Please retain these instructions after installation.
This device MUST be installed by a qualifi ed agency in accordance with the manufacturer's installation instructions. The defi nition of
a qualifi ed agency is: any individual, fi rm, corporation or company which either in person or through a representative is engaged
in, and is responsible for, the installation and operation of HVAC appliances, who is experienced in such work
page 2 of 8
MOUNTING JUNCTION BOX
The junction box can be mounted at the venter or remotely mounted away from the venter.
(See Figures 1 & 2)
1. Remove one of the knockouts from the side of the junction box. Install the fl exible conduit connector onto the
CK-20FV junction box and secure with fastening nut. If remote mounting the CK-20FV junction box, mount the
fl exible conduit connector onto a 2" x 4" installer supplied junction box.
2. Fasten the fl
page 3 of 8
INSTALLATION OF GAS PRESSURE SWITCH
CAUTION: Check gas control valve pressure.
Pressure must not exceed 14” WC pressure.
1. Remove pressure tap plug in gas valve.
(See Figure 3) NOTE: If installing on an existing
appliance, shut off gas supply to gas valve before
plug removal.
2. Replace the pressure tap plug with the 1⁄8” pipe
nipple and pipe tee. Install pressure tap plug at the
bottom of the pipe tee. (See Figure 4)
3. Install the gas
page 4 of 8
DRAFT HOOD SAFETY SWITCH INSTALLATION
NOTE: 12 ga. wire must be used when wiring safety spillage
switches, to reduce the voltage drop in the thermocouple circuit.
1. Remove the thermocouple from the gas control valve.
(See Figure 3)
2. Thread the junction block into the thermocouple port and
thermocouple into the bottom of the junction block. Connect
lead wire from the junction block to the jacketed lead wires
or wire enclosed in an accepted wi
page 5 of 8
Diagram A
WIRING
CAUTION: Disconnect electrical power when wiring power venter.
Wire the venter motor and controls in accordance with the National Electrical Code, manufacturer’s
recommendations and/or applicable local codes. Units must be grounded. Check ground circuit to make
certain that the unit has been properly grounded. The wiring should be protected by an overcurrent circuit
device rated at 15 amperes. CAUTION must be taken to ensure
page 6 of 8
P/N 46285000 Rev K 01/18
Diagram B
WIRING 750mV GAS VALVE SYSTEM WITH ELECTRONIC TEMPERATURE CONTROL
CAUTION: Disconnect electrical power when wiring power venter.
When wiring with a power-pile system having an intergrated electronic control, which have a
diagnostic LED indicator; please refer to Diagram B. You will not use the TCA thermocouple adapter,
supplied with the CK-20FV. Install the GSK spill switches per instruction and connect to t
page 7 of 8
TROUBLE SHOOTING HINTS
1. Venter does not activate when thermostat calls for heat:
a. Check wiring.
b. Check gas pressure switch for continuity across terminals when gas valve is pressurized.
c. Check gas pressure.
2. Flue gas odor:
a. Check system draft.
b. Check for negative pressure in building.
3. Pilot will not stay lit on water heater:
a. Solder all spillage switch wire terminal connections.
b. Check reset buttons on spillage switches.
c.
Phone: 252.522.3031 • Fax: 252.522.0214
www.fieldcontrols.com
© Field Controls, LLC
P/N 46285000 Rev K 01/18
This manual may be downloaded and printed from the Field Controls website (www.fi eldcontrols.com)
WARRANTY
For warranty information about this or any Field Controls product, visit:
www.fi eldcontrols.com
Field Controls Technical Support
1.800.742.8368
fi eldtec@fi eldcontrols.com