BAC PT2 Rigging And Assembly Instructions
| Brand: | BAC |
| Category: | Desktop |
| Model: | PT2 (Rigging And Assembly Instructions) |
| File Type: | |
| File Size: | — |
| Pages: | 8 |
Text of BAC PT2 Rigging And Assembly Instructions
The PT2 Cooling Tower should be rigged and assembled as outlined in this bulletin. These
procedures should be thoroughly reviewed prior to the actual rigging and assembly of the equipment
to acquaint all personnel with procedures to be followed and to ensure that all necessary equipment
will be available beforehand.
Be sure to have a copy of the certified drawing available for reference. If you do not have a copy of this
drawing, or if you
WARNING: In the event of extended lifts or where hazards exist, the lifting devices should be used in conjunction with
safety slings placed under the unit.
Anchoring
Seven-eighths inch (7/8”) diameter holes are provided in the bottom flange of the basin section for
bolting the unit to the support beams. Refer to the suggested support location drawing included in
the submittal for location and quantity of the mounting holes. The unit must be level for
BAC PT2 All PT2 Cooling Towers are designed to be lifted in one assembled piece as shown in Figure 2. The
optional 2-piece lift is shown in Figure 1.
Lower Section
Lower Section
Middle Section
Upper Section
Upper Section
One Piece
PT2 Model Number
H (distance from lift point to lifting device in feet)
Lower Section
Upper Section
PT2-0412
16
8
PT2-0709
14
10
PT2-0809
14
12
PT2-0812
16
12
PT2-1009
14
14
PT2-1012
16
14
PT2-1212
16
16
Figure 3 shows the pr
Note: IBC Rating is void if section assembly is not performed as described below.
Two-section PT2 Cooling Tower assembly:
Position the lower section in the working location. No sealer tape is required on the InterLok™
Casing joint. Using drift pins in the bolt holes provided, guide the upper section onto the lower
section. Match marks must line up. Bolt in place as illustrated in Figure 5, using a 1/2” bolt and flat
washer. The as
Use the lifting devices at the top of each subsequent cell to slide the cells together. Use the flume box
assembly procedure outlined below to connect the basins of multi-cell units.
PT2 Flume Box Installation
1. Position Cell #1 on the unit support and bolt in place
2. Wipe down the mating surface by the flume opening to remove any dirt or moisture that may
have accumulated during shipment
3. Wipe down the flanges on both ends of the flume box. On on
Positive Closure Plate Option
The optional Positive Closure Plate and gasket can be furnished on
multi-cell units to allow individual cells to be isolated for cleaning
and routine maintenance. For PT2 Cooling Towers, the plate ships
loose inside the basin. To install the Positive Closure Plate and
gasket, follow the steps that correspond to your unit from the
“Assembly of Multi-Cell Towers” section; then complete the
installation of your spe
BAC PT2 PT2-0709, 0809 and 0812 Motor Installation (Figures 12 and 13):
Attach lifting strap to the motor base eyelet and remove the motor and motor base assembly from the
cold water basin shipping location. The motor assembly remains vertical to maintain proper
alignment during installation. Lift assembly into position next to access door. Attach the assembly to
the unit using the six supplied studs and hardware. Install power band and check sheave alignment.
BAC PT2 Platform and Ladder Installation
Remove platform and ladder assembly from cold
water basin. Hang pre-assembled platform by
inserting top guide pins into fan deck notches
(shown in Figure 15, Detail A). Secure with
tappers. Assemble lower platform clamps and
secure to side of tower, tightening nuts and
bolts shown in Figure 15, Detail B.
Optional Factory Pre-Wired Terminal Box
BAC offers an optional terminal box with factory
pre-wiring for PT2 models 041