TechnipFMC Smith Meter AccuLoad IV Series Installation And Maintenance Manual

File Specifications

Brand: TechnipFMC
Category: Measuring Instruments
Model: Smith Meter AccuLoad IV Series (Installation And Maintenance Manual), prSV6dGKeuAnA
File Type: PDF
File Size: —
Pages: 80 pages

Download Document

Get a high-quality, printable PDF version of this manual for offline use.

Download PDF Manual (80 pages)

⚠️ Download Safety: This PDF is completely safe to download (last scan date: 24/06/2026).

Read Online

Read the TechnipFMC Smith Meter AccuLoad IV Series Installation And Maintenance Manual online using the built-in PDF viewer.

Key Pages of Document

Electronic Preset Delivery System

Bulletin MN06201 Issue/Rev 0.1 (2/20) Installation and Maintenance Manual Smith Meter® AccuLoad® IV MANUAL ...

Page 2 • MN06201 ║ Issue/Rev. 0.1 (2/20)

Important All information and technical specifications in this documentation have been carefully checked and compiled by the author. However, we cannot completely exclude the possibility of errors. TechnipFMC is always grateful to be informed of any errors. Contact us on the website. Smith Meter is a registered trademark of TechnipFMC. Caution The default or operating values used in this manual and in the progra ...

Issue/Rev. 0.1 (2/20) ║ MN06201 • Page 3

AccuLoad IV Installation and Maintenance Manual Table of Contents Table of Contents 1 – Introduction........................................................5 1.1. Warnings and Precautions...........................5 1.2. Weights & Measures Requirements............7 2 – Pre-Installation Considerations.......................9 2.1. Environment.................................................9 2.2. Mechanical... ...

Page 4 • MN06201 ║ Issue/Rev. 0.1 (2/20)

13 – Maintenance...................................................67 13.1 Enclosure Maintenance..........................67 13.2. A4I Kit Retrofit Installation......................68 13.3 Touch Screen Recalibration Procedures...69 13.3.1 Equipment and Other Requirements......69 13.3.2 Accessing the Display Module menu.....70 13.3.3 Display Module touch screen recalibration procedure...................... ...

Issue/Rev. 0.1 (2/20) ║ MN06201 • Page 5

AccuLoad IV Installation and Maintenance Manual Introduction 1 – Introduction This manual provides guidance for the installation of AccuLoad preset models ST, QT, N4 and SA. When installed following the guidelines contained in this manual, the AccuLoad will provide many years of safe, accurate and reliable delivery control. This manual addresses the requirements specific to the AccuLoad and it is assumed that ...

Page 6 • MN06201 ║ Issue/Rev. 0.1 (2/20)

Electrostatic Discharge Precautions The electronic components in the AccuLoad are susceptible to damage by static discharge. To minimize the risk of damage, the following precautions should be followed: • Before touching a circuit board with hands or tools, personnel/tools should be grounded using a wrist strap. • Avoid touching components or traces on the circuit boards and handle by the edges/ mounting hol ...

Issue/Rev. 0.1 (2/20) ║ MN06201 • Page 7

1.2 Weights & Measures Requirements The AccuLoad is a device marketed for a global market. Requirements vary depending on the region. It is a user requirement to verify that the AccuLoad is programmed and operated in a manner consistent with local codes and that proper notification (permit for use) or registration has been filed with the local authority or jurisdiction. AccuLoad IV Installation and Maintenance M ...

Issue/Rev. 0.1 (2/20) ║ MN06201 • Page 9

2 – Pre-Installation Considerations 2.1. Environmental Considerations Models ALIV-ST-XP and ALIV-QT-XP The enclosures of Explosion / Flame proof models are manufactured from aluminum alloy, and are designed to be operated in normal environmental conditions free of corrosive agents. In areas including but not limited to environmentally corrosive atmospheres, special considerations for additional environmental p ...

Page 10 • MN06201 ║ Issue/Rev. 0.1 (2/20)

Table 1. Cable Access Model Top Cable Access Bottom Cable Access AccuLoad ST 2 – 1” 11.5 NPT 3 – 1.25” 11.5 NPT AccuLoad QT 1 – 1” 11.5 NPT 2 – 1.25” 11.5 NPT 5 – 1” 11.5 NPT AccuLoad N4 3 – 1.75” AccuLoad SA MMI 3 – 1.75” AccuLoad SA FCM 10 – 2” 5. While the AccuLoad is rated to operate in ambient temperatures up to 60 degrees Celsius, it is advisable to keep all electronics as ...

Issue/Rev. 0.1 (2/20) ║ MN06201 • Page 11

AccuLoad IV Installation and Maintenance Manual Pre-Installation Considerations 3. For Ethernet connections, a minimum of CAT-5 rated cable should be used and the Ethernet wiring practices described in the Ethernet standard should be followed for cable lengths etc.. 4. Connectors are sized for a maximum of 14 gauge wire, consult the local electrical codes for the minimum wire size required for your applicatio ...

Issue/Rev. 0.1 (2/20) ║ MN06201 • Page 13

AccuLoad IV Installation and Maintenance Manual Installation 3 – Installation The general steps in the installation process are to physically mount the AccuLoad, elec­ trically connect it to the associated equipment and then tailor the configuration database parameters to suit the specific operational and measurement environment. The following sections cover the mounting and wiring. Refer to the AccuLoad IV ...

Page 14 • MN06201 ║ Issue/Rev. 0.1 (2/20)

AccuLoad IV Installation and Maintenance Manual Installation (f) Grounding: The Touch Keypad sensor is protected by an intrinsic safe barrier, the enclosure must be grounded as per national electrical code regulations, for example NEC/CEC, etc. Equipment bonding shall be provided at the external grounding facility terminal, external connection is not required when using metallic conduit or armored cable. Exte ...

Issue/Rev. 0.1 (2/20) ║ MN06201 • Page 15

AccuLoad IV Installation and Maintenance Manual Installation 3.2. General Requirements (a) It is imperative that the electrical installation be performed by a competent individual that is familiar with associated risks involved with the installation, operation, and maintenance, of electrical equipment in hazardous (classified) locations. This individual must possess knowledge of local, national electrical code ...

Issue/Rev. 0.1 (2/20) ║ MN06201 • Page 17

AccuLoad IV Installation and Maintenance Manual AccuLoad Models 4 – AccuLoad Models There are four models of the AccuLoad: the ST, QT, N4, and SA shown in the following figures: Figure 1. AccuLoad IV-ST Figure 2. AccuLoad IV-QT ...

Page 18 • MN06201 ║ Issue/Rev. 0.1 (2/20)

AC WIRING TRAY 'A' 'B' 'C' 'D' DC WIRING TRAY DC WIRING TRAY DC WIRING TRAY AccuLoad IV Installation and Maintenance Manual AccuLoad Models Figure 3. AccuLoad Model N4 Figure 4. AccuLoad Model SA ...

Issue/Rev. 0.1 (2/20) ║ MN06201 • Page 19

AccuLoad IV Installation and Maintenance Manual AccuLoad Models There is a common set of electronic modules used in the different AccuLoad models as follows: THMI – The touchscreen display module mounted in the front panel of the unit. A4M – The main CPU and I/O module. All AccuLoad models will contain at least one A4M module. A4B – Provides expanded I/O capability to support additional load arms. Note: M ...

Page 20 • MN06201 ║ Issue/Rev. 0.1 (2/20)

AccuLoad IV Installation and Maintenance Manual AccuLoad Models Table 6. Functions and capacities by module Module Usage/Location Power Interfaces Description THMI Front cover of: ST QT N4 SA - MMI 24 VDC Ethernet USB Serial Provides user interface touch screen. Connects to the A4M with Ethernet. A4M ST QT N4 SA - FCM 93 – 230 VAC Meter Pulse Input Pulse Outputs Digital I/O AC/DC Analog I/O Ethernet Main I/O ...

Related Devices for TechnipFMC Smith Meter AccuLoad IV Series:

Smith Meter AccuLoad IV
TechnipFMC Smith Meter AccuLoad IV Installation & maintenance manual
23.05.2026 72 pages

Smith Meter® AccuLoad IV Installation & Maintenance Manual Bulletin MN06201 Issue/Rev. 0.2 (3/21) March 2021 Installation instructions for the TechnipFMC Smith Meter AccuLoad IV Measuring Instruments. It includes troubleshooting procedures and maintenance procedures, error handling, control functions.

Smith Meter 210
TechnipFMC Smith Meter 210 Installation, operation & service manual
14.04.2026 26 pages

Valve and Line Accessories MANUAL MN03010 Issue/Rev. 0.4 (6/17) Installation / Operation / Service Manual Smith Meter® Model 210 Digital Electro-Hydraulic Set Complete operating guide for the TechnipFMC Smith Meter 210 Control Unit. This manual details specifications, power requirements, safety guidelines, usage recommendations.

Proline Promass F 500
TechnipFMC Proline Promass F 500 Operating instructions manual
29.03.2026 292 pages

K e e p c over h ti g t w hi l e Sp an nung öff ne n Nic ht u nt e r c i r c u it s a r e a li v e MANUAL BA01812O/06/EN/01.17 Valid as of version 01.00.zz (De Device guide for the TechnipFMC Proline Promass F 500 Measuring Instruments. This guide explains the features and troubleshooting, device safety checks, wiring setup.

Smith Meter
TechnipFMC Smith Meter Service manual
11.08.2026 12 pages

Contents Section 1 – General Information.................................................................................................................. Pag Professional operation guide for the TechnipFMC Smith Meter Measuring Instruments. It includes maintenance procedures and replacement parts, hardware setup, system setup, safety guidelines.

Proline Promass 500
TechnipFMC Proline Promass 500 Manual 
22.08.2026 32 pages

SD01918O/06/EN/02.17 Valid as of version 01.01.zz (Device firmware) 71382450 Web Server Manual MANUAL Special Documentation Proline Promass 500 Modbus RS485 Step-by-step user manual for the TechnipFMC Proline Promass 500 Server. It details operating modes and internal layout, usage procedures, replacement parts.

TRIPLEX M06
TechnipFMC TRIPLEX M06 Operation and maintenance manual
05.06.2026 68 pages

Doc No: OMM50001243 Rev: C Page 1 of 68 This document and all the information contained herein are the confidential and exclusive property of TechnipFMC, and User support manual for the TechnipFMC TRIPLEX M06 Water Pump. It explains operation, maintenance, and software installation, compatibility information, usage examples, setup guidelines.

Proline Promass 300 EtherNet/IP
TechnipFMC Proline Promass 300 EtherNet/IP Manual 
19.07.2026 36 pages

SD02129O/06/EN/01.17 Valid as of version 01.00.zz (Device firmware) 71382455 Web Server MANUAL Special Documentation Proline Promass 300 EtherNet/IP User reference guide for the TechnipFMC Proline Promass 300 EtherNet/IP Server. This manual covers safety features, operating modes, reset instructions.

Smith Meter AccuLoad III
TechnipFMC Smith Meter AccuLoad III Installation manual
06.07.2026 94 pages

Electronic Preset Delivery System Smith Meter® AccuLoad® III with ALX Firmware Installation Manual Bulletin MN06135 Issue/Rev 1.3 (6/17) Advanced user guide for the TechnipFMC Smith Meter AccuLoad III Measuring Instruments. It outlines the setup and compatibility information, power requirements, repair references.

Measuring Instruments: Frequently Requested PDF Instructions

GOLD G2
SENSIT Technologies GOLD G2 Quick start instructions
28.06.2026 2 pages

Quick-Start Instructions HINT: As you approach the source of the leak, continue pressing the “B” button to slow down the tick if it is rapidly increasing. I Service and user manual for the SENSIT Technologies GOLD G2 Measuring Instruments. It offers guidance on safety guidelines, troubleshooting guides, component replacement, functional overview.

ALDD28V5A401
Analog Technologies ALDD28V5A401 Quick start manual
11.08.2026 10 pages

1161 Ringwood Ct, #110, San Jose, CA 95131, U. S. A. Tel.: (408) 748-9100, Fax: (408) 770-9187 www.analogtechnologies.com Copyright Device technical manual for the Analog Technologies ALDD28V5A401 Measuring Instruments. The documentation includes reset instructions, connectivity options, support details.

RID16
Endress+Hauser RID16 Operating instructions manual
28.06.2026 58 pages

BA284R/09/en/02.10 71092450 Operating Instructions RID16 Field Indicator with FOUNDATION Fieldbus™ - protocol 9 User support guide for the Endress+Hauser RID16 Measuring Instruments. This manual covers installation, operation, and device features, error codes, network setup, safety precautions.

S203TA
Seneca S203TA Manual 
05.04.2026 16 pages

Technical Specifications Input S203TA Advanced Three-phase Network Analyzer General Description Model S203TA is a complete three-phase network analyzer suited Complete usage guide for the Seneca S203TA Measuring Instruments. This reference manual outlines adjustment procedures, software updates, safety information, error codes.