Thermo King V-500 Manual
Read Online
Read the Thermo King V-500 Manual online using the built-in PDF viewer.
Text of the manual
TK 51859-1-MM (Rev. 1, 05/05)
Copyright© 2004 Thermo King Corp., Minneapolis, MN, USA.
Printed in USA.
all-guides.co
m
This manual is published for informational purposes only and the information so provided should
not be considered as all-inclusive or covering all contingencies. If further information is required,
Thermo King Corporation should be consulted.
Sale of product shown in this manual is subject to Thermo King’s terms and conditions
including, but not limited to, the Thermo King Limited Express Warranty. Such terms and
conditions are available upon request. Thermo King’s warranty will not apply to any
equipment which has been “so repaired or altered outside the manufacturer’s plants as,
in the manufacturer’s judgment, to effect its stability.”
No warranties, express or implied, including warranties of fitness for a particular
purpose or merchantability, or warranties arising from course of dealing or usage of
trade, are made regarding the information, recommendations, and descriptions
contained herein. Manufacturer is not responsible and will not be held liable in contract
or in tort (including negligence) for any special, indirect or consequential damages,
including injury or damage caused to vehicles, contents or persons, by reason of the
installation of any Thermo King product or its mechanical failure.
The maintenance information in this manual covers unit models:
V-500-10 (920271)
V-500-20 3PH (920272)
V-500-20 1PH (920273)
V-500 MAX-10 (920274)
V-500 MAX-20 3PH (920275)
V-500 MAX-20 1PH (920276)
For further information, refer to:
V-500 Series Operating Manual
TK 51878
V-500 Series Parts manual
TK 52763
Diagnosing Thermo King Refrigeration Systems
TK 5984
Evacuation Station Operation and Field Application
TK 40612
Tool Catalog
TK 5955
The information in this manual is provided to assist owners, operators and service people in the
proper upkeep and maintenance of Thermo King units. The above manuals may be purchased from
your local Thermo King dealer.
At Thermo King, we recognize the need to preserve the environment
and limit the potential harm to the ozone layer that can result from
allowing refrigerant to escape into the atmosphere.
We strictly adhere to a policy that promotes the recovery and limits
the loss of refrigerant into the atmosphere.
In addition, service personnel must be aware of Federal regulations
concerning the use of refrigerants and the certification of technicians.
For additional information on regulations and technician certification
programs, contact your local Thermo King dealer.
R-134a/R-404A
WARNING: Use only Polyol Ester-based refrigeration compressor oil in
R-134a/R-404A units. See Thermo King Parts Manual for part number.
Do not mix Polyol Ester and standard synthetic compressor oils. Keep Polyol
Ester compressor oil in tightly sealed containers. If Polyol Ester oil becomes
contaminated with moisture or standard oils, dispose of properly–DO NOT USE.
When servicing Thermo King R-134a or R-404A units, use only those service
tools certified for and dedicated to R134a/R-404A refrigerant and Polyol Ester
compressor oils. Residual non-HFC refrigerants or oils will contaminate R-134a
and R-404A systems.
About This Manual
Purpose
The purpose of this manual is to provide general maintenance information necessary to maintain the
climate control unit at peak operating standards. This includes safety information, unit information such
as bills of material and kit numbers, general unit information, maintenance procedures and related
information (such as wiring and schematic diagrams), and some diagnostic and troubleshooting
information.
NOTE: This manual may cover more than one unit. Therefore, it may contain information not
applicable to your unit.
Contents
This manual is organized into the following chapters:
Chapter
Purpose
Safety Precautions
Provides detailed safety information. You should be familiar with the
safety precautions before working on any unit.
Model Systems and Update
Matrices
These tables list the bills of material and kit options that make up your
unit. Use them for the following purposes:
1. To determine if you have the right manual for your unit: the bill of
material (B/M) number on your unit serial plate should match one of the
bill of material numbers listed in this section. If you cannot find your unit
in the matrix, call TK Service for more information.)
2. To communicate with TK Service Department: If you need to call TK
Service, you must know your model number so that the service
representative to help you.
Specifications
Lists unit specifications.
General Description
Gives an overview description of your unit including standard and
optional features, illustrations, and general a/c theory.
Operating Instructions
Provides unit operating instructions.
Maintenance Inspection Schedule
Table of routine maintenance procedures.
Maintenance Chapters
Provide detailed maintenance procedures required for your unit.
(Electrical, Refrigeration, Compressor, Structural, Clutch)
Refrigeration Diagnosis
Provides troubleshooting information for diagnosing problems.
Wiring and Schematic Diagrams
Wiring and Schematic diagrams applicable to the unit.
About This Manual
6
Before you Call Thermo King Service!
Who to call: Your Thermo King Service Representative.
Before you call Thermo King Service, have the following information on hand:
•
Bill of Material (usually located on the unit serial plate)
•
Model Number - found on side of the unit
Blank Pages
This manual may contain blank pages at the end of chapters. This is normal. There is no information
missing from the manual.
Roadside/Curbside Terminology
Roadside/Curbside terminology: These terms can be confusing because of differences between North
America and Europe. Please note:
Using the Model Tables in “About this Unit”
The model tables in this section (called “About this Unit,” “Model Systems and Update Matrices,” or
something similar) list important unit information that you will need to communicate with the Thermo
King Service Department. See the table on the previous page for a description of how to use these tables.
Curbside:
The side of the truck to the driver’s right when the driver is in his seat and facing forward.
Roadside:
The side of the truck to the driver’s left when the driver is in his seat and facing forward.
all-guides.co
m
Table of Contents
About This Manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Before you Call Thermo King Service! . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Blank Pages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Roadside/Curbside Terminology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Using the Model Tables in “About this Unit” . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Safety Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
General Practices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Auto Start/Stop . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Refrigerant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
First Aid . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Refrigeration Oil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
First Aid . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Electrical Hazards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Microprocessor Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Welding of Units or Truck Bodies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
High Voltage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Low Voltage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Model Systems (System Designations) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Electrical System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Refrigerant System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Compressors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Belt Tension (Using Tool P/N 204-427) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
AC Electric Motors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
Electric Standby Power Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
Solder Applications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
General Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Condenser . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Evaporator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Compressor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Control Circuits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
In-Cab Control Box . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Oil Separator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Refrigerant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Liquid Injection System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Evaporator Drain Tube Heaters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Electric Standby Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Unit Features . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Protection Features . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Control Box . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
P.C. Board . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Connectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Fuses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Common Relays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Electric Standby Relays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Unit Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Thermostat Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Serial Number Locations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Unit Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Table of Contents
8
Operating Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .33
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .33
Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .33
In-Cab Control Box Operating Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34
Display Return Air (Box) Temperature . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34
Display Setpoint Temperature . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34
Enter Setpoint Temperature . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34
Defrost Mode Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34
Unit Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36
Weekly Pretrip Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36
Starting the unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36
After Start Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36
Loading Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36
Post Load Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36
Maintenance Inspection Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39
Electrical . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39
Refrigeration/Heating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39
Structural . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39
Electrical Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .41
Maintenance Inspection Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .41
Trouble Shooting In-Cab Control Box M-13 and M-16 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .42
Defrost System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .43
Defrost Timer Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .43
Defrost Termination Switch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .44
Defrost Relay . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .44
Defrost Solenoid Valve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .44
Testing the Defrost System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .44
Defrost Timer Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .45
Condenser Fan Pressure Switch (CFPS) R-134a Units Only . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .45
Testing CFPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .45
Liquid Injection System (R-404A Units Only) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .45
Testing Liquid Injection Solenoid Valve and Metering Orifice . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .46
Electric Standby Circuits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .46
Refrigeration Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47
Maintenance Inspection Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47
RCharging the Refrigeration System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47
Checking the Refrigerant Charge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .48
Checking Compressor Oil Charge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .49
High Pressure Cutout Switch (HPCO) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .50
Low Pressure Cutout Switch (LPCO) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .50
Cleanup Procedure for Small Truck Units . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .51
Structural Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .53
Maintenance Inspection Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .53
Evaporator Coil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .53
Condenser Coil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .53
Unit Mounting Bolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .53
Table of Contents
9
Compressor Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
Refrigerant Handling Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
Refrigerant Handling Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
Refrigerant Recovery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
Compressor Installation Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Compressor Handling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Compressor Storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Compressor Installation Position . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Compressor Installation Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Compressor Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
Mounting Compressors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
Adding Extra Oil To System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
Major Loss Of Refrigerant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
Checking Compressor Oil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Oil Check Interval . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Oil return procedure (System Operational) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Compressor Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Draining and Replacing Oil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
Clutch Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
Clutch Removal, Inspection, and Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
Clutch Run In . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
Shaft Seal Cover and Shaft Seal Removal, Inspection, and Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
Seal Cover Installation (When Equipped) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
Front and Rear Cylinder Head Disassembly, Inspection, and Reassembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
Disassembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68
Reassembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
Compressor Leak Test Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71
Special Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
Belt Tensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73
Engine Driven Compressor Belt and Pulleys . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73
Over-the-Road Mechanical Diagnosis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
Electric Standby Mechanical Diagnosis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
Electric Standby Service Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
Refrigeration Diagnosis Chart . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
Index . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
Wiring, Refrigeration and Schematic
Diagrams Index . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85
List of Figures
Figure 1: P.C. Board Fuses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Figure 2: Fuse 4/1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Figure 3: Thermostat Algorithm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Figure 4: Unit Components (Model 20) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Figure 5: Condenser Electric and Capacitor Boxes (Model 20) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Figure 6: Evaporator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
Figure 7: Evaporator with Hot Water and Electric Heat Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Figure 8: M13 In-Cab Control Box . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
Figure 9: On/Off Key & LED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
Figure 10: Celsius/Fahrenheit LED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
Figure 11: Setpoint Key & Dial . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
Figure 12: Misc. LED’s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
Figure 13: Defrost Key & LED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
Figure 14: On/Off Key and Defrost Key . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Figure 15: Setpoint Key . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Figure 16: Entering Setpoint . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Figure 17: Back of Cab Control Box with Cover Removed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
Figure 18: Block Diagram M-13, M-16 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
Figure 19: Defrost Timer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
Figure 20: Testing CFPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
Figure 21: Charging Refrigeration System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
Figure 22: High Pressure Cutout Manifold . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
Figure 23: Connecting Flushing Compressor to Unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
Figure 24: Evaporator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
Figure 25: Condenser . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
Figure 26: Typical Recovery Unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
Figure 27: Rotate Compressor Clutch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Figure 28: Compressor Installation Range . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Figure 29: Loosen Cap Slowly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
Figure 30: Rotate Compressor Clutch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
Figure 31: Shim Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
Figure 32: Oil Inspection Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Figure 33: Draining the Oil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
Figure 34: Typical Compressor Oil Fill Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
Figure 35: Remove Center Bolt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
Figure 36: Remove Armature Plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
Figure 37: Remove Snap Ring and Cover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
Figure 38: Remove Pulley . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
Figure 39: Remove Coil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
Figure 40: Inspect Clutch Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
Figure 41: Install Coil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
Figure 42: Install Pulley . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
Figure 43: Install Cover and Snap Ring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
Figure 44: Install Cover and Snap Ring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
Figure 45: Install Shims and Drive Plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
Figure 46: Check Air Gap . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
Figure 47: Shaft Seal Cover Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
Figure 48: Remove Shaft Seal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
Figure 49: Inspect Shaft Seal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
Figure 50: Place Guide on Shaft . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
all-guides.co
m
List of Figures
12
Figure 51: Place Shaft Seal on Guide . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .65
Figure 52: Press Seal Into Cylinder Head . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .65
Figure 53: Install Snap Ring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .66
Figure 54: Install Shaft Seal Cover (When Equipped) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .66
Figure 55: Proper Shaft Seal Cover Position . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .66
Figure 56: Remove Body Bolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .67
Figure 57: Tap Front Cylinder Head Projections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .67
Figure 58: Front Cylinder Head Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .67
Figure 59: Front Valve Plate and Suction Valve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .67
Figure 60: Tap Rear Cylinder Head Projections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .68
Figure 61: Rear O-ring and Gasket . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .68
Figure 62: Rear Valve Plate and Suction Valve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .68
Figure 63: Front Cylinder and Valve Plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .68
Figure 64: Rear View . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .69
Figure 65: Rear Suction Valve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .69
Figure 66: Rear Cylinder Head Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .69
Figure 67: Front Suction Valve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .70
Figure 68: Front Cylinder Head Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .70
Figure 69: Tightening Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .70
Figure 70: Compressor Drain Plug Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .71
Figure 71: Discharge and Suctions Caps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .71
Figure 72: Pulley Arbor P/N 204-804 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .72
Figure 73: Shaft Seal Kit P/N 204-805 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .72
Figure 74: Clutch Remover P/N 204-806 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .72
Figure 75: Compressor Holder P/N 204-807 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .73
Figure 76: Snap Ring Pliers P/N 204-808 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .73
Figure 77: Clutch Installation Kit P/N 204-890 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .73
1. Always wear goggles or safety glasses.
Refrigerant liquid, refrigeration oil, and
battery acid can permanently damage the eyes.
2. Never close the compressor discharge service
valve with the unit operating.
3. Never operate the unit with the compressor
discharge valve closed.
4. Keep your hands, clothing and tools clear of
the fans and belts when the unit is running.
This should also be considered when opening
and closing the compressor service valves.
5. Make sure gauge manifold hoses are in good
condition. Never let them come in contact
with a belt, fan motor pulley, or any hot
surface.
6. Never apply heat to a sealed refrigeration
system or container.
7. Fluorocarbon refrigerants in the presence of
an open flame produce toxic gases that are
severe respiratory irritants capable of causing
death.
8. Make sure all mounting bolts are properly
torqued and are of correct length for their
particular application.
9. Use extreme caution when drilling holes in the
unit. The holes may weaken structural
components, and holes drilled into electrical
wiring can cause fire or explosion. Holes
drilled into the refrigeration system will
release refrigerant.
10. Use caution when working around exposed
coil fins. The fins can cause painful
lacerations.
11. Use caution when working with a refrigerant
or refrigeration system in any closed or
confined area with a limited air supply (for
example, a truck body or garage). Refrigerant
tends to displace air and can cause oxygen
depletion resulting in suffocation and possible
death.
12. When using ladder or scaffolding, use caution
and follow manufacturer recommendations.
Auto Start/Stop
Refrigerant
When removing refrigerant from a unit, a
recovery process that prevents or minimizes
refrigerant loss to the atmosphere is required by
law.
When a refrigerant is exposed to the atmosphere
in the liquid state, it evaporates rapidly, freezing
anything it contacts. If refrigerant contacts the
skin, severe frostbite can result.
First Aid
In the event of frostbite, the objectives of First
Aid are to protect the frozen area from further
injury, to warm the affected area rapidly and to
maintain respiration.
•
Eyes: For contact with liquid, immediately
flush eyes with large amounts of water and get
prompt medical attention.
•
Skin: Flush area with large amounts of
lukewarm water. Do not apply heat. Remove
contaminated clothing and shoes. Wrap burns
with dry, sterile, bulky dressing to protect
from infection/injury. Get medical attention.
Wash contaminated clothing before reuse.
•
Inhalation: Move victim to fresh air and use
cardiopulmonary resuscitation (CPR) or
mouth-to-mouth ventilation if necessary. Stay
with victim until arrival of emergency medical
personnel.
CAUTION: The unit may start
automatically and at any time when the
unit On/Off switch is in the On position.
Units with CYCLE-SENTRYTM start
automatically in both CYCLE-SENTRY
mode and Continuous mode. Be sure to
turn the On/Off switch Off before opening
doors or inspecting or working on any part
of the unit.
Observe the following precautions when working
with or around synthetic or polyol ester refrigerant
oil:
•
Do not allow refrigerant oil to contact your
eyes.
•
Do not allow prolonged or repeated contact
with skin or clothing.
•
To prevent irritation, you should wash
thoroughly immediately after handling
refrigerant oil. Rubber gloves are
recommended when handling polyol ester oil.
First Aid
•
Eyes: Immediately flush eyes with large
amounts of water for at least 15 minutes while
holding the eyelids open. Get prompt medical
attention.
•
Skin: Remove contaminated clothing. Wash
thoroughly with soap and water. Get medical
attention if irritation persists.
•
Inhalation: Move victim to fresh air and
restore breathing if necessary. Stay with
victim until arrival of emergency personnel.
•
Ingestion: Do not induce vomiting. Contact a
local poison control center or physician
immediately.
Electrical Hazards
Microprocessor Service
Precautions must be taken to prevent electrostatic
discharge when servicing the microprocessor
controller and related components. Potential
differences considerably lower than those which
produce a small spark from a finger to a door
knob can severely damage or destroy solid-state
integrated circuit components.
The following procedures must be rigidly adhered
to when servicing units to avoid microprocessor
damage or destruction.
1. Disconnect all power to the unit.
2. Avoid wearing clothing that generates static
electricity (wool, nylon, polyester, etc.).
3. Do wear a static discharge wrist strap (see
Tool Catalog) with the lead end connected to
the microprocessor’s ground terminal. These
straps are available at most electronic
equipment distributors. Do not wear these
straps with power applied to the unit.
4. Avoid contacting the electronic components
on the circuit boards of the unit being
serviced.
5. Leave the circuit boards in their static proof
packing materials until ready for installation.
6. If a defective controller is to be returned for
repair, it should be returned in the same static
protective packing materials from which the
replacement component was removed.
7. After servicing the controller or any other
circuits, the wiring should be checked for
possible errors before restoring power.
8. Never use testers consisting of a battery and a
light bulb to test circuits on any
microprocessor based equipment.
9. Before connecting or disconnecting the
battery, the Microprocessor Power On/Off
switch must be turned to the Off position. It is
located on the roadside of the unit, lower left
corner.
Welding of Units or Truck Bodies
When electric welding is to be performed on any
portion of the temperature control unit, truck or
truck chassis when the temperature control unit is
attached, it is necessary to ensure that welding
currents are not allowed to flow through the
electronic circuits of the unit.
These procedures must be rigidly adhered to when
servicing units to avoid damage or destruction of
the controller.
1. Disconnect all power to the unit.
2. Disconnect all wire harnesses from the
controller.
3. Switch all of the electrical circuit breakers in
the control box to the Off position.
4. Weld unit or container per normal welding
procedures. Keep ground return electrode as
close to the area to be welded as practical.
This will reduce the likelihood of stray
welding currents passing through any
electrical or electronic circuits.
5. When the welding operation is completed, the
unit power cables, wiring and circuit breakers
must be restored to their normal condition.
High Voltage
When servicing or repairing a temperature control
unit, the possibility of serious or even fatal injury
from electrical shock exists. Extreme care must be
used when working with a refrigeration unit that
is connected to a source of operating power, even
if the unit is not operating. Lethal voltage
potentials can exist at the unit power cord, inside
the control box, at the motors and within the
wiring harnesses.
Precautions
1. Be certain the Unit On/Off switch is turned
Off before connecting or disconnecting the
standby power plug. Never attempt to stop the
unit by disconnecting the power plug.
2. Be certain the unit power plug is clean and dry
before connecting it to a power source.
3. When working on high voltage circuits on the
temperature control unit, do not make any
rapid moves. If a tool drops, do not grab for it.
People do not contact high voltage wires on
purpose. It occurs from an unplanned
movement.
4. Use tools with insulated handles that are in
good condition. Never hold metal tools in
your hand if exposed, energized conductors
are within reach.
5. Treat all wires and connections as high
voltage until a meter and wiring diagram show
otherwise.
6. Never work alone on high voltage circuits on
the temperature control unit. Another person
should always be present to shut off the
temperature control unit and to provide aid in
the event of an accident.
7. Have electrically insulated gloves, cable
cutters and safety glasses available in the
immediate vicinity in the event of an accident.
First Aid
Immediate action must be initiated after a person
has received an electrical shock. Obtain
immediate medical assistance if available.
The source of shock must be immediately
removed by either shutting down the power or
removing the victim from the source. If it is not
possible to shut off the power, the wire should be
cut with either an insulated instrument (e.g., a
wooden handled axe or cable cutters with heavy
insulated handles) or by a rescuer wearing
electrically insulated gloves and safety glasses.
Whichever method is used do not look at the wire
while it is being cut. The ensuing flash can cause
burns and blindness.
If the victim must be removed from a live circuit,
pull the victim off with a non-conductive material.
Use the victim’s coat, a rope, wood, or loop your
belt around the victim’s leg or arm and pull the
victim off. Do not touch the victim. You can
receive a shock from current flowing through the
victim’s body. After separating the victim from
the power source, check immediately for the
presence of a pulse and respiration. If a pulse is
not present, start CPR (Cardiopulmonary
Resuscitation) and call for emergency medical
assistance. If a pulse is present, respiration may be
restored by using mouth-to-mouth resuscitation,
but call for emergency medical assistance.
Low Voltage
Control circuits used in the temperature control
unit are low voltage (12 Vdc). This voltage
potential is not considered dangerous, but the
large amount of current available (over 30 amps)
can cause severe burns if shorted or ground.
Do not wear jewelry, watch or rings when
working on the unit. If these items contact an
electrical circuit, severe burns may result.
all-guides.co
m
Model Systems (System Designations)
Thermo King Model V-500 Truck Refrigeration Systems
NOTE: When calling the dealer or factory for information or parts please have the Bill of Material
number for your particular unit handy.
System Designation
System
Number
Power Pack
Install Kit
Refrig
Schematic, Wiring
Diagrams
V-500-10
920387
8800002
R-134a
1E24520, 1E24518
V-500-20 3PH
920388
085060
8800002
R-134a
1E18884, 1E24443
V-500-20 1PH
920388
085014
8800002
R-134a
1E24519, 1E24517
V-500 MAX-10
920390
8800002
R-404A
1E24520, 1E24518
V-500 MAX-20 3PH
920391
085060
8800002
R-404A
1E18884, 1E24443
V-500 MAX-20 1PH
920391
085014
8800002
R-404A
1E24519, 1E24517
Fuse 1: Evaporator Fan Motor (EF1)
15 amps
Fuse 2: Evaporator Fan Motor (EF2)
15 amps
Fuse 3: Engine-driven Compressor Clutch Coil, Condenser
Solenoid Valve Coil (heating option), Hot Gas Solenoid Valve Coil
15 amps
Fuse 5: Condenser Fan Motor (CFM1)
15 amps
Fuse 6: Condenser Fan Motor (CFM2)
15 amps
Fuse 7: Evaporator Fan Motor (EF3)
15 amps
Fuse 4: Cab Control Box when in Electric Standby
3amps
Fuse 4/1: Cab Control Box
3 amps
Condenser Fan Motors
Voltage
Full Load rpm
Full Load Current
13 Vdc
3000
9.2 Amps
Evaporator Fan Motors
Voltage
Full Load rpm
Full Load Current
13 Vdc
2700
6.2 Amps
Coils for Hot Gas Solenoids, Condenser Solenoids, and Liquid Line Solenoids
Voltage
Current
Resistance
12 Vdc
2.3 amps
5.2 ohms
R-134A REFRIGERATION SYSTEM (V-500)
Refrigerant Charge
V-500
7.93 lbs (3.6 kg) R-134a
Defrost Termination Switch:
Opens
48.0 ± 5.4 F (8.9 ± 3.0 C)
Closes
36.0 ± 5.4 F (2.2 ± 3.0 C)
High Pressure Cutout Switch:
Opens
300 ± 10 psi (2068 ± 69 kPa)
Closes
200 ± 20 psi (1378 ± 69 kPa)
Low Pressure Cutout:
Opens
5 to 11 in. Hg vacuum (-17 to -34 kPa)
Closes
4 to 7 psi (28 to 48 kPa)
Condenser Fan Speed Control (CFSC) Pressure Cutout Switch:Opens
200 ± 7 psi (1379 ± 48 kPa)
Closes
160 ± 7 psi (1103 ± 48 kPa)
R-404A REFRIGERATION SYSTEM (V-500 Max)
Refrigerant Charge
V-500 Max
8.15 lbs (3.7 kg) R-404A
Defrost Termination Switch:
Opens
48.0 ± 5.4 F (8.9 ± 3.0 C)
Closes
36.0 ± 5.4 F (2.2 ± 3.0 C)
Liquid Injection Switch:
Opens
200 ± 5 F (93 ± 3 C)
Closes
230 ± 5 F (110 ± 3 C)
High Pressure Cutout Switch:
Opens
450 ± 10 psi (3100 ± 69 kPa)
Closes
375 ± 10 psi (2585 ± 69 kPa)
Low Pressure Cutout:
Opens
5 to 11 in. Hg vacuum(-17 to -34 kPa)
Closes
4 to 7 psi (28 to 48 kPa)
Condenser Fan Speed Control (CFSC) Pressure Cutout Switch:Opens
300 + 20 psi/-0 psi (2068 ± 138 kPa)
Closes
200 ± 20 psi (1379 ± 138 kPa)
Condenser Fan Pressure Cutout Switch (CFPS): Opens
130 ± 10 psi (896 ± 69 kPa)
Closes
180 ± 10 psi (1241 ± 69 kPa)
Compressors
Main Compressor
SELTEC TM-16XD, Engine Driven, Swash Plate, 6
Cylinder
Electrical Compressor
FRASCOLD D211Y, Reciprocating, 3 Cylinder,
System Oil Capacity
Main: 15.1 oz (150 cc)
Standby Operation: 40.1 oz (1200 cc)
Compressor Oil Type
Polyol Ester P/N 203-515
Refrigerant
8.1 lbs (3.7 kg) R-404A
8.0 lbs (3.6 kg) R-134a
Defrost Method:
Hot gas
Defrost Timer:
Initiation Interval
Adjustable, 1 hour to 10 hours
Termination Interval Termination is not timed.
Defrost is terminated by Klixon switch.
CAUTION: Failure to use correct Thermo King recommended oil will invalidate your warranty.
Belt Tension (Using Tool P/N 204-427)
AC Electric Motors
Electric Standby Power Requirements
Electric Heaters
Field Reset
Engine Driven Compressor Belt
Check vehicle manufacturer specifications
Voltage
Phase
Frequency
Full Load Current
208/230
3
60 Hz
14.1 Amps
208/230
1
60 Hz
16.0 Amps
Supply Circuit Breaker
30 amp
Extension Cord Size
25 ft - 10 gauge, up to 75 ft - 8 gauge
Voltage
Power Rating Watts
Current
Resistance
208/230
2000
14.7 Amps
16.2 ohms at 230 V
Solder Applications
Refrigeration Component
For general refrigeration tubing connections:
copper to copper or copper to brass
Joint Clearances: 0.003 to 0.005 in. (0.076 to 0.127 mm)
Use: Solder Type 15% Silver TK No. 203-364 Use: Flux
Type TK No. 203-365
For refrigeration tubing connections of dissimilar
metals: copper to stainless steel or brass to
stainless steel
Joint Clearances: 0.003 to 0.005 in. (0.076 to 0.127 mm)
Use: Solder Type 35% Silver TK No. 203-366 Use: Flux
Type TK No. 203-365
Hot Water Component
For hot water tubing connections: copper to
copper or copper to brass
Joint Clearances: 0.003 to 0.005 in. (0.076 to 0.127 mm)
Use: Solder Type 95% Tin and 5% antimony
TK No. 204-167 Use: Flux Type TK No. 204-417
For hot water tubing connections of dissimilar
metals: copper to stainless steel or brass to
stainless steel
Joint Clearances: 0.003 to 0.005 in. (0.076 to 0.127 mm)
Use: Solder Type 35% Silver TK No. 203-366 Use: Flux
Type TK No. 203-365
NOTE: Some units may be equipped with an compressor pressure regulating valve (CPR). To reduce the
chance of overheating the CPR valve, 95-5 solder or equivalent may be used.
Use 95-5 TK No. 204-167
Use Flux TK No. 204-417
all-guides.co
m
The Thermo King V-500 10/20 and V-500 MAX
truck refrigeration systems are two piece units.
The unit is designed for medium-sized trucks and
vans carrying fresh produce and frozen and deep
frozen goods.There are two basic models:
There are two basic models:
•
Model 10: Cool and defrost on truck engine
driven compressor operation.
•
Model 20: Cool and defrost on both truck
engine driven compressor operation and
electric standby compressor operatio
The system consists of three separate assemblies:
the condenser, the evaporator, and the compressor.
The condenser is mounted on the front of the
truck box or container. The evaporator is mounted
on the cargo compartment ceiling. The main
compressor is powered by the vehicle engine via a
belt. The unit is connected to the compressor by
refrigeration hoses. In electric standby operation
models, the second compressor is driven by an
elecric motor.
Control circuits operate on 12 VDC supplied by
the truck batteries for over-the-road operation.
The refrigeration system is protected by a high
pressure cutout and a low pressure cutout.
The in-cab control includes an on/off switch,
manual defrost switch, thermometer, thermostat,
thermostat adjustments and indicator lights.
The operating mode is selected automatically:
When the unit is connected to an electric power
source, engine-driven operation is automatically
blocked. If the vehicle engine is started up while
the power cable is still connected to the electric
power source, the unit will continue to operate in
electric standby mode. It is not possible to start
the engine-driven compressor until the power
cable is disconnected from the unit.=
Condenser
The condenser has a unique design that allows it
to be mounted horizontally on the roof, or on the
front of the truck box.
Evaporator
An evaporator is mounted on the ceiling inside the
truck box.
Compressor
The compressor is mounted on and driven by the
truck engine. Refrigeration hoses or lines are used
to connect the condenser, the evaporator, the
compressor and any other components. Model 20
units have another compressor and an electric
motor mounted in the condenser section for
electric standby operation.
The engine compressor is driven by a belt from
the engine. The electric standby compressor is
connected in parallel with the engine-driven
compressor. The standby compressor is driven by
a belt from the electric motor. Both compressors
use the same refrigeration system circuit. Check
valves isolate one compressor from the other
during operation.
Compressor operation is controlled by the
thermostat, which energizes the compressor clutch
during engine operation or starts the electric
motor and energizes the compressor clutch on
electric standby operation. The refrigeration
system is protected by a high pressure cutout
switch and a low pressure cutout switch.
When plugged into standby power, engine
operation is automatically locked out. If the truck
engine is turned on while the power cord is still
plugged into a power receptacle, the unit will
remain working in electric mode; the engine
driven compressor cannot be started until the
power cord is unplugged from the unit as the
selection of engine operation or standby operation
is automatic.
The control circuits operate on 12V supplied by
the truck batteries for engine operation. On
standby operation, the power is rectified from an
AC transformer.
In-Cab Control Box
Unit operation is controlled with an in-cab control
box, which is mounted in the truck cab. It includes
an On-Off switch, manual defrost switch,
thermometer, thermostat, thermostat adjustment,
and indicator lights.
Oil Separator
An oil separator is a standard feature. The oil
separator separates compressor oil from
refrigerant vapor and returns the oil to the
compressor through the suction line. The oil
separator helps provide positive oil return at high
compressor speeds and low operating
temperatures. This feature enhances compressor
lubrication and extends compressor life.
Refrigerant
•
V-500-10 and V-500-20 units use R-134a
refrigerant.
•
V-500 MAX-10 and V-500 MAX-20 units use
R-404A refrigerant.
Liquid Injection System
V-500 MAX units use R-404A and have a liquid
injection system to limit discharge temperature of
the engine driven compressor. If the discharge gas
leaving the compressor reaches a temperature of
230 ± 5 F (110 ± 3 C) the liquid injection switch
closes, providing voltage to the liquid injection
solenoid. The solenoid opens a valve, allowing
liquid refrigerant to flow from the liquid line near
the drier inlet to the metering orifice attached to
the suction line fitting on the engine driven
compressor. As the refrigerant passes through the
metering orifice it expands and evaporates,
cooling the suction gas entering the compressor.
This cooling effect is transferred to the discharge
gas leaving the compressor from the adjacent
cavity in the compressor head. When the
discharge gas is cooled to 200 ± 5 F (93 ± 3 C),
the liquid injection switch opens, the liquid
injection solenoid closes and refrigerant no longer
flows through the liquid injection system.
Evaporator Drain Tube Heaters
Evaporator heaters are used in R-404A units to
avoid drain tube blockage because of ice
accumulation inside the evaporator. Two
harnesses are located inside the drain tube. These
resistive wires melt the ice while the unit is in
DEFROST mode.
Electric Standby Operation
During electric standby operation, the thermostat
controls the operation of the unit by energizing
and de-energizing the power relay, the electric
relays, and the heat contactor. The thermostat
places the unit in cool by energizing the power
relay and the electric relays.
The thermostat places the unit in null by
de-energizing all the relays and contactors. The
thermostat places the unit in heat by energizing
the heat contactor.
When the power relay and the electric relays are
energized, they close contacts that energize the
fan relay, the motor contactor, and the electric
standby compressor clutch.
When the heat contactor is energized, it energizes
the electric evaporator heaters and the fan relay.
M-13 In-Cab Control Box with Digital LED
Thermometer (Standard)
•
Digital Thermometer
•
Electronic Thermostat (Standard)
•
Defrost Timer (Standard)
•
Defrost Thermostat
•
Hot Gas Defrost (Standard)
•
Manual Defrost Switch (Standard)
•
Oil Separator (Standard)
•
Liquid Injection (MAX only)
•
Main Compressor TM 16 XD
•
Electric Compressor D211Y (60 Hz)
•
Evaporator Drain Heaters
Protection Features
•
High Pressure Cutout Switch - The High
Pressure Cutout Switch is a pressure sensitive
switch. It is located in the discharge line near
the oil separator on Model 10 units. It is
located in the discharge check valve on Model
20 units.
If the discharge pressure rises above the
switch’s opening pressure, the switch opens
the circuit to the PR Relay to stop the unit.
The opening pressure for R-134a units is
300 psi (2068 kPa). The opening pressure for
R-404A units is 450 psi (3100 kPa).
When the discharge pressure falls below the
switch’s closing pressure, the switch closes to
restart the unit. The closing pressure for
R-134a units is 200 psi (1379 kPa). The
closing pressure for R-404A units is 375 psi
(2585 kPa).
•
Condenser Fan Pressure Switch - V500-20
units with R-134a are equipped with a
Condenser Fan Pressure Switch. This switch
is located on the discharge line near the oil
separator. It helps the unit to keep the
condenser head pressure higher in cool
ambients and on-road. This feature allows
better control of the head pressure and the
thermostatic expansion valve, and at the same
time increases the evaporator pressure. In cool
ambients and on-road, the defrost is carried
out quicker.
When the condenser head pressure rises above
180 psi (1241 kPa), the condenser fan pressure
switch closes, starting the condenser fan.
When the condenser head pressure falls below
130 psi (896 kPa), the condenser fan pressure
switch opens, stopping the condenser fan.
•
Low Pressure Cutout Switch - The Low
Pressure Cutout Switch is a pressure sensitive
switch located in the suction line. If the
pressure falls below 5 to 11 in. Hg vacuum
(-17 to -34 kPa), the switch opens the circuit
to the PR Relay to stop unit operation.
All Printed Circuit Boards manufactured by
Thermo King can be easily identified by the Part
Number stamped on them.
Even though that all P.C. Boards have a similar
layout, there are some differences from one to
another depending on the unit model and which
functions they carry out.
Connectors
All connector codes (C-1, C-2, etc.) are stamped
on the P.C. Board. Pins on the connectors are
numbered counter-clockwise.
Fuses
Figure 1: P.C. Board Fuses
Fuse 1: Protects the evaporator fan motor (EFM1)
from possible overload.
Fuse 2: Protects the evaporator fan motor (EFM2)
from possible overload.
Fuse 3: Protects:
•
The engine-driven compressor clutch coil.
•
Condenser solenoid valve coil (heating
option).
•
Hot gas solenoid valve coil.
Fuse 5: Protects the condenser fan motor (CFM1)
from possible overload.
Fuse 6: Protects the condenser fan motor (CFM2)
from possible overload.
Fuse 7: Protects the evaporator fan motor (EFM3)
from possible overload.
Fuse 4/1: Protects the in-cab control box from
possible overload. It is located inside the in-cab
control box.
(Fuses 1, 2, 4, 5, 6, 7 and 8 are located on the
printed circuit board.)
Electric Standby Operation Fuses:
Fuse 4 protects the in-cab control box when the
unit is in electric standby mode.
Fuse 8 is located in the electric box and protects
the transformer from possible overload.
1.
Fuse 2
5.
Fuse 3
2.
Fuse 1
6.
Fuse 4
3.
Fuse 7
7.
Fuse 5
4.
Fuse 8 (not used)
8.
Fuse 6
AMA524
6
3
2
1
7
8
4
5
1.
Fuse 4/1
Figure 2: Fuse 4/1
AGA1234
1
all-guides.co
m
The common relays are located on the P.C. Board.
Power Relay (PR)
The Power Relay is energized when the In-Cab
Control Box ON/OFF Switch is pressed (Unit
Start) and the box temperature is higher than the
setpoint temperature.
Evaporator Fan Relay (EFR)
When the Fan Relay is energized, battery voltage
energizes evaporator fan motors EF1 and EF2.
DR (D) Defrost Relay
The Defrost Relay controls operation of the
defrost cycle.
The Defrost Relay is energized when the In-Cab
Control Box Defrost Switch or by the Defrost
Timer completes the circuit through the Defrost
Termination Switch to ground.
The Defrost Relay will remain energized until the
defrost cycle is terminated by the Defrost
Termination Switch or the In-Cab Control Box
ON/OFF Switch is pressed.
FR2 Condenser Fan Relay
When energized, condenser fans start running at
high speed. It is energized depending on the CFPS
(Condenser Fan Pressure Cutout Switch).
Condenser fans only operate in Cool mode.
PS2R, PS3R Series/Parallel Relays
These are energized depending on the CFSC
(Compressor Fan Speed Control). They control
condenser fan speed: hihg, low or stopped.
Electric Standby Relays
Relays ER and C1 are located on the P.C. Board in
Model 20.
Electric Standby Relay (ER)
When the Electric Standby Relay is energized it
turns on the AC Motor of the electric standby
compressor and de-energized engine driven
compressor clutch.
Overload Relay (OL)
The Overload Relay is located in the Control Box
below the P. C. Board.
The Overload Relay switches off the unit when
the current draw through the AC Motor is
excessive.
C1: Battery Disconnection Relay
When this is energized, power is disconnected
from the battery relay coil. This prevents the two
power sources for the unit (battery and laternating
current) from being connected at the same time.
Located in the electic box.
N1: Battery Relay:
When this is energized, the unit is powered from
the battery.
N2: Electric Power Relay:
When this is energized, the unit is powered from
the power supply through a cable.
CMC: Compressor Motor Contactor
When this is energized, it connects the electric
standby operation AC compressor to the power
supply.
Unit Operation
These units cycle between Cool and Null to
maintain the box temperature at the thermostat
setpoint. Heat is available as an option. The
operating modes are: Cool, Null, Heat (optional)
and Defrost.
The thermostat controls the operation of the unit
by energizing and de-energizing the Power Relay
(PR). When PR is energized it energizes the
evaporator fans, the condenser fans, and the
compressor clutch (or the compressor motor
contactor during electric stand-by operation). The
condenser fan is also controlled by the condenser
fan pressure switch (CFPS) on R-134a units. This
normally open switch monitors the compressor
discharge pressure. When the discharge pressure
rises to 180 psi (1241 kPa) the switch closes and
energizes the condenser fan. When the discharge
pressure drops below 130 psi (896 kpa) the switch
opens and de-energizes the condenser fan.
The thermostat energizes the (PR) at box
temperatures higher than 5.4 F (3.0 C) above
setpoint. The thermostat keeps PR energized
while the box temperature is higher than setpoint.
The fans and the compressor run and the unit
cools.
Null
The thermostat de-energizes PR at box
temperatures lower than setpoint. The thermostat
keeps PR de-energized while the box temperature
is lower than 5.4 F (3.0 C) above the setpoint
temperature. When PR is de-energized the unit
does not operate.
Defrost
The defrost cycle can be initiated any time the
evaporator coil temperature is below 36 F (2.2 C).
Defrost is initiated automatically by the defrost
timer, or manually by pressing the manual defrost
switch.
The defrost relay energizes the defrost solenoid
valve (and the condenser solenoid valve on units
equipped with the heat option) to route hot
refrigerant gas to the evaporator when PR is
energized. The defrost relay also interrupts power
to the evaporator and condenser fans during
defrost.
The defrost cycle will continue until the
evaporator coil temperature rises 48 F (8.9 C),
causing the defrost termination switch to open
ending the defrost cycle. Defrost cycle can be also
terminated stopping the unit pressing the ON/OFF
Switch twice.
Temperature
Drop
Temperature
Rise
3.0 C (5.4 F)
Above Setpoint
Setpoint
NULL
COOL
Figure 3: Thermostat Algorithm
Serial Number Locations
CONDENSER: Nameplate located on the back
inside wall of condenser frame.
ENGINE DRIVEN COMPRESSOR: Nameplate
located on compressor body. The engine driven
compressor is located in the truck engine
compartment.
STANDBY COMPRESSOR: Nameplate located on
compressor body. The Standby compressor is
located inside the Condenser assembly.
Unit Components
Figure 4: Unit Components (Model 20)
1
6
11
AMA511
2
3
4
5
7
8
12
9
10
1.
Filter-Drier
5.
Oil Separator
9.
Transformer Cover
2.
Liquid Sight Glass
6.
Electric Standby Compressor
10.
Condenser Fans
3.
Liquid Injection Valve
7.
Condenser Coil
11.
AC Compressor Electric Box
4.
Liquid Tank
8.
Rectifier Heat Sink
12.
Defrost Valve
Figure 5: Condenser Electric and Capacitor Boxes (Model 20)
AMA512
3
1
4
2
AMA532
1.
PC Board
3.
Heat Option Contactor
2.
Motor Contactor
4.
Capacitor Box
Figure 6: Evaporator
AMA513
1
2
4
3
AMA514
1.
Evaporator Fans
3.
Temperature Sensor
2.
Expansion Valve
4.
Defrost Switch
all-guides.co
m
Figure 7: Evaporator with Hot Water and Electric Heat Options
AMA525
1
2
3
4
1.
Hot Water Heat Defrost Coil
3.
High Temperature Limit Switch
2.
Electric Heat Element
4.
Air Temperature Sensor
Figure 8: M13 In-Cab Control Box
Introduction
Unit operation is controlled with a in-cab control
box, which is mounted in the truck cab. It includes
an on-off switch, manual defrost switch,
thermometer, thermostat, thermostat adjustment,
and indicator lights.
Description
1. ON-OFF KEY
It is used to start/stop the unit. The internal
return air temperature will be automatically
displayed.
2. ON LED Indicator
When on, it indicates that the unit has been
started by pressing the on-off key.
Figure 9: On/Off Key & LED
3. Celsius LED Indicator
When on, it indicates the temperature being
displayed is in degrees celsius.
4. Minus Sign
Indicates the temperature being displayed is
below zero.
5. Fahrenheit LED Indicator.
When on, it indicates the temperature being
displayed is in degrees fahrenheit.
Figure 10: Celsius/Fahrenheit LED
6. Setpoint Adjust Dial
It is used to adjust the setpoint temperature.
7. Setpoint Key
It is used to display the setpoint temperature.
Figure 11: Setpoint Key & Dial
Figure 12: Misc. LED’s
AJA1772
1
2
AJA1802
3
4
5
AJA1803
6
7
AJA1804
8
11
10
9
AJA1805
Figure 13: Defrost Key & LED
8. Power Cord LED
When on, it indicates the unit is plugged to the
A.C. voltage power supply.
9. AC Overload LED
When on, it indicates the unit has been
stopped by the AC overload relay.
10. Unit Operation LED
When on, it indicates the unit is cooling.
When the unit is Stopped by the Thermostat,
HPCO or LPCO, the Unit Operation LED
must be “OFF” and the ON LED Indicator
must remain “ON”.
11. Defrost LED Indicator
When on, it indicates the unit is working on
defrost mode.
12. Manual Defrost Key
It is used to initiate the defrost cycle manually.
Selecting the Temperature Scale
Temperature readings can be displayed in the
Celsius scale or Farenheit scale. Dip switch 3,
located inside the cab control box, is used to select
which scale is displayed. See the Electrical
Maintenance chapter for complete instructions.
In-Cab Control Box Operating
Instructions
Display Return Air (Box)
Temperature
During normal operation (unit is ON and cooling),
the ON LED Indicator, the Unit Operation LED
and Celsius/Fahrenheit LED Indicator should be
ON; the return air (box) temperature should be
displayed on the screen. (See Figure 14.)
Display Setpoint Temperature
During normal operation, press the Setpoint Key
to display the Setpoint Temperature.
Enter Setpoint Temperature
Press and hold the Setpoint Key. The Setpoint
Temperature will be displayed on the screen. (See
Figure 15.)
13. At the same time, turn the Setpoint Adjust
Dial until the display shows desired
temperature.(See Figure 16.)
14. Release the Setpoint Key. The box
temperature will be displayed on the screen.
(See Figure 15.)
Defrost Mode Operation
Initiate a Manual Defrost : Pressing the Manual
Defrost Key will start the defrost cycle if the
evaporator coil temperature is below 36 F (2.2
C). The defrost LED will go ON. The unit will
return to the cool mode automatically when
the defrost cycle is finished. (See Figure 14.)
Initiate a Automatic Defrost: If the evaporator coil
temperature is below 36 F (2.2 C), the defrost
timer will initiate a defrost cycle. The defrost
LED will go ON. The unit will return to the
cool mode automatically when the defrost is
finished.(See Figure 14.)
Stop the Defrost Cycle: Press and release the
On-Off Key twice to stop the defrost cycle.
11
12
AJA1806
Manual Defrost Key
Figure 14: On/Off Key and Defrost Key
1.
Setpoint Key
Figure 15: Setpoint Key
1.
Setpoint Adjustable Dial
2.
Setpoint Key
Figure 16: Entering Setpoint
2
1
AJA1808
1
AJA1809
1
2
AJA1807
Weekly Pretrip Inspection
The following Weekly Pretrip Inspection should
be completed before loading the truck. While the
weekly inspection in not a substitute for regularly
scheduled maintenance inspections, it is important
part of the preventive maintenance program
designed to head off operating problems before
they happen.
1. LEAKS. Inspect for refrigerant leaks and
worn refrigerant lines.
2. BELTS. Inspect for cracks, wear and proper
belt tension.
3. MOUNTING BOLTS. Inspect bolts are
properly tightened.
4. ELECTRICAL. Electrical connections should
be securely fastened. Wires and terminals
should be free of corrosion, cracks or
moisture.
5. DEFROST DRAINS. Check the defrost drain
hose and fittings to be sure that they are open
so condensate can run out during defrosting.
Check the bottom end of drain hose to be sure
that is not plugged or crushed.
6. STRUCTURAL. Visually check for physical
damage.
7. REFRIGERANT CHARGE. Check for proper
refrigerant charge level.
Starting the unit
Engine Operation
1. Start the truck engine.
2. Press the On-Off switch on the In-Cab Control
Box, the ON/OFF LED must go ON.
3. Adjust the thermostat setting. Electric Standby
Operation
1. Connect the external power supply to the
power receptacle. Make sure that the power
supply voltage is correct for the unit. The
Power Cord LED should go ON.
2. Press the On-Off switch in the In-Cab Control
Box, the ON LED should go ON.
3. Adjust the thermostat setting.
NOTE: The unit will work on Electric Standby
even though the truck engine is started if the
power cord is plugged in.
After Start Inspection
1. THERMOSTAT. Dial the thermostat setting
above and below the box temperature to check
thermostat operation.
2. PRE-COOLING. With the thermostat set at
the desired temperature, allow the unit to run
for one-half to one hour (longer if possible)
before loading the truck. Pre-cooling will
remove residual body heat and moisture from
the box interior and provide a good test of the
refrigeration system.
3. DEFROST. When the unit has finished
pre-cooling the truck interior (evaporator
temperature dropped below 36 F [2.2 C),
initiate a defrost cycle with the manual defrost
switch. The defrost cycle should end
automatically.
Loading Procedure
1. Be sure the unit is OFF before opening the
doors to minimize frost accumulation on the
evaporator coil and heat gain inside the box.
(Unit may be running when loading the truck
from a warehouse with door seals.)
2. Spot check and record load temperature while
loading. Especially note any off-temperature
product.
3. Load product so that there is adequate space
for air circulation completely around the load.
DO NOT block the evaporator inlet or outlet.
4. Products should be pre-cooled before loading.
Thermo King units are designed to maintain
loads at the temperature at which they were
loaded. Transport refrigeration units are not
designed to pull hot loads down to
temperature.
Post Load Procedure
1. Be sure all the doors are closed and locked.
2. Adjust the thermostat to the desired
temperature setpoint.
all-guides.co
m
3. Start the unit.
4. Half an hour after loading, defrost the unit by
momentarily pressing the Manual Defrost
switch. If the coil temperature has dropped
below 36 F (2.2 C), the unit will defrost. The
defrost cycle should stop automatically.
Weekly Post Trip Checks
1. Wash the unit.
2. Check for leaks.
3. Check for loose or missing hardware.
4. Check for physical damage to unit.
Maintenance Inspection Schedule
NOTE: Thermo King reserves the right to deny
warranty coverage on claims due to lack of
maintenance or neglect. Claims in question must
be supported by maintenance records.
NOTE: See the appropriate chapter in this
maintenance manual for instructions on how to
correctly perform required maintenance.
Electrical
Weekly
Monthly
Semi-
Annual
Annually Check condition of or service the following:
•
•
Check defrost initiation and termination.
•
•
Check thermostat cycle sequence.
•
•
Check operation of protection shutdown circuits.
•
Check thermostat and thermometer calibration in 0 C (32 F)
ice-water bath.
•
Inspect wire harness for damaged wires or connections.
•
•
Check defrost initiation and termination.
Refrigeration/Heating
Weekly
Monthly
Semi-
Annual
Annually Check condition of or service the following:
•
•
Check refrigerant level.
•
Replace dehydrator.
Structural
Weekly
Monthly
Semi-
Annual
Annually Check condition of or service the following:
•
•
•
•
Visually inspect unit and refrigerant hoses for fluid leaks.
•
•
•
•
Visually inspect unit for damaged, loose or broken parts.
•
•
•
•
Clean defrost drains.
•
•
•
Inspect belts for condition and proper tension
•
•
•
Clean entire unit including evaporator coil and condenser coil.
•
•
Check all unit mounting bolts, brackets, lines, hoses, etc.
Selecting the Temperature Scale
Temperature readings can be displayed in the
Celsius scale or Farenheit scale. Dip switch 3 is
used to select which scale is displayed. It is
located inside the cab control box. Indicator lights
next to the digital display show which scale has
been selected. Place dip switch 3 in the ON
position to display temperatures in degrees
Celsius. Place dip switch 3 in the OFF position to
display temperatures in degrees Fahrenheit.
To change the temperature scale selection:
1. Remove the cover from the back of the cab
control box.
2. Place dip switch 3 in the proper position:
•
ON for Celsius, OFF for Fahrenheit
3. Replace the Cover
Maintenance Inspection Schedule
Procedures
Weekly
Monthly
Semi-
Annual
Annually
Check defrost initiation and termination.
•
•
Check thermostat cycle sequence.
•
•
Check operation of protection shutdown circuits.
•
•
Check thermostat and thermometer calibration in 0 C
(32 F) ice-water bath.
•
Inspect wire harness for damaged wires or
connections.
•
Inspect/replace DC fan motor brushes.
•
WARNING: Take precautions to ensure the unit will not
accidentally start while you are servicing the system.
1.
Dip Switches
Figure 17: Back of Cab Control Box with Cover Removed
all-guides.co
m
Trouble Shooting In-Cab
Control Box M-13 and M-16
Before starting this trouble shooting, verify that
the In-Cab Control Box 12/24V selector is placed
in the correct position and check the ground
circuit through Pin 9 Connector C-9.
Figure 18: Block Diagram M-13, M-16
IMPORTANT: This trouble shooting only covers
In-Cab Control Box functions and should not be
considered as all-inclusive or meant to cover all
other electric contingencies; on these cases you
should check the wiring against a diagram.
AJA1775
SYMPTOMS
REMEDY
Blank display when the On/Off Switch is pressed.
1st. Check voltage on Pin 3 C-9 (Pin 2 when is unit
working in electric mode).
2nd. Check Fuse 4/1 located inside the Cab Control
Box.
3rd. Replace Cab Control Box.
Unit is not cooling when the Box Temperature is
higher than the Setpoint Temperature.
1st. Check voltage on Pin 6 C-9.
2nd. Replace Cab Control Box.
Unit Operation LED is OFF when the unit is cooling. 1st. Check voltage on Pin 7 C-9.
2nd. Replace Cab Control Box.
A defrost cycle can be started by pressing the
manual defrost switch, or automatically by the
defrost timer, when the defrost termination switch
is closed and the unit is in cool mode.
The defrost cycle operates by energizing the
defrost relay. The defrost relay energizes the
defrost solenoid valve (and the condenser
solenoid valve on units equipped with the heat
option). The defrost relay also interrupts power to
the evaporator and condenser fans, which stops
the evaporator and condenser fans.
Energizing the defrost solenoid valve diverts hot
gas into the evaporator coil, melting ice. A defrost
termination switch de-energizes the defrost relay
when evaporator temperature rises above 48 F
(8.9 C).
To check the defrost cycle, run the unit on Cool to
drop the evaporator coil to a temperature below
36 F (2.2 C).
Press the manual defrost switch. The unit should
shift from Cool to Defrost Mode. If the unit
continues to Cool, double check the evaporator
coil temperature, and refer to “Testing the Defrost
System.”
On TC units defrost is performed on both
evaporators at the same time. Defrost termination
is controlled by the defrost termination switch on
the main evaporator.
Defrost Timer Settings
NOTE: The defrost timer is directly connected to
the battery. This means that the defrost timer is
always timing, even if the unit is turned off.
The defrost timer has two selector switches (A
and B) and a round red selector that are used to set
the timer interval.
The factory setting for the defrost timer is four
hours. Use the following information to change
the setting of the defrost timer.
Defrost cycle is not initiated when the Manual
Defrost Switch is pressed.
1st. Box temperature must be higher than Setpoint
temperature; unit must be in cool mode.
2nd. Evaporator coil temperature must be lower than
36.0 ± 5.4 F (2.2 ± 3.0 C) (defrost termination switch
closed).
3rd. While keeping the Manual Defrost Switch pressed,
check voltage on Pin 8 C-9.
4th. Replace Cab Control Box.
Defrost LED is OFF when the unit is in Defrost
Mode.
1st. Check for open circuit on Wire Y, between Pin 4
C-9 and Pin 2 C-3.
2nd. Check voltage on Pin 8 C-9.
3rd. Replace Cab Control Box.
Temperature displayed is out of range.
1st. Check that the Cab Control Box 12/24V selector is
in the correct position.
2nd. Check the thermostat sensor.
Unit is not working in Electric Mode.
1st. Check the AC Overload Relay (AC Overload Led
must be OFF).
2nd. Check the fuses on the P.C. Board.
3rd. Check voltage on Pin 2 C-9.
4th. Check voltage on Pin 1 C-9.
5th. Replace Cab Control Box.
Unit is stopped by the AC OL Relay, but the AC
Overload LED is OFF.
1st. Check voltage on Pin 5 C-9.
2nd. Replace Cab Control Box.
SYMPTOMS
REMEDY
Figure 19: Defrost Timer
1. Refer the following timing table. A similar
table is located on the printed circuit board.
2. Choose the range in the timing table in which
your timing needs are included and set
switches A and B to the desired position.
Example: Setting selector switches A and B to
positions A: down and B: down chooses the
time range of approximately 1 to 10 hours (64
to 640 minutes).
3. Set the round red selector to the desired value.
The round red selector multiplies the
minimum value of the chosen range by the
value it is pointing at.
Example: If the selector points to position 2,
approximately 2 hours (2 x 64 = 128 minutes)
Example: If the selector points to position 4,
approximately 4 hours (4 x 64 = 256 minutes).
Defrost Termination Switch
The switch is mounted in the evaporator coil and
controls the defrost cycle in response to the
evaporator coil temperature. The switch is closed
when the evaporator coil temperature is below
36 F (2.2 C). completing the defrost circuit to
ground and preparing the electrical system for the
defrost cycle.
When the unit does shift into a defrost cycle, the
evaporator fan stops, and heat from the hot
refrigerant gas melts the frost from the evaporator
coil. The switch opens and terminates the defrost
cycle when the evaporator coil temperature rises
above 48 F (8.9 C).
Defrost Relay
The defrost relay controls operation of the defrost
cycle. When the defrost timer or the manual
defrost switch completes the circuit through the
defrost termination switch to ground, the defrost
relay is energized. This energizes the defrost
solenoid valve (wire 26) and de-energizes the fan
relay.
The defrost relay stays energized until the defrost
cycle is terminated by the defrost termination
switch, or the On/Off Key is pressed.
Defrost Solenoid Valve
The defrost solenoid valve is an electrical valve
that controls the flow of refrigerant through the
refrigeration system.
The defrost solenoid valve is energized by the 26
wire (Pin 1 C-1). When the defrost solenoid valve
is energized it routes hot refrigerant gas to the
evaporator.
Testing the Defrost System
To test the defrost system, run the unit on cool
until the evaporator coil temperature is below
36.0 ± 5.4 F (2.2 ± 3.0 C) and press the manual
defrost switch.
If the unit doesn’t shift to defrost cycle go to
step 1.
1. Check the evaporator temperature.
Be sure the evaporator temperature is actually
below 36.0 ± 5.4 F (2.2 ± 3.0 C), otherwise
the unit will not defrost. Use a test
thermometer to check the evaporator
temperature.
2. Check the defrost termination switch.
TIMING TABLE
Switch
SCALE
A
B
0.25 - 2.5
Down
Up
From 0.25 to 2.5
minutes
1 - 10
Up
Down
From 1 to 10 minutes
8 - 80
Up
Up
From 8 to 80 minutes
64 - 640
Down
Down
From 1 to 10 hours
AGA1225
1
2
If the unit fails to defrost, place a jumper wire
between the 12 and CH wires at the defrost
termination switch. Press the manual defrost
switch.
If the unit shifts to defrost, the defrost
termination switch is defective.
If the unit does not shift to defrost, check for
an open circuit in the 12 wire back to Pin 2
C-3. If the 12 wire is not open go to step 3.
3. Check voltage on Pin 1 C-3.
If voltage is present on Pin 1 C-3, replace the
defrost relay.
If voltage is not present, go to step 4.
4. Check for open circuit on wire GR that goes to
the in-cab control box (Pin 8 C-9).
If the wire GR is not open, go to step 5.
5. Press and hold manual defrost switch, check
the voltage on Pin 8 C-9.
If voltage is present on Pin 8 C-9 and the rest
of the above mentioned points are correct,
replace the printed circuit board.
If voltage is not present on Pin 8 C-9, check
the in-cab control box.
Defrost Timer Test
The defrost timer initiates the defrost cycle.
1. Verify that the evaporator coil temperature is
lower than 36.0 ± 5.4 F (2.2 ± 3.0 C). If not,
place a jumper wire between the 12 and CH
wires at the defrost termination switch.
2. Set the defrost timer to approximately 1
minute (selector switches A: down, B: down
and round red selector in position 4).
3. After approximately one minute, defrost
should be initiated. The Defrost LED, defrost
relay, and defrost solenoid valve must be
activated.
4. See the Defrost Timer Settings instructions on
preceding pages in this chapter. You should
set the defrost timer for your cargo
application.
Condenser Fan Pressure
Switch (CFPS) R-134a Units
Only
When the condenser head pressure rises above
180 ± 10 psi (1241 ± 69 kPa) the condenser fan
pressure switch closes, starting the condenser fan.
When the condenser head pressure falls below
130 ± 10 psi (896 ± 69 kPa), the condenser fan
pressure switch opens, stopping the condenser
fan.
Testing CFPS
The CFPS is located on the discharge line.
Electrically it is located between wires CF and
CF1.
Figure 20: Testing CFPS
Use the following procedure to test the CFPS:
1. Install a manifold gauge set on the
compressor.
2. Connect a voltmeter between the CF and the
CF1 wires by the CFPS switch connector.
3. Run the unit on Cool. When the condenser
head pressure is higher than 180 ± 10 psi
(1241 ± 69 kPa) the condenser fan motor must
be running and the voltmeter should indicate
approximately 0 volts.
4. Run the unit on Cool. When the condenser
head pressure is lower than 130 ± 10 psi (896
± 69 kPa) the condenser fan motor must be
stopped and the voltmeter should indicate
approximately truck battery voltage.
Liquid Injection System
(R-404A Units Only)
This liquid injection switch is a temperature
sensitive switch located on the discharge fitting of
the truck engine compressor. When the discharge
temperature rises above 230 ± 5 F (110 ± 3 C), the
AGA1226
switch closes to open the liquid injection solenoid
valve. When the discharge temperature falls
below 200 ± 5 F (93 ± 3 C), the switch opens to
close the liquid injection solenoid valve.
Testing Liquid Injection Solenoid
Valve and Metering Orifice
1. Disconnect the LIS wire from the liquid
injection solenoid valve.
2. Install the gauge manifold set on the
engine-driven compressor.
3. Set thermostat on the lowest setting.
4. Start and run the unit on the engine-driven
compressor until the suction pressure
stabilizes.
5. Place a jumper between CH and LIS terminal
on the liquid injection solenoid valve. This
simulates that the discharge temperature is
higher than 230 F (110C).
6. With the jumper wire in place the suction
pressure should rise.
7. Remove the jumper. The suction pressure
should return to the stabilized pressure in
step 4.
8. If the suction pressure does not change, check
the CLU wire for voltage, the liquid injection
solenoid valve, or the metering orifice.
9. Shut off the unit and the truck, remove the
gauge manifold set, and replace the LIS wire.
Electric Standby Circuits
If the unit does not run in the electric standby
mode use the following procedure.
Make sure the unit is connected to the proper
power source.
Check the power cable receptacle for power. If
power is there, check for power at the unit
terminal plug.
If the contactor is pulled down and the overload
relay is closed, but the standby motor fails to start,
the trouble is probably in the standby motor.
If the contactor is not pulling down proceed as
follows:
1. Check the AC line voltage and the transformer
fuse. If the AC line voltage is acceptable and
the transformer fuse is intact, go to step 2.
2. Measure the transformer output voltage (AC)
at the terminal board. Measure the voltage
between wires X1 and X4. The voltage
reading should be approximately 12/24V
(depending on the unit voltage). If not, the
transformer is defective. If the transformer
output voltage is acceptable, go to step 3.
3. Check the rectifier output voltage (DC) on the
2R wire (Pin 3 C-2). If this voltage is less than
approximately 12/24V, the rectifier bridge is
defective. If the rectifier output voltage is
acceptable, go to step 4.
4. Check the voltage on 2R1 wire (Pin 4 C-4). If
voltage is not present, check Fuse 4. If Fuse 4
is intact, go to step 5.
5. Check the voltage on Pin 2 C-9. If voltage is
not present, check for open circuits on wires
2R1 and R. If voltage is present on Pin 2 C-9,
check the in-cab control box.
all-guides.co
m
NOTE: The following procedures involve
servicing the refrigeration system. Some of these
service procedures are regulated by Federal, and
in some cases, by State and Local laws.
All regulated refrigeration service procedures
must be performed by an EPA certified
technician, using approved equipment and
complying with all Federal, State and Local
laws.
RCharging the Refrigeration System
The liquid line sight glass helps the operator to
determine the amount of charge under established
operating conditions. These units can be damaged
by an overcharge of refrigerant. The amount of
refrigerant the system can hold depends on circuit
volume which is affected by hose length.
The most satisfactory method of charging the
engine driven compressor circuit and the electric
standby driven compressor circuit is as follows:
1. Connect a gauge manifold set to the suction
and discharge service ports on the engine
driven compressor.
2. Connect the center hose of the gauge manifold
to the manifold of an evacuation station. The
use of Thermo King Evacuation Station
P/N 204-725 is recommended.
3. Connect the hose from a drum of refrigerant to
the manifold of the evacuation station. Make
sure the valve on the refrigerant drum is
closed.
4. Open the valves on the gauge manifold and
the valves on the evacuation station.
5. Start the vacuum pump and evacuate the
system to 500 microns. After the system
reaches 500 microns, evacuate the system for
an additional hour.
NOTE: If the system will not come down to
500 microns, there is probably a leak in the
system or in the evacuation and charging
equipment hoses. Find and repair the leak.
6. After the additional hour of evacuation, close
the valve at the evacuation pump, stop the
vacuum pump, and observe the reading on the
vacuum gauge for 5 minutes. The pressure
should not exceed 2000 microns.
NOTE: If the pressure exceeds 2000 microns
within 5 minutes, look for a leak in the
system or in the evacuation and charging
equipment hoses. Find and repair the
leak.Then repeat steps 5 and 6.
7. Open the vacuum valve at the vacuum pump,
start the vacuum pump, and evacuate the
system to 500 microns.
Maintenance Inspection Schedule
Procedures
Weekly
Monthly
Semi-
Annual
Annually
Check refrigerant level.
•
•
Replace dehydrator.
•
1.
Gauge Manifold Set
2.
Engine Driven Compressor
3.
Evacuation Station
4.
Refrigerant Drum
Figure 21: Charging Refrigeration System
2
1
ARA053
3
4
8. When the system reaches 500 microns, close
the vacuum valve at the evacuation station
manifold. The system is now ready to charge.
9. Close the low side valve on the gauge
manifold, leave the high side valve on the
gauge manifold open, and open the valve on
the refrigerant drum to deliver liquid.
10. Allow 2.60 lb (1.20 kg) of R-134a or 2.75 lb
(1.25 kg) of R- 404A refrigerant to enter the
system. Then close the valve on the refrigerant
drum and the high side valve on the gauge
manifold.
11. Start the unit on engine operation and run the
truck engine at approximately 1000 rpm.
12. Set the thermostat at 32 F (0 C), and run the
unit in cool until the box temperature
approaches 32 F (0 C).
13. Make sure that the unit is running in cool, the
compressor is running at approximately 1000
rpm, the suction pressure is 2 to 8 psig (14 to
55 kPa), and the head pressure is at least
180 psig (1241 kPa) for R-134a systems or
275 psig (1896 kPa) for R-404A systems. If
necessary, raise the head pressure by covering
the condenser grille.
14. With these conditions established, open the
valve on the refrigerant drum to deliver liquid.
15. Observe the suction pressure and slowly open
the low side gauge manifold valve to allow
liquid refrigerant to flow into the compressor
suction service valve.
16. Control the liquid flow so the suction pressure
increases approximately 20 psig (138 kPa).
17. Observe the liquid line sight glass. Close the
valve on the refrigerant drum when the
bubbles disappear from the sight glass or
when the system capacity has been reached
(see unit specifications).
18. Close the low side valve on the gauge
manifold and operate the unit for 15 minutes.
19. Model 20 only.
a.
Turn the unit Off and shut off the truck
engine.
b. Connect the electric power receptacle to
an appropriate electric power supply. Start
and run the unit in cool on electric
operation for a minimum of 15 minutes.
c.
Turn the unit Off and disconnect the
electric power supply. Start the truck and
run the unit in cool on engine operation for
a minimum of 15 minutes.
20. Check the liquid line sight glass for bubbles.
Repeat steps 13 through 20 if bubbles are
visible.
21. Stop the unit, shut off the truck engine and
remove the gauge manifold set.
22. The above conditions MUST be established
each time the refrigerant level is checked, or if
refrigerant needs to be added for any reason.
NOTE: To prevent oil migration from one
compressor to another, and for proper oil
return when a compressor is operating,
operate a compressor for a minimum of 15
minutes. Do not operate a compressor for
shorter intervals.
Checking the Refrigerant Charge
If the unit has an insufficient charge of refrigerant,
the evaporator will be “starved” and the box
temperature will rise even though the unit is
operating. Also, an insufficient charge does not
circulate enough oil to properly lubricate the
compressor. The charge can be determined by
inspection of the refrigerant through the sight
glass with the following conditions established:
Testing the Refrigerant Charge with an
Empty Box
1. Place a test box over the evaporator.
2. Install gauge manifold set.
3. Run the unit in cool on engine driven
compressor operation until the thermometer
reads 32 F (0 C).
4. Establish head pressure of 180 psi (1241 kPa)
for R-134a systems or 275 psi (1896 kPa) for
R-404A systems. It may be necessary to
partially cover the condenser grille on the
front of the unit to create the desired head
pressure.
5. Look at the liquid line sight glass. Under these
conditions there should be no bubbles in the
flow of refrigerant through the liquid line sight
glass. Bubbles in the refrigerant indicate the
unit is low on refrigerant. Refer to “Charging
the Refrigeration System” for information
about adding refrigerant.
Testing the Refrigerant Charge with a
Loaded Box
1. Install a gauge manifold.
2. Run the unit in cool on engine driven
compressor operation.
3. Cover the condenser to drive any excess
refrigerant from the condenser into the
receiver tank.
4. As the head pressure rises, check the liquid
line sight glass. There should be no bubbles in
the flow of refrigerant through the liquid line
sight glass. Bubbles in the refrigerant indicate
the unit is low on refrigerant. Refer to
“Charging the Refrigeration System” for
information about adding refrigerant.
NOTE: If no bubbles are present, there is
sufficient refrigerant in the unit for that load
at that particular box temperature. This test
does not determine if the unit contains a full
charge of refrigerant.
Checking Compressor Oil Charge
The compressors are furnished with the amount of
oil shown in the Specifications chapter. The oil
level in the compressor will change after the
compressor is initially run, making any level
measurements inaccurate.
To ensure an adequate oil supply, the following
procedure must be followed whenever the
refrigerant charge is lost or removed from a unit:
1. Install a compressor on the system having a
residual oil supply and self-lubricating system
such as a TK 214 model. Connect an oil
separator on the discharge or suction line to
collect and drain out circulated oil.
NOTE: A suction line oil separator can be
improvised by installing a suction filter
upside down in the suction line near the
compressor. Cap off both access ports, and
use the lower one to drain off the
accumulated oil.
2. Place a normal amount of oil in the cleanup
compressor before operating.
3. Charge with 6.0 to 7.0 lb (2.7 to 3.2 kg) of
refrigerant.
4. Operate at a low speed (600 to 800 rpm) for 2
hours, or until the compressor oil level reaches
a minimum allowable level, whichever occurs
first. Drain the collected oil from the oil
separator as it fills, taking care to not allow
any collected oil to recirculate.
5. Prepare the original compressor that was
removed from the unit (or a replacement) by
draining out any existing oil and replacing the
oil with the amount of oil shown in the
Specifications chapter.
6. Install the original compressor (or its
replacement), and proceed with the manual
evacuation and refrigerant charging
procedure.
High Pressure Cutout Switch
(HPCO)
The high pressure cutout switch is located on a
discharge line inside the condenser unit. If the
discharge pressure rises above 300 psig
(2068 kPa) on R-134a units or 450 psig (3102
kPa) on R-404A units, the switch opens the 7A
circuit de-energizing the power relay.
To test the switch, rework a gauge manifold per
Figure 22.
7. Connect the gauge manifold to the compressor
discharge service port.
NOTE: Service manifold hoses must have
Schrader valve (tube valve) depressors.
8. Set the thermostat well below the box
temperature so that the unit will be in cool.
9. Raise the discharge pressure of the
compressor by blocking the condenser coil air
flow. When the discharge pressure reaches
300 psig (2068 kPa) on R-134a units, or
450 psig (3102 kPa) on R-404A units, the
High Pressure Cutout will stop the
compressor.
NOTE: The discharge pressure should never
be allowed to exceed a pressure of 450 psig
(3102 kPa).
10. Failure of the high pressure cutout system to
stop compressor operation should be
investigated first by checking the control
circuit operation and second by high pressure
cutout switch replacement.
Low Pressure Cutout Switch
(LPCO)
The low pressure cutout switch is located on the
suction line in the evaporator. If the suction
pressure drops below 5 to 11 in. Hg of vacuum
(-17 to -37 kPa), it opens the circuit to the power
relay to stop the unit. To check the low pressure
cutout:
1. Install a gauge manifold at the compressor.
2. Close the receiver tank outlet valve and run
the unit in cool.
3. When the suction pressure drops below 5 to
11 in. Hg of vacuum (-17 to -37 kPa), the
LPCO should open and the unit should stop.
1.
Relief Valve (66-7392)
2.
O-Ring (33-1015)
3.
Adapter Tee Weather Head (No. 552X3)
Figure 22: High Pressure Cutout Manifold
Cleanup Procedure for Small
Truck Units
NOTE: If a Van Steenburgh reclaimer is
available, do not use this procedure. Follow
procedure described in Service Bulletin T&T
134.
Tools Required
•
Motor-driven TK 214 “Flushing Compressor”
•
Suction Line Filter (P/N 204-498 with Filter
P/N 66-2988)
•
Pipes (In Place of Oil Separator, Check Valve,
Oil Separator and Standby Compressor)
Clean-up Procedure
1. Make sure all hose routing is correct.
2. Make sure that the oil trap is correctly
installed.
3. Recover the contaminated refrigerant from the
system.
4. Remove the lines from the compressors
(engine driven and standby).
5. Flush each compressor using the flushing
compressor and an HFC refrigerant. (Always
recover the refrigerant before disconnecting
the flushing compressor.)
6. Remove the check valve (or check valve seats)
from system to ensure flow in all directions.
7. Remove the oil separator and install a
connecting pipe.
8. Remove the internal parts from the expansion
valve.
9. Open the suction pressure regulator (CPR)
valve to its highest setting.
10. Install a temporary suction line filter (P/N
204-498 and P/N 66-2988) in the suction line.
11. Install a connecting pipe in place of the
standby compressor.
12. Connect the flushing system to the engine
driven discharge and suction lines (see
illustration).
13. Evacuate the system and check for leaks.
Continue to evacuate to remove moisture and
air.
14. Install HFC refrigerant and flush the system.
(Energize the defrost solenoid during 30% to
40% of the clean-up. Solid contaminants will
collect in the suction line filter. Oil from the
system and from the flushing compressor will
drain out of the suction line filter. (Add
compressor oil as required.) Refrigerant oil in
the flushing compressor will absorb acids
from the system.
15. Test the recovered compressor oil for acid
contamination.
16. Continue flushing until the compressor oil is
clean.
1.
Remove Internal Parts From Expansion Valve
2.
Disconnect and Cap (If So Equipped)
3.
Replace Drier With Tube
4.
Discharge Line
5.
Flushing Compressor
6.
Suction Line
7.
Suction Oil
8.
Recovered Oil
Figure 23: Connecting Flushing Compressor to
Unit
all-guides.co
m
Putting the Unit Back Into Operation
1. Replace the check valve (or check valve
seats).
2. Install a new oil separator.
3. Install a new liquid injection orifice.
4. Install a new drier.
5. Install a new expansion valve.
6. Install the compressors and lines.
7. Use dry nitrogen to pressurize the system to
150 psi (1034 kPa).
8. Use a bubble solution to check for leaks.
9. Install correct amount of oil.
10. If no leaks are found, evacuate the system. A
leak-free and dry system will maintain a 1000
micron vacuum for five minutes or longer.
11. Charge the system with proper amount of the
correct refrigerant.
12. Operate the unit and check for proper
operation. (Adjust the suction pressure
regulator.)
13. After two weeks of operation, change the
drier.
Clean the coils during scheduled maintenance
inspections. Remove any debris (e.g., leaves or
plastic wrap) that reduces the air flow. Clean dirty
coils with compressed air or a pressure washer. Be
careful not to bend the fins when cleaning a coil.
If possible, blow the air or water through the coil
in the direction opposite the normal air flow.
Repair bent fins and any other noticeable damage.
Condenser Coil
Clean the coils during scheduled maintenance
inspections. Remove any debris (e.g., leaves or
plastic wrap) that reduces the air flow. Clean dirty
coils with compressed air or a pressure washer. Be
careful not to bend the fins when cleaning a coil.
If possible, blow the air or water through the coil
in the direction opposite the normal air flow.
Repair bent fins and any other noticeable damage.
Unit Mounting Bolts
Periodically check and torque the unit mounting
bolts.
Figure 24: Evaporator
Figure 25: Condenser
Maintenance Inspection Schedule
Procedures
Weekly
Monthly
Semi-
Annual
Annually
Visually inspect unit and refrigerant hoses for fluid
leaks.
•
•
•
•
Visually inspect unit for damaged, loose or broken
parts.
•
•
•
•
Clean defrost drains.
•
•
•
•
Inspect belts for condition and proper tension (belt
tension tool P/N 204-427).
•
•
•
Clean entire unit including evaporator coil and
condenser coil.
•
•
•
Check all unit mounting bolts, brackets, lines, hoses,
etc.
•
•
WARNING: Take precautions to ensure
the unit will not accidentally start while
you are servicing the system.
CAUTION: The air pressure should not
be high enough to damage coil fins.
AMA523
AMA508
Refrigerant Handling Safety
Refrigerant Recovery
Some refrigeration system refrigerant compounds
are chlorofluorocarbons, and therefore may be
damaging to the earth’s ozone layer.
Consequently, the release of refrigerant into the
atmosphere must be avoided. Whenever
refrigerant is to be removed from the refrigeration
system, a refrigerant recovery unit must be used to
recover the refrigerant. This refrigerant can then
be recycled and reused, which is both
environmentally safe and economical.
NOTE: Consult the operators manual for your
recovery unit for the proper hookup and
operating procedures.
Figure 26: Typical Recovery Unit
DANGER: Explosion Hazard! Never
throw or strike refrigerant bottles and
never handle the packing carton roughly.
Do not use refrigerant bottles that are
damaged or dented. Store refrigerant
bottles out of reach of children.
DANGER: Explosion Hazard! Never
directly heat refrigerant bottles or put
them in hot water heated above 104 F (40
C) because the bottle might explode and
cause personal injury. When it is
necessary to heat refrigerant bottles for
charging in cold weather, use warm water
at a temperature below 104 F (40 C).
DANGER: Explosion Hazard! Never put
refrigerant bottles on the engine or the
radiator when charging Excessive heat
increases pressure to a dangerous level
that might cause the bottle to explode.
DANGER: Explosion Hazard! Never store
refrigerant bottles in direct sunlight, near
flame, or where the temperature exceeds
104 F (40 C). Always store refrigerant
bottles in a cool dry place.
CAUTION: Do not put the charge valve in
warm water.
Both new and rebuilt compressors should be
stored with the correct oil charge. They should be
stored within the orientation range shown Figure
28 on page 56. If the compressor is allowed to sit
outside that orientation for more than a minute,
the compressor must be turned over by hand
(slowly) to clear oil from the cylinders.
NOTE: All compressors in storage must have a
holding charge of refrigerant or nitrogen to a
pressure of between 7 to 21 psig (48 to 145 kPa,
0.5 to 1.5 bar, 0.5Kg/cm2 to 1.5 Kg/cm2). This will
protect internal parts from moisture and
corrosion.
Compressor Installation Position
The compressor should be installed on the vehicle
within the range shown below. If installed outside
this range, the compressor will be adversely
affected. This compressor is equipped with a
pressure feed lubrication system that cannot
function properly if the compressor is installed
outside this range.
As a precaution, it is recommended that once the
compressor is mounted in its proper and final
position, turn it over by hand at least 10
revolutions before hooking the drive belt up to the
pulley. If this is not done before the compressor is
put in service, damage to the compressor valves
can result from oil slugging. This is not covered
under warranty!
Figure 28: Compressor Installation Range
Compressor Installation
Precautions
The new compressor is filled with the specified
quantity of compressor oil and nitrogen gas (N2).
When mounting the compressor on the vehicle,
take the following steps:
1. Loosen the discharge side connector’s cap and
slowly release the nitrogen from the
compressor.
CAUTION: Do not strike the compressor
or turn it upside down. If the compressor
is knocked over or turned upside down,
rotate the compressor clutch 5 to 6 times
by hand to circulate the oil that has settled
in the cylinders. Sudden rotation of the
compressor with oil in the cylinders can
cause valve damage and adversely affect
durability.
1.
Rotate Compressor Clutch 5 to 6 Times
Figure 27: Rotate Compressor Clutch
all-guides.co
m
Figure 29: Loosen Cap Slowly
2. Slowly rotate the compressor’s magnetic
clutch several times by hand to distribute the
oil that has settled in the cylinders.
Figure 30: Rotate Compressor Clutch
3. When replacing the compressor on a system,
the amount of oil in the compressor should be
adjusted before the compressor is installed
(see “Checking Compressor Oil” on page 59.)
When installing the compressor on a new
system, be sure to follow factory
specifications.
Compressor Installation
The compressor is mounted on the truck engine
using a special mounting bracket. The side to side
mounting angle of the compressor must remain
± 45 degrees from the horizontal. The forward to
backward angle must be within ± 10 degrees of
horizontal. (see Figure 28 on page 56). Access to
the refrigeration system service ports may vary,
but usually access to the system can be made from
under the engine compartment hood from the
front of the truck.
Special care must be used when routing the
suction and discharge hoses through the engine
compartment. These hoses must be kept away
from sharp objects and hot areas of the engine.
These things can cause damage to the hoses and
leaks of the refrigerant. The hot areas can also rob
you of cooling by adding heat into the refrigerant
inside the hoses. This added heat must then be
removed in the condenser coil. Since each coil has
a limited ability to remove heat, that kind of extra
heat simply means less cooling inside the box
where it is needed.
Each compressor kit comes with a standard oil
charge. This quantity of oil is enough to supply
the compressor lubrication when it is installed in
an already “oil wet” system. New systems require
an extra quantity of oil be added to “wet” all the
interior surfaces of the system.
During normal operation there is always a
quantity of oil that travels around inside the
system. This oil lubricates all the components,
returns to the compressor for a while, and again
travels around the system.
CAUTION: Take care not to let oil escape.
AUA0032
AUA0033
CAUTION: Be sure to verify the oil that is
used in the compressor kit matches the oil
used in your system. Failure to use the
correct oil will contaminate and damage
your system.
Clearance between the compressor mounting
supports and its bracket must be less than 0.004
inches (0.10 mm). Use shims as necessary to
adjust this clearance. This will reduce the stresses
on the compressor which can cause components to
fail. Be sure to maintain proper pulley alignment
for the drive belt.
It is important that the compressor be mounted
properly when installed. Figure 28 on page 56
shows the maximum range of installation
positions for the compressor. Be sure to verify this
positioning at both extremes of the belt
adjustment.
Adding Extra Oil To System
The initial oil charge into a new system is based
on the size of the system and the amount of oil,
which remains in the compressor during
operation.
Major Loss Of Refrigerant
In case of a major loss of refrigerant, it must be
assumed that some system oil is lost also. The oil
level should be verified. See “Checking
Compressor Oil” below.
1.
Bracket
2.
Shim
3.
Compressor
Figure 31: Shim Installation
CAUTION: Keep all containers tightly
closed until ready to use. Both
Polyalkylene Glycol (PAG) and Polyol
Ester (POE) oil will absorb moisture from
the air. Moisture that gets into the oil
causes a chemical reaction that creates
acid. Evacuation of the system will not
remove this moisture from the oil. This
process is not reversible and will happen
in a short period of time.
CAUTION: Do not leave the oil container
open to the air any longer than necessary
to properly service of the system.
Refrigeration oils are hydroscoptic, which
means they absorb moisture from the air.
CAUTION: Do not open a refrigeration
system unnecessarily. This increases the
chance of contamination.
CAUTION: Always discard used
containers. These containers are
hazardous.
CAUTION: Never store PAG oil in plastic
containers. PAG oil will absorb moisture
through the plastic container
CAUTION: Check the system decals and
operation manual for the proper oil. The
mixing of incompatible oils will cause
system damage. Compressor Oil 1L PAG
recommended for R-134a Systems.
CAUTION: Be sure to verify the oil that is
used in your compressor kit matches the
oil that is used your system. Failure to use
the correct oil will contaminate and
damage your system.
CAUTION: Keep all oil containers tightly
sealed from the air. Oil tends to absorb
moisture from the air and can become
contaminated if left open. If contaminated
oil is put into a system, it may damage the
components of the system.
Checking Compressor Oil
Oil Check Interval
Unlike engine oil, it is not necessary to frequently
check or change the compressor oil. However it is
necessary to check and replenish or replace the
compressor oil in the following cases:
•
Every 3,200 miles (5000 km) or every 5
months for commercial vehicles and vehicles
that are in constant use.
•
When the compressor, evaporator coil,
condenser coil, or receiver tank (if used) is
replaced.
•
When the refrigeration system has leaked
refrigerant.
•
When the refrigeration system has an
oil-related problem.
Oil return procedure (System
Operational)
There is a close affinity between oil and
refrigerant. During normal operation, some of the
oil circulates with the refrigerant in the system.
Before checking the oil level, or replacing any
system components, we need to place the system
in a condition that will return as much oil as
possible to the compressor sump. As the oil
returns, it will reach a maximum level inside the
compressor—this is the point we need to check
the oil level. To get the oil to return to the
compressor it is necessary to run the system at an
elevated load condition for 20 minutes. Place the
engine in idle or high idle (if equipped). The
compressor speed should be between 800 and
1500 rpm. Open the compartment doors to raise
the interior air (unit return air) temperature to
between 75 to 80 degrees (24 to 27 C). The
condenser inlet air (ambient air temperature)
should be above 85 degrees F (29 C). If not,
partially block the condenser air flow to raise the
compressor discharge pressure above 170 psig
(1172 kPa). This condition will return most oil to
the compressor.
Compressor Removal
1. Perform the “Oil return procedure (System
Operational)” on page 59 if the compressor is
operational. If the compressor is inoperable,
go to step 2.
2. Recovery the refrigerant from the system. For
more information, see “Refrigerant Recovery”
on page 55.
3. Remove the compressor from the system and
cap or plug all open connections immediately.
4. Drain the oil from the compressor (see
“Draining and Replacing Oil” on page 60).
5. Measure the amount of oil drained from the
compressor and check the oil for
contamination (see “Oil Contamination” on
page 60).
1.
Oil Return Operation
2.
Refrigerant Recovery
3.
Compressor Removal
4.
Oil Inspection
Figure 32: Oil Inspection Procedure
CAUTION: Systems without service valves
require that the refrigerant be removed
from the system before the compressor is
removed.
Draining and Replacing Oil
Figure 33: Draining the Oil
Drain the oil from the compressor drain plug and
all other ports. Turn the clutch (rotating the
internal compressor parts) by hand and drain the
oil again. Repeat until all oil is removed from the
compressor. Measure the amount oil drained from
the compressor and inspect the oil for signs of
contamination.
Oil Contamination
Unlike engine oil, no cleaning agent is added to
the compressor oil. Even if the compressor is run
for a long period (approximately 1 season), the oil
never becomes turbid as long as there is nothing
wrong with the compressor or the refrigeration
system. Inspect the extracted oil for any of the
following:
1. Dirt in the oil.
2. Color changed to red, brown, or black.
3. Presence of foreign substances, metal
shavings, etc. in the oil.
When a System Becomes Contaminated
A severely contaminated system may be indicated
by black oil in the compressor. If severe
contamination occurs, it will be necessary to flush
the complete system. If flushing is required, use
industry approved materials.
In all cases when this occurs, the extent of
contamination must be determined. Do this by
removing the filter-drier and determine if the
darker-colored oil is present at that point of the
system. If so, flushing the system is
recommended.
If the oil appears clean at the filter-drier, install a
new filter-drier and replace the compressor oil
with clean new oil.
Replacing Oil
Pour the oil into the compressor through the
suction port.
NOTE: Always replace the oil with new fresh oil
taken only from a sealed metal container.
NOTE: Always replace the filter-drier anytime
the system has been opened for service.
Figure 34: Typical Compressor Oil Fill Procedure
CAUTION: Check the system decals and
operation manual for the proper oil. The
mixing of incompatible oils will cause
system damage. Compressor Oil 1L PAG
recommended for R-134a Systems.
1. If the field coil lead wire is broken, replace the
field coil.
2. Check the amperage and voltage. The
amperage range should be 3.6 to 4.2 amps at
12 volts or 1.8 to 2.1 amps at 24 volts. Note
the following symptoms and conditions:
a.
A very high amperage reading—a short
within the field coil.
b. No amperage reading—an open circuit in
the winding.
c.
An intermittent or poor system ground
results in lower voltage at the clutch.
Check for tight fit on the coil retaining
snap ring or for a good ground at the coil
retaining screws.
3. Air Gap—An incorrect air gap can cause
erratic engagement or disengagement, and/or
clutch rattle. Check the air gap with a feeler
gauge. The air gap should be 0.016 to
0.031 in. (0.4 to 0.8 mm). See “Clutch
Installation” for information about adjusting
the air gap.
Clutch Removal, Inspection,
and Installation
NOTE: Make sure the proper tools are available
before performing maintenance procedures.
Refer to “Special Tools” at the end of this
chapter for the tools required. Contact your local
Thermo King dealer for further information.
Removal
1. Remove the center armature bolt.
Figure 35: Remove Center Bolt
2. Remove the armature plate using the armature
plate puller. Then remove the shims from
either the drive shaft or the drive plate.
3. Remove the snap ring using external snap ring
pliers.
4. Remove the cover (if equipped).
5. Remove the pulley assembly using the pulley
remover and the spacer positioned on the
cylinder head hub.
AUA0034
1.
Armature Plate Puller
Figure 36: Remove Armature Plate
1.
Snap Ring
2.
Cover (If Equipped)
Figure 37: Remove Snap Ring and Cover
1
all-guides.co
m
Figure 38: Remove Pulley
6. Remove the coil’s lead wire from the holder
on the top of the compressor.
7. Remove the three screws that attach the coil to
the compressor and remove the coil.
NOTE: DO NOT hold the coil by the lead wire.
Figure 39: Remove Coil
Inspection
1. Armature Plate: If the contact surface is
scorched, the armature plate and pulley should
be replaced.
2. Pulley Assembly: If the pulley’s contact
surface is excessively grooved due to
slippage, both the pulley and armature plate
must be replaced. There should also be no
foreign matter, such as oil or grit, lodged
between the armature plate and pulley.
Thoroughly clean these contact surfaces and
the armature plate.
3. Coil: Inspect the coil for a loose connector or
cracked insulation. If the insulation is cracked,
replace the coil. Repair or replace the wire or
the connector if either is loose or damaged.
Installation
NOTE: Before installing the clutch, perform the
“Inspection” procedures described previously.
1. Install the coil on the compressor (with the
lead wire on top). Then torque the mounting
screws to 2.9 to 4.3 ft-lb (4 to 6 N•m).
2. Install the lead wire in the wire holder on the
compressor.
Figure 41: Install Coil
CAUTION: To avoid damaging the pulley
groove, the puller claws should be hooked
into, not under, the pulley groove.
1.
Drive Plate
2.
Pulley Assemble
3.
Coil
Figure 40: Inspect Clutch Components
3. Install the pulley assembly using the installer
and a hand press.
Figure 42: Install Pulley
4. Install the cover (if equipped) and the snap
ring using external ring pliers.
NOTE: The snap ring should be installed
with the chamfered inner edge outward
(facing away from seal).
5. Install the driver plate on the drive shaft,
together with the original shim(s). Press the
drive plate down by hand.
NOTE: If replacement or additional shims
are required, a clutch hardware kit is
available.
6. Install the armature bolt and torque it to 8.7 to
10.1 ft-lb (12 to 14 N•m). Use the pulley arbor
to prevent armature plate rotation. After
tightening the bolt, ensure that the pulley
rotates smoothly.
1.
Snap Ring
2.
Cover (If Equipped)
Figure 43: Install Cover and Snap Ring
1.
Snap Ring
2.
Cover (If Equipped)
Figure 44: Install Cover and Snap Ring
1.
Shims
Figure 45: Install Shims and Drive Plate
7. Check the air gap with a feeler gauge. The air
gap should be 0.016 to 0.031 in. (0.4 to 0.8
mm). If necessary, adjust the air gap by adding
or removing shims. Adjusting shims are
available in a Clutch Hardware Kit.
Figure 46: Check Air Gap
Electrical Connection
1. Connect the lead wire to the electrical circuit.
NOTE: The stationary field is grounded at
the factory; therefore, it is necessary only to
connect the hot (lead) wire.
2. Engage and disengage the clutch several times
to check the clutch engagement. The disc
should snap firmly against the pulley.
Clutch Run In
The clutch should be “run in” after it has been
installed on the compressor and the compressor
has been installed in the system.
1. Run the truck engine at idle speed.
2. Turn the unit On and Off at 10 second
intervals to engage and disengage the clutch.
Do this at least ten times.
Shaft Seal Cover and Shaft Seal
Removal, Inspection, and
Installation
Removal
1. Remove the magnetic clutch assembly (see
“Clutch Removal, Inspection, and
Installation” on page 61).
2. Use the seal remover (from the shaft seal kit)
to remove the shaft seal cover. Turn the seal
remover to engage the hook on the seal
remover with the hook on the shaft seal cover,
then slowly pull the shaft seal cover out of the
cylinder head (some models).
NOTE: The shaft seal cover SHOULD NOT
be reused. Always use a new shaft seal cover
when reassembling a compressor (some
models).
3. Remove the snap ring using an internal snap
ring pliers.
4. Use the seal remover (from the shaft seal kit)
to remove the shaft seal. Turn the seal remover
to engage the hook on the seal remover with
the hook on the shaft seal, then slowly pull the
shaft seal housing out of the cylinder head.
1.
Shaft Seal Cover (If Equipped)
Figure 47: Shaft Seal Cover Removal
1.
Shaft Seal
Figure 48: Remove Shaft Seal
The shaft seal should not be reused. Always use a
new shaft seal when reassembling the compressor.
Be extremely careful that the lip of the new shaft
seal is not scratched or damaged in any way.
Make sure the shaft seal is free from lint and dirt
that could damage the shaft seal surface.
Figure 49: Inspect Shaft Seal
Installation
Before installing a shaft seal inspect it carefully
(see “Inspection” above).
1. Clean the seal section of the front cylinder
head that holds shaft seal.
2. Apply clean compressor oil to the new shaft
seal and to the front cylinder head. If the slip
surfaces are dirty, clean them with thinners,
dry the clean surfaces, and apply clean
compressor oil — same type that is used in the
system.
3. Place the seal guide (from the shaft seal kit)
on the end of the spline shaft.
4. Place the shaft seal over the seal guide and
slide the seal into the front cylinder head.
5. Use the seal installer (from the shaft seal kit)
to press the shaft seal into the cylinder head as
far as possible.
Figure 52: Press Seal Into Cylinder Head
6. Remove the seal guide from the spline shaft.
7. Install the snap ring using internal snap ring
pliers.
1.
Seal Guide
Figure 50: Place Guide on Shaft
1.
Seal Guide
2.
Shaft Seal
Figure 51: Place Shaft Seal on Guide
8. Press the snap ring using the installing end of
the remover until a “Click” is heard.
NOTE: When installing the snap ring, the
chamfered edge of the snap ring must face
upward as shown in the figure below.
Seal Cover Installation (When
Equipped)
1. Place the seal guide (from the shaft seal kit)
on the end of the shaft.
2. Place the shaft seal cover on the seal guide
and slide the shaft seal cover into the cylinder
head.
Figure 54: Install Shaft Seal Cover
(When Equipped)
3. Use the seal installer (from the shaft seal kit)
to press the shaft seal cover into the cylinder.
NOTE: Position the shaft seal cover as shown in
the illustration.
4. Remove the seal guide from the spline shaft.
Front and Rear Cylinder Head
Disassembly, Inspection, and
Reassembly
Disassembly
1. Remove the magnetic clutch assembly
(see“Clutch Removal, Inspection, and
Installation” on page 61).
2. Remove the connector’s caps and the drain
plug and then drain the oil.
3. Remove the shaft seal cover and shaft seal
(“Shaft Seal Cover and Shaft Seal Removal,
Inspection, and Installation” on page 64).
1.
Shaft Seal
2.
Guide
3.
Snap Ring
Figure 53: Install Snap Ring
AUA0103
1.
Top
2.
Shaft Seal Cover
3.
Bottom
Figure 55: Proper Shaft Seal Cover Position
all-guides.co
m
4. Remove the six body bolts securing the head
using a socket wrench.
Figure 56: Remove Body Bolts
5. To remove the front cylinder head alternately
tap the two projections on the circumference
of the front cylinder head with a screwdriver
and a plastic mallet.
Figure 57: Tap Front Cylinder Head Projections
6. Remove the O-ring from the front cylinder
head and the remove all the gasket material
from the front cylinder head.
7. Remove the valve plate and suction valve
from the cylinder shaft assembly and remove
all the gasket material from the valve plate.
1.
O-ring
2.
Gasket
3.
Front Cylinder Head
Figure 58: Front Cylinder Head Assembly
1.
Valve Plate
2.
Suction Valve
Figure 59: Front Valve Plate and Suction Valve
8. To remove the rear cylinder head alternately
tap the projections on the circumference of the
rear head with a screwdriver and a plastic
mallet.
Figure 60: Tap Rear Cylinder Head Projections
9. Remove the O-ring from the rear cylinder
head, and remove all the gasket material from
the rear cylinder head.
10. Remove the valve plate and suction valve
from the cylinder shaft assembly and remove
all the gasket material from the valve plate.
Inspection
Check the front and rear valve plates for
scratched, bent or damaged parts. Inspect both
cylinder heads and both valve plate assemblies for
nicks and/or burrs on the sealing surfaces. Clean
or replace them if damaged. Ensure that all
passages in the valve plate are unobstructed. If
either the cylinder head or valve plate is cracked,
it must be replaced.
1.
O-ring
2.
Gasket
Figure 61: Rear O-ring and Gasket
1.
Valve Plate
2.
Suction Valve
Figure 62: Rear Valve Plate and Suction Valve
1.
Front Cylinder
2.
Valve Plate Assembly
Figure 63: Front Cylinder and Valve Plate
Rear Cylinder Head
1. Place the cylinder shaft assembly on the bench
with the rear side up.
Figure 64: Rear View
2. Install the rear suction valve so that it aligns
with the alignment pin.
3. Install the rear valve plate on the rear suction
valve.
4. Coat the new gasket with clean compressor oil
and install it on the rear valve plate. Use the
same type of oil that is used in the system.
5. Thinly coat the new O-ring with clean
compressor oil (same type of oil that is used in
the system) and install it on the rear cylinder
head.
6. Install the rear cylinder head. If the rear
cylinder head is difficult to install, tap the
cylinder head lightly with a mallet.
CAUTION: Ensure that the valve is
aligned with the valve escape groove of
each cylinder.
1.
Escape Groove
2.
Suction Valve
3.
Piston
Figure 65: Rear Suction Valve
CAUTION: Be careful not to mistake the
front valve plate for the rear valve plate.
1.
Rear Cylinder Head
2.
O-ring
3.
Gasket
4.
Valve Plate
5.
Suction Valve
Figure 66: Rear Cylinder Head Assembly
Front Cylinder Head
1. Place the cylinder shaft assembly on the bench
with the front side up.
2. Install the front suction valve so that it aligns
with alignment pin.
3. Install the front valve plate on the front
suction valve.
4. Coat the new gasket with clean compressor oil
(same type of oil that is used in the system)
and install it on the front valve plate.
5. Thinly coat the new O-ring with clean
compressor oil (same type of oil that is used in
the system) and install it on the front cylinder
head.
6. Install the front cylinder head. If the front
cylinder head is difficult to install, tap the
cylinder head lightly with a plastic mallet.
7. Install new gaskets on the body bolts. Insert
the six body bolts from the front cylinder head
side and tighten them in three or more stages
to a torque of 14.5 to 17.3 ft-lb (20 to 24
N•m). The bolts should be tightened in the
order shown in Figure 69.
Figure 69: Tightening Sequence
8. Turn the drive shaft two to three times by hand
to ensure that the shaft rotates smoothly.
CAUTION: Ensure that the valve is
aligned with the valve escape groove of
each cylinder.
1.
Escape Groove
2.
Suction Valve
3.
Piston
Figure 67: Front Suction Valve
CAUTION: Be careful not to mistake the
rear valve plate for the front valve plate.
1.
Front Cylinder Head
2.
Valve Plate
3.
Suction Valve
4.
Gasket
5.
O-ring
Figure 68: Front Cylinder Head Assembly
9. Install the oil drain plug with a new O-ring,
thinly coated with clean compressor oil, and
torque it to 9.4 to 10.8 ft-lb (13 to 15 N•m).
10. Fill the compressor with the specified amount
of clean compressor oil through the
suction-side connector.
11. Install the shaft seal and shaft seal cover (see
“Shaft Seal Cover and Shaft Seal Removal,
Inspection, and Installation” on page 64).
12. Install the clutch (see “Clutch Removal,
Inspection, and Installation” on page 61).
13. Leak test the compressor (see “Compressor
Leak Test Procedure”).
14. Check the clutch air gap with a feeler gauge.
The air gap should be 0.016 to 0.031 in. (0.4
to 0.8 mm). If necessary, adjust the air gap by
adding or removing shims. Adjusting shims
are available in the Clutch Hardware Kit.
Compressor Leak Test
Procedure
When a compressor is repaired it should be
checked prior to installation.
1. Install discharge and suction caps on the
connector.
2. Fill the compressor with refrigerant gas (same
type that is used in the system) through the
connector’s suction port raising the pressure to
at least 70 psig (483 kPa).
3. Check the compressor for leaks using a
reliable leak detector.
NOTE: Be sure that the leak tester being used is
capable of detecting fluorine based refrigerants.
1.
Drain Plug
Figure 70: Compressor Drain Plug Location
CAUTION: Be sure to verify the oil you
are using matches what is used in the
system. The use of the incorrect oil will
damage the system.
1.
Caps
Figure 71: Discharge and Suctions Caps
CAUTION: Never leave the compressor
upside down for more than 30 seconds
because the oil inside the compressor will
enter the cylinders. This causes liquid
compression, which will damage the
compressor’s suction and discharge
valves.
1
all-guides.co
m
Figure 72: Pulley Arbor P/N 204-804
Figure 73: Shaft Seal Kit P/N 204-805
Figure 74: Clutch Remover P/N 204-806
8932f
8932e
8932a
Figure 75: Compressor Holder P/N 204-807
Figure 76: Snap Ring Pliers P/N 204-808
Figure 77: Clutch Installation Kit P/N 204-890
Belt Tensions
Engine Driven Compressor Belt and
Pulleys
Correct pulley alignment and proper belt tension
are very important factors in compressor
installation. The compressor clutch must be
perfectly aligned with the engine pulley and any
auxiliary idler or belt adjustment pulley
components. When installing the clutch, be sure
the shaft drive key is in place and the shaft bolt is
properly tightened. Check the pulley alignment by
holding a 24 to 35 in. (60 to 90 cm) long rod, 0.5
in.(13 mm) in diameter firmly into the V-groove
of the clutch pulley and make sure the rod aligns
squarely with the engine drive pulley groove.
Double check by making sure the belt goes from
pulley to pulley in perfect alignment with no
indication of a sideward bend.
Adjust the belt tension to vehicle manufacturer
specifications. Check the belt tension again after
36 to 48 hours of initial operation of the unit
because the belt may stretch slightly during the
first hours of use. Remember, good alignment and
proper belt tension ensure long belt life.
8932b
8932d
8932c
Over-the-Road Mechanical Diagnosis
If desired box temperature cannot be obtained
during engine driven compressor operation, any
of the following may be indicated:
1. EXCESSIVE HEAT LOAD. An excessive
heat load on the system will be caused by too
many, or excessively long, stops with the
doors open. Excessive heat loads will also be
caused by loose doors, loose body panels,
warm loads and poor insulation.
2. DIRT ON COILS. Dirt on the condenser or
evaporator coil acts as an insulator reducing
the capacity of the unit.
3. INCORRECT BELT TENSION. If the drive
belt is not correctly tensioned, the compressor
will not be driven at proper speed, and unit
efficiency will be reduced. By contrast, too
much tension will place an additional load on
the bearings causing rapid wear.
4. SHORTAGE OF REFRIGERANT. Shortage
of refrigerant reduces capacity of the unit.
Find and remedy the cause of the shortage and
recharge the system. DO NOT operate the unit
if there is an indication of low charge.
5. FAULTY EXPANSION VALVE
ADJUSTMENT. High superheat settings will
starve the evaporator causing low suction
pressure. Low superheat settings will flood the
coil causing high suction pressure. The
superheat setting should be adjusted ONLY by
a trained refrigeration serviceman.
6. EXCESSIVE OIL. Too much compressor oil
in the system may result in lower than normal
suction pressure as well as lowered capacity.
7. MOISTURE IN THE SYSTEM. Symptom:
Expansion valve freeze-up—will not
refrigerate. Usually this can be checked by
warming the expansion valve with either the
hand or hot towels to see if the valve opens.
Evacuate the system in the same manner used
during installation. Install a new drier.
8. EXPANSION VALVE LOSES ITS CHARGE.
If the expansion valve loses its charge, the
valve will close causing the system to go into
vacuum. Replace the valve.
9. AIR IN SYSTEM. Air is not condensable. Its
presence in the system increases head
pressure. When the compressor is stopped, air
will gather at the high point of the high side.
Reclaim the refrigerant, evacuate the system
to 500 microns and recharge with the proper
amount of refrigerant.
10. TEMPERATURE OF THE LIQUID LINE.
During normal operation, the liquid line will
be slightly warmer than surrounding air. An
extremely hot line indicates either shortage of
refrigerant or lack of a liquid seal at the
receiver outlet. A cold line indicates a
restriction, and some flashing takes place in
the liquid line sight glass.
11. DIRTY OR WET FILTER DRIER. If the
outlet line of the filter drier is colder than the
inlet line, the filter is either saturated with
moisture or is dirty and must be replaced.
12. DIRT IN THE EXPANSION VALVE
SCREEN. Reclaim the refrigerant charge,
remove the screen and clean. Moisture is in
the system will collect at the expansion valve
and freeze. This is indicated by abnormally
low suction pressure. Replace the drier, dry
the system and recharge.
13. ICE ON THE EVAPORATOR COIL. Note
operation under DEFROST CYCLE.
14. AIR FLOW. Do not load product directly in
front of the air return or discharge. Insure that
the fan is correctly positioned in the orifice to
achieve maximum air flow.
15. COMPRESSOR LIFE. The following will
shorten the life of the compressor:
•
Operating a contaminated system
•
No oil trap
•
Clogged oil separator (JetLube™)
•
Clogged liquid injection orifice
(JetCool™)
•
Defective liquid injection switch
(JetCool™)
•
Insufficient oil charge
•
Wrong or mixed oil
Over-the-Road Mechanical Diagnosis
76
•
Lack of compressor lubrication on
installation and startup
•
Excessive compressor speed (maximum
speed 3,000 rpm)
all-guides.co
m
Electric Standby Mechanical Diagnosis
Condition
Possible Cause
Remedy
Compressor does not run
Improperly wired
Check wiring against diagram
Low line voltage
Check line voltage, determine
location of voltage drop
Relay contacts not closing
Check by operating manually.
Replace relay if defective
Fuses blown
Replace fuses
Open circuit in motor winding
Check stator leads
High pressure cutout open
Eliminate cause of excessive
pressure
Thermostat faulty
Repair or replace
Compressor faulty
Replace compressor
Shortage of refrigerant
Recharge
Low pressure cutout open
Recharge leak test
Overload relay open
Locate overload, reset
Unit short cycles
Shortage of refrigerant
(low pressure cutout)
Repair leak and recharge
Restricted expansion valve
Clean expansion valve
Refrigerant overcharge
(high pressure cutout)
Remove excess charge
Cycling on high pressure cutout
Check air flow and fan
Dirty condenser coil
Clean coil
Defrost timer set too low for
application.
Adjust timer to higher interval.
Electric Standby Mechanical Diagnosis
78
Unit operates long or
continuously
Shortage of refrigerant
Repair leak and recharge
Discharge valve leaking
Replace leak
Thermostat faulty
Repair or replace
Dirty condenser
Clean condenser
Air in system
Evacuate and recharge system
Compressor inefficient
Replace compressor
Plugged expansion valve
Clean expansion valve
Iced or plugged coil
Defrost or clean coil
Defective truck body insulation
Correct or replace
Too many door openings
Keep doors closed, install plastic
curtains
Load too warm
Precool hot product
Excessive superheat at expansion
valve
Adjust superheat
Door seals worn
Repair/replace
Box temperature too high
Refrigerant shortage
Repair leak and recharge
Thermostat setpoint too high
Reset thermostat
Expansion valve or strainer plugged
Clean or replace
Restricted lines
Clean restriction. Tubing pinched
shut
Hot load
Precool hot product
Expansion valve superheat too high
or too low
Adjust superheat
Head pressure too high
Refrigerant overcharge
Remove excess
Air in system
Evacuate and recharge system
Dirty condenser
Clean
Restricted condenser
Clean condenser
Condenser fan not running
Check fan motor
Condenser fan rotation
Check fan motor polarity
Condition
Possible Cause
Remedy
Electric Standby Mechanical Diagnosis
79
Head pressure too low
Refrigerant shortage
Repair leak and recharge
Compressor suction or discharge
valve inefficient
Replace valve
Noisy unit
Insufficient compressor oil
Add oil to proper level
Mounting bolts loose
Tighten
Refrigerant flooding back
Adjust oil level or refrigerant charge.
Check expansion valve for proper
superheat
Compressor loses oil
Shortage of refrigerant
Repair leak and recharge
Plugged expansion valve or strainer
Clean expansion valve
Wrong oil viscosity
Use proper oil
Short cycling
Refer to unit “short cycling”
Superheat too high
Adjust expansion valve
Frosted or sweating suction line
Expansion valve set too low,
admitting excess refrigerant
Adjust expansion valve
Hot liquid line
Shortage of refrigerant
Repair leak and recharge
Condenser fan not running
Check fan motor
Dirty condenser coil
Clean condenser
Frosted liquid line
Restricted dehydrator or strainer
Replace restricted part
Condenser coil is cool when unit
is in cool operation
Refrigerant undercharge
Repair leak and recharge
Compressor inefficient
Replace compressor
Unit in vacuum. Frost expansion
valve only
Ice plugging expansion valve orifice
Apply hot wet cloth to expansion
valve. Moisture indicated by
increase in suction pressure.
Replace drier
Plugged expansion valve strainer
Clean strainer
Sensor bulb lost charge
Replace expansion valve
Electric Standby Service Checks
1.Compressor does not run.
a.Check for power at source.
b.Check for power at plug.
c.Check for power at compressor contactor.
d.Check for power at overload terminals (contactor
closed).
e.Check for power at motor terminals.
2.Power at compressor terminals but motor does not
run.
a.Replace compressor.
Condition
Possible Cause
Remedy
Electric Standby Mechanical Diagnosis
80
3.Compressor hums but does not run.
a.Check for locked rotor.
b.Check for worn bearings. Replace if necessary.
c.Check for locked compressor and repair.
d.Check power source for single phasing (on three
phase units).
e.Check capacitors (on single phase units).
f.Check start relay.
4.Check transformer.
a.Check for power output.
5.Check rectifier.
a.Check for rectifier output.
Electric Standby Service Checks
Refrigeration Diagnosis Chart
Unit Not Heating
Rapid cycling
Unit cools in defrost cycle
High head pressure
Low head pressure
No head pressure
High suction pressure
Low suction pressure
No suction pressure
Unit operating in vacuum
Sight glass / empty
Suction line frosting back
Noisy compressor
Unit not refrigerating
Unit not defrosting
SYMPTOM
POSSIBLE CAUSES
•
•
Overcharge of refrigerant
•
•
•
•
•
•
•
Shortage of refrigerant
•
•
•
•
•
•
•
•
No refrigerant
•
Air through condenser too hot (ambient)
•
Air flow through condenser restricted (dirty)
•
•
Air through condenser too cold (ambient)
•
•
•
Air in refrigerant system
•
Condenser fan blades bent or broken
•
Air short cycling around evaporator coil
•
•
•
•
Air through evaporator restricted
•
•
•
•
•
•
Evaporator needs defrosting
•
•
Broken engine driven compressor belt
•
Compressor discharge valves leaking
•
•
•
Too much compressor oil in system
•
Loose engine driven compressor pulley
•
Compressor bearing loose or burned out
•
•
•
•
Broken valve plate in compressor
•
•
•
•
Expansion valve power element lost its charge
•
•
•
Expansion valve feeler bulb improperly mounted
•
•
•
Expansion valve feeler bulb making poor contact
•
•
•
•
Expansion valve open too much
•
•
Expansion valve closed too much
•
•
•
Expansion valve needle eroded or leaking
•
•
•
•
Expansion valve partially closed by ice, dirt or wax
•
Hot gas solenoid stuck open
•
Water valves not open
•
Water pump not working.
•
Truck engine not running
•
•
•
•
Liquid refrigerant entering compressor
•
•
•
Restricted line on the low side
•
•
Restricted line on the high side
•
•
•
Restricted dehydrator
•
•
Reverse fan rotation
•
•
•
•
Faulty pilot solenoid
•
•
Loose or broken electrical connections
•
•
•
•
Gauge out of calibration
•
Condenser fan motor not operating
•
•
•
•
•
•
Evaporator fan motor not operating
all-guides.co
m
Thermostat Operation 28
26590
Numbered
3. Entering the Setpoint Temperature. 34
A
about this manual 5
After Start Inspection 36
C
Checking Compressor Oil Charge 48, 49
Checking the Refrigerant Charge 48
Cleanup Procedure for Small Truck Units 48, 51
clutch
inspection 62
installation 62
removal 61
run in 64
test 61
Common Relays 27
Compressor 23
compressor
cylinder head
disassembly 66
inspection 68
reassembly 69
handling 56
installation 57
installation guidelines 56
installation position 56
installation precautions 56
leak test procedure 71
maintenance 55
mounting 58
removal 59
seal cover installation 66
shaft seal cover and shaft seal
inspection 65
installation 65
removal 64
special tools 72
compressor oil
adding extra to system 58
check interval 59
checking 59
checking charge 49
contamination 60
draining and replacing 60
return procedure 59
Condenser 23
Condenser Coil 53
condenser coil
maintenence 53
condenser fan pressure switch 45
testing 45
Condenser Fan Pressure Switch (CFPS) R-134a Units
Only 45
Connectors 26
contents, manual, description of 5
Control 24
Control Box 26
Control Circuits 24
curbside, definition 6
curbside/roadside terminology, explained 6
D
Defrost Components 43
Defrost Mode Operation (M-13, and M-16 only). 34
Defrost Relay 44
defrost relay 44
Defrost Solenoid Valve 44
defrost solenoid valve 44
defrost system 43
testing 44
Defrost Termination Switch 44
defrost termination switch 44
defrost timer
settings 43
test 45
Defrost Timer Test 45
Description 33
Display Return Air (Box) Temperature 34
Display Setpoint Temperature 34
E
Electric Standby Circuits 46
electric standby circuits 46
Electric Standby Operation 24
Engine Driven Compressor Belt and Pulleys 73
Evaporator 23
evaporator coil
maintenance 53
Evaporator Drain Tube Heaters 24
F
Fuses 26
H
high pressure cutout switch (HPCO) 50
I
In 24
In-Cab Control Box 24
in-cab control box M-13 and M-16
trouble shooting 42
In-Cab Control Box Operating Instructions (M-13,
M-16, M-17) 34
Introduction 33
L
liquid injection solenoid valve and metering orifice,
testing 46
Liquid Injection System 24
liquid injection system 45
Liquid Injection System (R-404A Units Only) 45
Loading Procedure 36
Low Pressure Cutout Switch (LPCO) 48, 50
low pressure cutout switch (LPCO) 50
M
Manual Defrost Switch 44
manual, how to use 5
matrix, how to use 5
model systems, how to use list 5
O
Oil 24
Operating Instructions 33
Over-the-Road Mechanical Diagnosis 75
P
P.C. Board 26
Post Load Procedure 36
Protection Features 25
R
R 20
R-404A 3
Recover Refrigerant 3
Refrigerant 24
refrigerant
handling instructions 55
major loss of 58
Refrigerant Charge 47
refrigerant charge
checking 48
Refrigeration Diagnosis Chart 81
refrigeration system
cleanup procedure for small truck units 51
refrigeration system, charging 47
roadside, definition 6
roadside/curbside terminology, explained 6
S
Safety Precautions 13
Safety, Auto Start/Stop 13
Safety, Electrical Hazards 14
Safety, High Voltage 15
Safety, Low Voltage 16
Safety, Refrigerant 13
Safety, Refrigeration Oil 14
Safety, Welding 15
Serial Number Locations 29
specifications
compressor 20
electrical controls 19
refrigerant controls 20
Standby Relays 27
Starting the unit 36
T
Testing The Defrost System 44
Trouble Shooting M-17 In-Cab Control Box (TC Units
Only) 43
U
Unit Features 25
Unit Mounting Bolts 53
unit mounting bolts 53
Unit Operation 27, 36
W
Weekly Pretrip Inspection 36
Wiring, Refrigeration and Schematic
Diagrams Index
Dwg No.
Drawing Title
Page
1E24520
V-500-10, V-500 MAX-10 Schematic Diagram
87
1E24518
V-500-10, V-500 MAX-10 3PH Wiring Diagram
88
1E18884
V-500-20 3PH, V-500 MAX-20 3PH Schematic Diagram
90
1E24443
V-500-20 3PH, V-500 MAX-20 3PH Wiring Diagram
91
1E24519
V-500-20 1PH, V-500-20 1PH Schematic Diagram
94
1E24517
V-500-20 1PH, V-500-20 1PH Wiring Diagram
95
3B17228
V-500-10 Refrigeration Diagram
98
1E30139
V-500 MAX-10 Refrigeration Diagram
100
1E28575
V-500-20 Refrigeration Diagram
102
1E28576
V-500 MAX-20 Refrigeration Diagram
104
1E31000
V-500 Outline Diagram
106