CommScope BUDI-M Installation Instructions Manual

File Specifications

Brand: CommScope
Category: Enclosure
Model: BUDI-M (Installation Instructions Manual), prONxUUYRGh/2
File Info: Adobe Acrobat PDF (DjVu)
File Size: —
Pages: 12 pages

Download PDF

Download CommScope BUDI-M Manual (12 pages)

Read Online:

Read the CommScope BUDI-M Installation Instructions Manual online using the built-in PDF viewer.

Key Pages of Document

I N S T A L L A T I O N I N S T R U C T I O N

Building distributor • Box • Base tray • Base tower • Termination units • Inserts for SMOUV and ANT Accessories Introduction Suitable for FTTH applications where easily pre-connectorized splitters modules can be build in. The box is designed In such a way that it is suitable for both spliced and ...

Different wrap-around ports are available (including brackets).

Use two guiding pins to open the ports. Secure the bottom part to the box with the screws. 1.4 Use a hacksaw to reach the onion rings, which can be opened with a plier to open the in-line ports (S6/S7). 1.3 Install the cable bracket depending the cable seal.. Cut out plastic part, in case ...

Install the bracket and terminate the looped cable. Take out the

loose tube(s) from the basket for further use. 1.5 Install the wrap-around rubber seal into the port. 2.1 Cable installation into the wrap around ports. Bracket can be different depending on the port. Secure with hook and loop fastener tape and seal with foam (see length page 1). 2 Looped ...

Route the loose tubes to the base tray. Mark left and right side

of the loose tube at their position on the base tray. 2.5 1: Storage area (looped storage shaved LT) 2: Splicing to splitter modules 3: Point-to-point applications 2.6 Store the unused looped fibers in the storage area. 2.7 Store the fibers which will be used later. 1 2 3 1 2 3 ...

Store the fibers which will be spliced day 1 to the splitter

modules. 2.9 Store the fibers which will be spliced day 1 for the point-to- point applications. 3.4 Install the terminated drop cable in the numbered ports on the base tray. 3.3 Wrap one layer of foam (20 mm) on the securing position if needed. Terminate the aramid strength member by securing ...

Install the cover onto the tray.

4.1 Install the splitter holder 4 Splitters 3.5 Splice the fibers from the drop cable to the fibers from the looped cable. In case of SMOUV, use the insert. Slide Click ...

Route the incoming pigtails of the splitter (marked with red flag)

to the base tray (area nr. 2). Remove the outer jacket from the mark over a distance of 1.2m. Secure with foam and tie-wrap onto the base tray. 4.2 Install the splitter into the holder and route the pigtails via the bend control. OCM6 butt Slide Click OCM6 in-line 4.4 In case of splitte ...

To release the splitter module out of the splitter holder.

4.6 Splice the incoming of the splitter to the fibers coming from the looped cable. In case of SMOUV, use the insert. Store the overlength in the tray. 4.7 Install the cover onto the tray. Click Click 5 Patching trays 5.1 Install the patch tray onto the tower. 5.2 Insert the adaptor into the de ...

Install the drop seals and push the PICO cable through the

seals. Remove the outer jacket over a length of 1.5 m. Secure the cable onto the bracket with foam and tie-wraps. 5.4 Install the pigtails and store the overlength in the splice area. Mini-PICO (no connectors) 5.6 Install the foam at the position on the patch tray and secure with 2 tie-wraps as ...

Install the cover onto the tray.

5.10 In case of pre-connectorized MINI PICO cable, fibers are also routed behind the tower and secured with foam and tie-wraps onto the tray. 6.1 Route the pigtails through the bend control towards the patch trays. Hook and loop fastener can be used to keep them bundled. Mini-PICO (pre-conectorized) 6 Routing pigtails ...

CommScope BUDI-M user guide recommended for: FOSC-450A, AEKT, ODF-SPLCAB-24, MDCC, FOSC-450-BS.

⚠️ Download Safety

The Enclosure Installation instructions manual (12 pages) is completely safe to download (last scan date: 25/05/2026).

Related PDF Instructions for CommScope BUDI-M: