Flowmaster American Thunder Installation Instructions

Text of Flowmaster American Thunder Installation Instructions

409S® Stainless Steel

Removal: 1) Raise the rear of the vehicle and support securely with jack stands. 2) Remove the existing system from the header collector or manifold down pipes back. Installation: 1) Locate the center carrier bearing cross member; this is where the front hangers will be mounted. Measuring in 9-5/8” from the frame toward the center of the cross member there should be a factory hole. Using a drill and bit, open the hole up to 3/8”.

Take the 86076S muffler inlet pipes and place a supplied 2½” clamp onto

the expanded end, place them onto the back of the H-pipe assembly’s 86074S & 86075S. Rotate them up into their approximate position and tighten the clamps enough to hold, but still allow for adjustment. 5) Take one of the 842548-Z mufflers and place a supplied clamp onto the inlet, slide the inlet onto the back of one of the 86076S inlet pipes with the outlet of the muffler in

It will be necessary to adapt from your existing headers or manifold downpipes to the Flowmaster H-

pipe assembly. Due to the many different variables in header/manifold down pipe locations, we have included 2 #86084S adapter pipes to aid in the fabrication of the connection between these two areas. 11) Remove temporary support and allow the system to suspend on the hangers. 12) Adjust the position of the pipes and mufflers to provide a satisfactory fi
409S® Stainless Steel Installation diagram for: SYSTEM #817654 1967-1972 GM C10 TRUCKS 2½” HEADER BACK SYSTEM FLOWMASTER PERFORMANCE EXHAUST EXHAUST SYSTEMS

Flowmaster Automobile Parts Owners Instructions: