instructions [email protected] 9 ...

Figure 3: Installation space measures

3.4 Operating space Make sure the pod has enough space for the air to circulate correctly. Figure 4: Operating space measures 10 Framery O VCR Installation Instructions [email protected] ...

4 Level the floor module

1. Lay the floor module down at the intended final location. Leave approximately 0.5 m (2 ft) of empty space behind the floor module. Note: The stool mounting notch is closer to the backside of the pod. Framery O VCR Installation Instructions [email protected] 11 ...

Screw out the feet of the leveling screws (4 pcs) gradually with a T-handle socket wrench.

The leveling screws are against the floor when you feel resistance. 3. Measure the floor module with a spirit level at four measuring points: • On top of the walls on the right and left sides • At the edge of the floor module (on the ABS strips) Measure opposite points repeatedly and adjust the feet of the leveling screws gradually. 12 Framery O VCR Installati ...

5 Install the wall modules

5.1 Remove the wall cover panels 1. Place the wall modules lengthwise against a wall. 2. Unscrew the 4x30 screws (8 pcs) and remove the cover panels (4 pcs). Set the cover panels and screws aside. Note: Make sure that the wall modules do not fall over. Framery O VCR Installation Instructions [email protected] 13 ...

Unscrew the 4x30 screws (24 pcs) and remove the cover panels (4 pcs). Set the cover

panels and screws aside. 14 Framery O VCR Installation Instructions [email protected] ...

5.2 Connect the wall modules to the floor module

1. Lift the floor module up to stand on its side. Note: Do not move the floor module away from the intended location. Note: Check that the leveling screws are past the floor board level. Framery O VCR Installation Instructions [email protected] 15 ...

Install the guide pins (4 pcs) to the mounting holes of the floor module.

Note: Make sure that the flat side of the guide pin goes into the mounting hole. 3. Push the blank wall module carefully into place. Note: Make sure that the "This side up" sticker faces upwards and its arrows point to the inside of the pod. Note: Make sure that you install the blank wall module on the correct side of the floor module. The electrical channel is on the other sid ...

Install M8x35 bolts (3 pcs) and M8 washers (3 pcs).

5. Push the techwall module carefully into place. Note: Make sure that the "This side up" sticker faces upwards and its arrows point to the inside of the pod. Note: Make sure that you install the techwall module on the correct side of the floor module. The power cord and the electrical channel are on the same side. Framery O VCR Installation Instructions [email protected] 17 ...

Install M8x35 bolts (3 pcs) and M8 washers (3 pcs).

18 Framery O VCR Installation Instructions [email protected] ...

6 Connect the roof module to the wall modules

1. Install the guide pins (4 pcs) to the mounting holes. Note: Make sure that the flat side of the guide pin goes inside the mounting holes of the wall modules. Framery O VCR Installation Instructions [email protected] 19 ...

Push the roof module carefully into place.

Note: Make sure that the roof module cord is in the electrical channel. Make sure that the wall module cord is not between the modules. 3. Install M8x35 bolts (3 pcs on each side) and M8 washers (3 pcs on each side). 20 Framery O VCR Installation Instructions [email protected] ...