Dell PowerVault DL2000 Setup Diagram
Text of Dell PowerVault DL2000 Setup Diagram
Review preinstallation requirements.
2
Verify that your solution is complete.
5
Connect the power and attach the power cord retention brackets. Install the cable management arm and ramp
assembly, then route and secure the cables. For more information, see the documentation included with your rail kit.
4
Install the MD1000 in the rack and connect the power
Power on the system components.
Information in this document is subject to change without notice.
© 2008–2009 Dell Inc. All rights reserved.
Reproduction of these materials in any manner whatsoever without
the written permission of Dell Inc. is strictly forbidden.
Dell, PowerVault, PowerEdge, and the DELL logo are trademarks of
Dell Inc. Microsoft, Wind