Graf 300 Installation Instructions And Maintenance

Specifications

Brand: Graf
Category: Water Heater
Model: 300
File Type: PDF
File Size: —
Pages: 4

Read Online

Read the Graf 300 Installation Instructions And Maintenance online using the built-in PDF viewer.

Text of the manual

2. Technical data

Page 6 3. Installation requirements Page 7 3.1 Choice of location: 3.2 Excavation dimensions: 4. Installation Page 8 4.1 Connecting the inlet and venting pipes 4.2 Installation of the drainage blocks The points described in these instructions must be followed correctly. If not correctly observed, any right to claim on the guarantee may be refused. For all additional GARANTIA articles purchased there are separate installation instructions enclosed in the transportation packing. Any missing instructions must be requested directly from us. A complete check of the tank for possible damage must be carried out before the installation in the excavation begins. The installation must be carried out by a professional firm. Graf drainage block 300 lorry Order Nr: 360014 Graf drainage block 300 lorry inspect Order Nr: 360015 Graf drainage block 300 car Order Nr: 360016 Graf drainage block 300 car inspect Order Nr: 360017 Accessories: Connection elements (10 pieces) Order Nr: 369012 Geo-textile 200 (Per m., roll wid. 5m) Order Nr: 369014 Installation instructions and maintenance for the GRAF drainage block 300 Deutsch Englisch Page 5 of 8

When working, the appropriate accident prevention regulations must be followed.

Furthermore, when carrying out assembly and installation work, inspection, maintenance and repairs, all work regulations and norms must be followed. The GRAF company offers an extensive range of accessories that are all compatible with one another and may be used to construct a complete system. The use of other manufacturers accessories can impair the function of the system and liability for any resulting damages will no longer be covered under the guarantee. Volume Gross 300 Litre Net 285 Litre Length 1200 mm Width 600 mm Height 420 mm Connections 12 x DN 150 + 6 x D 125 + 6 x DN 100 Weight Rain Bloc car: 15,5 kg Rain Bloc car inspect: 16,5 kg Rain Bloc lorry: 17,5 kg Rain Bloc lorry inspect: 18,5 kg Material Drainage block for HGV: 100 % Polypropylene (PP) Drainage block for light traffic: 100 % Polypropylene (PP) Recycling materials 2. Technical data 1. General notes Page 6 of 8

3. Installation requirements

3.1 Choice of location: x Distance from basement > 6 m x Distance from ground water minimum > 1 m x The distance from the existing or planned trees must be at least the expected spread of the trees crown. 3.2 Excavation dimensions The measurements of the excavation is in accordance with the number of drainage blocks to be installed by multiplying the length and width dimensions. The following table gives the required earth covering and the maximum installation depth to the lower edge of the blind drain; Transportation loads Rain Bloc car and car inspect Rain Bloc lorry and lorry inspect Short duration Max. 7,5 t/m² Max. 10,0 t/m² Long duration Max. 3,5 t/m² Max. 5,0 t/m² max. Earth covering* 2000 mm 2750 mm max. Installation depth* 3500 mm 5000 mm Light traffic(and without traffic loads) max. Number of layers 7 layers 10 layers min. Earth covering 250 mm 250 mm max. Earth covering* - 2750 mm max. Installation depth* - 5000 mm HGV 12 max. Number of layers - 10 layers min. Earth covering - 500 mm max. Earth covering* - 2500 mm max. Installation depth* - 5000 mm SLW 30 max. Number of layers - 10 layers min. Earth covering - 500 mm max. Earth covering* - 2250 mm max. Installation depth* - 5000 mm SLW 40 max. Number of layers - 10 layers min. Earth covering - 500 mm max. Earth covering* - 2000 mm max. Installation depth* - 5000 mm SLW 60 max. Number of layers - 10 layers min. Earth covering - 500 mm The maximum installation depth or earth covering* is related to the ground substance with an inside angle of friction from ˻ = 50,0° Deutsch Englisch Page 7 of 8

Connecting the inlet and venting pipes

To connect the inlet and venting piping there are prepared positions for the openings to be cut out of the plastic ribbing. The pipes must extend at least 20 cm into the module. Should an installation over a wider area be proposed, then there must also be an appropriately greater number of inlet pipes to ensure an even distribution of the water. 4.2 Installation of the drainage blocks The geo-textile must be laid out in the excavation that has an even bottom surface with an overlap of not less than 30-50 cm. The modules are then positioned on the geo-textile (only laying down, never in the standing position) and all fastened together with the fastening pieces. For fastening lengthwise as well as widthwise, at least two fastening pins are required in each direction. When the system is to be built in several levels, then the individual layers must be arranged both lengthwise and crosswise (widthwise) to one another to ensure a stable interconnection. Before filling, the module must be completely wrapped in the Geo-textile and special attention must be paid to ensure that all the ends and edges of each fleece roll overlap by at least 30-50 cm. To conclude the installation, the excavation is evenly backfilled and compacted. The terrain of the ground surface and substructure should be the expected load to be prepared. If it is intended that grass should be sown over the GRAF drainage blocks, then a heavy duty plastic sheeting should first be laid over the drainage blocks and this then covered by an approximately 10 cm thick layer of clay otherwise the grass will dry out too quickly. Otto Graf GmbH Carl-Zeiss-Straße 2-6 D - 79331 Teningen Tel: 0049/(0)7641/589-0 Fax: 0049/(0)7641/589-50 www.graf.info [email protected] Stand: 12/2010 Graf Distribution SARL 45, Route d´Ernolsheim F - 67120 Dachstein-Gare Tel: 0033/388497310 Fax: 0033/388493280 www.graf.info [email protected] Version : 12/2010 Graf IBERICA Tecnología del Plástico S.L. Sant Miquel 37 (Ver Situación) ES – 17003 Girona Tel: 0034/972913767 Fax: 0034/972913766 www.graf.info [email protected] Versión: 12/2010 4. Installation Page 8 of 8