The PT2 Cooling Tower should be rigged and assembled as outlined in this bulletin. These

procedures should be thoroughly reviewed prior to the actual rigging and assembly of the equipment to acquaint all personnel with procedures to be followed and to ensure that all necessary equipment will be available beforehand. Be sure to have a copy of the certified drawing available for reference. If you do not have a copy of this drawing, or if you

WARNING: In the event of extended lifts or where hazards exist, the lifting devices should be used in conjunction with

safety slings placed under the unit. Anchoring Seven-eighths inch (7/8”) diameter holes are provided in the bottom flange of the basin section for bolting the unit to the support beams. Refer to the suggested support location drawing included in the submittal for location and quantity of the mounting holes. The unit must be level for

BAC PT2 All PT2 Cooling Towers are designed to be lifted in one assembled piece as shown in Figure 2. The

optional 2-piece lift is shown in Figure 1. Lower Section Lower Section Middle Section Upper Section Upper Section One Piece PT2 Model Number H (distance from lift point to lifting device in feet) Lower Section Upper Section PT2-0412 16 8 PT2-0709 14 10 PT2-0809 14 12 PT2-0812 16 12 PT2-1009 14 14 PT2-1012 16 14 PT2-1212 16 16 Figure 3 shows the pr

Note: IBC Rating is void if section assembly is not performed as described below.

Two-section PT2 Cooling Tower assembly: Position the lower section in the working location. No sealer tape is required on the InterLok™ Casing joint. Using drift pins in the bolt holes provided, guide the upper section onto the lower section. Match marks must line up. Bolt in place as illustrated in Figure 5, using a 1/2” bolt and flat washer. The as

Use the lifting devices at the top of each subsequent cell to slide the cells together. Use the flume box

assembly procedure outlined below to connect the basins of multi-cell units. PT2 Flume Box Installation 1. Position Cell #1 on the unit support and bolt in place 2. Wipe down the mating surface by the flume opening to remove any dirt or moisture that may have accumulated during shipment 3. Wipe down the flanges on both ends of the flume box. On on

Positive Closure Plate Option

The optional Positive Closure Plate and gasket can be furnished on multi-cell units to allow individual cells to be isolated for cleaning and routine maintenance. For PT2 Cooling Towers, the plate ships loose inside the basin. To install the Positive Closure Plate and gasket, follow the steps that correspond to your unit from the “Assembly of Multi-Cell Towers” section; then complete the installation of your spe

BAC PT2 PT2-0709, 0809 and 0812 Motor Installation (Figures 12 and 13):

Attach lifting strap to the motor base eyelet and remove the motor and motor base assembly from the cold water basin shipping location. The motor assembly remains vertical to maintain proper alignment during installation. Lift assembly into position next to access door. Attach the assembly to the unit using the six supplied studs and hardware. Install power band and check sheave alignment.

BAC PT2 Platform and Ladder Installation

Remove platform and ladder assembly from cold water basin. Hang pre-assembled platform by inserting top guide pins into fan deck notches (shown in Figure 15, Detail A). Secure with tappers. Assemble lower platform clamps and secure to side of tower, tightening nuts and bolts shown in Figure 15, Detail B. Optional Factory Pre-Wired Terminal Box BAC offers an optional terminal box with factory pre-wiring for PT2 models 041