Matsuko Switch Box Installation And Operating Manual
Text of Matsuko Switch Box Installation And Operating Manual
Matsuko Switch Box Ensure that your Matsuko Switch Box is switched off at the mains before you
attempt to conduct any type of maintenance on the Matsuko Switch Box.
Switch Box, Switch Box Timer, Switch Box Timer + Pump Guard
INSTALLATION AND
OPERATING MANUAL
PROFESSIONAL
INSTALLERS VERSION
IMPORTANT SAFETY INFORMATION
PLEASE READ CAREFULLY
• Always consult with a qualified electrician before
attempting any electrical installation.
• Always isolate the unit from mains electricity supply
before carrying out any maintenance.
• Use in the area of the garden pond only if the
installation complies with the relevant wiring regulations.
• Power must be supplied through a Residual Current Device (RCD) with a
residual operating current not
Matsuko Switch Box Dimensions & Specifications
PAGES
4
Installation
PAGES
5-8
Programming (Switch Box Timer, Switch Box Timer + PG)
PAGES
9-11
INTRODUCING THE MATSUKO SWITCH BOX RANGE
Congratulations on purchasing your Matsuko Switch Box. All Matsuko Switch Boxes are built to
complement your outdoor enjoyment giving you total control of your lifestyle. All Matsuko Switch
Boxes are designed to be weatherproof, stylish, rob
* 1500 Watts per line when installed into the mains household electrical wiring using appropriate cable.
** A double layer capacitor stores electrical energy to remember your programs in case of a power cut for at least 24 hrs
when fully charged. The Matsuko double layer capacitors need minimum 48 hours to be fully charged.
DIMENSIONS
Switch
Box
Switch Box
Timer
Switch Box
Timer + PG
Output
220/240 V
220/240 V
220/240 V
Max. Power Pe
INSTALLATION (PLEASE SEE SEPARATE SHEET FOR WALL MOUNT INSTRUCTIONS)
OPENING THE COVER
To open the cover insert a small
screwdriver (1) or similar implement into
the round opening at the base of the
cover.
Use it to push the fastening connection
towards the left until the catch is released
(2). Gently lift the cover open to the
maximum angle of 100 degrees (3). DO
NOT force the cover to open further.
Once you have connected all your
appliances (see
Matsuko Switch Box IMPORTANT: Connect the wires to the appropriate pins (Live,
Neutral, Earth). Up to five outgoing connections can be installed into
the Switch Box (9-13).
Power input is supplied into a separate mains channel (14). Use two
screws to secure the cable grip and fix each cable into place inside
the Switch Box (16). Outside the Switch Box, if using the supplied
cable gland sealing ring, ensure the cable gland sealing ring is
turned clockwise until the cable is f
Once you have connected all of your appliances, always secure the lid with the closing screw.
There are two blanking plugs supplied with Matsuko Switch Boxes. These blanking plugs should
be used to replace the cable glands if you decide not to wire a device in at any point.
FINISHING CONNECTIONS & BLANKING PLUGS
WARNING: ALWAYS TURN THE SWITCH BOX POWER
OFF AT THE MAINS ELECTRIC BEFORE OPENING
THE COVER. ALWAYS SECURE WITH CLOSING SCREW.
To activate each appliance, simply press the corresponding
on / off button on the front of the Switch Box, labelled:
For more detailed programming instructions (for the Switch Box Timer)
see page 10.
TYPICAL EXAMPLE OF A COMPLETE INSTALLATION
PUMP
LIGHTS
FEEDER
SKIMMER
POWER
IN
UV
PUMP
LIGHTS
FEEDER
SKIMMER
POWER
IN
UV
ACTIVATING CONNECTED APPLIANCES (SWITCH BOX ONLY)
Page 8
After starting the power supply there is a short delay while the system starts up. Once the screen
has turned on, press Menu to display the programming menu. To return to the main menu press
Menu . The icons below represent the buttons.
TO PROGRAM THE DATE AND TIME
Press Menu to enter the programming mode, then use Down to select the clock icon (6 clicks
down), then press Enter . Select date in the format DD/MM/YYYY and 24hr clock as displayed.
T
What is PumpGuard™ (Switchbox Timer+PG only)
PumpguardTM is patent pending, smart technology that helps to avoid possible disasters occurring when your pump blocks
or overloads.
Line 1 on every Matsuko Switch Box Timer + PG is set to automatically learn how the new pump behaves when it is first
connected and turned on through the timer.
The PumpGuardTM will run the pump at different power levels for a twenty minute period until it und
TO EDIT OR DELETE A PROGRAM SLOT
Press Menu to enter the programming menu. Select the line you want to change using Up
and Down . Press Enter .
If required, use Up and Down to change the name of the device and press Enter . Then
Press Enter to scroll through the program settings and press Up and Down to edit times.
If you need to delete a program slot, move the cursor back to highlight the program slot check
mark and press the Up button. The check m
Place the box against the wall to ensure that the wall surface is
flat. Use the paper template (below) to mark out the position of
the box and the location of the four screw holes on the wall (4).
Drill suitable holes (and insert rawl plugs if needed).
MOUNTING YOUR MATSUKO
SWITCH BOX (ALL VERSIONS)
WARNING: ALWAYS TURN THE SWITCH BOX POWER
OFF AT THE MAINS ELECTRIC BEFORE OPENING
THE COVER. ALWAYS SECURE WITH CLOSING SCREW.
The Switch Box must be mounte