ABB i-bus EIB Product Manual
Read Online
Read the ABB i-bus EIB Product Manual online using the built-in PDF viewer.
i-bus EIB Product Manual: Key Pages of Document
Application Unit Time ABZ/S 2.1 Intelligent Installation Systems ABB ...
Subject to changes and errors excepted. Exclusion of liability: Despite checking that the contents of this document match the hardware and software, exclusions cannot be completely excluded. We therefore cannot accept any liability for this. Any necessary corrections will be inserted in new versions of the manual. Please inform us of any suggested improvements. E-mail: [email protected] ...
© 2006 ABB STOTZ-KONTAKT GmbH 3 ABB i-bus ® EIB / KNX Contents Page 1 General 6 1.1 Product and functional description........................................................7 2 Device technology 8 2.1 Technical data.......................................................................................8 2.2 Circuit diagram......................................................................................9 2.3 Dimension drawing .............................................................................10 2.4 Assembly and installation ...................................................................10 3 Commissioning ...
© 2006 ABB STOTZ-KONTAKT GmbH 4 ABB i-bus ® EIB / KNX 3.3.10.7 Hotkey selection ............................................................................30 3.4 Parameters .........................................................................................31 3.4.1 General.............................................................................................31 3.4.1.1 Operating mode of clock................................................................36 3.4.2 Time switch program........................................................................44 3.4.3 Day routines - General............................ ...
© 2006 ABB STOTZ-KONTAKT GmbH 5 ABB i-bus ® EIB / KNX A.2 List of diagrams................................................................................. VIII A.3 List of tables....................................................................................... XII A.4 List of key words ............................................................................... XIII A.5 Ordering information.........................................................................XIV A.6 Notes..................................................................................................XV ...
6 ABB i-bus ® EIB / KNX 1 General Complex timer operations and time controllers are becoming increasingly important in modern buildings with ABB i-bus® EIB / KNX. Time-controlled day or week routines e.g. of lighting installations should be implemented in buildings, factories or hotels. In schools, the lighting should e.g. be switched off at the weekend for energy reasons or the heating system should be lowered to a minimum using time control. In hotels, it should be possible to set different lighting or ventilation sequences for different events. In underground car parks for example, different time sequences sh ...
7 ABB i-bus ® EIB / KNX 1.1 Product and functional description The Application Unit Time ABZ/S 2.1 is a DIN rail mounted device for insertion in the distribution board. The connection to the bus is carried out via a bus connecting terminal at the front of the device. Both the assignment of the physical address and the setting of parameters are carried out with ETS3 from version V1.0. The device is supplied via the ABB i-bus® and does not require an additional power supply. The processing is carried out in the application program Times Groups/2. The device is characterised by its comprehensive and clear functiona ...
8 ABB i-bus ® EIB / KNX 2 Device technology The Application Unit Time is a DIN rail mounted device for insertion in the distribution board. The device contains a year time switch program with the option of defining day routines and week routines individually. Complex group formations are also possible. The device is ready for operation after connecting the bus voltage. The Application Unit Time is parameterised via ETS3. The connection to the bus is established via the bus connecting terminal at the front of the device. Fig. 1: ABZ/S 2.1 2.1 Technical data Power supply - Bus voltage 21 … 32V DC - Powe ...
9 ABB i-bus ® EIB / KNX Application program Max. number of communication objects Max. number of group addresses Max. number of associations Times Groups/2 250 250 254 Table 2: Application program Note: ETS3 is required for programming. A file of type “.VD3” must be imported. The application program is stored in ETS3 under ABB/Controller/Controller. 2.2 Circuit diagram 2CDC 072 053 F0005 Fig. 2: Circuit diagram 1 Label carrier 2 Programming button 3 Programming LED 4 Bus connecting terminal ...
10 ABB i-bus ® EIB / KNX 2.3 Dimension drawing 2CDC 072 051 F0006 Fig. 3: Dimension drawing 2.4 Assembly and installation The Application Unit Time is a DIN rail mounted device for insertion in distribution boards for snap-on mounting on 35mm mounting rails, in accordance with DIN EN 60 715. The connection to the bus is carried out via the bus connecting terminal supplied. The device is ready for operation once the bus voltage has been applied. The accessibility of the devices for operation, testing, inspection, maintenance and repair must be ensured (according to DIN VDE 0100-520). Commissioning requir ...
11 ABB i-bus ® EIB / KNX Supplied state The Application Unit Time is supplied with the physical address 15.15.255. The application program is pre-loaded. During the commissioning stage, only group addresses and parameters need to be loaded. If required, the complete application program can be reloaded. When changing the application program or after unloading, a longer download process may occur. Download behaviour Due to the complexity of the device, it can take up to 1.5 min. during a download until the progress bar appears, depending on the computer being used. Assignment of the physical address The a ...
12 ABB i-bus ® EIB / KNX 3 Commissioning 3.1 Overview The application program “Times Groups/2” is available for the Application Unit Time. Programming requires ETS3. A maximum of 250 communication objects, 250 group addresses and 254 associations can be linked. The following functions are available: Time switch program Defines when telegrams with specific group addresses and values are sent on the bus. Day routines Contains the time program of a day from 00:00 to 23:59. Day routines can be activated and deactivated by the time switch program and by telegrams. There are 15 day routines available. Switchi ...
13 ABB i-bus ® EIB / KNX 3.2 Parameterisation software (PZM 2.0) The parameterisation software “PZM 2.0” is used by the system operator and offers the following options: - loading the installation configuration which has been created in ETS into the ABZ/S 2.1. - modifying the time switch program and then downloading the program to the ABZ/S 2.1 - saving of the modified time switch program - reading out and setting the time and date of the ABZ/S 2.1 - reading out the status information of the ABZ/S 2.1. Note: The parameterisation software PZM 2.0 has its own manual which can be downloaded from the Inter ...
14 ABB i-bus ® EIB / KNX Parameterising the ABZ/S 2.1 with ETS A comment for the system operator should be entered in the “Description” field in the ETS3 “Properties” window e.g. project name, function of the Application Unit Time in the installation and the date. Fig. 4: ETS3 “General” dialog window Note: This information is displayed in the table area of the parameterisation software PZM 2.0 as “Comment of the installer” after loading the time switch program. ...
15 ABB i-bus ® EIB / KNX 3.3 Interface 3.3.1 ABB – Times Groups/2 Fig. 5: “Times Groups/2” screen 3.3.2 Title bar Fig. 6: “Title bar” screen The title bar contains information about the manufacturer, the name of the application program, the physical address as well as the type and the name of the device. 3.3.3 Menu bar Fig. 7: “Menu bar” screen The File, Edit, Online, Window and Help menus are visible in the menu bar. 3.3.4 Status bar Fig. 8: “Status bar” screen The status bar can be activated or deactivated in the Window menu, under the Status bar menu item. If it is activated, it always ...
16 ABB i-bus ® EIB / KNX 3.3.5 File menu Fig. 9: “File” menu Some menu items are context-sensitive and are only activated for specific configurations. Inactive menu items are greyed out. 3.3.5.1 Save The parameter data is stored in the ETS3 database by selecting the Save menu item. ...
17 ABB i-bus ® EIB / KNX 3.3.5.2 Export Fig. 10: “Export” screen By selecting the Export menu item, the time switch program is saved as a Times Groups (*.zm2) file or in CSV format (*.csv). Note: Files with the ending .zm2 can be imported in the parameterisation software PZM2 and edited. Files with the ending .csv can be imported in other programs e.g. data processing programs or spreadsheets and edited further. ...
18 ABB i-bus ® EIB / KNX 3.3.5.3 Import Fig. 11: “Import” screen By selecting the Import menu item, the time switch program which has been exported from the application program or the parameterisation software PZM2 is read in as a .zm2 file. Note: Older .zm1 files can be imported in the Application Unit Time ABZ/S 2.1 and edited. When importing a zm2 file into an existing ETS3 project, the parameters that were saved in the edited project are overwritten. When importing the .zm2 file, note that changes have possibly been carried out to the time switch program since exporting the file. It is strongly reco ...
19 ABB i-bus ® EIB / KNX 3.3.5.5 View page Fig. 12: “View page” screen By selecting the View page menu item, the parameter assignment that is to be printed out is shown on the screen. ...
20 ABB i-bus ® EIB / KNX 3.3.5.6 Filter print data Fig. 13: “Filter print data” screen By selecting the menu item Filter print data, those parts of the parameter assignment which should be printed out are selected. Type Options: All/ Selection Option All = The entire configuration is printed out. Option Selection = Only certain parts of the configuration are printed out. Select the entries which should be printed out with the left mouse button, while holding down the Control button [Ctrl]. “OK” button When the “OK” button is pressed, the settings are adopted and the parameter window closes. “C ...
Timer PDF Instructions
Timers 755 Series 755-503revB Printed in USA 12/06 © 2006 Operation Manual Product Identification The Prince Castle Model 755 Series Multi-display 10-Channel Timer and 16-Channel Timer are easy-to-use timers that count down in minutes and seconds, or hours an
Auto 0 6 12 18 24 Prog Man 3 1 2 4 5 6 7 SHT-1, SHT-1/2, SHT-3, SHT-3/2 cos φ ≥ 0.95 M M HAL.230V K M M AC12 x DC14 x AC1 250V / 16A AC13 x AC2 250V / 5A AC14 250V / 6A AC3 250V / 3A AC15 250V / 6A AC5b 1000W DC5 24V / 2A AC6a x DC12 24V / 6A AC7b 250V / 3A
THERMO ICE WI-FI (SURFACE-MOUNTING) GW16970CB GW16970CN GW16979CT Programming manual
1 Document Name : OIM V 1.0 Page 1 of 7 i INSTALLATION GUIDELINES 1. Prepare the cut-out with proper dimension as shown in figure. 2. Remove clamp from Controller. 3. Push the Timer through panel cut-out and secure the Controller in its place by tightening